CN1646927A - 供电功率系统使用的有同步的相量测量能力的保护继电器 - Google Patents

供电功率系统使用的有同步的相量测量能力的保护继电器 Download PDF

Info

Publication number
CN1646927A
CN1646927A CNA038087030A CN03808703A CN1646927A CN 1646927 A CN1646927 A CN 1646927A CN A038087030 A CNA038087030 A CN A038087030A CN 03808703 A CN03808703 A CN 03808703A CN 1646927 A CN1646927 A CN 1646927A
Authority
CN
China
Prior art keywords
voltage
equipment
circuit
value
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA038087030A
Other languages
English (en)
Other versions
CN100392410C (zh
Inventor
E·O·施魏策尔三世
L·S·安德森
A·古斯曼-卡西利亚斯
G·C·茨威格勒
G·本穆亚尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schweitzer Engineering Laboratories Inc
Original Assignee
Schweitzer Engineering Laboratories Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schweitzer Engineering Laboratories Inc filed Critical Schweitzer Engineering Laboratories Inc
Publication of CN1646927A publication Critical patent/CN1646927A/zh
Application granted granted Critical
Publication of CN100392410C publication Critical patent/CN100392410C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0007Details of emergency protective circuit arrangements concerning the detecting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/40Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to ratio of voltage and current

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

一种继电器系统,该继电器系统从电力线得到电压和电流值,使用第一采样元件在选择的时间间隔对电压和电流值采样。所得到的采样信号用作对功率全系统的保护、控制、监控和计量。然后,采样信号以是功率系统频率的选择的倍数的速率重新采样。重新采样的结果由处理电路用于包括故障确定的保护功能。

Description

供电功率系统使用的有同步的相量测量能力的保护继电器
技术领域
本发明总体涉及电功率系统的监控和保护,更具体地,涉及功率系统继电器设备,能够监控全系统(system-wide)性能,如利用电压和电流示波法以及谐波分析和电压/电流同步的相量测量,同时还能够提供保护功能,如用于故障确定的线路距离保护。
背景技术
迄今为止,全系统功率监控功能,包括系统控制以及干扰分析和谐波频率分析,例如需要对来自参照时间,或者是当地时钟或者是如来自一个全球定位系统的绝对时间基准的电力线的数据采样。例如,数字故障记录器需要在固定的时间间隔来自电力线的数据(电流和电压值),进行电压和电流示波法和谐波分析。典型的采样率是每秒1000(1k)采样或更快,如上所述,采样对于内部时钟或一个外部时间源是同步的。
另一方面,许多功率系统保护功能,如线路距离保护算法,需要在功率系统工作频率(典型的为60Hz)的倍数采样,以避免相量测量误差。保护算法使用的相量是从电压和电流值发展的,但在系统频率与标称不同时能包含显著的误差。保护继电器确定功率系统的工作频率,并且利用该频率信息产生是一个工作频率选择倍数的采样频率。该方法把相量计算中可能的误差降到最小;然而,所得到的相量测量没有参照绝对时间,所以使得不能对整个功率系统进行同步的相量测量的应用。
作为对上述系统的一个可选方案,功率系统工作频率,在得到时,能被用来更改用来过滤采样输入数据的数字带通滤波器的系数。这样的系统提供适用于某些保护功能的信息,而且由于原始输入数据通过基于时间的钟(内部的或外部的)被采样来提供示波法和谐波分析的能力,因此没有一个通用,即绝对的时间基准用于位于该功率系统中不同点的多个保护继电器和其它保护装置。因此,这样的系统不适合用于需要同步的相量测量的那些保护应用。
因此希望有一种单个的、综合的系统,能够产生同步的相量值,包括能用于全系统控制和干扰分析的值,以及能够在单个的功率系统继电器装置中产生线路保护功能。
发明内容
因此,本发明是一种用于电功率系统的保护继电器,用于对全系统进行控制和分析以及保护,它包括:采集电路,用于得到以下中的至少一个:来自电力线的(1)电压值和(2)电流值;第一采样电路,用于在选择的时间间隔对所说的电压和/或电流值采样;第一计算系统,使用所得到的采样值进行选择的功率全系统的控制和分析确定;一个频率估计电路,用于确定功率系统的频率;第二采样电路,用来以与功率系统频率有关的速率对采样电压和/或电流值重新采样;和第二计算系统,使用重新采样的电压和电流值对与保护继电器相关的电力线部分执行选择的保护功能。
附图说明
图1是一个框图,示出现有技术的基于时间的采样设备,用于电功率系统记录器,如数字故障记录器。
图1A的图与图1中的类似,使用全球定位接收机来提供一个绝对时间基准。
图2是现有技术系统的框图,使用在功率系统工作频率的倍数进行的采样用于电功率系统继电器。
图3是本发明系统的框图。
图4是图3系统的一个可选系统。
图5-7的图示出在一个继电器装置,和包括主机和/或另一个继电器装置的其它单元之间不同的通讯方案,涉及请求和非请求信息。
具体实施方式
如上所述,某些功率系统监控装置,如数字故障记录器,需要在固定时间间隔来自电力线的模拟电压和电流值,从而在整个功率系统上进行电压和电流示波法分析以及谐波分析。这样的系统是由图1中的10所示,有电压源VA用12表示。典型地,模拟数据包括来自电力线的所有三个电压相位和所有三个电流相位。
模拟信号VA(在适当的量值水平,由变压器提供)被引到一个低通滤波器14,然后到一个A-D转换器16。这是常规的情况。图1中的本地时钟源18工作在特定的选择采样间隔(框20),以选择的速率,例如每秒8000采样,对A-D转换器16采样。所得到的时间采样的信号被送到一个常规的处理系统24用来进行示波法和谐波分析。由于时间采样的数据保持有功率系统的频率信息,所以能在功率系统干扰过程中分析功率系统频移。
图1A的系统,在与时间同步系统通信中使用一个绝对时间基准,而不是本地时钟,如来自一个GPS(全球定位系统)基准26,通过处理器25提供同步的相量值(除示波法和谐波分析之外)。对这些同步的相量测量或值,也称作同步相量(synchrophasor)测量的使用,将在以下将详细讨论。
在恒定的时间间隔对输入数据采样典型地没有用于保护功能,如线路距离保护,因为它能把误差引入保护功能。并且,如上文所简述的,传统的线路距离保护需要在功率系统工作频率的一些倍数采样。参考图2,来自电力线30的数据,如来自变压器的相位A电压(VA),被施加于低通滤波器32。系统频率估计电路34从低通滤波器的输出得到系统频率,发展一个功率系统工作频率(fsys)。该频率信息在36与因数K相乘,得到系统采样频率fs,它被施加到A/D转换器37。许多类型的频率估计电路可在本系统中使用。在以下参考文章中公开了一个实施例:Phadke等的“A New Measurement Technique for TrackingVoltage Phasors,Local System Frequency and Rate of Change ofFrequency(用于跟踪电压相量,本地系统频率和频率变化速率的新测量技术)”,IEEE Transactions on Power Apparatus and System,1983年5月,Vol.PAS-102 No.5。来自A-D转换器37的采样数据通过数字带通滤波器38。数字带通滤波器的输出被施加于常规的保护处理器电路41。
图2系统的缺点是相量测量没有同步的相量测量应用所必需的绝对时间基准。因此,该系统没有对于全系统的监控、计量、保护和控制功能所必需的时间同步。
图3示出本发明的系统,它产生同步的相量值(测量),与系统频率无关,并且因此能用于某些全系统保护功能。全系统的保护,监控,计量和控制功能,包括图1和图1A的示波法和谐波分析,能由使用同步相量用于基于时间的应用的基于时间的采样来完成。另外,输入信号在功率系统工作频率的倍数被重新采样,从而提供典型范围的保护功能,如线路距离保护和故障确定。
图3包括一个本地保护设备或装置42,也称为智能电装置,如保护继电器,和包括一个远程设备44。远程设备与本地设备相同,二者在通信信道46上互相连通。以下说明涉及本地装置的结构和操作;相同的说明可适用于远程设备44。
更详细地,数据取自电力线,典型地是三相电流(IA、IB、IC)和三相电压(VA、VB、VC)。为简化说明之目的,图3中仅示出VA。元件50包括常规的变压器装置(变压器/变流器),把电流和/或电压值降到适于在基于微处理器的保护继电器42中使用的水平。元件50的典型的电压输出在正常工作条件下约为1.34伏特。
元件50的输出施加于低通滤波器52,它的输出施加于A-D转换器54。取得的数据被以固定时间间隔采样。采样信号参照外部时钟信号,如来自GPS接收机56,是一个绝对时间基准。GPS接收机56的输出施加于一个时间同步元件58。为了产生同步的相量测量,需要这样的一个绝对时间基准。所得到的来自A-D转换器的采样输出被施加于一个计算在数据采集硬件中可能发生的任何数据采集误差从而使数据在装置42和44之间被调整的校准电路62。校准电路62的输出,典型地以较高的采样速率,如每秒8000的采样被提供,施加于一个处理电路64,用于常规的示波法和谐波分析的应用。
然而,另外,同步的相量值是从电力线输入电压和电流值来确定。电路64的同步的相量输出与系统频率无关,并且能在由本地设备42进行的某些保护功能中使用。
确定同步相量值本身是已知的,如在名为“Measurement of VoltagePhase for the French Future Defense Team Plan Against Loss ofSynchronism(用于对抗失去同步的法国未来国防小组计划的电压相位的测量)”的,在IEEE TRANSACTIONS ON POWER DELIVERY,1992年1月,Vol.7 No.1的论文中所公开的。处理电路64中的算法使用输入值VA、VB、VC和IA、IB、IC,以每秒8000采样,有一个绝对时间基准。处理器64抽选(decimate),即减少样本数目,除以8,以每秒1000(1k)采样产生电压和电流信号。接下来,每个输入信号与基准信号cos(2πt+β)和sin(2πt+β)相乘,其中时间t是绝对时间基准,β是用于所用的特定硬件的校准调节。在下一步,相乘的信号由一个低通滤波器解调,从而得到VA、VB、VC和IA、IB、IC相量的实和虚部。继电器每50毫秒计算这些特定的相量。
接下来,处理器使用来自上述步骤中VA相量计算的角度信息和来自过滤的量VFA(过滤的基本的A-pphase电压量)的量值计算,产生A-相位电压同步相量(VAsync)。继电器对其它相量进行类似计算。每个所得到的同步相量与特定的时间标记相关,称为时间同步。该时间标记参照绝对时间。
然后,正序列的量(例如V1sync)由三相电流和电压同步相量计算如下:
V1sync=(1/3)(VAsync+aVBsync+a2VCsync)
I1sync=(1/3)(IAsync+aIBsync+a2ICsync)
其中,在角度120度时a=1。用于保护计算的一个可选的正序列电压,称为Alpha Clarke组件,如下所述:
Valphasync=(2/3)(VAsync-VBsync/2-VCsync/2);和
Ialphasync=(2/3)(IAsync-IBsync/2-ICsync/2)
使用同步的相量测量,如同步的正序列相量值的保护功能包括电流差动保护,其中来自本地装置,如装置42的电流值与来自远程装置,如装置44的电流值一起使用,来提供保护功能。对于同步相量的绝对时间基准提供了执行这些保护功能和进行故障确定的能力。尽管同步的相量测量本身是已知的,如上述参考文献所述,但对于线路距离保护在保护继电器中应用同步的相量却是迄今为止所不知道的。因此,全系统的分析能力以及一些保护功可离开处理电路64单独有效。
再参考图3,校准电路62的输出也施加于数字低通滤波器68,它的输出施加于一个抽选,即分割样本数目的“减少(down)”采样装置70,如从每秒8000采样减到每秒1000采样。减少采样数据在传输线路71在通信信道46上以适于通信信道带宽的速率被施加到远程装置44。减少采样数据输出还施加于一个常规的频率估计器72,如上所述,它能是任何已知的装置。频率估计器72提供关于电力线信号实际频率的估计。
频率估计器电路72的输出施加于双位置开关74的一个输入73。另一个输入75是来自远程装置的传输数据,在接收线路76上来自通信信道46。因此,到开关74的输入是本地和远程功率信号频率信息。开关74的输出作为采样信号fsys施加于一个重新采样电路78。到重新采样器78有两个数据输入,一个在线路79来自本地装置42的数字低通滤波器68的输出(本地信号),另一个在线路81通过远程信道82来自远程装置(远程信号)。
这两个输入信号,在所示的实施例中,都以是工作系统频率的选择的倍数的频率来重新采样,如32·fsys。可以使用其它倍数。本地和远程重新采样数据分别显现在输出线路80和83上。然后这些信号通过数字带通滤波器84和86来施加。开关88控制本地或远程频率采样数据对一个常规的保护、计量和可编程逻辑电路90的应用。二者之间的选择取决于与特定保护功能有关的可编程逻辑的需要。
本地重新采样数据还在94处理,来产生一个RMS(均方根)值。该RMS数据用于继电器的计量和保护应用。电路90的输出在通信信道46上施加给远程装置,同时来自远程装置的类似信息施加于保护电路90,来执行保护功能并且产生故障指示,以及在适当时为继电器所覆盖的该部分的功率系统松开断路器。
单个装置中的图3系统提供示波法和谐波分析的能力,由于基于时间的采样以及使用基于系统频率倍数采样的保护和计量功能。因此,装置具有综合的保护,监控,计量和控制能力。绝对时间基准,如GPS接收机的使用使得能够产生在保护功能中使用的同步的相量(同步相量)值。保护能力包括与远程装置的连通和协调。
图4示出图3的一个变化,其中来自电力线的输入电压和电流数据的采样是基于来自源99的一个本地时钟信号,提供一个采样频率fs给A-D转换器101,同时重新采样电路100使用来自GPS接收机102的一个绝对时间基准来提供同步的相量值。系统频率也由电路104估计,并且施加于重新采样器100。绝对时间基准和系统工作频率,根据应用,以特定频率对来自A-D转换器101的数据重新采样。一个频率能被用于进行保护,另一个频率能被用于同步相量测量。
来自图3装置42的同步的相量测量数据能以两种不同的方式报告,在特定时间间隔的非请求的二进制信息和在特定时间的请求的ASCII码信息。图5示出一个实施例,其中两个装置(智能电装置,如保护继电器)112和114在常规的通信信道118和120上与主机连通,使用常规的CRC(周期性冗余位数校验)检错方法。
非请求的二进制信息,从IED到主机116,典型地包含以下数据:由主机使用来确定数据源的IED地址;数据的样本数目;有绝对时间基准的数据采集时间戳记;功率系统的估计频率;相位和来自电力线的正序列电压和电流;校正时间同步的指示;确认数据包准备好;后面是通用位;和最后,检错码。根据每个数据包中的时间戳记和样本数目,主机116解析来自网络中与其连通的几个不同装置的接收数据。
对于请求信息,装置响应来自主机116与相量测量有关的命令,通过报告特定的时间功率系统中计数器数据(三相电流和电压的大小与角度)的同步的相量测量。这方案用来在特定的时间穿过整体功率系统拍同步相量的“快照”,当放在一起时,示出在系统中的所有点在一个特定的时间点的功率系统的情况。采样报告由图6示出。
对于继电器到继电器的非请求的二进制信息(图7),使用非请求二进制信息的一个本地继电器130能把一个远程继电器132用作一个基准,有通信信道134。被传输的数据包类似于图6所示的非请求信息。数据包包含一个或多个电压和/或电流值。通常,正序列电压被传输。本地装置(继电器)130使用时间戳记信息来调整本地与远程数据包。例如,本地角度信息ANGLOCAL能以远程角度ANGREMOTE调整,从而得到线路两端之间的角度差。然后,该角度差能由继电器逻辑使用,对于固定或可编程逻辑,来执行控制或保护功能。
对于那些信息,如上述的非请求二进制信息,把从同步的相量测量确定的正序列电压值用作基准,能使用一个称为Alpha Clarke电压的可选方案。Alpha Clarke电压是一个比正序列电压更好的基准选择,因为它更容易计算,并且因此降低了继电器处理的负担。Alpha Clarke组件的计算如上所述。
因此,已对一个系统进行了说明,它能够产生电功率系统的控制和分析信息,以及对系统的保护功能。在一个方案中,绝对时间基准被用来产生电压和/或电流的同步的相量测量用于电流或电压差动分析,而在另一个方案中,频率与频率估计技术和重新采样结合,提供能被用于其它类型的保护,如线路距离保护的信息。
尽管,为了说明之目的已公开了本发明的一个优选实施例,但应能理解的是,在不偏离本发明实质精神和范围的情况下,可对本发明进行各种改变、更改和替代。

Claims (15)

1.一种用于电功率系统的保护继电器,用来对全系统进行控制和分析以及保护,包括:
采集电路,用来得到以下的至少一个:来自电力线的(1)电压值和(2)电流值;
第一采样电路,用于在选择的时间间隔对电压和/或电流值采样;
第一计算系统,使用所得到的采样进行选择的功率全系统的控制和分析确定;
一个频率估计电路,用于确定所述功率系统频率;
第二采样电路,用来以与所述功率系统频率有关的速率对采样电压和/或电流值重新采样;和
第二计算系统,使用重新采样的电压和电流值对与所述保护继电器相关的电力线部分执行选择的保护功能。
2.如权利要求1所述的设备,其中一个选择的功能是线路距离保护。
3.如权利要求1所述的设备,其中所述第一采样电路有一个绝对时间基准。
4.如权利要求3所述的设备,其中所述绝对时间基准由全球定位系统提供。
5.如权利要求1所述的设备,包括一个校准电路,用于更改所得到的采样信号,计算数据采集中的误差。
6.如权利要求1所述的设备,包括一个减少采样电路,用于减少所述第一采样元件提供的样本数目。
7.如权利要求1所述的设备,其中所述重新采样电路对来自所述保护继电器的数据做出响应,还对相同电力线上来自远离所述保护继电器的另一个继电器的数据做出响应。
8.如权利要求7所述的设备,其中所述估计的功率系统频率选自所述本地保护继电器或所述远程保护继电器。
9.如权利要求7所述的设备,其中来自所述本地保护继电器和远程保护继电器的所述重新采样信号施加于具有不依赖于所述功率系统工作频率的固定系数的带通滤波器。
10.如权利要求7所述的设备,包括一个计算电路,用来确定来自所述本地保护继电器的所述重新采样信号的RMS(均方根)值,其中所述RMS值用于计量功能。
11.一种用于电功率系统的保护继电器,使用同步的相量测量进行全系统的控制和分析以及电力线保护,它包括:
电压和电流采集电路,用于从电力线得到电压和电流值;
一个采样电路,用于在选择的时间间隔对电压和/或电流值采样,其中所述采样是基于一个绝对时间基准;
第一计算系统,使用所述采样信号,执行选择的功率全系统的保护,控制和分析确定,并且从获得的电压和电流值产生同步的电压和电流相量值,所述同步的电压和电流值对于保护和控制功能基本上与系统频率无关;和
第二计算系统,响应来自所述保护继电器和相同电力线上来自远离所述保护继电器的另一个继电器的同步的相量值。
12.如权利要求11所述的设备,包括用于将包含同步的相量值的非请求的二进制信息从所述保护继电器传到主机的通信装置,其中所述二进制信息包含所述保护继电器的地址,绝对时间戳记,用于被传输数据的样本数目,所述功率系统估计频率,和相对于绝对时间用于所述采样的所述电力线上电压和电流的同步的相量值。
13.如权利要求11所述的设备,其中所述继电器包括一个通信电路,响应来自主机的请求,报告特定时间线路上出现的电压和电流的同步的相量值,其中在所述功率系统中来自多个保护继电器的同步的相量值由主机组合,提供所述特定时间所述功率系统工作情况的指示。
14.如权利要求11所述的设备,其中所述第二计算系统使用电力线上来自远程继电器的绝对时间戳记信息,调整来自本地和远程源数据,包括量值和角度,和进一步使用调整的量值和角度信息执行保护和控制功能。
15.如权利要求10所述的设备,其中所述同步的相量值用来产生一个Alpha Clarke组件电压,用作替代同步的相量保护应用中的正序列电压。
CNB038087030A 2002-04-17 2003-04-15 供电功率系统使用的有同步的相量测量能力的保护继电器 Expired - Fee Related CN100392410C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/124,858 US6662124B2 (en) 2002-04-17 2002-04-17 Protective relay with synchronized phasor measurement capability for use in electric power systems
US10/124,858 2002-04-17

Publications (2)

Publication Number Publication Date
CN1646927A true CN1646927A (zh) 2005-07-27
CN100392410C CN100392410C (zh) 2008-06-04

Family

ID=29214665

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB038087030A Expired - Fee Related CN100392410C (zh) 2002-04-17 2003-04-15 供电功率系统使用的有同步的相量测量能力的保护继电器

Country Status (8)

Country Link
US (2) US6662124B2 (zh)
EP (1) EP1495337A4 (zh)
CN (1) CN100392410C (zh)
AU (1) AU2003224929A1 (zh)
BR (1) BR0309270A (zh)
CA (1) CA2482797C (zh)
MX (1) MXPA04010164A (zh)
WO (1) WO2003090327A2 (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101141080B (zh) * 2006-09-07 2011-11-16 通用电气公司 具有信号和命令接口的电力网络保护和控制系统
CN101512871B (zh) * 2006-08-02 2012-06-13 姚子文 产生多相交流电力系统中电气实体的相量表示的设备和方法
CN103207312A (zh) * 2013-03-25 2013-07-17 国家电网公司 基于动态数据窗的电压电流相量测量方法
CN103323693A (zh) * 2012-05-15 2013-09-25 欧姆克容电子两合公司 用于测试电力工程测试对象的测试装置、测试系统及方法
CN103575980A (zh) * 2012-07-26 2014-02-12 施耐德电器工业公司 系统频率测量方法、同步相量测量方法及设备
CN102577006B (zh) * 2009-06-15 2014-10-01 Abb技术有限公司 用于保护电力系统的设备的装置
CN107003345A (zh) * 2015-05-29 2017-08-01 惠美仪器股份有限公司 测量多相系统中多个相的功率的功率测量设备和测量系统
CN107104702A (zh) * 2016-02-19 2017-08-29 恩智浦有限公司 一种通信系统及装置
CN112114188A (zh) * 2019-06-20 2020-12-22 施耐德电气美国公司 分布式电能表

Families Citing this family (148)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE326073T1 (de) * 2001-12-21 2006-06-15 Abb Schweiz Ag Ermittlung der betriebsgrenzwerte in einem energieverteilungsnetz
US7126800B2 (en) * 2003-07-11 2006-10-24 General Electric Company Method and system for communications channel delay asymmetry compensation using global positioning systems
US7902854B2 (en) * 2003-07-25 2011-03-08 Power Measurement, Ltd. Body capacitance electric field powered device for high voltage lines
US7282944B2 (en) * 2003-07-25 2007-10-16 Power Measurement, Ltd. Body capacitance electric field powered device for high voltage lines
US20060027261A1 (en) * 2004-08-04 2006-02-09 Plevich Chuck W Method for repair of regulator poppet and seat
US7265533B2 (en) * 2004-06-15 2007-09-04 Power Measurement Ltd. Non-intrusive power monitor
US7259547B1 (en) * 2004-06-24 2007-08-21 Cypress Semiconductor Corporation System and method to use dynamic feedback of analog to digital converter sample rate to adaptively lock the sample rate to input frequency
US7337080B2 (en) * 2004-06-25 2008-02-26 Power Measurement, Ltd. Method and apparatus for instrument transformer reclassification
US20050288877A1 (en) * 2004-06-25 2005-12-29 Power Measurement Ltd., Method and apparatus for instrument transformer reclassification
US7877543B2 (en) * 2004-12-03 2011-01-25 Hewlett-Packard Development Company, L.P. System and method for writing data and a time value to an addressable unit of a removable storage medium
US20060224336A1 (en) * 2005-04-05 2006-10-05 Charles Petras System and method for transmitting power system data over a wide area network
US20060259255A1 (en) * 2005-04-05 2006-11-16 Anderson James C Method of visualizing power system quantities using a configurable software visualization tool
US7444248B2 (en) * 2005-04-29 2008-10-28 General Electric Company System and method for synchronized phasor measurement
US7345488B2 (en) * 2005-06-01 2008-03-18 Schweitzer Engineering Laboratories, Inc. Apparatus and method for determining a faulted phase of a three-phase ungrounded power system
US7480580B2 (en) * 2005-10-18 2009-01-20 Schweitzer Engineering Laboratories, Inc. Apparatus and method for estimating synchronized phasors at predetermined times referenced to an absolute time standard in an electrical system
EP1780858A1 (en) * 2005-10-31 2007-05-02 ABB Technology AG Arrangement and method for protecting an electric power system
EP1830450A1 (en) * 2006-03-02 2007-09-05 ABB Technology AG Remote terminal unit and monitoring, protection and control of power systems
EP1830447A1 (en) 2006-03-02 2007-09-05 ABB Research Ltd Converter control unit using time-stamped voltage or current phasors
CN100392936C (zh) * 2006-06-15 2008-06-04 北京交通大学 一种基于距离算法的集成保护系统及其保护方法
US7786894B2 (en) 2006-06-20 2010-08-31 Battelle Energy Alliance, Llc Methods, apparatus, and systems for monitoring transmission systems
US7630863B2 (en) * 2006-09-19 2009-12-08 Schweitzer Engineering Laboratories, Inc. Apparatus, method, and system for wide-area protection and control using power system data having a time component associated therewith
US7899619B2 (en) * 2006-10-18 2011-03-01 Schweitzer Engineering Laboratories, Inc. Apparatus and method for transmitting information using an IRIG-B waveform generated by an intelligent electronic device
US7468593B2 (en) * 2006-11-14 2008-12-23 Beckwith Electric Co., Inc. Digital system for motor bus transfer
US7684900B2 (en) * 2007-02-20 2010-03-23 Abb Research Ltd. Adaptive provision of protection function settings of electrical machines
JP4987068B2 (ja) * 2007-02-27 2012-07-25 三菱電機株式会社 交流電気量測定装置
JPWO2008126240A1 (ja) * 2007-03-30 2010-07-22 三菱電機株式会社 同期フェーザ測定装置及びこれを用いた母線間位相角差測定装置
JP4912994B2 (ja) * 2007-09-13 2012-04-11 株式会社東芝 保護制御計測システム
WO2009042964A1 (en) * 2007-09-28 2009-04-02 Schweitzer Engineering Laboratories, Inc. Amplitude and phase comparators for line protection
US8498832B2 (en) * 2007-09-28 2013-07-30 Schweitzer Engineering Laboratories Inc. Method and device for assessing and monitoring voltage security in a power system
MX2010002165A (es) * 2007-09-28 2010-06-02 Schweitzer Engineering Lab Inc Sistemas y metodos para deteccion de variacion de energia y perdida de sincronia utilizando datos marcados en tiempo.
US20090088990A1 (en) * 2007-09-30 2009-04-02 Schweitzer Iii Edmund O Synchronized phasor processor for a power system
MX2010002162A (es) * 2007-10-09 2010-06-02 Schweitzer Engineering Lab Inc Monitor de angulo de energia.
WO2009048964A1 (en) * 2007-10-09 2009-04-16 Schweitzer Engineering Laboratories, Inc. Real-time power system oscillation detection using modal analysis
US8405944B2 (en) * 2007-10-09 2013-03-26 Schweitzer Engineering Laboratories Inc Distributed bus differential protection using time-stamped data
US8321162B2 (en) * 2007-10-09 2012-11-27 Schweitzer Engineering Laboratories Inc Minimizing circulating current using time-aligned data
US7856327B2 (en) * 2007-10-09 2010-12-21 Schweitzer Engineering Laboratories, Inc. State and topology processor
US7903381B2 (en) * 2008-03-11 2011-03-08 Schweitzer Engineering Laboratories, Inc. Negative sequence differential element
US8108165B2 (en) * 2008-04-04 2012-01-31 Schweitzer Engineering Laboratories, Inc. Acquiring phasors outside the frequency tracking range for power protective relays
US8494795B2 (en) * 2008-05-05 2013-07-23 Schweitzer Engineering Laboratories Inc Apparatus and method for estimating synchronized phasors at predetermined times referenced to a common time standard in an electrical system
CN102084569B (zh) * 2008-05-09 2014-02-19 埃森哲环球服务有限公司 用于管理电网的方法和系统
US20110004446A1 (en) 2008-12-15 2011-01-06 Accenture Global Services Gmbh Intelligent network
US20090287428A1 (en) * 2008-05-13 2009-11-19 Elster Electricity, Llc Fractional samples to improve metering and instrumentation
US20090307233A1 (en) * 2008-06-02 2009-12-10 Guorui Zhang Efficient Handling of PMU Data for Wide Area Power System Monitoring and Visualization
US8665102B2 (en) 2008-07-18 2014-03-04 Schweitzer Engineering Laboratories Inc Transceiver interface for power system monitoring
US8140283B2 (en) * 2008-12-24 2012-03-20 Schweitzer Engineering Laboratories, Inc. Independent frequency measurement and tracking
US8103467B2 (en) * 2009-01-14 2012-01-24 Accenture Global Services Limited Determination of distribution transformer voltages based on metered loads
US8103466B2 (en) * 2009-01-14 2012-01-24 Accenture Global Services Limited Distribution system analysis using meter data
JP5419485B2 (ja) * 2009-02-09 2014-02-19 三菱電機株式会社 保護継電装置
US8437969B2 (en) * 2009-03-31 2013-05-07 Virginia Polytechnic Institute And State University Accurate magnetic field sensor and method for wireless phasor measurement unit
US8346402B2 (en) * 2009-05-11 2013-01-01 Schweitzer Engineering Laboratories Inc Islanding detection in an electrical power delivery system
US8082367B2 (en) * 2009-07-23 2011-12-20 Schneider Electric USA, Inc. Differential time synchronization of intelligent electronic devices
BR112012002904A2 (pt) * 2009-08-10 2016-04-05 Scweitzer Engineering Lab Inc sistema e método para controlar um sistema de distribuição de energia elétrica, e, dispositivo eletrônico inteligente
US8373309B2 (en) * 2009-08-19 2013-02-12 Schweitzer Engineering Laboratories Inc Systems and methods for asynchronous sampling data conversion
US8554385B2 (en) * 2009-09-11 2013-10-08 Schweitzer Engineering Laboratories Inc. Systems and methods for monitoring and controlling electrical system stability
CA2774517C (en) * 2009-09-18 2015-01-27 Schweitzer Engineering Laboratories, Inc. Electrical power system phase and ground protection using an adaptive quadrilateral characteristic
US9257827B2 (en) 2009-09-18 2016-02-09 Schweitzer Engineering Laboratories, Inc. Electrical power system phase and ground protection using an adaptive quadrilateral characteristic
US8476874B2 (en) 2009-10-13 2013-07-02 Schweitzer Engineering Laboratories, Inc Systems and methods for synchronized control of electrical power system voltage profiles
CA2699596A1 (fr) 2010-03-24 2011-09-24 Hydro-Quebec Systeme et methode de synchronisation de phase de signaux produits par des unites de mesure respectives
US8706309B2 (en) 2010-04-10 2014-04-22 Schweitzer Engineering Laboratories Inc Systems and method for obtaining a load model and related parameters based on load dynamics
JP5925774B2 (ja) 2010-07-30 2016-05-25 アクセンチュア グローバル サービスィズ リミテッド インテリジェントコアエンジン
US8738318B2 (en) 2010-08-02 2014-05-27 Lindsey Manufacturing Company Dynamic electric power line monitoring system
US10310480B2 (en) 2010-08-24 2019-06-04 Schweitzer Engineering Laboratories, Inc. Systems and methods for under-frequency blackout protection
US9008850B2 (en) 2010-08-24 2015-04-14 Schweitzer Engineering Laboratories, Inc. Systems and methods for under-frequency blackout protection
US8965592B2 (en) 2010-08-24 2015-02-24 Schweitzer Engineering Laboratories, Inc. Systems and methods for blackout protection
US8792217B2 (en) 2010-09-15 2014-07-29 Schweitzer Engineering Laboratories Inc Systems and methods for protection of components in electrical power delivery systems
US9191147B1 (en) * 2010-09-16 2015-11-17 Benjamin J. Sheahan Apparatus and method for conversion between analog and digital domains with a time stamp for digital control system and ultra low error rate communications channel
US11496173B2 (en) * 2010-09-16 2022-11-08 Benjamin J. Sheahan Apparatus and method for conversion between analog and digital domains with a time stamp
US8767898B2 (en) * 2010-10-22 2014-07-01 Agilent Technologies, Inc. Method and system of synchronizing data to reference time signal with data resampling
US9435835B2 (en) * 2010-12-27 2016-09-06 Schweitzer Engineering Laboratories, Inc. Validation of electric power system monitoring systems
US9157940B2 (en) 2011-02-09 2015-10-13 Smart Energy Instruments, Inc. Power measurement device
EP2490031B1 (en) * 2011-02-15 2013-04-24 ABB Technology AG Method and system for measuring an electrical quantity in an electrical network
US9128130B2 (en) 2011-09-15 2015-09-08 Schweitzer Engineering Laboratories, Inc. Systems and methods for synchronizing distributed generation systems
US9350163B2 (en) * 2011-10-19 2016-05-24 General Electric Company Inter-area oscillation detection
US8908343B2 (en) 2011-10-31 2014-12-09 General Electric Company System for electric distribution system protection and control and method of assembling the same
US9037306B2 (en) 2011-11-10 2015-05-19 International Business Machines Corporation Monitoring and optimizing an electrical grid state
US9043037B2 (en) * 2011-11-10 2015-05-26 International Business Machines Corporation Monitoring and optimizing an electrical grid state
US9488681B2 (en) 2012-01-27 2016-11-08 General Electric Company Convolution integral for synchronized phasor
US9007731B2 (en) * 2012-03-26 2015-04-14 Schweitzer Engineering Laboratories, Inc. Leveraging inherent redundancy in a multifunction IED
US8912792B2 (en) 2012-08-24 2014-12-16 Schweitzer Engineering Laboratories, Inc. Systems and methods for rotor angle measurement in an electrical generator
GB2506626B (en) 2012-10-03 2018-02-07 Imperial Innovations Ltd Frequency estimation
US9383735B2 (en) 2012-10-04 2016-07-05 Schweitzer Engineering Laboratories, Inc. Distributed coordinated electric power delivery control system using component models
US9324122B2 (en) 2012-10-19 2016-04-26 Schweitzer Engineering Laboratories, Inc. Voting scheme for time alignment
RU2519810C1 (ru) * 2012-12-12 2014-06-20 Открытое акционерное общество "Проектно-изыскательский и научно-исследовательский институт по проектированию энергетических систем и электрических сетей "ЭНЕРГОСЕТЬПРОЕКТ" Способ измерения синхрофазора режимного параметра энергосистемы и устройство для его осуществления
US9478378B2 (en) 2013-01-04 2016-10-25 Schweitzer Engineering Laboratories, Inc. Preventing out-of-synchronism reclosing between power systems
US9568513B2 (en) 2013-02-14 2017-02-14 Schweitzer Engineering Laboratories, Inc. Systems and methods to detect poorly damped oscillation modes
CN104020342B (zh) * 2013-03-01 2017-03-01 西门子公司 流过断路器的电流方向判断方法及装置
US9784766B2 (en) 2013-03-12 2017-10-10 Lindsey Manufacturing Company Dynamic real time transmission line monitor and method of monitoring a transmission line using the same
CN103353717B (zh) * 2013-05-31 2016-08-10 国家电网公司 网络化综合智能插座及其实现方法
CN103414184B (zh) * 2013-07-24 2015-06-17 南京南瑞继保电气有限公司 一种频率变化情况下序分量的计算方法
CN103439607B (zh) * 2013-08-28 2016-11-23 三川电力设备股份有限公司 由故障录波辨识元件全参数的方法和系统及故障定位方法
US9128140B2 (en) 2013-09-16 2015-09-08 Schweitzer Engineering Laboratories, Inc. Detection of a fault in an ungrounded electric power distribution system
US9985860B2 (en) 2013-09-23 2018-05-29 Schweitzer Engineering Laboratories, Inc. Selection and display of polled and streamed electric power system measurements
CA2927999A1 (en) * 2013-10-21 2015-04-30 Washington State University Performance analysis of power grid monitors
CN103760411A (zh) * 2013-11-06 2014-04-30 国网安徽省电力公司淮南供电公司 一种直流母线电压录波装置
US9673994B2 (en) 2014-01-20 2017-06-06 General Electric Company Synchrophasor data management systems and methods
KR101398400B1 (ko) * 2014-03-06 2014-05-27 전북대학교산학협력단 시변 드룹 기반 풍력발전기의 관성 제어 방법
US10317467B2 (en) 2014-05-19 2019-06-11 Schweitzer Engineering Laboratories, Inc. Synchronous machine monitoring and determination of a loss-of-field event using time stamped electrical and mechanical data
US20150346266A1 (en) * 2014-05-30 2015-12-03 Eaton Corporation System and method for pulsed ground fault detection and localization
KR20150141053A (ko) * 2014-06-09 2015-12-17 엘에스산전 주식회사 보호계전시스템 및 이의 데이터 수집방법
US9568516B2 (en) 2014-09-23 2017-02-14 Schweitzer Engineering Laboratories, Inc. Determining status of electric power transmission lines in an electric power transmission system
US9891142B2 (en) * 2014-11-21 2018-02-13 Rockwell Automation Technologies, Inc. Time-stamping and synchronization for single-wire safety communication
US9797552B2 (en) 2014-12-22 2017-10-24 Rockwell Automation Technologies, Inc. Diagnostics and enhanced functionality for single-wire safety communication
CN104502707A (zh) * 2015-01-06 2015-04-08 福州大学 一种基于三次样条插值的电力系统同步相量测量方法
US9798342B2 (en) 2015-02-23 2017-10-24 Schweitzer Engineering Laboratories, Inc. Detection and correction of fault induced delayed voltage recovery
WO2016143021A1 (ja) * 2015-03-09 2016-09-15 株式会社日立製作所 電力系統安定化システム
US9525247B2 (en) * 2015-03-11 2016-12-20 Eaton Corporation Interlocking outlet and associated method
EP3288139A4 (en) * 2015-04-24 2018-11-14 Hitachi, Ltd. Power system stabilization system and method
US9941684B2 (en) 2015-05-12 2018-04-10 Schweitzer Engineering Laboratories, Inc. Phase and ground protection using tilt-limited adaptive quadrilateral characteristic
EP3096428B1 (en) * 2015-05-18 2018-08-08 General Electric Technology GmbH Dynamic line rating determination apparatus and associated method
US10303127B2 (en) 2015-09-15 2019-05-28 Rockwell Automation Technologies, Inc. Apparatus to interface process automation and electrical automation systems
US10474119B2 (en) * 2015-09-15 2019-11-12 Rockwell Automation Technologies, Inc. Industrial automation packaged power solution for intelligent motor control and intelligent switchgear with energy management
US10312041B2 (en) 2015-11-20 2019-06-04 Schweitzer Engineering Laboratories, Inc. Frequency measurement for electric power delivery system
US10063124B2 (en) 2015-12-10 2018-08-28 Schweitzer Engineering Laboratories, Inc. Shaft mounted monitor for rotating machinery
US9800055B2 (en) 2016-01-21 2017-10-24 Schweitzer Engineering Laboratories, Inc. Synchronization of generators using a common time reference
US9906041B2 (en) 2016-03-16 2018-02-27 Schweitzer Engineering Laboratories, Inc. Decentralized generator control
US9912158B2 (en) 2016-03-16 2018-03-06 Schweitzer Engineering Laboratories, Inc. Decentralized generator control
US10135250B2 (en) 2016-05-25 2018-11-20 Schweitzer Engineering Laboratories, Inc. Inertia compensated load tracking in electrical power systems
US10523150B2 (en) 2016-09-15 2019-12-31 Schweitzer Engineering Laboratories, Inc. Systems and methods for motor slip calculation using shaft-mounted sensors
WO2018080523A1 (en) * 2016-10-28 2018-05-03 Hitachi, Ltd. Data cost effective fast similarity search with priority access
US10644493B2 (en) 2017-05-01 2020-05-05 Schweitzer Engineering Laboratories, Inc. Power system disturbance detection using power and frequency
US10333301B2 (en) 2017-05-04 2019-06-25 Schweitzer Engineering Laboratories, Inc. Transient simulation modeling for dynamic remedial action schemes using real-time protection setting updates
US10191094B2 (en) * 2017-05-31 2019-01-29 University Of Tennessee Research Foundation Synchrophasor measurement method for power systems
US10312694B2 (en) 2017-06-23 2019-06-04 Schweitzer Engineering Laboratories, Inc. Mode-based output synchronization using relays and a common time source
US10664553B2 (en) 2017-10-06 2020-05-26 Schweitzer Engineering Laboratories, Inc. Generating a representation of high-frequency signal data from an electric power delivery system
US10802457B2 (en) 2017-10-23 2020-10-13 Schneider Electric USA, Inc. Centralized motor thermal memory management
US10476268B2 (en) 2018-02-09 2019-11-12 Schweitzer Engineering Laboratories, Inc. Optimized decoupling and load shedding
US10381835B1 (en) 2018-02-09 2019-08-13 Schweitzer Engineering Laboratories, Inc. Electric power generator selection, shedding, and runback for power system stability
CN108957231B (zh) * 2018-07-17 2021-09-14 国网辽宁省电力有限公司电力科学研究院 一种分布式系统及其主机和子机数据交互的方法
CN109066607B (zh) * 2018-07-17 2021-11-26 中国电力科学研究院有限公司 一种用于电网线路的变时限距离保护的电压加速方法和装置
US10677834B2 (en) 2018-09-14 2020-06-09 Schweitzer Engineering Laboratories, Inc. Distance protection of electric power delivery systems using time domain and frequency domain
US11231449B2 (en) 2018-09-21 2022-01-25 Schweitzer Engineering Laboratories, Inc. Frequency sensing systems and methods
US10641815B2 (en) 2018-09-27 2020-05-05 Schweitzer Engineering Laboratories, Inc. Secure distance protection of electric power delivery systems under transient conditions
US10992134B2 (en) 2019-05-10 2021-04-27 Schweitzer Engineering Laboratories, Inc. Load shedding system for both active and reactive power based on system perturbation
US11239659B2 (en) 2019-06-10 2022-02-01 Schweitzer Engineering Laboratories, Inc. Microgrid autosynchronizing using remote recloser inputs and outputs
US11218023B2 (en) 2019-06-10 2022-01-04 Schweitzer Engineering Laboratories, Inc. Recloser control fast open circuit detection
US11316349B2 (en) 2019-06-10 2022-04-26 Schweitzer Engineering Laboratories, Inc. Recloser control with distributed energy resource synchronization
CN110968834B (zh) * 2019-11-05 2023-01-31 云南电网有限责任公司 一种基于谐波含量分析的电网监测站点选取方法
CN110940854B (zh) * 2019-11-14 2022-04-12 国网江西省电力有限公司电力科学研究院 一种基于北斗/gps时钟的交流同步电能计量系统
US11035891B1 (en) 2020-03-06 2021-06-15 Schweitzer Engineering Laboratories, Inc. Electric power system voltage monitoring and control with energy packets
US11281191B2 (en) 2020-04-29 2022-03-22 Rockwell Automation Germany Gmbh & Co. Kg Global e-stop in an industrial safety system with local and global safety input devices
CN111864706A (zh) * 2020-08-19 2020-10-30 剑科云智(深圳)科技有限公司 一种配电网的故障预警和继电保护系统
US11735907B2 (en) 2021-02-03 2023-08-22 Schweitzer Engineering Laboratories, Inc. Traveling wave overcurrent protection for electric power delivery systems
CN113359021B (zh) * 2021-06-23 2022-10-21 深圳市锦祥自动化设备有限公司 静态同期检查继电器及高精度相位差和幅值差判断系统
CN113488962B (zh) * 2021-06-25 2024-06-28 科大智能电气技术有限公司 一种差动保护的采样同步控制系统及方法
US11899517B2 (en) 2021-08-26 2024-02-13 Schweitzer Engineering Laboratories, Inc. Event analysis and display
US12107414B2 (en) 2021-09-01 2024-10-01 Schweitzer Engineering Laboratories, Inc. Systems and methods for operating an islanded distribution substation using inverter power generation
US11381084B1 (en) 2021-10-05 2022-07-05 Schweitzer Engineering Laboratories, Inc. Frequency measurement for load shedding and accurate magnitude calculation
US11962140B2 (en) 2021-10-25 2024-04-16 Schweitzer Engineering Laboratories, Inc. Coordination of protective elements in an electric power system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4829298A (en) * 1983-04-13 1989-05-09 Fernandes Roosevelt A Electrical power line monitoring systems, including harmonic value measurements and relaying communications
US5006846A (en) * 1987-11-12 1991-04-09 Granville J Michael Power transmission line monitoring system
US5224011A (en) * 1991-04-19 1993-06-29 Gas Research Institute Multifunction protective relay system
US5369356A (en) * 1991-08-30 1994-11-29 Siemens Energy & Automation, Inc. Distributed current and voltage sampling function for an electric power monitoring unit
CA2106357A1 (en) * 1993-07-07 1995-01-08 Murty V. V. S. Yalla Method for implementing selectable protective relay functions
US5446682A (en) * 1994-03-21 1995-08-29 Square D Company System for calibrating a line isolation monitor
US6446682B1 (en) * 1995-06-06 2002-09-10 James P. Viken Auto-loading fluid exchanger and method of use
US5995911A (en) * 1997-02-12 1999-11-30 Power Measurement Ltd. Digital sensor apparatus and system for protection, control, and management of electricity distribution systems

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101512871B (zh) * 2006-08-02 2012-06-13 姚子文 产生多相交流电力系统中电气实体的相量表示的设备和方法
CN101141080B (zh) * 2006-09-07 2011-11-16 通用电气公司 具有信号和命令接口的电力网络保护和控制系统
CN102577006B (zh) * 2009-06-15 2014-10-01 Abb技术有限公司 用于保护电力系统的设备的装置
CN103323693A (zh) * 2012-05-15 2013-09-25 欧姆克容电子两合公司 用于测试电力工程测试对象的测试装置、测试系统及方法
CN103575980A (zh) * 2012-07-26 2014-02-12 施耐德电器工业公司 系统频率测量方法、同步相量测量方法及设备
CN103575980B (zh) * 2012-07-26 2016-12-21 施耐德电器工业公司 系统频率测量方法、同步相量测量方法及设备
US9658259B2 (en) 2012-07-26 2017-05-23 Schneider Electric Industries Sas System frequency measurement method, synchrophasor measurement method and device thereof
CN103207312A (zh) * 2013-03-25 2013-07-17 国家电网公司 基于动态数据窗的电压电流相量测量方法
CN103207312B (zh) * 2013-03-25 2015-07-08 国家电网公司 基于动态数据窗的电压电流相量测量方法
CN107003345A (zh) * 2015-05-29 2017-08-01 惠美仪器股份有限公司 测量多相系统中多个相的功率的功率测量设备和测量系统
CN107104702A (zh) * 2016-02-19 2017-08-29 恩智浦有限公司 一种通信系统及装置
CN112114188A (zh) * 2019-06-20 2020-12-22 施耐德电气美国公司 分布式电能表

Also Published As

Publication number Publication date
US20030200038A1 (en) 2003-10-23
US6845333B2 (en) 2005-01-18
EP1495337A4 (en) 2012-02-15
CA2482797A1 (en) 2003-10-30
US6662124B2 (en) 2003-12-09
WO2003090327A3 (en) 2004-03-18
EP1495337A2 (en) 2005-01-12
AU2003224929A8 (en) 2003-11-03
BR0309270A (pt) 2005-02-22
CA2482797C (en) 2009-08-25
WO2003090327A2 (en) 2003-10-30
MXPA04010164A (es) 2005-07-05
CN100392410C (zh) 2008-06-04
AU2003224929A1 (en) 2003-11-03
US20040093177A1 (en) 2004-05-13

Similar Documents

Publication Publication Date Title
CN100392410C (zh) 供电功率系统使用的有同步的相量测量能力的保护继电器
EP0708339B1 (en) Data collection and processing for digital AC power system monitor/analyzer
CA2663609C (en) An apparatus, method, and system for wide-area protection and control using power system data having a time component associated therewith
CA2701278C (en) Symmetrical component amplitude and phase comparators for line protection using time stamped data
EP0873583B1 (en) Digital current differential system
US11204377B2 (en) Estimation of a waveform period
US7583771B2 (en) Systems and methods for resampling unreliable data
US20100007333A1 (en) Wide area protection control measurement system and method
EP0224089A1 (en) Information data output device for electric-power systems
US10979330B2 (en) Communication of electric power system samples without external time reference
US10797985B2 (en) Systems and methods for selection between multiple redundant data streams
US20170146577A1 (en) Frequency Measurement for Electric Power Delivery Systems
US20230400499A1 (en) Method and System for Detecting Location of Fault in a Cable
US20220239089A1 (en) Sample time offset alignment of electric power system samples independent of a common time source
CN113671309A (zh) 配电网故障点检测和定位方法
EP3715875B1 (en) Frequency measuring method and frequency measuring device
Bright et al. Fault and disturbance data requirements for automated computer analysis. Summary paper
CN110794195B (zh) 一种三相同步采样方法、装置及存储介质
Kagami et al. Web-based Wide Area Measurement System-System Architecture and Experiences
CN116893319A (zh) 基于多源广域同步信息的配电网接地故障定位方法及系统
Bertagnollia et al. Northeastern US Oscillation Detection and Recording Project
Moore Numeric protection
WO2009025641A1 (en) Systems and methods for resampling unreliable data
JPH0989976A (ja) 故障点標定装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080604

Termination date: 20100415