CN1560381A - Steel structural locking shaft beam and method of suporting protecting founddation pits using it - Google Patents

Steel structural locking shaft beam and method of suporting protecting founddation pits using it Download PDF

Info

Publication number
CN1560381A
CN1560381A CNA2004100128251A CN200410012825A CN1560381A CN 1560381 A CN1560381 A CN 1560381A CN A2004100128251 A CNA2004100128251 A CN A2004100128251A CN 200410012825 A CN200410012825 A CN 200410012825A CN 1560381 A CN1560381 A CN 1560381A
Authority
CN
China
Prior art keywords
shaft beam
fore shaft
steel work
founddation
suporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2004100128251A
Other languages
Chinese (zh)
Other versions
CN1239787C (en
Inventor
平 王
王平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410012825 priority Critical patent/CN1239787C/en
Publication of CN1560381A publication Critical patent/CN1560381A/en
Application granted granted Critical
Publication of CN1239787C publication Critical patent/CN1239787C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention is a constructing method for supporting the ground pit by using the steel structure collar beam, which includes following steps: (1) constructs the stress mechanism for resisting the lateral force of the ground pit according to the design demands; (2) the steel structure collar beam is arranged on top or the side surface of the stress mechanism; (3) digs the ground pit. The invention has simple process, short period, high efficiency, the contamination to environment can be reduced.

Description

Steel work fore shaft beam and utilize it to carry out the method for pattern foundation pit supporting structure
Technical field
The present invention relates to fore shaft fine strain of millet and method thereof in building and the building engineering field pattern foundation pit supporting structure,
Specifically a kind of steel work fore shaft beam and utilize it to carry out the method for pattern foundation pit supporting structure.
Background technology
At present, in building and building engineering field, foundation pit support construction adopts steel reinforced concrete fore shaft beam (Guan Liang) to construct often, and there are some problems in steel reinforced concrete fore shaft beam in this method (Guan Liang):
1. because fore shaft beam (Guan Liang) is a reinforced concrete structure, so the program of its construction or operation are soil excavation → formwork → reinforcement fabrication colligation → concreting → form removals.There is the problem that operation is many, cost is high, long in time limit in this method.
2. because traditional fore shaft beam adopts reinforced concrete structure, determined that its access times are disposable, can't reuse that therefore, its cost is higher, especially the section of fore shaft beam and arrangement of reinforcement are all very big, and cost is often high.
3. when traditional steel reinforced concrete fore shaft beam need be removed, engineering quantity was very big on the one hand, and difficulty is also very big, and the also corresponding raising of cost on the other hand, also needs the place to stack and processing after the dismounting, also do not meet the environmental protection policy of country.
Summary of the invention
One of purpose of the present invention is in order to solve the problem that the above-mentioned background technology exists, to propose a kind of steel work fore shaft beam, making it have easy for installation, the reusable effect of energy.
For achieving the above object, the present invention adopts following technical scheme: a kind of steel work fore shaft beam is characterized in that fore shaft beam adopts steel structure member to make.
Can link to each other by linkage between the above-mentioned steel structure member.
Two of purpose of the present invention is in order to solve the problem that the above-mentioned background technology exists, and proposes a kind ofly to utilize above-mentioned steel work fore shaft beam to carry out the method for pattern foundation pit supporting structure.Make that it has that operation is few, the duration is short, construction is simple, effect is high, cost is low, reduce the effect to the pollution of environment.
For achieving the above object, the present invention adopts following technical scheme:
A kind ofly utilize above-mentioned steel work fore shaft beam to carry out the method for pattern foundation pit supporting structure, comprise the steps:
(1) resists the primary structure member of foundation ditch lateral force by the designing requirement construction;
(2) in the upper end or the side of above-mentioned primary structure member the steel work fore shaft beam is installed;
(3) excavation pit.
The present invention has following advantage:
1. because the steel work fore shaft beam is a member capable of being combined, adopt compound mode to connect, easy construction, operation is few, the duration is short.
2. the steel work fore shaft beam can be reused, and cost is low, has more the market competitiveness.
3. adopt the steel work fore shaft beam, because its reusable characteristics are not polluted environment.
Description of drawings
Fig. 1 is a steel work fore shaft beam schematic diagram among the embodiment 1.
Fig. 2 is a steel work fore shaft beam schematic diagram among the embodiment 2.
Fig. 3 is a steel work fore shaft beam schematic diagram among the embodiment 3.
Fig. 4 is a steel work fore shaft beam schematic diagram among the embodiment 4.
Fig. 5 is the pattern foundation pit supporting structure generalized section.
The specific embodiment
Embodiment 1: with reference to Fig. 1, Fig. 5, the base pit stand construction of present embodiment is as follows:
(1) excavation foundation trench;
(2) construct in foundation trench according to designing requirement and lead wall;
(3) construction campshed or diaphragm wall or steel work soldier pile 1;
(4) wait to lead the wall effect and finish after, remove and lead wall;
(5) in the upper end or the side of campshed or diaphragm wall or steel work soldier pile 1 steel work fore shaft beam 2 is installed, this fore shaft beam 2 usefulness fore shaft fine strain of millet member 2-1 and steel structure connecting member 2-2 are connected and form.
Embodiment 2: with reference to Fig. 2, Fig. 5, the base pit stand construction of present embodiment is identical with embodiment 1.
Embodiment 3: with reference to Fig. 3, Fig. 5, the base pit stand construction of present embodiment is identical with embodiment 1.
Embodiment 4: with reference to Fig. 4, Fig. 5, the base pit stand construction of present embodiment is identical with embodiment 1.
In Fig. 5, the absolute altitude position of fore shaft fine strain of millet can be located at nature ground more than 3, natural ground or natural below ground as the case may be.At the bottom of the piece number 4 expression foundation ditches.Primary structure member (campshed or diaphragm wall or steel work soldier pile 1) is used to resist the foundation ditch lateral force.

Claims (3)

1, a kind of steel work fore shaft beam is characterized in that fore shaft beam adopts steel structure member to make.
2,, it is characterized in that linking to each other by linkage between the described steel structure member according to the described steel work fore shaft beam of claim 1.
3, a kind of job practices of utilizing the described steel work fore shaft beam of claim 1 to carry out pattern foundation pit supporting structure comprises the steps:
(1) resists the primary structure member of foundation ditch lateral force by the designing requirement construction;
(2) in the upper end or the side of above-mentioned primary structure member the steel work fore shaft beam is installed;
(3) excavation pit.
CN 200410012825 2004-03-08 2004-03-08 Steel structural locking shaft beam and method of suporting protecting founddation pits using it Expired - Fee Related CN1239787C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410012825 CN1239787C (en) 2004-03-08 2004-03-08 Steel structural locking shaft beam and method of suporting protecting founddation pits using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410012825 CN1239787C (en) 2004-03-08 2004-03-08 Steel structural locking shaft beam and method of suporting protecting founddation pits using it

Publications (2)

Publication Number Publication Date
CN1560381A true CN1560381A (en) 2005-01-05
CN1239787C CN1239787C (en) 2006-02-01

Family

ID=34440118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410012825 Expired - Fee Related CN1239787C (en) 2004-03-08 2004-03-08 Steel structural locking shaft beam and method of suporting protecting founddation pits using it

Country Status (1)

Country Link
CN (1) CN1239787C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155554A (en) * 2015-09-25 2015-12-16 武汉高铁桩工科技有限公司 Deep foundation pit of arched supporting system
CN110080775A (en) * 2019-04-30 2019-08-02 中交第三航务工程局有限公司宁波分公司 Complex environment digs a well basic microvariations excavation method
CN115125961A (en) * 2021-03-25 2022-09-30 江苏华岩建设有限公司 Assembled concrete section steel combination beam and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155554A (en) * 2015-09-25 2015-12-16 武汉高铁桩工科技有限公司 Deep foundation pit of arched supporting system
CN105155554B (en) * 2015-09-25 2017-12-05 武汉谦诚桩工科技股份有限公司 A kind of deep basal pit of arching system
CN110080775A (en) * 2019-04-30 2019-08-02 中交第三航务工程局有限公司宁波分公司 Complex environment digs a well basic microvariations excavation method
CN115125961A (en) * 2021-03-25 2022-09-30 江苏华岩建设有限公司 Assembled concrete section steel combination beam and construction method thereof

Also Published As

Publication number Publication date
CN1239787C (en) 2006-02-01

Similar Documents

Publication Publication Date Title
US6074133A (en) Adjustable foundation piering system
CN201679147U (en) Underpinning structure for superstructure shear wall during underground top-down construction of high-rise building
CN1900467A (en) Horizontal force transfer method for underground building modification
CN1873163A (en) Method for supporting and replacing bed plate foundation
JP4167149B2 (en) Construction method of abutment accompanying bridge reconstruction
CN1239787C (en) Steel structural locking shaft beam and method of suporting protecting founddation pits using it
CN101067319A (en) Steel reinforced concrete precast panel
JP3850785B2 (en) Caisson laying method using main foundation pile
CN110984168B (en) Combined foundation pit supporting pile structure
CN202450548U (en) Adjustable support for fundament of construction elevator on basement top plate
CN101580214A (en) Hydraulic lifting method for large-scale equipment
CN107245954B (en) A kind of Mid and minor spans steel box girder bridge construction method
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN2612724Y (en) Wide width wing opening locking H-shaped steel
CN1198023C (en) Method of controlling foundation ditch deformation breaking up whole into parts
CN1793591A (en) Supporting displacement method for lifting component and supporting system thereof
CN211772907U (en) Temporary pier for bridge building construction
CN1247869C (en) Rigid bottom plate less reinforced concrete water pond and its construction method
CN1037286C (en) Foundation pit supporting structure and construction method thereof
CN102900099A (en) Drop-slab construction process for underground concrete structures
CN1226492C (en) Preparation method of manpower dug pile and lifting type combined forming device thereof
CN207362853U (en) A kind of steel-concrete structure assembled underground engineering support device
JP4121412B2 (en) Surface contact type reinforcement structure
CN103374916A (en) Pre-pressure steel arch foundation pit supporting structure
CN2835393Y (en) Quick-building beam column frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA FIRST METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: WANG PING

Effective date: 20111212

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430080 WUHAN, HUBEI PROVINCE TO: 430081 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20111212

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430080 Hubei Province, Wuhan City Qingshan District Green Park 60 Gate No. 701

Patentee before: Wang Ping

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060201

Termination date: 20150308

EXPY Termination of patent right or utility model