CN102409645A - 调水消峰扬水站 - Google Patents
调水消峰扬水站 Download PDFInfo
- Publication number
- CN102409645A CN102409645A CN2011102321249A CN201110232124A CN102409645A CN 102409645 A CN102409645 A CN 102409645A CN 2011102321249 A CN2011102321249 A CN 2011102321249A CN 201110232124 A CN201110232124 A CN 201110232124A CN 102409645 A CN102409645 A CN 102409645A
- Authority
- CN
- China
- Prior art keywords
- water
- reservoir
- peak
- transfer
- pumping station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Sewage (AREA)
Abstract
本发明涉及调水工程和电网调峰工程领域用的调水消峰扬水站,包括下水库、上水库和电力抽水机组,其特征是下水库至少为日调节水库,上水库为日调节水库。电力抽水机组利用夜间电网多余的电力把下水库的水抽到上水库暂时储存起来,然后通过调节水闸均匀地分配一天的流量。本发明不但能够为调水工程扬水和电网用电低峰期消峰,而且不必建设烧煤的扬水站和运煤专线,没有环境污染。
Description
技术领域
本发明涉及调水工程和电网调峰工程领域,特别是涉及一种调水消峰扬水站。
背景技术
夜间电网中的电用不完怎么办?现在主要用抽水蓄能水电站把多余的电力用可逆式泵水发电两用机组来抽水,把下水库的水抽到上水库,用电高峰时再放水发电来。但是,电力从发电厂输送到抽水蓄能水电站约损失10%,抽水和放水发电损失25%,总共白白损失了大约32%的电能。有的调水工程,如中国的南水北调工程沿途需要建多座大型的扬水站,从长江三峡水库提水,计划用烧煤的蒸汽轮机为扬水站提供动力,需要建设运煤专线,而且会造成环境污染。
发明内容
本发明的目的是提供一种调水消峰扬水站,不但可以用于调水和电网消峰,而且无需建设污染严重的燃煤扬水站和运煤专线,以克服现有方案的不足。
按此目的设计的一种调水消峰扬水站,包括下水库、上水库和电力抽水机组,其特征是下水库至少为日调节水库,上水库为日调节水库。电力抽水机组利用夜间电网多余的电力把下水库的水抽到上水库暂时储存起来,然后通过调节水闸均匀地分配一天的流量。
本发明具有调水调峰双重功能,节能环保。
附图说明
图1是本发明一个实施例示意图。
具体实施方式
下面结合附图及实施例对本发明作进一步详细描述。
参见图1,本调水消峰扬水站,包括下水库1、上水库2和电力抽水机组3,其特征是下水库至少为日调节水库,上水库为日调节水库。电力抽水机组利用夜间电网多余的电力把下水库的水抽到上水库暂时储存起来,然后通过具有能调节水流流量的水闸或水轮发电机组4把一天的水量均匀地分配到输水渠道5。
抽水时间一天只有2~3小时,因此,下水库的有效库容至少能够储存电力抽水机组2~3小时的抽水量,以免抽水时水量不够或造成下水库的下游河流水量过少;上水库的有效库容至少可以储存电力抽水机组2~3小时的抽水量,上水库安装的水轮发电机组4的目的是把上水库的水在排泄到水渠时产生的能量进行回收。
一个平均每秒流量200立方米的大型调水工程,每天的调水量为17280000立方米,扣除每天2~3小时抽水时水渠流走的流量,上水库的有效库容只要约16000000立方米就足够了。如果水库的有效蓄水深度为10米,水库的面积只要1.6平方千米就足够了,这只相当于一个小型水库面积的大小。因此,具有投资小,效益大。
Claims (1)
1.调水消峰扬水站,包括下水库、上水库和电力抽水机组,其特征是下水库至少为日调节水库,上水库为日调节水库,电力抽水机组利用夜间电网多余的电力把下水库的水抽到上水库暂时储存起来,然后通过具有能调节水流流量的水闸或水轮发电机组把一天的水量均匀地分配到输水渠道。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102321249A CN102409645A (zh) | 2011-08-05 | 2011-08-05 | 调水消峰扬水站 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102321249A CN102409645A (zh) | 2011-08-05 | 2011-08-05 | 调水消峰扬水站 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102409645A true CN102409645A (zh) | 2012-04-11 |
Family
ID=45911965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102321249A Pending CN102409645A (zh) | 2011-08-05 | 2011-08-05 | 调水消峰扬水站 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102409645A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1546856A (zh) * | 2003-12-09 | 2004-11-17 | 梁嘉麟 | 一种电量转移工程系统及其转移调配方法 |
CN1752437A (zh) * | 2005-10-31 | 2006-03-29 | 朱汪逸 | 风力抽水发电系统 |
CN101251078A (zh) * | 2008-03-23 | 2008-08-27 | 王彦明 | 低谷电在水利工程中的运用 |
-
2011
- 2011-08-05 CN CN2011102321249A patent/CN102409645A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1546856A (zh) * | 2003-12-09 | 2004-11-17 | 梁嘉麟 | 一种电量转移工程系统及其转移调配方法 |
CN1752437A (zh) * | 2005-10-31 | 2006-03-29 | 朱汪逸 | 风力抽水发电系统 |
CN101251078A (zh) * | 2008-03-23 | 2008-08-27 | 王彦明 | 低谷电在水利工程中的运用 |
Non-Patent Citations (3)
Title |
---|
亚荻: "目前的蓄能新技术", 《福建能源开发与节约》 * |
杨瑞棠: "兴建抽水蓄能电站势在必行(一)", 《江苏电机工程》 * |
袁伯英等: "蓄能新技术间接", 《华东电力》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206331B (zh) | 一种低水头轴伸贯流式水泵水轮机及其叶片 | |
CN102797613A (zh) | 一种抽水压缩空气储能系统 | |
CN202465405U (zh) | 一种风力发电的海水淡化装置 | |
CN106930252B (zh) | 一种新型抽水蓄能电站供水系统 | |
CN203098169U (zh) | 一种储能发电系统 | |
CN101852164A (zh) | 一种利用废弃矿井储贮电能的方法 | |
CN103626262B (zh) | 变负荷反渗透海水淡化系统及方法 | |
CN202047927U (zh) | 一种抽水压缩空气储能系统 | |
CN201615020U (zh) | 井下排水剩余能量的利用装置 | |
CN116696646B (zh) | 潮汐电站和海水抽水蓄能电站的联合电站及其调度方法 | |
CN109457671A (zh) | 输水工程风光水互补提水系统 | |
CN102979064B (zh) | 一种解决水电站水源不足和提高电站效益的方法及其装置 | |
CN202737483U (zh) | 光伏水力调峰系统 | |
CN204493063U (zh) | 一种水力发电机 | |
CN102748196A (zh) | 回流抽水式水力发电装置 | |
CN104099909B (zh) | 基于泄洪隧洞的泄洪发电同步组合消能工 | |
CN205567081U (zh) | 一种风光储存互补一体化移动抽水系统 | |
CN202659406U (zh) | 回流抽水式水力发电装置 | |
CN205559171U (zh) | 基于提高提灌效率的多能源提灌系统 | |
KR20110130124A (ko) | 수력터빈과 수소연료전지를 결합한 하이브리드발전시스템 | |
CN102409645A (zh) | 调水消峰扬水站 | |
CN202991328U (zh) | 一种水动力发电站 | |
CN102418330A (zh) | 一种蓄能调峰水电站 | |
CN112523918A (zh) | 一种抽水蓄能发电系统 | |
CN202789301U (zh) | 水增力循环发电机组 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120411 |