CN1514074A - Column pile and sheet pile joined body construction method and its special equipment - Google Patents
Column pile and sheet pile joined body construction method and its special equipment Download PDFInfo
- Publication number
- CN1514074A CN1514074A CNA031289762A CN03128976A CN1514074A CN 1514074 A CN1514074 A CN 1514074A CN A031289762 A CNA031289762 A CN A031289762A CN 03128976 A CN03128976 A CN 03128976A CN 1514074 A CN1514074 A CN 1514074A
- Authority
- CN
- China
- Prior art keywords
- pile
- sheet pile
- wing plate
- special equipment
- tubular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A technology for constructing the combination of pipe pile with plate pile features that the hole formers for pipe pile and plate pile, which are coupled via an inserting part and a recepting part, are sequentially sunk to designed depth in ground, the concrete is poured in the hole forms for pipe pile while the pipe is pulled up, and the concrete is then poured in the hole former for plate pile to form plate pile. Its advantages are high speed, low cost and high effect.
Description
(1) technical field
The present invention relates to conjuncted job practices of a kind of stake and sheet pile and specialized apparatus thereof.
(2) background technology
Build at present diaphragm wall especially build tube stake and sheet pile conjuncted in the main method that adopts have: (1) the cast-in-place filling method of slotting, use special grooving machinery soil diging groove-forming, concrete perfusion in the groove forms one wall after the concrete setting, combine with the tube stake constitute conjuncted.This method earth volume is big, and progress is slow, and operation is many, and the quality of wall is not good.(2) steel sheet pile hammering method, it is underground that steel sheet pile is squeezed into construction part, the disposable use of steel sheet pile, the formation that links to each other with the tube stake is conjuncted.This method involves great expense, and the connection between the wall element does not closely cause anti-seepage effect not good.(3) precast-concrete sheet-pile method.Prefabricated concrete sheet-piling is operated by the same step of above-mentioned steel sheet pile hammering method.This method difficulty of construction is big, and sheet pile is easily broken, and loss is big, connects not tight.
(3) summary of the invention
The present invention is big in order to overcome the cast-in-place irrigation technology earth volume of fluting, and progress is slow, and operation is many, and the quality of wall is not good; The steel sheet pile hammering method involves great expense, and anti-seepage effect is not good; Precast-concrete sheet-pile construction inconvenience, loss is big, connects the shortcoming of prior art such as not tight, conjuncted job practices of a kind of stake and sheet pile and special equipment are provided, and it is low to satisfy construction cost, easy construction, construction period is lacked, and strength of wall body is big, the requirement of the good grade of anti-seepage effect.
Utilization of the present invention comprises the special equipment that the tubular pile hole device of being with connection lead structure and sheet pile pile device are formed, and builds conjuncted job practices and is:
(1) shoe is all mixed in tubular pile hole device in used special equipment and sheet pile pile device bottom;
(2) the tubular pile hole device is erect placed construction location and on vibration head, exert pressure, make this tubular pile hole device be sink to the soil layer of projected depth;
(3) setting of sheet pile pile device is placed construction location, the plug-in unit that is subjected to of insert on the wing plate and described tubular pile hole device is connected the location cooperation, exerts pressure on sheet pile pile device, makes it be sink to the projected depth soil layer;
(4) the pre-part concrete of irritating from the feed hopper of tubular pile hole device pulls out this tubular pile hole device while pouring in the vibration afterwards, and shoe separates with the tube chamber, and the concrete of perfusion forms the tube stake together together;
(5) the pre-part concrete of irritating in the stake chamber of sheet pile pile device pulls out this sheet pile pile device while pouring in the vibration afterwards, and shoe forms sheet pile together from the concrete that sheet pile pile device separates with perfusion, and this sheet pile and described tube stake constitute conjuncted;
Further, described step (5) before execution in step (A) the tubular pile hole device of extracting is mixed new shoe or adopts an other ready prepd tubular pile hole device and described sheet pile pile device is connected the location, squeeze into the projected depth soil layer; Described step (5) afterwards the sheet pile pile device extracted of execution in step (B) load onto new shoe or adopt other ready sheet pile pile device, be connected mutually with described tubular pile hole device, squeeze into the projected depth soil layer; Repeating step (4) again after (B) step repeats by that analogy, can form alternate connect and compose conjuncted with sheet pile of tube stake of design length.
For the special equipment of implementing this job practices comprises the tubular pile hole device, in bottom, tubular pile hole device tube chamber shoe is housed, plug-in unit is built and is subjected in the insertion that outer wall has axis direction to arrange, this special equipment also comprises sheet pile pile device, sheet pile pile device comprises first web, second web, first wing plate and second wing plate, described wing plate is connected the two ends of described web, constitute four sides surrounding edge framework, shoe is equipped with in the bottom, be furnished with insert on first wing plate, be furnished with on second wing plate and be subjected to plug-in unit, be subjected to plug-in unit and insert in the described special equipment are the connection lead structures that can cooperatively interact.
First web of the sheet pile pile device in the further described special equipment is parallel with second web, and first wing plate is parallel with second wing plate, and they constitute the prolate rectangular frame.
Few with method construction earth volume of the present invention, easy construction is quick, and cost is lower, and the quality of body of wall is good, and anti-seepage effect is good.
The used special equipment of the present invention is simple in structure, and the insertion on tubular pile hole device and the sheet pile pile device is built and is subjected to plug-in unit to be connected the location easily, and easy to use, construction can reduce the cost of constructing fast, and the scope of application is wide.
(4) description of drawings
Accompanying drawing 1 is the drawing in side sectional elevation of sheet pile pile device embodiment in the special equipment of the present invention;
Accompanying drawing 2 for sheet pile pile device embodiment in the special equipment of the present invention along the web longitudinal section;
Accompanying drawing 3 is that tubular pile hole device and sheet pile pile device are connected the location schematic diagram;
Accompanying drawing 4 is tube stake and the conjuncted cross sectional representation of sheet pile.
(5) specific embodiment
Below in conjunction with accompanying drawing the present invention is further described: job practices essence of the present invention is to utilize by the tubular pile hole device of band connection lead structure and special equipment that sheet pile pile device is formed the stake of cast-in-situ concrete tube and sheet pile to be connected together to constitute conjunctedly, and its method is:
(1) shoe is all loaded onto in tubular pile hole device in used special equipment and sheet pile pile device bottom;
(2) the tubular pile hole device is erect placed construction location and on vibration head, exert pressure, make this tubular pile hole device be sink to the soil layer of projected depth;
(3) setting of sheet pile pile device is placed construction location, the plug-in unit 8 that is subjected to of insert 5 on first wing plate 1 and described tubular pile hole device is connected the location cooperation, exerts pressure on sheet pile pile device, makes it be sink to the projected depth soil layer;
(4) the pre-part concrete of irritating from the feed hopper of tubular pile hole device pulls out this tubular pile hole device while pouring in the vibration afterwards, and shoe separates with the tube chamber, and the concrete of perfusion forms the tube stake together together;
(5) the tubular pile hole device of extracting is loaded onto new shoe or adopt an other ready prepd tubular pile hole device and described sheet pile pile device linking location, squeeze into projected depth;
(6) the pre-part concrete of irritating in the stake chamber of sheet pile pile device pulls out this sheet pile pile device while pouring in the vibration afterwards, and shoe forms sheet pile together from the concrete that sheet pile pile device separates with perfusion, and this sheet pile and described tube stake constitute conjuncted;
(7) the sheet pile pile device of extracting is loaded onto new shoe or adopt other ready sheet pile pile device, be connected mutually, squeeze into the projected depth soil layer with described tubular pile hole device;
(8) repeating step (4) repeats by that analogy, until alternate connect and compose conjuncted with sheet pile of tube stake that forms design length.
The special equipment that is used for implementing this method comprises tubular pile hole device and sheet pile pile device, sheet pile pile device wherein comprises first web 1, second web 2, first wing plate 3 and second wing plate 4, described wing plate is connected the two ends of described web, constitutes the prolate rectangular frame, and shoe 7 is equipped with in the bottom.Be furnished with on first wing plate 3 to be furnished with on insert 5, the second wing plates and be subjected to plug-in unit 6.Here said insert 3 is section bars of a kind of flat strip shaped, and being subjected to plug-in unit 6 is to have respective shapes to have the section bar that slides groove, in fact also can be the section bar or the coupling device of other shapes, as long as it is just passable to play the linking effect.
Claims (4)
1, a kind of stake and the conjuncted job practices of sheet pile, the special equipment of use comprised the band insert and be subjected to the tubular pile hole device of plug-in unit, it is characterized in that described special equipment has also comprised the band insert and has been subjected to the sheet pile pile device of plug-in unit, and concrete construction sequence is:
(1) shoe is all mixed in tubular pile hole device in used special equipment and sheet pile pile device bottom;
(2) the tubular pile hole device is erect placed construction location and on vibration head, exert pressure, make this tubular pile hole device be sink to the soil layer of projected depth;
(3) setting of sheet pile pile device is placed construction location, cooperation is located in the plug-in unit linking that is subjected to of insert on the wing plate and described tubular pile hole device, on sheet pile pile device, exert pressure, make it be sink to the projected depth soil layer;
(4) the pre-part concrete of irritating from the feed hopper of tubular pile hole device pulls out this tubular pile hole device while pouring in the vibration afterwards, and shoe separates with the tube chamber, and the concrete of perfusion forms the tube stake together together;
(5) the pre-part concrete of irritating in the stake chamber of described sheet pile pile device pulls out this sheet pile pile device while pouring in the vibration afterwards, and shoe forms sheet pile together from the concrete that sheet pile pile device separates with perfusion, and this sheet pile and described tube stake constitute conjuncted;
2, job practices as claimed in claim 1 is characterized in that:
Described step (5) before execution in step (A) the tubular pile hole device of extracting is mixed new shoe or adopts an other ready prepd tubular pile hole device and described sheet pile pile device is connected the location, squeeze into the projected depth soil layer;
Described step (5) afterwards the sheet pile pile device extracted of execution in step (B) load onto new shoe or adopt other ready sheet pile pile device, be connected mutually with described tubular pile hole device, squeeze into the projected depth soil layer;
Repeating step (4) again after (B) step repeats by that analogy, can form alternate connect and compose conjuncted with sheet pile of tube stake of design length.
3, a kind of special equipment that is used to implement the described job practices of claim 1, comprise the tubular pile hole device, in tubular pile hole device bottom shoe is housed, outer wall has that axis direction arranges is subjected to plug-in unit and insert, it is characterized in that: described special equipment also comprises sheet pile pile device, sheet pile pile device comprises first web, second web, first wing plate and second wing plate, first wing plate and second wing plate are connected the two ends of first web and second web, constitute four sides surrounding edge framework, shoe is equipped with in the bottom, be furnished with insert on first wing plate, be furnished with on second wing plate and be subjected to plug-in unit, be subjected to plug-in unit and insert in the described special equipment are the connection lead structures that can cooperatively interact.
4, special equipment as claimed in claim 2 is characterized in that: first web of described sheet pile pile device is parallel with second web, and first wing plate is parallel with second wing plate, and they constitute the prolate rectangular frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03128976 CN1200178C (en) | 2003-05-28 | 2003-05-28 | Column pile and sheet pile joined body construction method and its special equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03128976 CN1200178C (en) | 2003-05-28 | 2003-05-28 | Column pile and sheet pile joined body construction method and its special equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1514074A true CN1514074A (en) | 2004-07-21 |
CN1200178C CN1200178C (en) | 2005-05-04 |
Family
ID=34239737
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03128976 Expired - Fee Related CN1200178C (en) | 2003-05-28 | 2003-05-28 | Column pile and sheet pile joined body construction method and its special equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1200178C (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101560766B (en) * | 2009-05-13 | 2011-03-02 | 江苏东大鸿基科技有限公司 | Grid-like underground continuous wall plate and production method thereof |
CN102041804A (en) * | 2010-12-02 | 2011-05-04 | 李布尔 | Combined hollow plastic sheet pile wall |
CN102182176A (en) * | 2010-12-20 | 2011-09-14 | 陈健雄 | Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof |
CN102995626A (en) * | 2012-12-25 | 2013-03-27 | 中铁十四局集团第四工程有限公司 | Steel sheet pile |
CN104120699A (en) * | 2014-05-20 | 2014-10-29 | 中交第二航务工程局有限公司 | Steel sheet pile bucket foundation artificial island dado structure |
CN105625438A (en) * | 2016-01-14 | 2016-06-01 | 中国建筑股份有限公司 | Steel plate and concrete diaphragm wall and construction method thereof |
CN106284272A (en) * | 2016-10-08 | 2017-01-04 | 江苏省交通工程集团有限公司 | Fore shaft grouting steel tube pile guide wall and construction method |
CN110050101A (en) * | 2016-12-07 | 2019-07-23 | 卢乔·佩德罗科 | Concrete sheet-piling |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102191778A (en) * | 2011-04-15 | 2011-09-21 | 傅健 | Construction method of immersed-tube compress soil-free underground continuous wall |
-
2003
- 2003-05-28 CN CN 03128976 patent/CN1200178C/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101560766B (en) * | 2009-05-13 | 2011-03-02 | 江苏东大鸿基科技有限公司 | Grid-like underground continuous wall plate and production method thereof |
CN102041804A (en) * | 2010-12-02 | 2011-05-04 | 李布尔 | Combined hollow plastic sheet pile wall |
CN102182176A (en) * | 2010-12-20 | 2011-09-14 | 陈健雄 | Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof |
CN102182176B (en) * | 2010-12-20 | 2012-12-19 | 陈健雄 | Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof |
CN102995626A (en) * | 2012-12-25 | 2013-03-27 | 中铁十四局集团第四工程有限公司 | Steel sheet pile |
CN102995626B (en) * | 2012-12-25 | 2015-05-06 | 中铁十四局集团第四工程有限公司 | Steel sheet pile |
CN104120699A (en) * | 2014-05-20 | 2014-10-29 | 中交第二航务工程局有限公司 | Steel sheet pile bucket foundation artificial island dado structure |
CN104120699B (en) * | 2014-05-20 | 2016-04-27 | 中交第二航务工程局有限公司 | Steel sheet pile bucket base man-made island dado structure |
CN105625438A (en) * | 2016-01-14 | 2016-06-01 | 中国建筑股份有限公司 | Steel plate and concrete diaphragm wall and construction method thereof |
CN105625438B (en) * | 2016-01-14 | 2018-01-23 | 中国建筑股份有限公司 | A kind of construction method of steel plate concrete ground-connecting-wall |
CN106284272A (en) * | 2016-10-08 | 2017-01-04 | 江苏省交通工程集团有限公司 | Fore shaft grouting steel tube pile guide wall and construction method |
CN110050101A (en) * | 2016-12-07 | 2019-07-23 | 卢乔·佩德罗科 | Concrete sheet-piling |
Also Published As
Publication number | Publication date |
---|---|
CN1200178C (en) | 2005-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2408765C2 (en) | Pyramid or cone ramming tip and method of its use to erect rammed crushed stone supports | |
JP4808241B2 (en) | Ground improvement method and ground improvement equipment | |
CN1200178C (en) | Column pile and sheet pile joined body construction method and its special equipment | |
CN110869563A (en) | Top-down building system | |
CN111719565A (en) | Deep foundation pit support structure and construction method thereof | |
JP2008075389A (en) | Retaining wall | |
JP2018184829A (en) | Retaining wall | |
CN1198020C (en) | Continuous underground wall constructing method with linked tubular pile and its special linked tubular pile hole former | |
CN108222656B (en) | The construction method of Prefabricated enclosure wall | |
EP1134319A2 (en) | Method and apparatus for obtaining a cast in situ concrete pile | |
US4465403A (en) | Method of constructing poured-concrete wall panels and wall thus obtained | |
CN109853534B (en) | Construction method of stiffening core pedestal pile | |
JP4847265B2 (en) | Retaining wall | |
KR100834920B1 (en) | Sheathing of tapetum sheet and construction method to use the above sheet | |
CN201520973U (en) | Precast pile with grouting hole | |
CN1367296A (en) | Soft foundation composite ground base construction method for field pouring pipe pile with large diameter | |
KR100969352B1 (en) | Geogrid fixing structure for retaining wall block | |
CN2632149Y (en) | Pile plank piler | |
JP2006022631A (en) | Method for constructing impervious layer of embankment dam | |
CN102182176A (en) | Cast-in-place concrete tube-sheet pile, piling device and piling construction method thereof | |
CN216108492U (en) | Construction device for preventing soil extrusion of precast tubular pile by using medium vibration method | |
JP5360657B2 (en) | Retaining wall made of precast concrete | |
CN1563600A (en) | Pile with enlarged head made from steel tube and manufacturing method | |
CN113529712A (en) | Construction method and construction device for preventing soil extrusion of precast tubular pile by medium vibration method | |
CN102605764A (en) | Construction method for immersed tube type underground continuous wall without compacting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |