CN1546856A - 一种电量转移工程系统及其转移调配方法 - Google Patents
一种电量转移工程系统及其转移调配方法 Download PDFInfo
- Publication number
- CN1546856A CN1546856A CNA200310109189XA CN200310109189A CN1546856A CN 1546856 A CN1546856 A CN 1546856A CN A200310109189X A CNA200310109189X A CN A200310109189XA CN 200310109189 A CN200310109189 A CN 200310109189A CN 1546856 A CN1546856 A CN 1546856A
- Authority
- CN
- China
- Prior art keywords
- water
- transfer
- tank
- head
- engineering system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/16—Mechanical energy storage, e.g. flywheels or pressurised fluids
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
一种电量转移工程系统及其转移调配方法,它主要由高位水池(1),抽水至该高位水池的水泵(5),使用高位水池(1)水的发电机(6),及其配用的输水管(2),形成电量转移工程系统,以及通过夜间:水泵(5)开机通过输水管(2)抽水至高位水池(1)暂时库存;白天:高位水池(1)通过输水管(2)放水让发电机(6)发电并输入电网的使用方法来实现的。
Description
技术领域:
本发明涉及电力调配工程及其调配方法。
背景技术:
我国目前电力不足,特别是白天用电高峰时期电力更显得不足,电力生产部门又难以在夜间根据需要大幅度减少其发电量。
白天频繁发生停电让电情况几乎遍及每个省市,对工农业生产和人民生活影响极大。为了解决电力不足的问题,电力部门采用的主要有效解决方案是:将一昼夜其间的用电峰谷时间分开记价,即夜间用电便宜,白天用电价高,二者的价格几乎相差一倍。这样做,的确在一定程度上缓解了一些矛盾,但不能根本解决问题。
如果,将电力部门夜间生产的电量也能够放到白天来使用,在我国当前缺电的情况下,确实能在很大的程度上解决了燃眉之急。
发明内容:
本发明之目的:正是为了解决上述问题。
为了实现发明之目的,拟采用以下的技术:
本发明的工程系统包括:高位水池,抽水至该高位水池的水泵,使用高位水池的的发电机,及其配用的输水管。
本发明工程系统的使用方法:夜间,水泵开机通过输水管抽水至高位水池暂时库存;白天:高位水池通过输水管放水让发电机发电并输入电网。
本发明的特点:让夜间生产的电量转移到白天使用,解决白天电力的燃眉之急。
附图说明:
图示意本发明的一个便于理解的原理型实施例。
1:高位水池;2:输水管;3阀A;4:阀B;5:水泵;6:发电机;7:养鱼池塘。
具体实施方式:
选择一个依山傍水的地理位置,在50米至100米高处充分利用地形的有利条件下,结合旅游景点的开发,修建一个足够大的用于储水的高位水池(1)。在山脚下,再设置水泵(5)和水利发电机(6)各一部及其为二者配用的输水管(2),并且,水泵(5)的功率是发电机(6)功率的二倍。
夜间11点钟至第二天早上7点钟,开启阀A(3),关闭阀B(4),水泵(5)开足马力连续开机8个小时通过输水管(2)抽水到高位水池(1)中暂时库存。
第二天早上7点钟至当天夜间10点钟,开启阀B(4),关闭阀A(3),高位水池(1)连续16个小时通过输水管(2)放水让发电机(6)发电,并将发出的电量输入到当地的供电电网。
------理论上不难计算:水泵(5)开机8小时抽取的水量正好可供给功率仅有水泵(5)一半功率的发电机(6)持续发电16小时。
------如果夜间的电价是白天的一半,那么,采用本发明技术工程的营业额毛利就是100%,即:不计工程折旧和人工费的单纯设备运行成本与营业额收入之比是1∶2。
Claims (2)
1.一种电量转移工程系统,
它包括:高位水池(1),抽水至该高位水池(1)的水泵(5),使用高位水池(1)水力的发电机(6),及其配用的输水管(2)。
2.一种如权利要求1所述的电量转移工程系统的转移调配方法,
夜间:水泵(5)开机通过输水管(2)抽水至高位水池(1)暂时库存;
白天:高位水池(1)通过输水管(2)放水让发电机(6)发电并输入电网。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200310109189XA CN1546856A (zh) | 2003-12-09 | 2003-12-09 | 一种电量转移工程系统及其转移调配方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200310109189XA CN1546856A (zh) | 2003-12-09 | 2003-12-09 | 一种电量转移工程系统及其转移调配方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1546856A true CN1546856A (zh) | 2004-11-17 |
Family
ID=34335079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA200310109189XA Pending CN1546856A (zh) | 2003-12-09 | 2003-12-09 | 一种电量转移工程系统及其转移调配方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1546856A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892938A (zh) * | 2010-07-26 | 2010-11-24 | 喻泽民 | 一种海水二级发电的方法 |
CN102409645A (zh) * | 2011-08-05 | 2012-04-11 | 黄必录 | 调水消峰扬水站 |
CN105464891A (zh) * | 2015-12-08 | 2016-04-06 | 广州联电能源投资有限公司 | 水电节水持续发电系统及其水电节水持续发电方法 |
CN106321333A (zh) * | 2015-06-29 | 2017-01-11 | 蒋小钊 | 自由落体水和人为超自由落体水循环水压力发电站 |
CN106762588A (zh) * | 2017-01-14 | 2017-05-31 | 商洛学院 | 一种夜间电力系统自动储能系统 |
-
2003
- 2003-12-09 CN CNA200310109189XA patent/CN1546856A/zh active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892938A (zh) * | 2010-07-26 | 2010-11-24 | 喻泽民 | 一种海水二级发电的方法 |
CN102409645A (zh) * | 2011-08-05 | 2012-04-11 | 黄必录 | 调水消峰扬水站 |
CN106321333A (zh) * | 2015-06-29 | 2017-01-11 | 蒋小钊 | 自由落体水和人为超自由落体水循环水压力发电站 |
CN105464891A (zh) * | 2015-12-08 | 2016-04-06 | 广州联电能源投资有限公司 | 水电节水持续发电系统及其水电节水持续发电方法 |
CN106762588A (zh) * | 2017-01-14 | 2017-05-31 | 商洛学院 | 一种夜间电力系统自动储能系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Shen et al. | Overall review of renewable energy subsidy policies in China–Contradictions of intentions and effects | |
Cloutier et al. | The feasibility of renewable energy sources for pumping clean water in sub-Saharan Africa: A case study for Central Nigeria | |
CN101761444A (zh) | 蓄能式水力发电系统 | |
CN1546856A (zh) | 一种电量转移工程系统及其转移调配方法 | |
Zhao et al. | Development strategies for wind power industry in Jiangsu Province, China: Based on the evaluation of resource capacity | |
CN102808398A (zh) | 反渗透海水淡化与沿海蓄能电站对接方法及海水淡化系统 | |
Fadhil et al. | Design and modeling of hybrid photovoltaic micro-hydro power for Al-Bakur road lighting: A case study | |
CN103202204A (zh) | 沙漠戈壁风光能制水绿化工程系统技术 | |
Wang et al. | Research on capacity optimization and real-time control of island microgrid considering time-shifting load | |
Ramakumar | Technical and socio-economic aspects of solar energy and rural development in developing countries | |
Xiang et al. | Current situation of small and medium-sized pumped storage power stations in Zhejiang Province | |
Adurodija et al. | The market potential of photovoltaic systems in Nigeria | |
Islam et al. | Potentiality of small-scale hydro power plant using the kinetic energy of flowing water of Gumoti & Surma river of Bangladesh: an energy odyssey | |
CN103319041A (zh) | 海水淡化及浓盐水利用的综合装置 | |
Dai et al. | Development status and application analysis of new energy photovoltaic power generation energy market based on artificial intelligence | |
CN114417625A (zh) | 一种考虑风气互补特性的季节储能解决方法 | |
Eljrushi et al. | Photovoltaic power plant for the southern region of Libya | |
CN1546857A (zh) | 一种电力调配方法 | |
CN203223361U (zh) | 泵站远程自动化运行系统 | |
Arampatzis et al. | Responding to water challenges through desalination: Energy considerations | |
Singh | Electrical load survey & load forecast for a stand alone small hydropower station | |
Tselepis | Electrification with solar powered mini-grids, a case study for the island of Kythnos | |
CN105552879A (zh) | 一种基于城市小型风力发电离散分布的规划方法 | |
CN208940570U (zh) | 移动式光伏提水设备 | |
Warnock et al. | Underground reservoirs for high-head pumped-storage stations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |