CN1624250A - Method of soft ground treatment using high vacuum variable energy cross tampering - Google Patents
Method of soft ground treatment using high vacuum variable energy cross tampering Download PDFInfo
- Publication number
- CN1624250A CN1624250A CN 200410065325 CN200410065325A CN1624250A CN 1624250 A CN1624250 A CN 1624250A CN 200410065325 CN200410065325 CN 200410065325 CN 200410065325 A CN200410065325 A CN 200410065325A CN 1624250 A CN1624250 A CN 1624250A
- Authority
- CN
- China
- Prior art keywords
- layer
- vacuum tube
- vacuum
- top layer
- soft foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
High vacuum compacting method | The present invention | |
Each layer vacuum tube planted | Each layer layering, the draining of substep pumping high vacuum pipe, substep hit close, 25~30 days construction periods | The draining of each layer hierarchical synchronization pumping high vacuum, hit close, 15~20 days construction periods |
Aspirating hole, filter cloth are arranged on the high-vacuum tube | The peripheral filter cloth underlying of aspirating hole in the processed soil layer on the vacuum tube and aspirating hole, easy generation " spring soil " is rammed at position, soil layer upper strata | The peripheral filter cloth of aspirating hole in the processed soil layer on the vacuum tube and aspirating hole is put up and down entirely, overcomes the defective that position, soil layer upper strata " spring soil " easily produces |
Pulling out of construction area high-vacuum tube | All pull out and hit behind the high-vacuum tube closely, hit close energy and be difficult to control, every to discharge the water yield all over high-vacuum densification relatively less | Pull out high-vacuum tube every row, the high-vacuum tube of keeping somewhere some does not pull out, high vacuum draining and ram synchronization job simultaneously, can intuitively reflect the reasonability of ramming energy by the vacuum tube chain water yield of keeping somewhere, maximum " was pressed many discharge waters at the beginning of other can effectively utilize and ram |
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004100653254A CN1293263C (en) | 2004-11-25 | 2004-11-25 | Method of soft ground treatment using high vacuum variable energy cross tampering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2004100653254A CN1293263C (en) | 2004-11-25 | 2004-11-25 | Method of soft ground treatment using high vacuum variable energy cross tampering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1624250A true CN1624250A (en) | 2005-06-08 |
CN1293263C CN1293263C (en) | 2007-01-03 |
Family
ID=34764663
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2004100653254A Active CN1293263C (en) | 2004-11-25 | 2004-11-25 | Method of soft ground treatment using high vacuum variable energy cross tampering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1293263C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100359100C (en) * | 2005-12-29 | 2008-01-02 | 徐士龙 | Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method |
CN100392194C (en) * | 2005-10-09 | 2008-06-04 | 南京工业大学 | Forced draining mixed mode dynamic consolidation method |
WO2008064550A1 (en) * | 2006-12-01 | 2008-06-05 | Shanghai Harbour Soft Soil Treatment Engineering Co. Ltd. | Information method combined with dynamic consolidation and vacuum drainage for reinforcement of soft soil ground |
CN101349051B (en) * | 2008-09-09 | 2010-06-02 | 建研地基基础工程有限责任公司 | Saline soil area combined drain system and forced ramming foundation treating method thereof |
CN101381990B (en) * | 2007-09-04 | 2011-03-23 | 徐望 | Method for treating surface layer of soft foundation |
WO2013037122A1 (en) * | 2011-09-16 | 2013-03-21 | 上海港湾软地基处理工程(集团)有限公司 | Quick consolidation method for soft base by striking and densifying under ultravacuum |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1228494A (en) * | 1998-03-06 | 1999-09-15 | 张凌 | Vacuum deep well reinforcing method for large thickness soft soil foundation |
CN1127595C (en) * | 2001-07-28 | 2003-11-12 | 徐士龙 | 'High-vacuum compacting method' for quickly treaitng soft foundation |
-
2004
- 2004-11-25 CN CNB2004100653254A patent/CN1293263C/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100392194C (en) * | 2005-10-09 | 2008-06-04 | 南京工业大学 | Forced draining mixed mode dynamic consolidation method |
CN100359100C (en) * | 2005-12-29 | 2008-01-02 | 徐士龙 | Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method |
WO2008064550A1 (en) * | 2006-12-01 | 2008-06-05 | Shanghai Harbour Soft Soil Treatment Engineering Co. Ltd. | Information method combined with dynamic consolidation and vacuum drainage for reinforcement of soft soil ground |
US8360682B2 (en) | 2006-12-01 | 2013-01-29 | Shanghai Harbour Soft Soil Treatment Engineering Co. Ltd. | Information method combined with dynamic consolidation and vacuum drainage for reinforcement of soft soil ground |
AU2007327261B2 (en) * | 2006-12-01 | 2013-08-22 | Shanghai Geoharbour Construction Group Co., Ltd. | An information-based high vacuum densification method for fast treatment of soft soil |
AU2007327261B9 (en) * | 2006-12-01 | 2013-09-12 | Shanghai Geoharbour Construction Group Co., Ltd. | An information-based high vacuum densification method for fast treatment of soft soil |
CN101381990B (en) * | 2007-09-04 | 2011-03-23 | 徐望 | Method for treating surface layer of soft foundation |
CN101349051B (en) * | 2008-09-09 | 2010-06-02 | 建研地基基础工程有限责任公司 | Saline soil area combined drain system and forced ramming foundation treating method thereof |
WO2013037122A1 (en) * | 2011-09-16 | 2013-03-21 | 上海港湾软地基处理工程(集团)有限公司 | Quick consolidation method for soft base by striking and densifying under ultravacuum |
Also Published As
Publication number | Publication date |
---|---|
CN1293263C (en) | 2007-01-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102561308B (en) | Light-well plastic-strip superposition vacuum preloading method for soft soil foundation | |
CN102116022B (en) | Method for treating soft foundation through overpressure vacuum densification | |
CN102220755B (en) | Overpressure vacuum dewatering combined dynamic consolidation foundation treatment method | |
CN100582377C (en) | Method for treating soft foundation by fast 'informationized high vacuum densification' | |
CN100480472C (en) | Quick reinforcing method and reinforcing device for super soft weak soil | |
CN101220598A (en) | Vacuum preloading method for non-water discharge sand cushion | |
CN201362845Y (en) | Plastic draining board and composite negative pressure well point pipe concreting system for soft soil foundation | |
CN102900067B (en) | Processing method for reinforcing soft clay ground through vacuum preloading in combination with electro-osmosis method | |
CN101130952A (en) | Packingless fast vacuum prepressing dynamic consolidation method | |
CN102817348A (en) | Treatment method of recent dredger-fill silt foundation | |
CN102220757A (en) | Immediate processing method for drainage solidifying of super soft soil shallow surface space | |
CN101845811A (en) | Improved 'high vacuum densification' soft foundation treatment method | |
CN102704488A (en) | Novel soft soil foundation pit excavation method | |
CN101597898B (en) | Rigid drainage pile and construction method thereof | |
CN101634139B (en) | Dynamic compaction method for backfill foundation with drainage layer | |
CN1127595C (en) | 'High-vacuum compacting method' for quickly treaitng soft foundation | |
CN100480471C (en) | Sand cushion-free pre-compacting water-draining consolidation method for soft soil foundation | |
CN1884709A (en) | Quick soft groundsill consolidation method of filling water for prepressing, kinetic differential pressure for discharging water | |
CN1293263C (en) | Method of soft ground treatment using high vacuum variable energy cross tampering | |
CN106677158B (en) | A kind of blowing-filling sludge superficial layer Quick uniform processing method and structure recently | |
CN1609345A (en) | High vacuum variable energy cross soft foundation treatment method | |
CN201785743U (en) | Vacuum preloading consolidated soft soil foundation for combining sand wells and water discharging plates | |
CN106958239A (en) | Precipitation union gently rams soft soil foundation reinforcing method | |
CN106638554A (en) | Treatment method of soft clay foundation | |
CN103122631A (en) | Soft soil foundation preloading stamping reinforcement method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shanghai Gangwan Soft Foundation Treatment Engineering Co., Ltd. Assignor: Xu Shilong Contract fulfillment period: 2008.8.20 to 2014.11.25 Contract record no.: 2008320000123 Denomination of invention: Method of soft ground treatment using high vacuum variable energy cross tampering Granted publication date: 20070103 License type: Exclusive license Record date: 2008.9.9 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.8.20 TO 2014.11.25 Name of requester: SHANGHAI GANGWAN SOFT BASE TREATMENT ENGINEERING Effective date: 20080909 |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170620 Address after: 201507, Shanghai, Jinshan District Town, East China Sea, eight groups Patentee after: Shanghai harbor infrastructure (Group) Co., Ltd. Address before: 214400, room 4, building 106, Chengjiang village, Jiangyin, Jiangsu Patentee before: Xu Shilong |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 201507 Shanghai Jinshan District, Caojing Town, Ting Wei Road, 3316, 1, two, 207 rooms. Patentee after: Shanghai Bay infrastructure construction (Group) Limited by Share Ltd Address before: 201507 eight Caojing Town, Jinshan District, Shanghai Patentee before: Shanghai harbor infrastructure (Group) Co., Ltd. |