CN1570278A - 拱桥预应力结构 - Google Patents

拱桥预应力结构 Download PDF

Info

Publication number
CN1570278A
CN1570278A CN 200410026151 CN200410026151A CN1570278A CN 1570278 A CN1570278 A CN 1570278A CN 200410026151 CN200410026151 CN 200410026151 CN 200410026151 A CN200410026151 A CN 200410026151A CN 1570278 A CN1570278 A CN 1570278A
Authority
CN
China
Prior art keywords
arch rib
old
new
stressed
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410026151
Other languages
English (en)
Other versions
CN1274907C (zh
Inventor
宋彧
项长生
王龙
党星海
罗维刚
杨文侠
曹辉
李恒堂
衡涛
王剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou University of Technology
Original Assignee
Lanzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University of Technology filed Critical Lanzhou University of Technology
Priority to CN 200410026151 priority Critical patent/CN1274907C/zh
Publication of CN1570278A publication Critical patent/CN1570278A/zh
Application granted granted Critical
Publication of CN1274907C publication Critical patent/CN1274907C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

拱桥预应力结构,其目的是通过预应力器在拱桥的新旧拱肋之间施加预应力,对拱桥的旧拱肋起到减负和加固的作用,设置在拱桥的旧拱肋之下,旧拱肋与新拱肋之间在垂直方向上有一间隙,在旧拱肋与新拱肋之间设有预应力加载器,预应力加载器上的螺杆有一部分插在与新拱肋固定连接的钢管中,旋转预应力加载器上的螺母,使螺杆升长,顶上垫板,螺母压下垫板,即通过预应力加载器依靠新拱肋托起旧拱肋。

Description

拱桥预应力结构
技术领域
本发明涉及以结构为特征的桥梁。
背景技术
目前,对拱桥结构加固的主要方法是增大拱肋的截面面积,该方法对增加原有结构的承载能力有积极的一面,也存在以下几个方面的不足:
1、增加拱肋截面面积,相当于增加原有拱桥结构的负荷;
2、新旧结构不能共同协调工作。新结构在施工完成时,不能立即承受荷载,只有当旧结构在荷载作用下继续变形后,新结构才能承担旧结构的一部分荷载,参与工作。新结构参与工作的前提就是旧结构继续变形,旧结构的继续变形加剧了结构的危险性。
3、为了加强新旧结构的连接,施工时对旧结构有一定的损伤;
4、施工难度大;
5、施工时阻断交通。
发明内容
本发明的目的是通过预应力器在拱桥的新旧拱肋之间施加预应力,对拱桥的旧拱肋起到减负和加固的作用。
本发明是拱桥预应力结构,设置在拱桥的旧拱肋(1)之下,旧拱肋(1)与新拱肋(3)之间在垂直方向上有一间隙,在旧拱肋(1)与新拱肋(3)之间设有预应力加载器(2),预应力加载器(2)上的螺杆(6)的下端插在与新拱肋(3)固定连接的钢管(9)中,旋转预应力加载器(2)上的螺母(7),使螺杆(6)升长,顶上垫板(5),螺母(7)压下垫板(8),即通过预应力加载器(2)依靠新拱肋(3)托起旧拱肋(1)。
本发明的有益效果是:对旧拱肋(1)不产生新的负荷,新旧拱肋能够立即共同协调作,施工过程对旧拱肋(1)没有任何损伤,结构简单,施工难度小,施工时不阻断交通。
附图说明
图1是现有技术拱桥加固技术的原理图。
图2是本发明的原理图。
图3是本发明的预应力加载器的结构图。
具体实施方式
如图2所示,本发明在拱桥的旧拱肋(1)的下方增设一道新拱肋(3),在垂直方向上新旧拱肋之间有一定尺寸的间隙,在间隙中安放一定数量的预应力加载器(2),操作预应力加载器(2),依靠旧拱肋(1)给新拱肋(3)垂直加载,同时新拱肋(3)托起旧拱肋(1),从而达到对旧拱肋(1)的减负与加固的作用。
如图3所示,预应力加载器(2)上的螺杆(6)的下端插在与新拱肋(3)固定连接的钢管(9)中,旋转预应力加载器(2)上的螺母(7),使螺杆(6)升长,顶上垫板(5),螺母(7)压下垫板(8),即通过预应力加载器(2)依靠新拱肋(3)托起旧拱肋(1),从而达到对旧拱肋(1)的减负与加固的作用。
本发明的优点是:
1、对原有拱肋没有产生新的负荷;
2、新旧结构能够立即共同协调工作。新结构的施工过程是对旧结构的托起过程,或是对旧结构的减负过程,新结构完成后,旧结构产生一定的负挠度,或旧结构已经被新结构托起,新旧结构从此协调工作。
3、施工过程对旧结构没有任何损伤。
4、结构简单,施工难度小。
5、施工时不阻断交通。

Claims (1)

1、拱桥预应力结构,设置在拱桥的旧拱肋(1)之下,其特征在于旧拱肋(1)与新拱肋(3)之间在垂直方向上有一间隙,在旧拱肋(1)与新拱肋(3)之间设有预应力加载器(2),预应力加载器(2)上的螺杆(6)的下端插在与新拱肋(3)固定连接的钢管(9)中,旋转预应力加载器(2)上的螺母(7),使螺杆(6)升长,顶上垫板(5),螺母(7)压下垫板(8),即通过预应力加载器(2)依靠新拱肋(3)托起旧拱肋(1)。
CN 200410026151 2004-05-12 2004-05-12 拱桥预应力结构 Expired - Fee Related CN1274907C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410026151 CN1274907C (zh) 2004-05-12 2004-05-12 拱桥预应力结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410026151 CN1274907C (zh) 2004-05-12 2004-05-12 拱桥预应力结构

Publications (2)

Publication Number Publication Date
CN1570278A true CN1570278A (zh) 2005-01-26
CN1274907C CN1274907C (zh) 2006-09-13

Family

ID=34480602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410026151 Expired - Fee Related CN1274907C (zh) 2004-05-12 2004-05-12 拱桥预应力结构

Country Status (1)

Country Link
CN (1) CN1274907C (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100357524C (zh) * 2005-09-26 2007-12-26 重庆交通学院 一种对大跨度坦拱桥进行加固的方法
CN110258366A (zh) * 2019-07-02 2019-09-20 重庆交通大学 采用装配式施工、可主动承载的拱桥加固方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100357524C (zh) * 2005-09-26 2007-12-26 重庆交通学院 一种对大跨度坦拱桥进行加固的方法
CN110258366A (zh) * 2019-07-02 2019-09-20 重庆交通大学 采用装配式施工、可主动承载的拱桥加固方法
CN110258366B (zh) * 2019-07-02 2021-01-12 重庆交通大学 采用装配式施工、可主动承载的拱桥加固方法

Also Published As

Publication number Publication date
CN1274907C (zh) 2006-09-13

Similar Documents

Publication Publication Date Title
CN1876995A (zh) 混凝土结构整体免拆模浇筑体系及其施工方法
CN1974931A (zh) 箱型底板预应力混凝土变截面箱梁桥及其施工方法
CN2799708Y (zh) 一种预应力钢结构门式刚架
CN1570278A (zh) 拱桥预应力结构
CN107804016A (zh) 一种废旧油漆桶回收装置
CN1974930A (zh) 底板索水平布置预应力混凝土变截面箱梁桥及其施工方法
CN101067319A (zh) 一种钢筋砼预制板
CN107558598A (zh) 下开式堰门系统及下开式堰门安装方法
CN201649303U (zh) 一种剪力连接件
CN206622546U (zh) 一种使用便捷的钢筋折弯机
CN1876996A (zh) 整体浇筑免拆模混凝土结构体系及其施工方法
CN206844127U (zh) 一种陡峭边坡强制式拉模
CN1279258C (zh) 高强混凝土外包薄层及其对柱的加固方法
CN200967239Y (zh) 箱梁全自动液压内模
CN205324557U (zh) 平面钢筋桁架全自动折弯机构
CN1974929A (zh) 内置斜腿刚架预应力混凝土变截面箱梁桥及其施工方法
CN210636595U (zh) 一种钢筋桁架楼承板与预制叠合梁连接结构
CN208844443U (zh) 一种基于拱的箱型梁加固结构
CN1250823C (zh) 大直径薄壁管桩(pbp)复合地基加固软基的方法
CN204277721U (zh) 一种去锈导向装置
CN101736815A (zh) 一种剪力连接件
CN2673997Y (zh) 模板卡
CN2658264Y (zh) 竖向预应力锚具
CN217191861U (zh) 一种用于钢结构生产的折弯装置
CN211138227U (zh) 建筑垃圾压缩装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee