CN1719413A - Upgrading method of communication equipment - Google Patents

Upgrading method of communication equipment Download PDF

Info

Publication number
CN1719413A
CN1719413A CN 200410071518 CN200410071518A CN1719413A CN 1719413 A CN1719413 A CN 1719413A CN 200410071518 CN200410071518 CN 200410071518 CN 200410071518 A CN200410071518 A CN 200410071518A CN 1719413 A CN1719413 A CN 1719413A
Authority
CN
China
Prior art keywords
software
memory block
communication facilities
upgrade
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410071518
Other languages
Chinese (zh)
Other versions
CN100428155C (en
Inventor
邱扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB2004100715180A priority Critical patent/CN100428155C/en
Publication of CN1719413A publication Critical patent/CN1719413A/en
Application granted granted Critical
Publication of CN100428155C publication Critical patent/CN100428155C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention discloses a method for up-grading communication equipment. In said method the single-board memory portion of system is equipped with main zone and stand-by zone, said main zone and stand-by zone can be switched over by means of controller. In the loading process of new software said system can be normally operated, has no need of interrupting service, only has need of interrupting system service operation when the main zone and stand-by zone are switched over. When the up-grading operation is failed, said system has no need of consuming time to make version backspace loading, the main and stand-by zones can be directly switched over.

Description

The upgrade method of communication facilities
Technical field
The present invention relates to the communications field, particularly the upgrade technique of communication system or equipment.
Background technology
Along with the progress in epoch, the information science develop rapidly, the cycle that the software and hardware upgrade of various systems is regenerated is shorter and shorter.Especially the renewal of software, because the cost of software upgrading is less, and can bring bigger income, so the update cycle of software is especially short.In various real application systems, for example in the system such as communication system, automated system, a kind of especially general phenomenon of software upgrading.
The intelligence part of various systems normally microcomputer is formed.The kind of microcomputer is a lot, can be divided into single-chip microcomputer by the structure branch, single card microcomputer and multicore sheet machine, many plates machine etc.The typical case of early stage microcomputer form be 6 or more the multicircuit plate---inserts in the base plate---and carries out central processor unit (Center Process Unit, abbreviation " CPU "), internal memory, Magnetic Disk Controller and serial port function.These microcomputers based on base plate are used to obtain data, process control and R﹠amp; D plan is to such an extent as to but volume can not be used as intelligent embedded in the equipment too greatly usually.In the eighties, along with development of integration technology, extensive integrated logic chip has appearred, the function of former entire circuit plate can be integrated in the circuit board, this chip is known as big plate.Platelet had appearred afterwards because the combining closely of its uniqueness, simply, reliable and low-cost, platelet is applicable to embedded system.Therefore just produced embedded board machine market, obtained development at full speed, can use at different embedded and dedicated calculation and produce the single card microcomputer product.The intelligence part of existing various system equipments much all is made of veneer.The for example radio network controller in the communication system (Radio Network Controller, be called for short " RNC "), NodeB or the like.
In the prior art, when certain needs that the software of the system of interrupt run need not upgraded, need specially section when free, in the process of upgrading, business is stopped, load new software then, business is in final state always in the process that loads new software; If new software discovery problem also needs business is stopped, original software and data are reloaded, make the software rollback return original state, in this section process, business also must stop.Up to new software loading fully or the software rollback finish, just can restart professional operation.
In actual applications, there is following problem in such scheme: when software upgrading loads new software or rollback return in the process of original software, business all is in interruption status, the time of interruption is long, and also more complicated of the operation of software rollback.
Cause the main cause of this situation to be, in existing equipment, each veneer only keeps a piece of data, and in the loading procedure, legacy data is capped when upgrading, finish up to all data load, send activation command, could move new program, if upgrading is unsuccessful, also need during rollback again just to restart service operation then with on original software loading.
Summary of the invention
In view of this, fundamental purpose of the present invention is to provide a kind of upgrade method of communication facilities, make needs not the system of interrupt run carrying out in the process of software upgrading, software upgrading reduces as much as possible to the influence of business.
For achieving the above object, the invention provides a kind of upgrade method of communication facilities, comprise second memory block that is used to deposit first memory block of current operating software and data and is used to deposit upgrade software and data in the described communication facilities, described method also comprises following steps:
A arrives described second memory block with upgrade software and data load;
After B loads and to finish, the memory block of current operation is switched to described second memory block from described first memory block, and activate and move the software in described second memory block.
Wherein, described method also comprises following steps:
When C fails when the running software in described second memory block, the memory block of current operation is switched to described first memory block from described second memory block, and activate and move the software in described first memory block.
Described method also comprises following steps:
D backups to described first memory block with software in described second memory block and data sync after the success of the running software in described second memory block.
Switch step among the described step B comprises following substep:
B1 interrupts the software that moving in described first memory block;
B2 adjusts program pointer, points to the software inlet in described second memory block;
B3 restarts described communication facilities.
Data in described first and second memory blocks are static datas.
Described communication facilities is the communication facilities that needs remote upgrade.
Described communication facilities is radio network controller or base station or media gateway.
By relatively finding, technical scheme difference with the prior art of the present invention is, the one-board memory of system partly is provided with the primary area and is equipped with the district, and can switch with being equipped with to distinguish the primary area by controller, in the loading procedure of new software, system can normally move does not need interrupting service, only need carry out active and standby district interrupt system service operation when switching; When the upgrading failure, system need not carry out the version rollback at spended time and load, and directly switches active and standby district and gets final product.
Difference on this technical scheme has brought comparatively significantly beneficial effect, and promptly in the process of system software upgrading, time of service interruption shortens dramatically during new software loading, and system is not had any harmful effect.Simultaneously the time of software version rollback also greatly reduces, and will arrive minimumly to the influence of business, and the operation of software version rollback has also been simplified a lot.
Description of drawings
Fig. 1 is a software upgrading modular construction synoptic diagram according to an embodiment of the invention;
Fig. 2 is a method for upgrading software process flow diagram according to an embodiment of the invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with accompanying drawing.
The present invention is mainly used in the professional upgrading of the system of demand of not interrupting.In this type systematic, the intelligence part of system all is to use Embedded veneer usually, so data and software all are stored on the veneer.Concrete example is exactly that the present invention can be used for upgrading in each device software of communication system.
In order to realize method of the present invention, need the veneer in the system be provided with, and increase controller.As shown in Figure 1.The memory block of veneer is divided into the master and uses the memory block, i.e. primary area, and spare memory area promptly is equipped with the district.In addition, controller is used for carrying out the operation that switch in active and standby district by the Systems Operator.
Controller can be realized by the software that system management platform increases corresponding function.Controller needs the interface that is connected to veneer, by this interface, the operator can send the order of switching the primary area and being equipped with the district to veneer, can realize by the mode of adjusting pointer with the switching that is equipped with the district in the primary area in the veneer, be the start pointer that has the primary area in the controller and be equipped with the district, when needs switched active and standby district, the definite object memory block that only needs initially to make a comment or criticism got final product, from here as can be seen, it is a lot of to have switched the simplified control that covers original software in the operation in active and standby district and the prior art.
In addition, the primary area in the veneer is distinguished and can be exchanged with being equipped with, but at any time, all has only a district to be used for professional operation.Usually, the district that is used to move is called as the primary area, and the district that is not activated is called as and is equipped with the district.
Below in conjunction with accompanying drawing 2, specify concrete enforcement of the present invention.
In step 100, when system need upgrade, the Systems Operator sent order by controller to veneer, and new software and data load are distinguished to being equipped with.In the process of distinguishing loading data and software fully, primary area operate as normal, business do not need to interrupt, and make like this at loading duration total system not to be had any impact.For example in communication system, equipment such as RNC, NodeB, media gateway are when using prior art to upgrade, because these equipment are generally at far-end, the problem of service disconnection can compare significantly, promptly in the escalation process, loading the new software time relatively can be long, therefore have the service disconnection of long period, and if the upgrade method among use the present invention, because new software is in loading procedure, system does not need interrupting service, therefore the upgrading influence that operation brings to system can be reduced to minimum.For the communication facilities of other types, comprise that the upgrading of the communication facilities, optical communication equipment etc. of fixed network can be used method of the present invention.
Then enter step 110, behind the loaded, the Systems Operator issues to veneer by controller switches the order of active and standby district, and activates new primary area software.In the process of switching, system business carries out of short duration interruption.If will switch active and standby district, the Systems Operator need be interrupted the program in original primary area by controller, adjust then program pointer to the corresponding place in new primary area to activate new primary area software, with system restart, all reinitialize, and at this moment system can bring into use new upgrading software and data to carry out work.In the process of switching active and standby district, the dynamic data of previous system operation is all lost, for example for communication system, ongoing conversation all can be interrupted when carrying out the switching of active and standby district, some information of those interrupted conversations are dropped, can the operation of new software not impacted, because these dynamic datas do not need to keep.And the data that new primary area needs are some configuration datas that loaded, and belong to static data, can normally commence business in therefore new primary area.
In step 120, whether the operator needs attention location system in the process of trial run, can normally move.If can normally move, then enter step 130.Otherwise enter step 140.Therefore new upgrading software need try out because stability and various aspects of performance are also uncertain.In the trial run process, being equipped with in the district after the switching kept original software and versions of data, and the primary area is different with the content that is equipped with the district.At this moment being equipped with the district is used for can reruning original early version software in case upgrade when failing.
In step 130, owing to judged that in step 120 system can normally move between trial run period, so the Systems Operator can will distinguish with the primary area synchronous at reasonable time fully.At this moment being equipped with the district can be as a backup in primary area, can be used for taking place in the primary area some when unusual, is directly switch to be equipped with the district and to carry out service operation.The time of trial run decides according to concrete system.After having tested the various performances of new software,, then can judge and upgrade successfully if new version software all can normally move.At this moment can send synchronous active and standby district order by controller by the Systems Operator.After active and standby district was synchronous, the content that is equipped with the district was identical with the primary area.Synchronous active and standby district does not have any impact to the normal operation of system.Being equipped with the district can be as the backup of system software and data, be used for when system's operational process contingency is damaged, can directly enabling backup software and data in the software and the data in primary area, cause damage avoiding, make when contingency primary area data or software damage simultaneously, system business minimizing break period, the influence that can cause the regular traffic operation of system reduces to minimum.
In step 140, owing to judge new upgrading software cisco unity malfunction in trial run in step 120, so the Systems Operator need pass through controller, switches active and standby district once more, return back to again in original software and the data and reruns.The method of switching active and standby district is identical with step 110.In the present invention, when system upgrade is failed, no longer need the time to reload original software,, therefore only need spend the time of switching active and standby district because original software in being equipped with the district, does not have deleted or covers, get final product so that system recovery to normal operating condition.And in the prior art, if the upgrading failure then needs system business is interrupted, reload original software then, therefore, usually when utilizing prior art to upgrade, need return back to original software when being used for upgrading failure for just in case certain hour is reserved in the upgrading failure.Therefore as can be seen, use upgrade method of the present invention, significantly reduced system's rollback and returned the required consumed time of original software, therefore significantly reduced because the time that the software upgrading failure is interrupted system business.Software upgrading is further reduced the influence of system.
Adopt the method in active and standby district to carry out software upgrading and also have an advantage, promptly in escalation process, various configuration informations that can saved system, these configuration informations are very important to the normal operation of system, if new software arrangements is made mistakes, cause system normally to move possibly.Even when using prior art to come system software upgraded, also need to come the configuration information of standby system by certain mode, but, might go out the situation of some important informations of active owing to might not be with original software and data full backup in the prior art.And use method of the present invention owing to do not delete or cover original software and data, therefore complete reservation all configuration informations, further guaranteed the reliability and the security of system software upgrading.
Though by reference some preferred embodiment of the present invention, the present invention is illustrated and describes, but those of ordinary skill in the art should be understood that, can do various changes to it in the form and details, and the spirit and scope of the present invention that do not depart from appended claims and limited.

Claims (7)

1. the upgrade method of a communication facilities is characterized in that, comprises second memory block that is used to deposit first memory block of current operating software and data and is used to deposit upgrade software and data in the described communication facilities, and described method also comprises following steps:
A arrives described second memory block with described upgrade software and data load;
After B loads and to finish, the memory block of current operation is switched to described second memory block from described first memory block, and activate and move the software in described second memory block.
2. the upgrade method of communication facilities according to claim 1 is characterized in that, described method also comprises following steps:
When C fails when the running software in described second memory block, the memory block of current operation is switched to described first memory block from described second memory block, and activate and move the software in described first memory block.
3. the upgrade method of communication facilities according to claim 1 is characterized in that, described method also comprises following steps:
D backups to described first memory block with software in described second memory block and data sync after the success of the running software in described second memory block.
4. the upgrade method of communication facilities according to claim 1 is characterized in that, the switch step among the described step B comprises following substep:
B1 interrupts the software that moving in described first memory block;
B2 adjusts program pointer, points to the software inlet in described second memory block;
B3 restarts described communication facilities.
5. the upgrade method of communication facilities according to claim 1 is characterized in that, the data in described first and second memory blocks are static datas.
6. the upgrade method of communication facilities according to claim 1 is characterized in that, described communication facilities is the communication facilities that needs remote upgrade.
7. the upgrade method of communication facilities according to claim 1 is characterized in that, described communication facilities is radio network controller or base station or media gateway.
CNB2004100715180A 2004-07-07 2004-07-07 Upgrading method of communication equipment Active CN100428155C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100715180A CN100428155C (en) 2004-07-07 2004-07-07 Upgrading method of communication equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100715180A CN100428155C (en) 2004-07-07 2004-07-07 Upgrading method of communication equipment

Publications (2)

Publication Number Publication Date
CN1719413A true CN1719413A (en) 2006-01-11
CN100428155C CN100428155C (en) 2008-10-22

Family

ID=35931255

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100715180A Active CN100428155C (en) 2004-07-07 2004-07-07 Upgrading method of communication equipment

Country Status (1)

Country Link
CN (1) CN100428155C (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100354825C (en) * 2006-08-02 2007-12-12 华为技术有限公司 Software staging and back spacing method
CN100395707C (en) * 2006-02-07 2008-06-18 华为技术有限公司 Method of upgrading sequence
CN100446607C (en) * 2006-11-10 2008-12-24 华为技术有限公司 Upgrade method, device and system for wireless network controller
CN102521006A (en) * 2012-01-09 2012-06-27 广州广电运通金融电子股份有限公司 Hardware driving and medium program upgrading method of automatic equipment
CN102651895A (en) * 2011-02-23 2012-08-29 上海远动科技有限公司 Real-time switching method and device for VPNs (Virtual Private Networks) and GPRS (General Packet Radio Service) networks
CN102880485A (en) * 2012-08-30 2013-01-16 浪潮(北京)电子信息产业有限公司 Method and system for upgrading double controllers
CN102999365A (en) * 2012-12-05 2013-03-27 深圳市理邦精密仪器股份有限公司 Network security upgrade method and system of fetal monitor software
CN103092662A (en) * 2013-02-04 2013-05-08 烽火通信科技股份有限公司 Software module upgrading method for terminal device based on embedded operating system
CN101699399B (en) * 2009-11-03 2014-04-30 中兴通讯股份有限公司 Software update system and method
CN103970556A (en) * 2013-02-01 2014-08-06 京信通信系统(中国)有限公司 Updating method and system for power amplification software in radio remote equipment
WO2014198018A1 (en) * 2013-06-09 2014-12-18 华为技术有限公司 Method and device for updating radio network controller
CN105406981A (en) * 2015-10-20 2016-03-16 上海斐讯数据通信技术有限公司 System and method used for upgrading router
CN109814908A (en) * 2019-01-17 2019-05-28 深圳忆联信息系统有限公司 Firmware stablizes method, apparatus, computer equipment and the storage medium of upgrading
CN109922998A (en) * 2016-10-27 2019-06-21 住友电气工业株式会社 Control device, method for updating program and computer program
CN112783535A (en) * 2021-03-10 2021-05-11 广州优胜汽车科技有限公司 Firmware upgrading method, embedded device and storage medium
CN112988204A (en) * 2021-05-19 2021-06-18 西安羚控电子科技有限公司 Method for remotely upgrading and rolling back software of unmanned aerial vehicle
CN113299018A (en) * 2021-06-22 2021-08-24 上海和数软件有限公司 ATM software remote upgrading method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102110005A (en) * 2011-02-28 2011-06-29 上海华为技术有限公司 Software upgrading method, device and system
CN112925548A (en) 2019-12-06 2021-06-08 台达电子工业股份有限公司 Online program updating method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100426875C (en) * 2001-12-20 2008-10-15 中兴通讯股份有限公司 Main and spare internal memory data processing method

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100395707C (en) * 2006-02-07 2008-06-18 华为技术有限公司 Method of upgrading sequence
CN100354825C (en) * 2006-08-02 2007-12-12 华为技术有限公司 Software staging and back spacing method
CN100446607C (en) * 2006-11-10 2008-12-24 华为技术有限公司 Upgrade method, device and system for wireless network controller
CN101699399B (en) * 2009-11-03 2014-04-30 中兴通讯股份有限公司 Software update system and method
CN102651895A (en) * 2011-02-23 2012-08-29 上海远动科技有限公司 Real-time switching method and device for VPNs (Virtual Private Networks) and GPRS (General Packet Radio Service) networks
CN102521006A (en) * 2012-01-09 2012-06-27 广州广电运通金融电子股份有限公司 Hardware driving and medium program upgrading method of automatic equipment
CN102521006B (en) * 2012-01-09 2014-08-20 广州广电运通金融电子股份有限公司 Hardware driving and medium program upgrading method of automatic equipment
CN102880485A (en) * 2012-08-30 2013-01-16 浪潮(北京)电子信息产业有限公司 Method and system for upgrading double controllers
CN102999365A (en) * 2012-12-05 2013-03-27 深圳市理邦精密仪器股份有限公司 Network security upgrade method and system of fetal monitor software
CN103970556A (en) * 2013-02-01 2014-08-06 京信通信系统(中国)有限公司 Updating method and system for power amplification software in radio remote equipment
CN103092662A (en) * 2013-02-04 2013-05-08 烽火通信科技股份有限公司 Software module upgrading method for terminal device based on embedded operating system
CN104969513B (en) * 2013-06-09 2018-08-21 华为技术有限公司 Wireless controller upgrade method and equipment
CN104969513A (en) * 2013-06-09 2015-10-07 华为技术有限公司 Method and device for updating radio network controller
WO2014198018A1 (en) * 2013-06-09 2014-12-18 华为技术有限公司 Method and device for updating radio network controller
CN105406981A (en) * 2015-10-20 2016-03-16 上海斐讯数据通信技术有限公司 System and method used for upgrading router
CN109922998A (en) * 2016-10-27 2019-06-21 住友电气工业株式会社 Control device, method for updating program and computer program
CN109814908A (en) * 2019-01-17 2019-05-28 深圳忆联信息系统有限公司 Firmware stablizes method, apparatus, computer equipment and the storage medium of upgrading
CN112783535A (en) * 2021-03-10 2021-05-11 广州优胜汽车科技有限公司 Firmware upgrading method, embedded device and storage medium
CN112988204A (en) * 2021-05-19 2021-06-18 西安羚控电子科技有限公司 Method for remotely upgrading and rolling back software of unmanned aerial vehicle
CN112988204B (en) * 2021-05-19 2021-08-31 西安羚控电子科技有限公司 Method for remotely upgrading and rolling back software of unmanned aerial vehicle
WO2022242080A1 (en) * 2021-05-19 2022-11-24 西安羚控电子科技有限公司 Unmanned aerial vehicle software remote upgrade and rollback method
CN113299018A (en) * 2021-06-22 2021-08-24 上海和数软件有限公司 ATM software remote upgrading method

Also Published As

Publication number Publication date
CN100428155C (en) 2008-10-22

Similar Documents

Publication Publication Date Title
CN100428155C (en) Upgrading method of communication equipment
CN100407638C (en) Method for software upgrading and withdrawing
CN100421071C (en) Updating method for distance equipment system software
CN202798798U (en) High availability system based on cloud computing technology
CN102244669B (en) Software upgrading method in stacking equipment and stacking equipment
CN100492305C (en) Fast restoration method of computer system and apparatus
CN102207879B (en) Hot-updating method and hot-updating system of Lua script
WO2007141180A2 (en) Apparatus and method for cluster recovery
CN1429037A (en) Processor duplex apparatus based on real time operation system in mobile communication system and its method
CN101996083A (en) Mirror image updating method and device
CN108829420A (en) A kind of distributed memory system method for upgrading software based on RPM packet
CN1622483A (en) A method for implementing software hot-backup of main and reserve machines
CN1322422C (en) Automatic startup of cluster system after occurrence of recoverable error
CN113515316A (en) Novel edge cloud operating system
CN114337944B (en) System-level main/standby redundancy general control method
CN101197709A (en) Method and system for upgrading telecommunication apparatus
CN103873516A (en) HA method and system for improving usage rate of physical servers in cloud computing resource pool
CN1741404A (en) Method for negat main spare board in communication equipment
CN1275476C (en) Clustering system for utilizing sharing internal memory in mobile communiation system and realizing method thereof
CN100501672C (en) Client terminal start-up software dynamic updating method and device
CN112214317B (en) Station auxiliary node of comprehensive rail transit monitoring system supporting multiple states and implementation method
CN110677288A (en) Edge computing system and method generally used for multi-scene deployment
CN106776997A (en) A kind of moving method of database
CN1518234A (en) Centralized control and hierarchical implementing switching control method and device
CN1917419A (en) System and method for enhancing reliability of software patch of net element devices

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant