CN1614328A - Air conditioner and its control - Google Patents

Air conditioner and its control Download PDF

Info

Publication number
CN1614328A
CN1614328A CN 200410090746 CN200410090746A CN1614328A CN 1614328 A CN1614328 A CN 1614328A CN 200410090746 CN200410090746 CN 200410090746 CN 200410090746 A CN200410090746 A CN 200410090746A CN 1614328 A CN1614328 A CN 1614328A
Authority
CN
China
Prior art keywords
compressor
mentioned
heat exchanger
air conditioner
cross valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410090746
Other languages
Chinese (zh)
Other versions
CN100504214C (en
Inventor
龙泷镇雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Publication of CN1614328A publication Critical patent/CN1614328A/en
Application granted granted Critical
Publication of CN100504214C publication Critical patent/CN100504214C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides an air conditioner which can restart the stopped compressor in advance under the condition that one compressor is stopped in the state of the rotation of two compressors through capability control. The invention is made into a structure that before starting the stopped compressor, a four-way valve is reversed in specified time with pressure balance at once.

Description

Air conditioner and control method thereof
Technical field
The present invention relates to the compressor start control method under the kind of refrigeration cycle that has connected a plurality of compressors side by side.
Background technology
Disclose in the Te Kaiping 7-174418 communique and be the air conditioner of on high-tension side compressor in many closed containers of a kind of existing connection arranged side by side.In Fig. 3, non-return valve 13 and 23 prevents that respectively cold-producing medium from flowing in the second big compressor of the first little compressor 1 of ability and ability.The following formation of kind of refrigeration cycle.
The ring-type connection constitutes kind of refrigeration cycle with the lower part successively, that is: outdoor heat converter 4; Decompressor 7a, the 7b, 7c, the 7d that possess totally-enclosed function; Indoor side heat exchanger 8a, 8b, 8c, 8d; Storage heater 5; Be communicated with in the fuel head of one end by first compressor 1 regulation and the closed container and the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop 11 of damping unit 12; Connection in the fuel head of one end by second compressor 2 regulation and the closed container and the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop 21 of damping unit 22.
In above-mentioned existing structure, because loop 11 and 21 forms the bypass of kind of refrigeration cycle, so cause ability low.Therefore, in the scope that can keep pasta, damping unit 12,22 is set big as far as possible resistance.The result has spent the time in pressure balance.Especially, under the state that first compressor 1 and 2 two compressors of second compressor all turn round, stopped a compressor in handling capacity control, for example under the situation of second compressor 2, spent the time on the pressure in the closed container in second compressor 2 that balance has stopped and the pressure of suction side.Therefore, when load rises and will start second compressor once again, must wait by the time pressure balance.
Summary of the invention
The present invention will solve above-mentioned existing problem, provides a kind of and possesses under the situation that the compressor of having wanted will to stop earlier owing to burden requirement once more starts, and can shift to an earlier date the air conditioner of the control module that pressure balance starts.
The invention provides a kind of air conditioner, it is characterized in that: be to have: many connect side by side and closed container in be on high-tension side compressor; Be arranged on the non-return valve of the discharge side of above-mentioned compressor; Cross valve; First heat exchanger; Decompressor; Second heat exchanger; Be communicated with in the fuel head of one end by above-mentioned compressor regulation and the closed container and the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop of damping unit; Air conditioner with control device; Above-mentioned control device possessed before the starting above-mentioned compressor, at the appointed time the control module that above-mentioned cross valve is reversed.
In addition, the invention provides a kind of control method of air conditioner, it is characterized in that: be to have: many connect side by side and closed container in be on high-tension side compressor; Be arranged on the non-return valve of the discharge side of above-mentioned compressor; Cross valve; First heat exchanger; Decompressor; Second heat exchanger; Be communicated with in the fuel head of one end by above-mentioned compressor regulation and the closed container and the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop of damping unit; Control method with the air conditioner of control device; Before the starting above-mentioned compressor, at the appointed time above-mentioned cross valve is reversed.
Description of drawings
Fig. 1 is the system diagram of the refrigeration system in the embodiment of the present invention 1.
Fig. 2 is the curve map that the pressure in the explanation embodiment of the present invention 1 changes.
Fig. 3 is the system diagram of existing refrigeration system.
Among the figure
1 first compressor, 2 second compressors
4 outdoor heat exchangers, 5 storage heaters
6 cross valves 7,7a, 7b, 7c, 7d decompressor
8 water heat exchanger 8a, 8b, 8c, 8d indoor side heat exchanger
11,21 loops, 12,22 damping units
13,23 non-return valve 17a, 17b, 17c, 17d switch valve
18a, 18b, 18c, 18d indoor heat converter
19 pumps, 31 control device
The specific embodiment
Air conditioner of the present invention, make: have many making of connecting side by side and be on high-tension side compressor in the closed container, be arranged on the non-return valve of the discharge side of above-mentioned compressor, cross valve, outdoor heat exchanger, decompressor, the heat exchanger that carries out heat exchange with water, the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop of damping unit with being communicated with in the fuel head of an end by above-mentioned compressor regulation and the closed container, and possess the structure of the control module that above-mentioned cross valve is reversed was at the appointed time arranged before the starting above-mentioned compressor.Like this, can carry out pressure balance at once, so can start at any time.
Moreover, control module of the present invention is under the situation of the compressor that the compressor more than on-stream starting has stopped, after the compressor in having stopped above-mentioned running, make at the appointed time after the cross valve counter-rotating, make necessary compressor start.So, can reduce the counter-rotating number of times of cross valve and prolong life-span of cross valve.
Below, with reference to the accompanying drawings embodiments of the present invention are described.In addition, present embodiment does not limit the present invention.Moreover, to the additional same-sign of existing same structure, and detailed.
(embodiment 1)
Utilize Fig. 1 that embodiment 1 is described.Among Fig. 1, water heat exchanger 8, each indoor heat converter 18a, 18b, 18c, 18d, switch valve 17a, 17b, 17c, 17d, pump 19 etc. that the cold-producing medium in the kind of refrigeration cycle mobile switched to the cross valve 6, decompressor 7 of air-cooling system, heater unit, carries out heat exchange with water have been expressed.
And water loop ring-type connects water heat exchanger 8, indoor heat converter 18a, 18b, 18c, 18d, switch valve 17a, 17b, 17c, 17d, pump 19.
Moreover, refrigeration system, also possess have timer unit, control is to the control device 31 of coil (not shown) energising of the motor (not shown) of the motor (not shown) of first compressor 1, second compressor 2, cross valve 6.
Below the action of the air conditioner that possesses above structure is described.Be under the cold air state at cross valve 6, and first compressor 1,2 runnings of second compressor time, cold-producing medium flows through outdoor heat converter 4, decompressor 7, water heat exchanger 8, storage heater 5 in regular turn.
In water heat exchanger 8, cool off by the water of low pressure refrigerant water loop, pump 19 is to each indoor water that has cooled off of sending to, and freezes by heat exchanger 18a, 18b, 18c, 18d.
At this moment, in kind of refrigeration cycle, in the closed container of two compressors and outdoor heat converter 4 in cold-producing medium become high pressure.And the cold-producing medium in water heat exchanger 8 and the storage heater 5 becomes low pressure.
Next, the on-stream indoor load of two compressors reduces, and for example, stops first compressor 1 entering, and only makes under the situation of the ability control running that second compressor 2 remains in operation, and becomes following state.Because the cold-producing medium in the closed container of first compressor 1, the discharge pipe side is turned off by non-return valve 13, so, only be communicated with by loop 11 with the suction side.
Be depressed by the pressure in the closed container, and oil and cold-producing medium in first compressor 1, flow into the suction side via loop 11.As a result, though the pressure decline in first compressor 1, because damping unit 12 is arranged, so pressure slowly descends.
Because forming the bypass of kind of refrigeration cycle, loop 11,21 causes ability drop, so damping unit 12,22 in the scope that can keep pasta, is established big resistance as much as possible.As a result, in pressure balance, expended the time.
When load is lighter, as shown in Figure 2, clearly make pressure balance need more than 8 minutes.Next, increase once again at load, handling capacity control is turned round first compressor to be needed in 8 minutes, and for example when 5 minutes took place, differential pressure was also at 2kgf/cm 2More than.Therefore, can not start like this and must wait for 3 minutes nearly.
Therefore, in second compressor 2 in shutting down, make cross valve 6 counter-rotatings and after 5 seconds, make cross valve 6 turn back to original position.So, then the pressure in the kind of refrigeration cycle is the same substantially, enter can starting compressor state.That is to say, cross valve 6 is turned back to after the original position, if first compressor 1, second compressor 2 all start, then can be with turning back to two runnings about 5 seconds, so can not produce very big delay yet and can follow the trail of to running change request based on the compressor of ability control.
Moreover, under the situation that has stopped all compressors, because cold-producing medium flows in the decompressor 7, so carried out pressure balance with about 3 minutes.Therefore, generally speaking, restart and to wait for 3 minutes control.But,, then need not to wait for 3 minutes and just can start if adopt the control method of the present invention that makes these cross valve 6 counter-rotatings.
In addition, because cross valve 6 is in case counter-rotating, then cold-producing medium can flow out without a break, so can produce mobile of cold-producing medium in kind of refrigeration cycle.But air conditioner of the present invention has been separated into kind of refrigeration cycle and water circulation by water heat exchanger 8.
That is, because kind of refrigeration cycle and the indoor of human living space are separated,, the circulation sound of cold-producing medium can not become problem so can not being communicated to an indoor side.
(embodiment 2)
In embodiments of the present invention 2, temperature does not in doors arrive under the state of design temperature, that is, when only any one compressor in a plurality of compressors turns round, make cross valve 6 counter-rotatings promote pressure balanced work.So, because reduce the counter-rotating number of times of cross valve 6, so can prolong the life-span of cross valve 6.
As previously discussed, air conditioner of the present invention, can carry out pressure balance at control module by making cross valve counter-rotating at the appointed time before starting compressor at once, and at any time can start.
In addition, the so-called a plurality of compressors among the present invention are meant more than two that the platform number of the upper limit is decided by the necessary environment of air conditioner.
Air conditioner of the present invention, make cold water or warm water and the water of making is sent in the so-called rudder stock formula air conditioner that each is indoor, carry out the air transfer in kind of refrigeration cycle, it can be widely used in having the air conditioner of the kind of refrigeration cycle of a plurality of compressors of connection arranged side by side.

Claims (6)

1. air conditioner is characterized in that:
Be to have:
Many connect side by side and closed container in be on high-tension side compressor;
Be arranged on the non-return valve of the discharge side of above-mentioned compressor;
Cross valve;
First heat exchanger;
Decompressor;
Second heat exchanger;
One end is communicated with in the fuel head of above-mentioned compressor regulation and closed container and the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop of damping unit; With
The air conditioner of control device;
Above-mentioned control device possesses the control module that the above-mentioned cross valve that reversed is at the appointed time arranged before the starting above-mentioned compressor.
2. air conditioner according to claim 1 is characterized in that:
Above-mentioned first heat exchanger is an outdoor heat exchanger, and above-mentioned second heat exchanger is the heat exchanger that carries out heat exchange with water, uses by carrying out carrying out indoor air conditioning with the water of the heat exchanger institute heat exchange of the heat exchange of above-mentioned water.
3. air conditioner according to claim 1 and 2 is characterized in that:
Above-mentioned control device, have: under the situation of the compressor on-stream in the above-mentioned compressor more than, that starting has stopped, after the compressor in having stopped above-mentioned running, make at the appointed time after the above-mentioned cross valve counter-rotating, make the control module of necessary compressor start.
4. the control method of an air conditioner is characterized in that:
Be to have:
Many connect side by side in the closed container on high-tension side compressor, are arranged on the non-return valve of the discharge side of above-mentioned compressor;
Cross valve;
First heat exchanger;
Decompressor;
Second heat exchanger;
One end is communicated with in the fuel head of above-mentioned compressor regulation and closed container and the other end and the suction side pipeline that above-mentioned compressor is close to are communicated with and possess the loop of damping unit; With
The control method of the air conditioner of control device;
Before the starting above-mentioned compressor, at the appointed time above-mentioned cross valve is reversed.
5. the control method of air conditioner according to claim 4 is characterized in that:
Above-mentioned first heat exchanger is an outdoor heat exchanger, and above-mentioned second heat exchanger is the heat exchanger that carries out heat exchange with water, uses by carrying out carrying out indoor air conditioning with the water of the heat exchanger institute heat exchange of the heat exchange of above-mentioned water.
6. according to the control method of claim 4 or 5 described air conditioners, it is characterized in that:
Above-mentioned control device, possessing has: under the situation of the compressor on-stream at the compressor more than, that starting has stopped, after the compressor in having stopped above-mentioned running, make at the appointed time after the cross valve counter-rotating, make the control module of necessary compressor start.
CNB2004100907462A 2003-11-07 2004-11-08 Air conditioner and its control method Expired - Fee Related CN100504214C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003378279A JP2005140444A (en) 2003-11-07 2003-11-07 Air conditioner and its control method
JP2003378279 2003-11-07

Publications (2)

Publication Number Publication Date
CN1614328A true CN1614328A (en) 2005-05-11
CN100504214C CN100504214C (en) 2009-06-24

Family

ID=34688720

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100907462A Expired - Fee Related CN100504214C (en) 2003-11-07 2004-11-08 Air conditioner and its control method

Country Status (2)

Country Link
JP (1) JP2005140444A (en)
CN (1) CN100504214C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101086375B (en) * 2006-06-07 2010-10-27 乐金电子(天津)电器有限公司 Method for controlling change-over valve of air conditioner
CN102016442A (en) * 2008-04-30 2011-04-13 三菱电机株式会社 Air conditioner
CN102278837A (en) * 2011-01-28 2011-12-14 大连三洋压缩机有限公司 Oil equalization system of compressor units
CN102667367A (en) * 2009-11-25 2012-09-12 三菱电机株式会社 Air conditioning device
CN103868298A (en) * 2012-12-07 2014-06-18 美的集团股份有限公司 Heat pump system and start control method thereof
CN105627515A (en) * 2016-01-11 2016-06-01 海信(山东)空调有限公司 Air conditioner control method, device and air conditioner
CN109282433A (en) * 2018-09-11 2019-01-29 广东美的暖通设备有限公司 Air conditioner and its control method and control device
CN111076350B (en) * 2019-12-30 2021-09-21 宁波奥克斯电气股份有限公司 Control method and device for starting compressor and air conditioner

Families Citing this family (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100772217B1 (en) * 2006-05-20 2007-11-01 엘지전자 주식회사 Control method of air conditioner
KR100853357B1 (en) 2007-07-10 2008-08-21 캐리어 주식회사 Pressure balanced equipment in air conditioner with multi compressors
EP2278237B1 (en) * 2008-04-30 2018-04-04 Mitsubishi Electric Corporation Air-conditioning apparatus
EP2282144B1 (en) * 2008-04-30 2017-04-05 Mitsubishi Electric Corporation Air conditioner
JP5274572B2 (en) * 2008-10-29 2013-08-28 三菱電機株式会社 Air conditioner
CN102422099A (en) 2009-05-08 2012-04-18 三菱电机株式会社 Air conditioner
WO2011030407A1 (en) 2009-09-09 2011-03-17 三菱電機株式会社 Air conditioning device
EP2472199B1 (en) 2009-09-10 2020-08-26 Mitsubishi Electric Corporation Air conditioning device
ES2699462T3 (en) 2009-09-10 2019-02-11 Mitsubishi Electric Corp Air conditioner device
CN102483250B (en) 2009-09-10 2014-08-27 三菱电机株式会社 Air conditioning device
ES2810011T3 (en) 2009-10-19 2021-03-08 Mitsubishi Electric Corp Heat medium conversion machine and air conditioning system
JP5614757B2 (en) 2009-10-22 2014-10-29 三菱電機株式会社 Air conditioner
CN102597640B (en) 2009-10-27 2014-12-31 三菱电机株式会社 Air conditioning device
US8839640B2 (en) 2009-10-27 2014-09-23 Mitsubishi Electric Corporation Air-conditioning apparatus
ES2712931T3 (en) 2009-10-27 2019-05-16 Mitsubishi Electric Corp Air conditioner device
CN102597661B (en) 2009-10-28 2014-10-01 三菱电机株式会社 Air conditioning device
WO2011052050A1 (en) 2009-10-28 2011-05-05 三菱電機株式会社 Air conditioning device
CN102597660B (en) 2009-10-28 2015-05-06 三菱电机株式会社 Air conditioning device
EP2495514B1 (en) 2009-10-29 2019-08-28 Mitsubishi Electric Corporation Air conditioning device
WO2011099059A1 (en) 2010-02-10 2011-08-18 三菱電機株式会社 Air conditioning device
JP5452628B2 (en) 2010-02-10 2014-03-26 三菱電機株式会社 Air conditioner
JPWO2011099067A1 (en) 2010-02-10 2013-06-13 三菱電機株式会社 Refrigeration cycle equipment
US8844301B2 (en) 2010-02-10 2014-09-30 Mitsubishi Electric Corporation Air-conditioning apparatus
ES2655891T3 (en) 2010-02-17 2018-02-22 Mitsubishi Electric Corporation Air conditioning device
JP5709838B2 (en) 2010-03-16 2015-04-30 三菱電機株式会社 Air conditioner
ES2785060T3 (en) 2010-03-25 2020-10-05 Mitsubishi Electric Corp Air conditioning device
US8720214B2 (en) 2010-04-14 2014-05-13 Mayekawa Mfg. Co., Ltd. Ice rink cooling facility
CN103080668B (en) 2010-09-10 2015-05-06 三菱电机株式会社 Air-conditioning device
WO2012035573A1 (en) 2010-09-14 2012-03-22 三菱電機株式会社 Air-conditioning device
CN103154637B (en) 2010-09-30 2015-11-25 三菱电机株式会社 Aircondition
US9494363B2 (en) 2010-10-12 2016-11-15 Mitsubishi Elelctric Corporation Air-conditioning apparatus
ES2778751T3 (en) 2010-10-12 2020-08-11 Mitsubishi Electric Corp Heat medium return unit
WO2012070083A1 (en) 2010-11-24 2012-05-31 三菱電機株式会社 Air conditioner
WO2012077156A1 (en) 2010-12-07 2012-06-14 三菱電機株式会社 Heat pump device
JP5752148B2 (en) 2010-12-09 2015-07-22 三菱電機株式会社 Air conditioner
CN103354891A (en) 2011-02-07 2013-10-16 三菱电机株式会社 Air-conditioning device
WO2012172605A1 (en) * 2011-06-16 2012-12-20 三菱電機株式会社 Air conditioner
WO2012172613A1 (en) 2011-06-16 2012-12-20 三菱電機株式会社 Air conditioner
JP5677571B2 (en) * 2011-06-16 2015-02-25 三菱電機株式会社 Air conditioner
JP2013181695A (en) 2012-03-01 2013-09-12 Fujitsu General Ltd Air conditioning device
ES2749352T3 (en) 2012-03-09 2020-03-19 Mitsubishi Electric Corp Air conditioning device
JP5955409B2 (en) 2012-11-29 2016-07-20 三菱電機株式会社 Air conditioner
US9638430B2 (en) 2012-11-30 2017-05-02 Mitsubishi Electric Corporation Air-conditioning apparatus
EP2927615B1 (en) 2012-11-30 2020-09-23 Mitsubishi Electric Corporation Air conditioning device
WO2014097438A1 (en) 2012-12-20 2014-06-26 三菱電機株式会社 Air-conditioning device
EP2937647B1 (en) 2012-12-20 2021-11-10 Mitsubishi Electric Corporation Air-conditioning device
WO2014097439A1 (en) 2012-12-20 2014-06-26 三菱電機株式会社 Air-conditioning device
US20150369498A1 (en) 2013-02-25 2015-12-24 Mitsubishi Electric Corporation Air-conditioning apparatus
JP6141454B2 (en) 2013-12-19 2017-06-07 三菱電機株式会社 Air conditioner and control method of air conditioner
JP2014089042A (en) * 2013-12-25 2014-05-15 Mitsubishi Electric Corp Refrigeration cycle device
EP3428550B1 (en) 2014-11-05 2020-04-08 Mitsubishi Electric Corporation Air-conditioning apparatus
JP6388559B2 (en) * 2015-06-03 2018-09-12 三菱電機株式会社 Air conditioner
WO2017072831A1 (en) 2015-10-26 2017-05-04 三菱電機株式会社 Air conditioning device
JP6906013B2 (en) * 2015-10-28 2021-07-21 株式会社神戸製鋼所 heat pump
JP6571491B2 (en) 2015-10-28 2019-09-04 株式会社神戸製鋼所 heat pump
CN109297155B (en) * 2018-11-29 2020-11-03 宁波奥克斯电气股份有限公司 Compressor protection method and device and air conditioner

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101086375B (en) * 2006-06-07 2010-10-27 乐金电子(天津)电器有限公司 Method for controlling change-over valve of air conditioner
CN102016442A (en) * 2008-04-30 2011-04-13 三菱电机株式会社 Air conditioner
CN102016442B (en) * 2008-04-30 2013-06-26 三菱电机株式会社 Air conditioner
CN102667367B (en) * 2009-11-25 2014-10-01 三菱电机株式会社 Air conditioning device
CN102667367A (en) * 2009-11-25 2012-09-12 三菱电机株式会社 Air conditioning device
CN102278837A (en) * 2011-01-28 2011-12-14 大连三洋压缩机有限公司 Oil equalization system of compressor units
CN102278837B (en) * 2011-01-28 2013-08-14 大连三洋压缩机有限公司 Oil equalization system of compressor units
CN103868298A (en) * 2012-12-07 2014-06-18 美的集团股份有限公司 Heat pump system and start control method thereof
CN103868298B (en) * 2012-12-07 2016-08-03 美的集团股份有限公司 Heat pump and startup control method thereof
CN105627515A (en) * 2016-01-11 2016-06-01 海信(山东)空调有限公司 Air conditioner control method, device and air conditioner
CN105627515B (en) * 2016-01-11 2018-12-11 海信(山东)空调有限公司 A kind of air conditioning control method, device and air-conditioning
CN109282433A (en) * 2018-09-11 2019-01-29 广东美的暖通设备有限公司 Air conditioner and its control method and control device
CN111076350B (en) * 2019-12-30 2021-09-21 宁波奥克斯电气股份有限公司 Control method and device for starting compressor and air conditioner

Also Published As

Publication number Publication date
JP2005140444A (en) 2005-06-02
CN100504214C (en) 2009-06-24

Similar Documents

Publication Publication Date Title
CN1614328A (en) Air conditioner and its control
AU2007226005B2 (en) Refrigerating apparatus
US20060225445A1 (en) Refrigerant system with variable speed compressor in tandem compressor application
CN1430030A (en) Heat pump air conditioner
CN1621758A (en) Air conditioner
CN1015657B (en) Operation control method for air conditioner of heat pump type
CN1256561C (en) Air conditioner and outdoor unit therefor
CN1193199C (en) Air conditioning system with two compressors and method for operating the same
CN100347490C (en) Multi-stage operation type air conditioner and operating method thereof
CN1244782C (en) Air conditioner and control method
CN1542341A (en) Air conditioner and outdoor unit therefor
CN100465537C (en) Air conditioner
JP4622296B2 (en) Combined power source heat pump air conditioner
CN100520232C (en) Air conditioner
JP5463995B2 (en) Multi-room air conditioner
CN111435045A (en) Air conditioner heat pump system
CN1124447C (en) Air conditioner
CN1322275C (en) Air conditioner
CN115638574A (en) Fluorine pump multi-connected refrigeration system and control method thereof
CN1265150C (en) Control method of air conditioner
JP2004144411A (en) Air conditioning equipment
CN100516702C (en) Refrigerating system for heat pump air conditioner and its realizing method
JP2002243295A (en) Air conditioner
JP2007113830A (en) Gas heat pump type air conditioner
JP2786911B2 (en) Air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CI01 Correction of invention patent gazette

Correction item: Inventor

Correct: Shizuo Otaki

False: Tatsutaki Shigeo

Number: 19

Volume: 21

CI02 Correction of invention patent application

Correction item: Inventor

Correct: Shizuo Otaki

False: Tatsutaki Shigeo

Number: 19

Page: The title page

Volume: 21

ERR Gazette correction

Free format text: CORRECT: INVENTOR; FROM: ZHENXIONG COUNTY, LONGSHUANG TO: ZHENXIONG COUNTY, DASHUANG

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090624

Termination date: 20101108