Prior art keywords
energy
heat
storing
cold
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2004100190727A
Other languages
Chinese (zh)
Other versions
CN1285875C (en
Inventor
赵力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinoma Energy Conservation Ltd
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CNB2004100190727A priority Critical patent/CN1285875C/en
Publication of CN1570536A publication Critical patent/CN1570536A/en
Application granted granted Critical
Publication of CN1285875C publication Critical patent/CN1285875C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/14Thermal energy storage

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The invention relates to the energy-storing technology with phase-changing. This phase-changing energy-storing system is composed of the implement for cold-producing and heating 1, equipment for energy-storing 2, recurring pump 3 and energy-exchanging facilities 4, etc. The circulating medium for phase-changing in the energy-storing equipment is NO2, with mole concentration 100%. Beside the energy-storing room the medium is glycol. The transformation of energy-storing and energy- releasing is completed through the changing of the valve. The advantages of this invention are that: it can be used for cold-producing in summer and heating in the winner; and compared to the air conditioning system by ice-making that only works in the summer, it increases the efficiency of the system, shortens the recycling of the investment, saves more the power rate and reduces energy-storing equipment.

Description

A kind of phase-changing energy-storing system
Technical field
The invention belongs to field of air conditioning, be specifically related to have the energy accumulating technique of phase transformation.
Background technology
Along with China's rapid development of economy, for balanced network load, the time-of-use tariffs of each big and medium-sized cities are than more and more high generally all more than 3: 1, be that the peak value period, (various places power office regulation differed, be generally daytime) electricity price be that the valley period (night) is more than 3 times, therefore can utilize the cheap condition of electricity consumption at night to carry out accumulation of energy, the air-conditioning unit be disconnected the energy that discharges the storage at night during peak of power consumption by day.Energy-storage air conditioner system helps the peak load shifting of electric load, reduces the construction of peak load stations, is an economy, environmental protection, energy-saving technology from macroscopic view.At present in the various energy accumulation air conditioner technology that China adopts, the cold-storage technology has accounted for great majority (utilize ice, water usually or be total to dissolved salt and finish), and heat storage technology is used less (being finished by water or paraffin usually), they only use in a certain season (summer or winter) in every year usually, for example: the Beijing area chilling air conditioning system generally moves in 5-9 month, satisfy the requirement of refrigeration in summer, then stop using winter; Running time at southern cold accumulation air-conditioner is longer relatively, but generally also has only the service time about 6 months.For systems for air conditioning, the time of operation is just shorter, and this just along having grown the time limit that investment is reclaimed, has increased the risk of investment.Though the water energy accumulating technique can satisfy the requirement of cold-storage, accumulation of heat simultaneously, along the service time of having grown system, it is to utilize the sensible heat of water to finish storing of energy, require the volume of catch basin very big, heat loss is big, has increased initial cost and running cost, and common buildings is difficult to realize.Suitable accumulation of energy material is the key that constitutes energy-storage system, and seeking novel accumulation of energy material becomes everybody institute's pursuing target naturally.For overcoming the above problems, the present invention intends adopting a kind of cheapness, is easy to get, helps environmental protection and has the suitable molten point and the accumulation of energy material of boiling point, utilize the latent heat of liquefaction of this material and the latent heat of vaporization to finish cold-storage and heat-accumulating process in the energy-storage system, just can reduce to deposit the volume of accumulation of energy material equipment greatly, and can ensure two the season operation uses of this energy-storage system in 1 year, be convenient to recoup capital outlay quickly, reduce risk.
Summary of the invention
The purpose of this invention is to provide a kind of phase-changing energy-storing system that has new working medium.
The present invention is achieved by the following technical programs.With reference to accompanying drawing phase-changing energy-storing system, have Cooling and Heat Source equipment 1, energy storage system 2, circulating pump 3 and heat-exchange apparatus 4 etc., in energy storage system 2, placed phase-changing energy-storing working medium nitrogen dioxide, its molar concentration is 100%.At the used cycle fluid of accumulation of energy side is ethylene glycol, finishes conversion between accumulation of energy, the exoergic by the switching of valve.During accumulation of energy valve 5-1,5-3 and 5-5 are closed, valve 5-2,5-4 and 5-6 open, and constitute the circulatory system by cold (heat) source device 1, energy storage system 2, circulating pump 3-1 and valve 5-2, by cold (heat) source 1 constantly to energy storage system 2 accumulation of energys.During exoergic valve 5-2,5-4,5-5 are closed, valve 5-1,5-3 and 5-6 open, promptly disconnect Cooling and Heat Source equipment 1, constitute the circulatory system, provide cold (heat) amount to the user by heat-exchange apparatus 4 and circulating pump 3-2 by energy storage system 2, circulating pump 3-1 and heat-exchange apparatus 4.Under the cool-storage in summer operating mode, cold source equipment is exported the aqueous solution (mass concentration is 30%) of-15 ℃ ethylene glycol, is-11.2 ℃ nitrogen dioxide curing cold-storage with molten point; Under accumulation of heat in the winter operating mode, heat resource equipment is exported 45 ℃ glycol water, is 21.1 ℃ nitrogen dioxide vaporization accumulation of heat with boiling point.Latent heat of liquefaction under the nitrogen dioxide normal pressure is 3.501kcal/mol (latent heat of liquefaction of water is 1.436kcal/mol), and the latent heat of vaporization is 9.11kcal/mol (latent heat of vaporization of water is 9.717kcal/mol), is easy to obtain, and is cheap.
The effect that the present invention produced is: this system both can move at cool-storage in summer, and also regenerative operation is in the winter time compared ice-chilling air conditioning system (can only at summer operation) and improved system availability, has shortened the investment payback time, has reduced investment risk.Because the accumulation of energy matter utilization latent heat of phase change of this system carries out cold-storage and accumulation of heat, compare water energy-storage system and can only utilize sensible heat to carry out cold-storage and accumulation of heat, use nitrogen dioxide will significantly reduce as this system's floor space of accumulation of energy material, adaptability is stronger.The present invention can unify to seal up for safekeeping to a large amount of harmful substances (nitrogen dioxide) in addition, and centralized management has reduced such harmful substance in the environment, has improved environmental quality.
Description of drawings
Accompanying drawing is work system figure of the present invention.Circulating pump 3-1 is an eg pump among the figure, and circulating pump 3-2 is a water pump.
The specific embodiment
Present embodiment is with 10000m 2Office building is an example.It is the screw type source pump of 250kW that cold (heat) source device 1 is selected input power for use, and nitrogen dioxide solution is poured in the spheroid that organic material makes, and the diameter of spheroid is 12~15 centimetres of sealings, and these spheroids are put in the energy storage system 2.Nitrogen dioxide solution can directly be buied from the manufacturer of nitric acid.Refrigeration duty is 1000kW, and thermic load is 600kW, and the heat exchange area of heat transmission equipment 4 is 100m 2, the flow of circulating pump 3-2 is 50kg/s, the flow of circulating pump 3-1 is 50kg/s.During accumulation of energy valve 5-1,5-3 and 5-5 are closed, valve 5-2,5-4 and 5-6 open, constitute the circulatory system by cold (heat) source device 1, energy storage system 2, circulating pump 3-1 and valve 5-2, by cold (heat) source 1 constantly to energy storage system 2 accumulation of energys, cold-storage operating mode cold storage capacity is 8000kW.h, and accumulation of heat operating mode amount of stored heat is 4800kW.h.During exoergic valve 5-2,5-4,5-5 are closed, valve 5-1,5-3 and 5-6 open, promptly disconnect Cooling and Heat Source equipment 1, constitute the circulatory system by energy storage system 2, circulating pump 3-1 and heat-exchange apparatus 4, provide 8000kW.h cold or 4800kW.h heat by heat-exchange apparatus 4 and circulating pump 3-2 to the user, satisfy the hot and cold amount demand of 8 hours this building peak value periods.
When energy storage system 2 maintenance,,, satisfy user's hot and cold load with the circulatory mediator heat-shift of opposite side with relying on Cooling and Heat Source equipment 1 directly the cycle fluid of low temperature or high temperature to be transported to heat exchanger 4.Under this operating mode: valve 5-2,5-3 and 5-6 close, and valve 5-1,5-4 and 5-5 open.
This phase-changing energy-storing system utilizes the heat of solution low power consumption period (being the valley electricity price) of phase-changing energy-storing material to store cold, the electricity consumption peak value period (electricity price and flat value electricity price during the peak) to user's cooling; Utilize the heat of vaporization of phase-changing energy-storing material to store heat in the low power consumption period (being the valley electricity price), the electricity consumption peak value period (electricity price and flat value electricity price during the peak) to user's heat supply, thereby realize the annual purpose of saving more electricity charge and reducing the energy storage system volume.

Claims (1)

1. phase-changing energy-storing system, have Cooling and Heat Source equipment (1), energy storage system (2), circulating pump (3) and heat-exchange apparatus (4) etc., it is characterized in that having placed phase-changing energy-storing working medium nitrogen dioxide in energy storage system (2), the nitrogen dioxide molar concentration is 100%.
CNB2004100190727A 2004-04-23 2004-04-23 Phase transformation heat accumulation system Expired - Lifetime CN1285875C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100190727A CN1285875C (en) 2004-04-23 2004-04-23 Phase transformation heat accumulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100190727A CN1285875C (en) 2004-04-23 2004-04-23 Phase transformation heat accumulation system

Publications (2)

Publication Number Publication Date
CN1570536A true CN1570536A (en) 2005-01-26
CN1285875C CN1285875C (en) 2006-11-22

Family

ID=34479627

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100190727A Expired - Lifetime CN1285875C (en) 2004-04-23 2004-04-23 Phase transformation heat accumulation system

Country Status (1)

Country Link
CN (1) CN1285875C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968328A (en) * 2010-09-29 2011-02-09 北京建筑工程学院 Phase-change energy storage device
CN102607310A (en) * 2012-04-01 2012-07-25 昆明理工大学 Transporting utilizing method of low-temperature excess heat of iron and steel enterprises
CN103644612A (en) * 2013-12-10 2014-03-19 重庆大学 Heat source tower heat pump air-conditioning system capable of using cool storage device to assist heating

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968328A (en) * 2010-09-29 2011-02-09 北京建筑工程学院 Phase-change energy storage device
CN102607310A (en) * 2012-04-01 2012-07-25 昆明理工大学 Transporting utilizing method of low-temperature excess heat of iron and steel enterprises
CN103644612A (en) * 2013-12-10 2014-03-19 重庆大学 Heat source tower heat pump air-conditioning system capable of using cool storage device to assist heating

Also Published As

Publication number Publication date
CN1285875C (en) 2006-11-22

Similar Documents

Publication Publication Date Title
CN107270580B (en) Cold and hot confession system that allies oneself with of compound solar energy collection of energy storage type and heat pump
CN201344597Y (en) Energy storage air-conditioning system
CN202420029U (en) Air-conditioning water heater with phase change energy storage function
CN106225043A (en) Heat pump and heating system
CN205717678U (en) A kind of ice storage cold-hot pump system
CN108870598A (en) A kind of separate heat pipe energy-storage air conditioner system
CN201476402U (en) Combined refrigerating or heating system
CN101000166A (en) Small multifunction solar energy-storage air conditioner
CN201032233Y (en) Cold and heat storage type ground source heat pump central air conditioner
CN201218577Y (en) Exhaust heat recovery and cold accumulation apparatus
CN103148554A (en) Water cold accumulating and ice crystal cold accumulating parallel central air conditioning system and running method thereof
CN201203296Y (en) Ground source heat pump air conditioner / refrigeration composite system
CN102261706A (en) Natural cold source multi-temperature-level cold accumulation system based on heat pipe
CN103673116B (en) A kind of energy-storage type fluorine pump heat pipe system and control method thereof
CN102937315A (en) Refrigeration and cold accumulation system
CN108895587B (en) Series-parallel connection heat pump double-storage energy supply system
CN201764712U (en) Phase-transition heat-accumulation type solar water heating apparatus with auxiliary air source heat pump
CN202902525U (en) Ice storage and water thermal storage system
CN203518337U (en) Efficient buried pipe heat exchange system of ground source heat pump central air conditioner
CN203147942U (en) Ground source heat pump hybrid air conditioning system
CN208652779U (en) A kind of power supply device of water accumulation of heat in conjunction with ice ball type ice storage
CN209295316U (en) A kind of series-parallel heat pump is double to store energy supplying system
CN1285875C (en) Phase transformation heat accumulation system
CN111928389A (en) Efficient cold and heat supply system based on combined operation of heat source tower and ice cold accumulation
CN203687197U (en) Energy-storage fluorine pump heat pipe system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOMA ENERGY DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: TIANJIN UNIVERSITY

Effective date: 20081107

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081107

Address after: Torch Hotel, 5 Huaihe Road, Beichen science and Technology Park, Tianjin,

Patentee after: Sinoma Energy Conservation Ltd.

Address before: Nankai District Wei Jin Road, Tianjin City No. 92

Patentee before: Tianjin University

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Wei Lianyou

Document name: Notification of Termination of Patent Right

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 300400 Tianjin city Beichen District Longzhou Road No. 1 Beichen building

Patentee after: Sinoma Energy Conservation Ltd.

Address before: 300072 Torch Hotel, 5 Huaihe Road, Beichen Science Park, Tianjin,

Patentee before: Sinoma Energy Conservation Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 300400 Tianjin city Beichen District Longzhou Road No. 1 Beichen building

Patentee after: Sinoma Energy Conservation Ltd.

Address before: 300400 Tianjin city Beichen District Longzhou Road No. 1 Beichen building

Patentee before: Sinoma Energy Conservation Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20061122