CN102383429A - Device for sinking pile while digging soil in center of large-diameter pipe pile and use method thereof - Google Patents

Device for sinking pile while digging soil in center of large-diameter pipe pile and use method thereof Download PDF

Info

Publication number
CN102383429A
CN102383429A CN201110020056XA CN201110020056A CN102383429A CN 102383429 A CN102383429 A CN 102383429A CN 201110020056X A CN201110020056X A CN 201110020056XA CN 201110020056 A CN201110020056 A CN 201110020056A CN 102383429 A CN102383429 A CN 102383429A
Authority
CN
China
Prior art keywords
pile
digging
stake
pipe pile
pile tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110020056XA
Other languages
Chinese (zh)
Other versions
CN102383429B (en
Inventor
卢寿根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai chengdixiangjiang Data Technology Co., Ltd
Original Assignee
SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd filed Critical SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN201110020056.XA priority Critical patent/CN102383429B/en
Publication of CN102383429A publication Critical patent/CN102383429A/en
Application granted granted Critical
Publication of CN102383429B publication Critical patent/CN102383429B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a device for sinking a pile while digging soil in the center of a large-diameter pipe pile. The device comprises a spiral drill rod, a pipe pile, a soil storage box and a power head, wherein the pipe pile is a cylinder with a round through hole in the center; the two sides of the top end on the lower part of the pipe pile are shaped like sharp knives; the spiral drill rod is inserted into the pipe pile; the upper end of the spiral drill rod is connected with the power head and the lower end of the spiral drill rod is connected with a bit capable of expanding wings through reverse rotation; the soil storage box is arranged at the upper end of the pipe pile; a central bearing is sleeved at the joint of the pipe pile and the soil storage box and is fixed together with a vertical column of external power equipment to play a role of stabilizing the pipe pile; a lower bearing is arranged on a certain part of the lower part of the pipe pile and is fixed together with the vertical column of the external power equipment to play a role of stabilizing the pipe pile; and the power head is connected with a steel wire rope on a rotating wheel of the external power equipment. The invention also provides a use method of the device. The device has the advantages of stability, safety, low cost, high benefit, no pollution, no noise, no squeezing, environment friendliness and the like.

Description

Digging pile sinking device and method for using thereof in the middle of a kind of heavy caliber pile tube
Technical field
The present invention is a kind of pile sinking device and method for using thereof, relates in particular to middle digging pile sinking device of a kind of heavy caliber pile tube and method for using thereof.Be used for the realm of building construction.
Technical background
At present, market upper big mouth footpath pile tube is fewer, and the urban district does not have at all, and general the employing earlier with a bench drill machine digging removed then, uses another stake machine pile sinking again, according to the geological condition top of some places be basically mucky soil one-tenth not hole or spoil the hole.Easy in addition off normal, verticality also is difficult to control, and both time-consuming also takes manual work, even can also influence safety.Adopt large-scale hammering stake machine piling simultaneously, this mechanical execution noise is big, and dense smoke is arranged, and vibration is big, and it is severe to squeeze soil, and is big especially to the surrounding enviroment influence.Another kind method adopts bored pile, and this method cost is high, efficient is low, the difficult again control of quality, and maximum shortcoming is that pollution is arranged, and noise is arranged, and particularly mud flows everywhere, stops up sewer, pours the river into, influences environment.
Summary of the invention
In order to overcome the prior art deficiency, the invention provides a kind of firmly, safety cost is low, high efficiency, noiselessness does not have the soil of squeezing, digging pile sinking device and method for using thereof in the middle of a kind of heavy caliber pile tube of environmental protection.
In order to solve the problems of the technologies described above, the technical scheme that the present invention takes is: digging pile sinking device in the middle of a kind of heavy caliber pile tube comprises the spirality drilling rod; Pile tube is deposited native case, unit head; Described pile tube is the cylinder of middle manhole, and described pile tube lower tip both sides are made as the sharp knife shape, and described spirality drilling rod inserts described pile tube; Described auger masthead is provided with a hole and passes straight through to drill bit, and described spirality drilling rod upper end connects described unit head, and the lower end connects a counter-rotating can expand wing drill bit; Described pile tube upper end is provided with the described native case of depositing, and an intermediate support is inserted in described pile tube and the described native case junction of depositing, and the column of described intermediate support and exterior power equipment is fixed; Play firm pile tube effect; A certain position, described pile tube bottom is provided with bottom supporting, and described lower support is fixed with the column of the power-equipment in the external world, plays firm pile tube effect.
Described unit head is connected with wire rope on the exterior power equipment moving runner.
Another object of the present invention has provided the method for using of the middle digging pile sinking of a kind of heavy caliber pile tube device, and it uses step to be:
1, pile-forming machine perching is to move on to the pile sinking position to pile sinking machinery;
2, stake position repetition measurement is on two different control points, repetition measurement stake position to make it correct with two transits;
3, inserting down, first segment stake lower end is a sharp knife shape;
4, proofreading and correct stake machine guide rod with two transits at different directions makes it vertical;
5, insert the spirality drilling rod that is connected with unit head in the stake hole;
6, digging limit, first segment stake limit pile sinking takes out then and deposits the soil in the native case or pile up the other or entrucking outward transport in building site until ground;
7, hello the second joint stake is put to the first segment stake and is connected auger stem;
8, be again to proofread and correct second joint with two transits to overlap with vertical with first segment;
9, use the carbon dioxide gas welding, the joint of weldering second joint and first segment stake;
10, passed examination, weld full tight, the compliant requirement; Digging limit, limit pile sinking is sink to ground, if the 3rd joint, the 4th joint are arranged according to above with the quadrat method pile extension; Connect digging limit, auger stem limit pile sinking and be sink to ground, continue digging limit, limit pile sinking and be sink to the regulation absolute altitude; Expand the wing through the hole water filling counter-rotating drill bit on the auger masthead then, make the injection cement paste (can add large bearing capacity) to the 5D place;
11, drill bit is withdrawed from water filling, and pile construction finishes, and moves to the second pile position to the stake machine and continues construction.
The present invention has following beneficial effect in sum:
1, firm, safety cost is low, high efficiency;
2, noiselessness does not have the soil of squeezing;
3, house and the road traffic to periphery do not exert an influence environmental protection.
Description of drawings
Fig. 1 is the structural representation of digging pile sinking device in the middle of a kind of heavy caliber pile tube of the present invention;
Fig. 2 is the use flow chart of digging pile sinking device in the middle of a kind of heavy caliber pile tube of the present invention.
Wherein: 1-spirality drilling rod; The 2-pile tube; 3-deposits native case; The 4-unit head; The 5-intermediate support; The 6-lower support; Wing drill bit is expanded in the 7-counter-rotating.
The specific embodiment
Digging pile sinking device comprises spirality drilling rod 1, pile tube 2 in the middle of a kind of heavy caliber pile tube as shown in Figure 1; Deposit native case 3, unit head 4, described pile tube 2 is the cylinder of middle manhole; Described pile tube 2 lower tip both sides are made as the sharp knife shape, and described spirality drilling rod 1 inserts described pile tube 2, and described auger stem 1 top is provided with a hole and passes straight through to drill bit; Described spirality drilling rod 1 upper end connects described unit head 4, and the lower end connects a counter-rotating and expands wing drill bit 7, and described pile tube 2 upper ends are provided with the described native case 3 of depositing; Described pile tube 2 is inserted in an intermediate support 5 with described native case 3 junctions of depositing; Described intermediate support 5 is fixed with the column of exterior power equipment, plays firm pile tube effect, and a certain position, described pile tube 2 bottoms is provided with bottom supporting 6; Described lower support 6 is fixed with the column of the power-equipment in the external world, plays firm pile tube effect.
Described unit head 4 is connected with wire rope on the exterior power equipment moving runner.
The method for using of digging pile sinking device in the middle of a kind of heavy caliber pile tube as shown in Figure 2, it uses step to be:
1, pile-forming machine perching is to move on to the pile sinking position to pile sinking machinery;
2, stake position repetition measurement is on two different control points, repetition measurement stake position to make it correct with two transits;
3, inserting down, first segment stake lower end is a sharp knife shape;
4, proofreading and correct stake machine guide rod with two transits at different directions makes it vertical;
5, insert the spirality drilling rod that is connected with unit head in the stake hole;
6, digging limit, first segment stake limit pile sinking takes out then and deposits the soil in the native case or pile up the other or entrucking outward transport in building site until ground;
7, hello the second joint stake is put to the first segment stake and is connected auger stem;
8, be again to proofread and correct second joint with two transits to overlap with vertical with first segment;
9, use the carbon dioxide gas welding, the joint of weldering second joint and first segment stake;
10, passed examination, weld full tight, the compliant requirement; Digging limit, limit pile sinking is sink to ground, if the 3rd joint, the 4th joint are arranged according to above with the quadrat method pile extension; Connect digging limit, auger stem limit pile sinking and be sink to ground, continue digging limit, limit pile sinking and be sink to the regulation absolute altitude; Expand the wing through the hole water filling counter-rotating drill bit on the auger masthead then, make the injection cement paste (can add large bearing capacity) to the 5D place;
11, drill bit is withdrawed from water filling, and pile construction finishes, and moves to the second pile position to the stake machine and continues construction.
What should explain at last is: above embodiment only in order to the explanation the present invention and and unrestricted technical scheme described in the invention; Therefore, although this manual has carried out detailed explanation to the present invention with reference to each above-mentioned embodiment,, those of ordinary skill in the art should be appreciated that still and can make amendment or be equal to replacement the present invention; And all do not break away from the technical scheme and the improvement thereof of the spirit and scope of the present invention, and it all should be encompassed in the claim scope of the present invention.

Claims (5)

1. the middle digging pile sinking of a heavy caliber pile tube device comprises the spirality drilling rod, pile tube; Deposit native case, unit head is characterized in that: described pile tube is the cylinder of middle manhole; Described pile tube lower tip both sides are made as the sharp knife shape; Described spirality drilling rod inserts described pile tube, and described auger masthead is provided with a hole and passes straight through to drill bit, and described spirality drilling rod upper end connects described unit head; The lower end connects a counter-rotating can expand wing drill bit, and described pile tube upper end is provided with the described native case of depositing.
2. digging pile sinking device in the middle of a kind of heavy caliber pile tube as claimed in claim 1, it is characterized in that: an intermediate support is inserted in described pile tube and the described native case junction of depositing.
3. digging pile sinking device in the middle of a kind of heavy caliber pile tube as claimed in claim 1 is characterized in that: a certain position, described pile tube bottom is provided with bottom supporting.
4. digging pile sinking device in the middle of a kind of heavy caliber pile tube as claimed in claim 1 is characterized in that: described unit head is connected with wire rope on the exterior power equipment moving runner.
5. the method for using of digging pile sinking device in the middle of the heavy caliber pile tube is characterized in that: use step to be:
1, pile-forming machine perching is to move on to the pile sinking position to pile sinking machinery;
2, stake position repetition measurement is on two different control points, repetition measurement stake position to make it correct with two transits;
3, inserting down, first segment stake lower end is a sharp knife shape;
4, proofreading and correct stake machine guide rod with two transits at different directions makes it vertical;
5, insert the spirality drilling rod that is connected with unit head in the stake hole;
6, digging limit, first segment stake limit pile sinking takes out then and deposits the soil in the native case or pile up the other or entrucking outward transport in building site until ground;
7, hello the second joint stake is put to the first segment stake and is connected auger stem;
8, be again to proofread and correct second joint with two transits to overlap with vertical with first segment;
9, use the carbon dioxide gas welding, the joint of weldering second joint and first segment stake;
10, passed examination, weld full tight, the compliant requirement; Digging limit, limit pile sinking is sink to ground, if the 3rd joint, the 4th joint are arranged according to above with the quadrat method pile extension; Connect digging limit, auger stem limit pile sinking and be sink to ground, continue digging limit, limit pile sinking and be sink to the regulation absolute altitude; Expand the wing through the hole water filling counter-rotating drill bit on the auger masthead then, make and inject cement paste to the 5D place;
11, drill bit is withdrawed from water filling, and pile construction finishes, and moves to the second pile position to the stake machine and continues construction.
CN201110020056.XA 2011-01-18 2011-01-18 Digging pile-sinking device in the middle of a kind of heavy caliber pile tube Active CN102383429B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110020056.XA CN102383429B (en) 2011-01-18 2011-01-18 Digging pile-sinking device in the middle of a kind of heavy caliber pile tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110020056.XA CN102383429B (en) 2011-01-18 2011-01-18 Digging pile-sinking device in the middle of a kind of heavy caliber pile tube

Publications (2)

Publication Number Publication Date
CN102383429A true CN102383429A (en) 2012-03-21
CN102383429B CN102383429B (en) 2016-08-10

Family

ID=45823230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110020056.XA Active CN102383429B (en) 2011-01-18 2011-01-18 Digging pile-sinking device in the middle of a kind of heavy caliber pile tube

Country Status (1)

Country Link
CN (1) CN102383429B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190745A (en) * 2017-06-29 2017-09-22 盐城市中标工程装备制造有限公司 A kind of novel tubular pile pile sinking method
CN107780408A (en) * 2017-09-19 2018-03-09 温州天泽建设有限公司 Concrete tubular pile device and its construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2172311Y (en) * 1993-10-12 1994-07-20 孔清华 Earther taking apparatus for planting pile
US6042304A (en) * 1997-06-16 2000-03-28 Foundation Constructors, Inc. Pile driving system and method
CN1685113A (en) * 2002-09-30 2005-10-19 三谷石产株式会社 Internal excavation method through pile, and foundation pile structure
CN1776113A (en) * 2005-11-28 2006-05-24 王国奋 Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile
CN201660892U (en) * 2010-01-11 2010-12-01 周久仁 Static-pressure pile planting hole leading machine
CN101974905A (en) * 2010-10-22 2011-02-16 上海中技桩业股份有限公司 Pile-embedding method for hollow pile and auger drill for implementing same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2172311Y (en) * 1993-10-12 1994-07-20 孔清华 Earther taking apparatus for planting pile
US6042304A (en) * 1997-06-16 2000-03-28 Foundation Constructors, Inc. Pile driving system and method
CN1685113A (en) * 2002-09-30 2005-10-19 三谷石产株式会社 Internal excavation method through pile, and foundation pile structure
CN1776113A (en) * 2005-11-28 2006-05-24 王国奋 Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile
CN201660892U (en) * 2010-01-11 2010-12-01 周久仁 Static-pressure pile planting hole leading machine
CN101974905A (en) * 2010-10-22 2011-02-16 上海中技桩业股份有限公司 Pile-embedding method for hollow pile and auger drill for implementing same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190745A (en) * 2017-06-29 2017-09-22 盐城市中标工程装备制造有限公司 A kind of novel tubular pile pile sinking method
CN107780408A (en) * 2017-09-19 2018-03-09 温州天泽建设有限公司 Concrete tubular pile device and its construction method
CN107780408B (en) * 2017-09-19 2019-08-20 温州天泽建设有限公司 Concrete tubular pile device and its construction method

Also Published As

Publication number Publication date
CN102383429B (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105649083B (en) The clear stake device of the disposable rotary-cutting type of full-sleeve and its clear piling method
CN104295239A (en) Method for using rotary drilling rig to drill into hard rock stratum
CN102061699B (en) Reinforcing bar of bottom-reamed bored pile and construction method thereof
CN105649012A (en) Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground
CN1265062C (en) Construction for making piles and tools
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
CN102839661A (en) Construction technology of reelingly stirring to eject anchor tube pile
CN110424896A (en) A kind of hole stake drilling construction method and device suitable for high backfill Karst Geological Landscape
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN204716130U (en) For the long-spiral drilling machine of shaping long spire hole-expanding pile
CN103343537A (en) Drilling machine of high-pressure rotary-spraying anchor rod and construction method of high-pressure rotary-spraying anchor rod
CN102383429A (en) Device for sinking pile while digging soil in center of large-diameter pipe pile and use method thereof
CN206956717U (en) Marine rock drilling strike-on type large diameter pile structure
CN201943073U (en) Middle digging and pile-sinking device of large-caliber pipe pile
CN205154025U (en) Drill bit that construction drilling bored concrete pile was used
CN101858196A (en) Low gravity center three-axle spiral drilling machine and drilling method thereof
CN206721875U (en) A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod
CN206512704U (en) One kind is repeatable to use new screw filling pile construction equipment
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN202000367U (en) Novel drilled pile casing
CN102220760B (en) Method for casting deep inverted T-shaped pile
CN202578513U (en) Filling pile aiguille
CN203701089U (en) Structure for manual hole digging and pile splicing on reinforced concrete drain pipe retaining wall
JP4645091B2 (en) Expanded pile and construction method of the expanded pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 200000, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Applicant after: Shanghai Chengdi Construction Co., Ltd.

Address before: 200000 room 1, building 188, 126 Nanan Road, Anting Town, Shanghai, Jiading District

Applicant before: Shanghai Chengdi Construction Development Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT CO., LTD. TO: SHANGHAI CHENGDI CONSTRUCTION CO., LTD.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200000, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Patentee after: Shanghai chengdixiangjiang Data Technology Co., Ltd

Address before: 200000, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Patentee before: SHANGHAI CHENGDI CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder