CN1597358A - Manufacturing process of ornament or artificial jewlery relief wall pointing - Google Patents
Manufacturing process of ornament or artificial jewlery relief wall pointing Download PDFInfo
- Publication number
- CN1597358A CN1597358A CN 200410071184 CN200410071184A CN1597358A CN 1597358 A CN1597358 A CN 1597358A CN 200410071184 CN200410071184 CN 200410071184 CN 200410071184 A CN200410071184 A CN 200410071184A CN 1597358 A CN1597358 A CN 1597358A
- Authority
- CN
- China
- Prior art keywords
- model
- add
- cured
- mold
- shade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
This invention relates to ornaments or relief fretwork on wall with artificial jewlries, which are produced by: perparing materials and casting in a short time and with low cost. They have various designs in size, color, shape and material, can be located anwhere, and are valuable for enjoy, collection and commercial development.
Description
Technical field
The present invention relates to the making construction method of ornaments or artificial jewlery relief wall pointing, belong to water mould, engraving, imitation fancy pearl material product field.
Existing jewelry is ring, bracelet, Xu vessel used to hold grain at the imperial sacrifice, and goods are frangible, and kind is single, so goods are not so good as Counterfeit Item and work with great care on sense organ, moulding and different, imitated vestige numerous in variety.
The purpose of this invention is to provide the process for making of ornaments or artificial jewlery relief wall pointing material and goods, goods obviously are better than existing goods, and the Counterfeit Item duration is short, and cost is low; Not being subjected to the restriction in environment, space, kind, specification, color, classification, traditional handicraft, material, environmental protection, market, is to have material and the goods of viewing and admiring, collect, develop value.
1) simulation:
(1) system wooden mold: timber is sawed, cuts, carves, bondd, the model that joggle becomes to adhere to specification;
(2) system plaster cast: gypsum is added 801 glue, mix well, water and be filled in, after solidifying it is engraved as the model that adheres to specification than in big 0.5~10 centimeter sylphon of model by the mixing of 100: 40~70 ratio;
(3) system mud model: the model that foundry loam or rubber cement kneading model are become to adhere to specification;
(4) engraving: work with great care according to layout;
(5) polishing: the corase grind machine, finish grind by hand, to the light cleaning;
(6) bonding: add talcum powder with 502 glue and add saw wood ash=100: 10~30: 10~30;
(7) play putty: add diluent with transparent resin and add curing agent=100: 10~30: 10~30;
(8) polishing: with the sand polishing, from thick number to thin number, to the light cleaning;
(9) go up cured: the floor is cured or mould is cured or the spray of table leather board is cured, brush or be sprayed on the model, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly.
2) system plane soft or hard mould:
(1) system sylphon: vary in size according to model, make the sylphon of different size;
(2) system soft mold: silicon rubber is added curing agent, mix well in 100: 5~20 ratio mixing, brush was being gone up on that cured half model;
(3) drying: dried in the shade slow curing 2~24 hours 1~2 hour;
(4) system hard mold: resin is added ketone slurry add and buy liquid and add talcum powder, ratio mixing in 100: 10~30: 10~30: 10~30 is mixed well, brush do not water gypsum mold half soft mold on, spread two layers of fine glass fibre cloth, again above-mentioned hybrid resin is brushed at fine glass fibre cloth, layer overlay thick glass fibre cloth waters above-mentioned hybrid resin and is filled on the thick glass fibre cloth till flood over half 0,5~10 centimeters of thick glass fibre cloth;
(5) drying: dried in the shade 10~30 minutes;
(6) die sinking tool: open box, remove tabula rasa, take out the model of the inside;
(7) upward cured; The floor is cured or mould is cured or table leather board spray is cured, brush or be sprayed on the soft or hard mould inner wall, to dry in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly;
3) system plane soft mold:
(1) system box: vary in size according to model, make different size, than model big 0.5 centimeter~10 centimeters sylphon;
(2) fixed model: model is placed on the tabula rasa, model bottom packing paper plate or fiberboard or plank or laminate, thickness determines what according to goods, goods fill up slab more, and goods fill up rich plate less, after fixing with 502 glue, again the sylphon of making is enclosed within on the model, fixes with 502 glue;
(3) system soft mold: silicon rubber is added curing agent, mix by 100: 5~20 ratio and mix well, water sylphon, till flooding 0.5~10 centimeter on model;
(4) drying: dried in the shade slow curing 2~24 hours 1~2 hour;
(5) die sinking tool: open box, remove tabula rasa, take out the model of the inside;
(6) go up cured: the floor is cured or mould is cured or it is cured to spray the spray of table leather board, brush or be sprayed on the soft mold, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly.
4) system imitation fancy pearl material: transparent resin is added diluent add curing agent and add required color=100: 10~30: 10~30: 10~30.
5) system imitation fancy pearl material and goods:
(1) mould: soft mold is put in the hard mold;
(2) goods: transparent resin is added diluent add curing agent and add required color, ratio mixing in 100: 10~30: 10~30: 10~30 is mixed well, water with vessel and to be filled in soft mold or soft or hard mould or hard mold or the gypsum mold, buckle the pressing mold tool, with the limit that a plurality of clips are clamped mould, above-mentioned hybrid resin can't be leached;
(3) drying: dry in the shade to just solidifying;
(4) die sinking tool: open mould, take out early-products;
(5) engraving: early-products is engraved as the goods that adhere to specification;
(6) cool off: goods are placed in the cold water soaked 30 minutes~1 hour;
(7) polishing: the corase grind machine, finish grind by hand, to the light cleaning;
(8) gluing: with above-mentioned mixed transparent resin goods are described repeatedly, till satisfied;
(9) drying: dried in the shade 10~30 minutes;
(10) japanning: with blowing varnish goods are sprayed repeatedly, dried in the shade 15~20 minutes, this step needs 2~3 times repeatedly.
Combination shaping:
(1) main body is shaped: the goods of making by above-mentioned same process method all are combined on the main body with methods such as perforating, bonding, vertebra connect, allow body reach design standard;
(2) engraving: adhesive has been carved, cleaned up;
(3) polishing: carry out with fine sandpaper, from thick number to thin number, to the light cleaning;
(4) gluing: with above-mentioned transparent hybrid resin goods are described, to the standard that adheres to specification;
(5) drying: dried in the shade 30 minutes~1 hour;
(6) drying: with being sprayed on the goods from spraying paint, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly;
With ornaments or the artificial jewlery relief wall pointing that above-mentioned process for making is finished, it is exquisite, elegant in appearance to do manual work, and is that the utmost point has material and the goods of viewing and admiring, collect, develop value.
The specific embodiment:
Introduce the step of making ornaments or artificial jewlery relief wall pointing material and goods of process provided by the present invention below.
Ornaments or artificial jewlery relief wall pointing profile: long * wide * high=0.98 meter * 0.68 meter * 0.78 meter
Basic pattern is the relief wall painting of the pattern that has together that the sworn brotherhood of the three Shu Han heroes in the Peach Garden.
1) simulation:
(1) system wooden mold: timber is sawed, cuts, carves, bondd, the model that joggle becomes to adhere to specification;
(2) system plaster cast: gypsum is added 801 glue, mix well, water and be filled in, after solidifying it is engraved as the model that adheres to specification than in big 0.5~10 centimeter sylphon of model by the mixing of 100: 40~70 ratio;
(3) system mud model: the model that foundry loam or rubber cement kneading model are become to adhere to specification;
(4) engraving: work with great care according to layout;
(5) polishing: the corase grind machine, finish grind by hand, to the light cleaning;
(6) bonding: add talcum powder with 502 glue and add saw wood ash=100: 10~30: 10~30;
(7) play putty: add diluent with transparent resin and add curing agent=100: 10~30: 10~30;
(8) polishing: with the sand polishing, from thick number to thin number, to the light cleaning;
(9) go up cured: the floor is cured or mould is cured or the spray of table leather board is cured, brush or be sprayed on the model, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly.
2) system plane soft or hard mould:
(1) system sylphon: vary in size according to model, make the sylphon of different size;
(2) system soft mold: silicon rubber is added curing agent, mix well in 100: 5~20 ratio mixing, brush was being gone up on that cured half model;
(3) drying: dried in the shade slow curing 2~24 hours 1~2 hour;
(4) system hard mold: resin is added ketone slurry add and buy liquid and add talcum powder, ratio mixing in 100: 10~30: 10~30: 10~30 is mixed well, brush do not water gypsum mold half soft mold on, spread two layers of fine glass fibre cloth, again above-mentioned hybrid resin is brushed at fine glass fibre cloth, layer overlay thick glass fibre cloth waters above-mentioned hybrid resin and is filled on the thick glass fibre cloth till flood over half 0,5~10 centimeters of thick glass fibre cloth;
(5) drying: dried in the shade 10~30 minutes;
(6) go up cured: analyse ground cured or mould is cured or the spray of table leather board is cured, brush or be sprayed on the soft or hard mould inner wall, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly;
3) system plane soft mold:
(1) system box: vary in size according to model, make different size, than model big 0.5 centimeter~10 centimeters sylphon;
(2) fixed model: model is placed on the tabula rasa, model bottom packing paper plate or fiberboard or plank or laminate, thickness determines what according to goods, goods fill up slab more, and goods fill up rich plate less, after fixing with 502 glue, again the sylphon of making is enclosed within on the model, fixes with 502 glue;
(3) system soft mold: silicon rubber is added curing agent, mix by 100: 5~20 ratio and mix well, water sylphon, till flooding 0.5~10 centimeter on model;
(4) drying: dried in the shade slow curing 2~24 hours 1~2 hour;
(5) die sinking tool: open box, remove tabula rasa, take out the model of the inside;
(6) go up cured: the floor is cured or mould is cured or it is cured to spray the spray of table leather board, brush or be sprayed on the soft mold, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly.
4) system imitation fancy pearl material: transparent resin is added diluent add curing agent and add required color=100: 10~30: 10~30: 10~30.
5) system imitation fancy pearl material and goods:
(1) mould: soft mold is put in the hard mold;
(2) goods: transparent resin is added diluent add curing agent and add required color, ratio mixing in 100: 10~30: 10~30: 10~30 is mixed well, water with vessel and to be filled in soft mold or soft or hard mould or hard mold or the gypsum mold, buckle the pressing mold tool, with the limit that a plurality of clips are clamped mould, above-mentioned hybrid resin can't be leached;
(3) drying: dry in the shade to just solidifying;
(4) die sinking tool: open mould, take out early-products;
(5) engraving: early-products is engraved as the goods that adhere to specification;
(6) cool off: goods are placed in the cold water soaked 30 minutes~1 hour;
(7) polishing: the corase grind machine, finish grind by hand, to the light cleaning;
(8) gluing: with above-mentioned mixed transparent resin goods are described repeatedly, till the standard that adheres to specification;
(9) drying: dried in the shade 10~30 minutes;
(11) japanning: with blowing varnish goods are sprayed repeatedly, dried in the shade 15~20 minutes, this step needs 2~3 times repeatedly.
Combination shaping 1:
(1) main body is shaped: by perforating bonding, joggle, grafting method, on main body, allow body reach design standard required article combination;
(2) engraving: adhesive has been carved, cleaned up;
(3) gluing, with above-mentioned mixed transparent resin to describing repeatedly on the goods, to the standard that adheres to specification;
(4) polishing: carry out with fine sandpaper, from thick number to thin number, to the light cleaning;
(5) drying: dried in the shade 30 minutes~1 hour;
(6) drying: with being sprayed on the duplicate from spraying paint, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly;
Claims (9)
1, the process for making of ornaments or artificial jewlery relief wall pointing, its particular-trade are to carry out according to the following steps:
1) simulation:
(1) system wooden mold: timber is sawed, cuts, carves, bondd, the model that joggle becomes to adhere to specification;
(2) system plaster cast: gypsum is added 801 glue, mix well, water and be filled in, after solidifying it is engraved as the model that adheres to specification than in big 0.5~10 centimeter sylphon of model by the mixing of 100: 40~70 ratio;
(3) system mud model: the model that foundry loam or rubber cement kneading model are become to adhere to specification;
(4) engraving: work with great care according to layout;
(5) polishing: the corase grind machine, finish grind by hand, to the light cleaning;
(6) bonding: add talcum powder with 502 glue and add saw wood ash=100: 10~30: 10~30;
(7) play putty: add diluent with transparent resin and add curing agent=100: 10~30: 10~30;
(8) polishing: with the sand polishing, from thick number to thin number, to the light cleaning;
(9) go up cured: the floor is cured or mould is cured or the spray of table leather board is cured, brush or be sprayed on the model, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly.
2) system plane soft or hard mould:
(1) system sylphon: vary in size according to model, make the sylphon of different size;
(2) system soft mold: silicon rubber is added curing agent, mix well in 100: 5~20 ratio mixing, brush was being gone up on that cured half model;
(3) drying: dried in the shade slow curing 2~24 hours 1~2 hour;
(4) system hard mold: resin is added ketone slurry add and buy liquid and add talcum powder, ratio mixing in 100: 10~30: 10~30: 10~30 is mixed well, brush do not water gypsum mold half soft mold on, spread two layers of fine glass fibre cloth, again above-mentioned hybrid resin is brushed at fine glass fibre cloth, layer overlay thick glass fibre cloth waters above-mentioned hybrid resin and is filled on the thick glass fibre cloth till flood over half 0,5~10 centimeters of thick glass fibre cloth;
(5) drying: dried in the shade 10~30 minutes;
(6) go up cured: analyse ground cured or mould is cured or the spray of table leather board is cured, brush or be sprayed on the soft or hard mould inner wall, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly;
3) system plane soft mold:
(1) system box: vary in size according to model, make different size, than model big 0.5 centimeter~10 centimeters sylphon;
(2) fixed model: model is placed on the tabula rasa, model bottom packing paper plate or fiberboard or plank or laminate, thickness determines what according to goods, goods fill up slab more, and goods fill up rich plate less, after fixing with 502 glue, again the sylphon of making is enclosed within on the model, fixes with 502 glue;
(3) system soft mold: silicon rubber is added curing agent, mix by 100: 5~20 ratio and mix well, water sylphon, till flooding 0.5~10 centimeter on model;
(4) drying: dried in the shade slow curing 2~24 hours 1~2 hour;
(5) die sinking tool: open box, remove tabula rasa, take out the model of the inside;
(6) go up cured: the floor is cured or mould is cured or it is cured to spray the spray of table leather board, brush or be sprayed on the soft mold, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly.
4) system imitation fancy pearl material: transparent resin is added diluent add curing agent and add required color=100: 10~30: 10~30: 10~30.
5) system imitation fancy pearl material and goods:
(1) mould: soft mold is put in the hard mold;
(2) goods: transparent resin is added diluent add curing agent and add required color, ratio mixing in 100: 10~30: 10~30: 10~30 is mixed well, water with vessel and to be filled in soft mold or soft or hard mould or hard mold or the gypsum mold, buckle the pressing mold tool, with the limit that a plurality of clips are clamped mould, above-mentioned hybrid resin can't be leached;
(3) drying: dry in the shade to just solidifying;
(4) die sinking tool: open mould, take out early-products;
(5) engraving: early-products is engraved as the goods that adhere to specification;
(6) cool off: goods are placed in the cold water soaked 30 minutes~1 hour;
(7) polishing: the corase grind machine, finish grind by hand, to the light cleaning;
(8) gluing: with above-mentioned mixed transparent resin goods are described repeatedly, till satisfied;
(9) drying: dried in the shade 10~30 minutes;
(1) japanning: with blowing varnish goods are sprayed repeatedly, dried in the shade 15~20 minutes, this step needs 2~3 times repeatedly.
Combination shaping 1:
(1) main body is shaped: by perforating bonding, joggle, grafting method, on main body, allow body reach design standard required article combination;
(2) engraving: adhesive has been carved, cleaned up;
(3) gluing adds diluent with transparent resin and adds curing agent and add required color mixture and mix well, and describes repeatedly on goods, to the effect that adheres to specification;
(4) polishing: carry out with fine sandpaper, from thick number to thin number, to the light cleaning;
(5) drying: dried in the shade 30 minutes~1 hour;
(6) drying: with being sprayed on the duplicate from spraying paint, dried in the shade 15~20 minutes, this step need be carried out 2~3 times repeatedly;
2, model: the preparation method of ornaments according to claim 1 or artificial jade relief wall painting is characterized in that described cast material is that wood, 801 glue add the shape that land plaster=100: 40~70 or foundry loam, rubber sculpture become designing requirement.
3, main body bonding: the preparation method of ornaments according to claim 1 or artificial jewlery relief wall pointing is characterized in that described binding material is that 302 glue or 502 glue add talcum powder and add saw wood ash=100: 10~30: 10~30.
4, moulding: the method for manufacturing technology of ornaments according to claim 1 or artificial jewlery relief wall pointing is characterized in that described Modeling Material is reinforcing bar or steel pipe or iron wire or iron pipe or iron nail or fastener or copper wire or copper pipe.
5, putty: ornaments according to claim 1 or artificial jewlery relief wall pointing process for making, it is characterized in that described putty material is that transparent resin adds diluent and adds curing agent and add talcum powder and add required color=100: 10~30: 10~30: 10~30: 10~30 or atom ash and add curing agent and add required color=100: 10~30: 10~30.
6, soft mold: the process for making of ornaments according to claim 1 or artificial jewlery relief wall pointing is characterized in that described soft model material is that silicon rubber adds curing agent=100: 5~20.
7, hard mold and hollow mould: the process for making of ornaments according to claim 1 or artificial jewlery relief wall pointing, it is characterized in that described hard mold and hollow mould material are that resin adds ketone slurry and adds and buy liquid and add talcum powder=100: 10~30: 10~30: 10~30 and add two layers of fine glass fibre cloth, one deck thick glass fibre cloth.
8, imitation fancy pearl: the process for making of ornaments according to claim 1 or artificial jewlery relief wall pointing is characterized in that described jewelry material is that transparent resin adds diluent and adds curing agent and add required color=100: 10~30: 10~30: 10~30.
9, go up coloring agent: the process for making of ornaments according to claim 1 or artificial jewlery relief wall pointing is characterized in that described coloring agent material is that transparent resin adds diluent and adds curing agent and add required color.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200410071184 CN1597358A (en) | 2004-08-02 | 2004-08-02 | Manufacturing process of ornament or artificial jewlery relief wall pointing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200410071184 CN1597358A (en) | 2004-08-02 | 2004-08-02 | Manufacturing process of ornament or artificial jewlery relief wall pointing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1597358A true CN1597358A (en) | 2005-03-23 |
Family
ID=34666812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200410071184 Pending CN1597358A (en) | 2004-08-02 | 2004-08-02 | Manufacturing process of ornament or artificial jewlery relief wall pointing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1597358A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108189287A (en) * | 2018-03-13 | 2018-06-22 | 深圳市石上清庭珠宝有限公司 | A kind of emulation animals and plants jewelry processing method |
-
2004
- 2004-08-02 CN CN 200410071184 patent/CN1597358A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108189287A (en) * | 2018-03-13 | 2018-06-22 | 深圳市石上清庭珠宝有限公司 | A kind of emulation animals and plants jewelry processing method |
WO2019174128A1 (en) * | 2018-03-13 | 2019-09-19 | 深圳市石上清庭珠宝有限公司 | Processing method for jewels imitating animals and plants |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH03504488A (en) | Artificial stones and their manufacturing methods and uses | |
CN1332090A (en) | Making process of imitation karst cave landscape | |
CN1363475A (en) | Artificial carved stone ornament | |
CN1586922A (en) | Process for making artificial natural landscape stalactite karst cave | |
CN1597360A (en) | Manufacturing process of ornament or artificial quartz crystal relief wall painting | |
CN1597358A (en) | Manufacturing process of ornament or artificial jewlery relief wall pointing | |
CN1586918A (en) | Process for producing ornaments or artificial white marbe relief screen | |
RU2452715C1 (en) | Method to make decorative items with filler from amber and/or wastes of its processing (versions) | |
CN1586920A (en) | Process for making artificial natural landscape color sand forest | |
CN1586919A (en) | Process for making artificial natural landscape weathered stone hill | |
CN1597359A (en) | Manufacturing process of ornament or artificial jade relief wall painting | |
CN1597361A (en) | Manufacturing process ornament or artificial jadite relief wall painting | |
CN1597356A (en) | Manufacturing process of ornament or artificial agate relief wall painting | |
CN1600580A (en) | Technical method for fabricating ornamental article or artificial white marble boss fresco | |
CN1586928A (en) | Process for making ornament or artificial jade relief carve ancient furniture | |
CN1597353A (en) | Manufacturing process and method of ornament or artificial white marble relief clossical furniture | |
CN1597364A (en) | Manufacturing process of ornament or artificial red sandal wood relief classic furniture | |
CN1597365A (en) | Manufacturing process of ornament or artificial red sandal wood relief screen | |
CN1586923A (en) | Process for making artificial natural landscape white marble stone hill | |
CN1597354A (en) | Manufacturing process of artificial natural scene amethyst rockwork | |
CN1586911A (en) | Process for producing artistic building or artificial crystal palace | |
CN1597362A (en) | Manufacturing process of ornament or artificial jewelry relief classic furniture | |
CN1597367A (en) | Manufacturing process of ornament or artificial jade relief screen | |
CN1597366A (en) | Manufacturing process of ornament or artificial pearls and jewels relief screen | |
CN1597363A (en) | Manufacturing process of ornament or artificial jadite relief classic furniture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Li Cuihua Document name: Notification before expiration of term |
|
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Li Cuihua Document name: Deemed as a notice of withdrawal |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |