CN1488821A CNA031556957A CN03155695A CN1488821A CN 1488821 A CN1488821 A CN 1488821A CN A031556957 A CNA031556957 A CN A031556957A CN 03155695 A CN03155695 A CN 03155695A CN 1488821 A CN1488821 A CN 1488821A
Authority
CN
China
Prior art keywords
hydraulic hose
pipeline
cantilever
geometrical clamp
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031556957A
Other languages
Chinese (zh)
Other versions
CN1262714C (en
Inventor
池田宗义
青柴则宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Publication of CN1488821A publication Critical patent/CN1488821A/en
Application granted granted Critical
Publication of CN1262714C publication Critical patent/CN1262714C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2275Hoses and supports therefor and protection therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Component Parts Of Construction Machinery (AREA)
  • Supports For Pipes And Cables (AREA)
  • Shovels (AREA)

Abstract

A swing bracket (16) has a first piping duct (42) communicating with the outside space of a boom cylinder mounting part (32) from the inside space (38) and a second piping duct (48) communicating with the outside space of the boom mounting part (33). A hydraulic hose (40) laid from the upper revolving inside through the first piping duct (42) is fixed by a first fixing clamp (49) in the neighborhood of a boom cylinder connection pin (39). Hydraulic hoses (43, 44) for each cylinder except a boom cylinder (20) laid through the second piping duct (48) are fixed in the neighborhood of a boom mounting shaft (17a) by the second fixing clamp (50) to connect to each hydraulic cylinder.

Description

The conduit under fluid pressure laying structure of left-right swing type apparatus for work
Technical field
The present invention relates to a kind of conduit under fluid pressure laying structure of left-right swing type apparatus for work, upper rotating body leading section at the rotary operation car, being equipped with can be along the rocking bracket of left and right directions swing, on this rocking bracket, cantilever, rocking arm and operating apparatus (scraper bowl etc.) are installed and have the apparatus for work of a plurality of oil cylinders that drive this cantilever, rocking arm, operating apparatus respectively.
Background technology
On the rotary operation cars such as hydraulic actuated excavator that described apparatus for work is housed on the rocking bracket, hydraulic hose that will be corresponding, pass the inner space of rocking bracket from upper rotating body inside with each oil cylinder of the cantilever of apparatus for work, rocking arm, scraper bowl, simultaneously, many hydraulic hoses that pass this inner space closed up in a row and with the state of one be fixed on the rocking bracket and crooked towards the fluctuating fulcrum top of the cantilever that is installed on rocking bracket top, lay, link to each other with described each oil cylinder by (the fair strictly according to the facts 7-12445 communique of reference example).
According to described prior art mounting arrangements conduit under fluid pressure, after cantilever tank is passed the rocking bracket inner space with hydraulic hose, import rocking bracket above, for can be in the deflection up and down of this top position, displacement and be bent and be deployed to a side above the cantilever, simultaneously, also will by be located at this cantilever on fixed-piping link to each other and be connected on the cantilever tank to the switching hydraulic hose that is provided with between the cantilever tank through this fixed-piping of associating.
Therefore, cantilever tank is not only long with hydraulic hose, and before arriving cantilever tank, described fixed-piping and described switching hydraulic hose expose around cantilever tank, the problem of being brought is like this, can increase because of contacting with the outer barrie thing to cause fixed-piping and the impaired possibility of switching hydraulic hose.
In addition, according to the conduit under fluid pressure laying structure of above-mentioned prior art, with the swing of rocking bracket, make hydraulic hose displacement, absorb by the variation of the radius of curvature that deflects into the flexible pipe position that roughly is circular-arc configuration.With regard to this absorbing mechanism, be at the flexible pipe arc end that links to each other with rocking bracket one side, on one side move left and right makes this radius of curvature change on one side with the swing of rocking bracket, thereby the circular-arc setting by flexible pipe combine with the move left and right of arc end and realize the displacement of hydraulic hose.Therefore, circular-arc for hydraulic hose is arranged to, upper rotating body inside needs the space of laying of bigger hydraulic hose.But, the laying the space and usually can therefore, in pipeline is laid the space, hydraulic hose is arranged to circular-arc very difficult of this hydraulic hose because being provided with of machine waits and be subjected to severely restricts.
And, have the flexible pipe position of described circular-arc deflection, move, during displacement can with reach left and right sides wall friction up and down, therefore have the problem of accelerating this hydraulic hose loss.
And, have the flexible pipe position of the circular-arc deflection of hydraulic hose, by cloth be set as about it, up and down can free displacement, and when free displacement, therefore snarl and produce friction mutually each other between flexible pipe has the problem of destroying the hydraulic hose durability.
Summary of the invention
The object of the present invention is to provide a kind of conduit under fluid pressure laying structure of the left-right swing type apparatus for work that can address the above problem, this structure can shorten by upper rotating body inside passes cantilever tank in the hydraulic hose of rocking bracket inner space with the whole length of hydraulic hose, avoid the crooked pipeline installing space of hydraulic hose excessive, when the hydraulic hose case of bending changes, can snarl between the flexible pipe, friction, can not contact the wall of laying of flexible pipe yet.
In order to achieve the above object, the formation of the 1st invention is, leading section in the upper rotating body of rotary operation car, can rocking bracket swingingly be installed around the longitudinal axis, the apparatus for work that has cantilever, rocking arm and operating apparatus and drive the hydraulic jack of this cantilever, rocking arm and operating apparatus respectively is installed on this rocking bracket, by a plurality of control transfer valves of being located at upper rotating body inside and behind described rocking bracket, each hydraulic hose links to each other with described each hydraulic jack respectively
Described rocking bracket has the 1st pipeline and lays path, this path is used for cantilever tank is deployed to from its inner space with hydraulic hose the space outerpace of cantilever tank installation portion, and the 2nd pipeline lay path, this path is used for rocking arm oil cylinder and operating apparatus oil cylinder etc. are deployed to from its inner space with hydraulic hose the space outerpace of its cantilever installation portion.
According to the 1st invention, only cantilever tank is laid path and directly is deployed near the connecting pin of cantilever tank installation portion from being located at special use on the rocking bracket with hydraulic hose, therefore, can shorten the length of cantilever tank with hydraulic hose, make arrange compact.Thus, can with except that cantilever tank arranged apart with other oil cylinder the hydraulic hose with hydraulic hose, so can be as not in the past, along with the swing of rocking bracket makes cantilever tank sustain damage because of deflection with hydraulic hose.
The formation of the 2nd invention, be on the basis of the 1st invention, lay the cantilever tank hydraulic hose that path is laid by inner inner space and described the 1st pipeline of upper rotating body through described rocking bracket, be fixed on by the 1st geometrical clamp near the connecting pin of cantilever tank and rocking bracket, the hydraulic hose of usefulness such as described rocking arm oil cylinder that the inner space of the described rocking bracket of process and described the 2nd pipeline laying path are laid and operating apparatus oil cylinder, be fixed near the axle that connects cantilever and rocking bracket by the 2nd geometrical clamp, and be connected with described each hydraulic jack.
According to the 2nd invention, only with the cantilever tank hydraulic hose, directly be deployed near the connecting pin of cantilever tank installation portion from being located at the special-purpose path of laying of the 1st on the rocking bracket, and fix by the 1st geometrical clamp, simultaneously, except that cantilever tank with other oil cylinder hydraulic hose the hydraulic hose, directly be deployed near the connecting pin of cantilever tank installation portion from being located at the special-purpose path of laying of the 2nd on the rocking bracket, and fix by the 2nd geometrical clamp, therefore, can shorten the length of cantilever tank, can also reduce between rocking bracket and the cantilever tank with hydraulic hose and other oil cylinder usefulness hydraulic hose, and the deflection of the pipeline of being installed between rocking bracket and other oil cylinder.Therefore, when the swing of cantilever and cantilever tank, each hydraulic hose can be because of the deflection damaged, thereby can improve durability.
The 3rd the invention formation be, the 2nd the invention the basis on, also have pipeline geometrical clamp parts, be used for and will tie up the piping erection space that is fixed to upper rotating body inside from each hydraulic hose of described a plurality of control transfer valves; And the pipeline guiding part, be used to make fixing described each hydraulic hose of this pipeline geometrical clamp to penetrate the inner space of described rocking bracket, limit the moving of the length direction that laterally moves, guides this flexible pipe of this flexible pipe.
According to the 3rd invention, the a plurality of control transfer valves that start from upper rotating body inside and before across the rocking bracket inner space bending of the hydraulic hose of face lay in the interval, keep by pipeline geometrical clamp parts and pipeline guiding part, therefore, can suppress the curved spout position because of counter-force effect deflection resilience.In addition, when hydraulic hose is subjected to tractive or pushing along with the swing of rocking bracket, the pipeline guiding part moves this flexible pipe horizontal direction and is limited and the mobile of its length direction guided, the deflection at described curved spout position is changed sleekly, therefore, can snarl between the hydraulic hose, interference, thereby can prevent the flexible pipe damage.
The formation of the 4th invention is, on the basis of the 3rd invention, described pipeline geometrical clamp parts are arranged on the aerial bearing, this aerial bearing is configured in the piping erection space of described upper rotating body inside vacantly, and make be in and described pipeline guiding part between flexible pipe, with leave described piping erection space top and below state fix.
According to the 4th invention, even hydraulic hose moves because of the displacement at curved spout position, but because this flexible pipe is in and the top of the piping erection space of upper rotating body inside and the state that separates below, therefore, hydraulic hose can not contact the last lower wall surface in piping erection space.Like this, hydraulic hose can not be subjected to damage by friction, thereby can improve durability.
The formation of the 5th invention is, on the basis of the 4th invention, described pipeline guiding part has 2 insertion portions up and down that insert 1 line hydraulic hose respectively, described pipeline geometrical clamp parts have the clamping part of tying up of clamping 2 file hydraulic hoses, thereby cloth is set as described pipeline guiding part can not overlapped with flexible pipe between the described pipeline geometrical clamp parts.
According to the 5th invention, pipeline geometrical clamp parts have 2 files and tie up clamping part, the pipeline guiding part has can insert 2 insertion portions up and down that 1 line ground inserts hydraulic hose respectively, make that tying up clamping part by 2 files between each curved spout position arranges to vacate predetermined distance ground along the vertical direction, simultaneously, because the pipeline guiding part of also wanting left and right directions to pass through makes each curved spout position can not overlap with forming a line.Like this, when each hydraulic hose is mobile along with the swing of rocking bracket, can not rub mutually, therefore, each hydraulic hose moves smooth and easy, can snarl, thus can improve the durability of each hydraulic hose.
The formation of the 6th invention is, on the basis of the 5th invention, only with the cantilever tank in described each hydraulic hose with the upper/lower positions place of hydraulic hose clamping in 2 files of tying up clamping part of described pipeline geometrical clamp parts, simultaneously, insert in the following insertion portion of described pipeline guiding part, so that differently lay with hydraulic hose with rocking arm oil cylinder and operating apparatus oil cylinder etc.
According to the 6th invention, by the described rocking bracket of the 1st invention that constitutes, make the cantilever mounted oil cylinder with the geometrical clamp of hydraulic hose with fixing remove this cantilever tank with the rocking arm oil cylinder the hydraulic hose use, the geometrical clamp of the hydraulic hose of usefulness such as scraper bowl and auxiliary activities utensil, lay respectively at different positions by oscillation center to radial direction relatively, therefore, swing along with rocking bracket, the shift motion of two hydraulic hoses produces difference, yet, can avoid the damage that produces because of friction by laying the cantilever tank hydraulic hose dividually.
The formation of the 7th invention is, on the basis of one of the 3rd~6 invention, described pipeline geometrical clamp parts is installed, make its can according to the deflection displacement of described hydraulic hose, with have roughly be upper and lower to the axis of rotation in axle center be that rotate at the center.
According to the 7th invention, because pipeline geometrical clamp parts can rotate under the effect of the tractive deflection that puts on the curved spout position with the rocking bracket swing, pushing deflection counter-force, therefore, can reduce the displacement between each hydraulic hose, make the not mutual snarl of flexible pipe, simultaneously, the hydraulic hose position of described bending also can not be subjected to the effect of unreasonable power, thereby can improve the durability of hydraulic hose.
Description of drawings
Fig. 1 is the lateral view that the rotary operation car of left-right swing type apparatus for work of the present invention is equipped with in expression;
Fig. 2 is the lateral view of the carriage that swings of the present invention;
Fig. 3 is that the X of Fig. 2 is to view;
Fig. 4 is the A-A sectional view of Fig. 3;
Fig. 5 is the oil cylinder that is formed in rocking arm on the rocking bracket, scraper bowl, auxiliary activities utensil with hydraulic hose geometrical clamp portion sectional view;
Fig. 6 is the lateral view of the conduit under fluid pressure laying structure of expression apparatus for work;
Fig. 7 is the vertical view of the conduit under fluid pressure laying structure of expression apparatus for work;
Fig. 8 is the front view of expression pipeline guiding part;
Fig. 9 is the front view of expression pipeline geometrical clamp parts.
The specific embodiment
Below, with reference to the accompanying drawings embodiments of the invention are elaborated.
At first, be example so that the rotary operation car that is applicable to left-right swing type apparatus for work of the present invention to be housed, with Fig. 1 the formation of swing type hydraulic excavator is described.Fig. 1 is the lateral view that the rotary operation car of left-right swing type apparatus for work of the present invention is equipped with in expression.
The rotary operation car on the top of crawler travel device 10, is rotatably carrying the upper rotating body 12 that apparatus for work 11 is housed.On upper rotating body 12, except that apparatus for work 11, also disposing to be provided with and be rotated travelling and the driver's cabin 13 of the various operating mechanisms of the Job Operations of apparatus for work 11 of working vehicle, with constitute described travelling and the motor 14 of the power source of operation, pass to the not shown hydraulic press of crawler travel device 10 and apparatus for work 11 and make the stable counterweight of car body 15 with the hydraulic power that described motor 14 is produced.
Apparatus for work 11 is installed on the rocking bracket 16, and this carriage can be configured in the leading section of described upper rotating body 12 around the longitudinal axis with freely swinging.This apparatus for work 11 has its base portion and is articulated in cantilever 17 on the described rocking bracket 16, base portion is articulated in the rocking arm 18 of these cantilever 17 leading sections, and base portion is articulated in the scraper bowl 19 of these rocking arm 18 leading sections, simultaneously, the cantilever tank 20 that is made of oil cylinder is set between described rocking bracket 16 and described cantilever 17, the rocking arm oil cylinder 21 that is made of oil cylinder is set between described cantilever 17 and described rocking arm 18, the bucket cylinder 22 that is made of oil cylinder is set between described rocking arm 18 and described scraper bowl 19, so that make described cantilever 17 dipping and heavings, described rocking arm 18 also thereupon during dipping and heaving, drives described scraper bowl 19 and turns down, action with rolling up.
And, make the hydraulic hose that links to each other with control transfer valve (with reference to Fig. 6 described below) with each oil cylinder of being located at upper rotating body 12 inside, by after the inner space of described rocking bracket 16, linked these cantilever tanks 20, on rocking arm oil cylinder 21 and the bucket cylinder 22.
Below, about the improvement structure that the hydraulic hose of the left-right swing type apparatus for work of this rotary operation car is installed, at first the piping erection structure with Fig. 2,3 pairs of rocking brackets describes.Fig. 2 is the lateral view of the carriage that swings of the present invention, and Fig. 3 is that the X of Fig. 2 is to view.
Rocking bracket 16 is provided with the side and sees the main part 25 that is " ヨ " font, this main part 25 has and is divided into the outstanding walls 26,27 and 29 of 3 sections and along continuous straight runs up and down, 3 sections Zhi Bizhong up and down at this main part 25, epimere props up wall 26 and wall 27 formation concave shaped connecting portions 28 are propped up in the stage casing, and hypomere props up wall 29 and constitutes spirogyrate connecting portions 30.In addition, on the position, front of vertical wall 31 of described main part 25, form the cantilever tank installation portion 32 that cantilever tank 20 is installed, on described epimere props up wall 26, form the cantilever installation portion 33 that cantilever 17 is installed on the position.Between the epimere division wall 26 and stage casing division wall 27 of the connecting portion 28 of described concave shaped, be embedded in the outstanding spirogyrate bearing 35 of leading section along continuous straight runs of described upper rotating body 12, in addition, at a pair of concave shaped support unit 36a that arranges up and down, between the 36b, embed described spirogyrate connecting portion 30, make described spill connecting portion 28 and spirogyrate bearing 35, and described spirogyrate connecting portion 30 and concave shaped bearing 36 are connected to each longitudinal axis 34 up and down, on 37, wherein, said a pair of concave shaped support unit 36a, 36b are flatly given prominence to and form with prescribed distance along the vertical direction to each other by the concave shaped bearing 36 on upper rotating body 12 leading sections of being located at described spirogyrate bearing 35 belows.Therefore, between this longitudinal axis 34,37, be configured for oil cylinder is led to flexible pipe the inner space 38 of rocking bracket 16 inside.
Therefore, prop up wall 27 and hypomere props up on vertical wall 31 between the wall 29 in described stage casing, have near the intercommunicating pore 41 of the space outerpace the connecting pin 39 that is communicated with described inner space 38 and described cantilever tank installation portion 32, lay path 42 to form the 1st pipeline, through this intercommunicating pore 41, cantilever tank can be deployed near the space outerpace the connecting pin 39 of described cantilever tank installation portion 32 by described inner space 38 with hydraulic hose 40 (two flexible pipes that will come and go with an invoking marks number represent).In addition, prop up wall 27 and epimere props up on the wall 26 in described stage casing, have near the intercommunicating pore 46,47 of the space outerpace the cantilever installation shaft 17a that is communicated with described inner space 38 and described cantilever installation portion 33, lay path 48 to form the 2nd pipeline, through this intercommunicating pore 46,47, each oil cylinder of rocking arm, scraper bowl, auxiliary activities utensil (not shown) can be deployed near the space outerpace the cantilever installation shaft 17a of described cantilever installation portion 33 by described inner space 38 with hydraulic hose 43,44,45 (two round flexible pipes with an invoking marks number represent).
In addition, near the position connecting pin 39 of described cantilever tank installation portion 32 has the 1st geometrical clamp portion 49 of fixing described cantilever tank with hydraulic hose 40; Near the position cantilever installation shaft 17a of described cantilever installation portion 33 has the 2nd geometrical clamp portion 50 that each oil of rocking arm, scraper bowl, auxiliary activities utensil is gathered, fixed with cylinder hydraulic hose 43,44,45.
Fig. 4 is the A-A sectional view of Fig. 3, has gone out the sectional view that shows above-mentioned the 1st geometrical clamp portion, and Fig. 5 is the sectional view of above-mentioned the 2nd geometrical clamp portion.
Fixing described cantilever tank as shown in Figure 4, has the hold assembly 52 of the rubber buffer 51 that the clamping hydraulic hose is installed with the 1st geometrical clamp portion 49 of hydraulic hose 40.By this rubber buffer 51 is embedded in the intercommunicating pore 41 of described rocking bracket 16 front faces, described hold assembly 52 can be fixed on the front of this intercommunicating pore 41 by screw 55.
In addition, fixing described rocking arm, each oil cylinder hydraulic hose 43 of scraper bowl and auxiliary activities utensil, 44 and 45 the 2nd geometrical clamp portion 50, as shown in Figure 5, be with rocking arm, each oil cylinder hydraulic hose 43 except that cantilever such as scraper bowl and auxiliary activities utensil, 44,45 line up a line inserts in the rubber buffer 53 of each hydraulic hose of clamping, and described rubber buffer 53 is clipped in is formed at a pair of fixed part 57 that epimere props up wall 26 upper parts, screw 56 is used from the top of rubber buffer 53 in location between 57 with being pressed into, 56 are installed to a pair of fixed part 57 with pressing plate 54, on 57.
The above pipeline of the rocking bracket 16 of Gou Chenging, as shown in Figure 2, each oil cylinder passes the described inner space 38 of rocking bracket 16 from upper rotating body inside 60 with hydraulic hose, cantilever tank in it is laid path 42 with hydraulic hose 40 by the 1st pipeline that is formed at rocking bracket 16 only, and near the connecting pin 39 of cantilever tank installation portion 32 and link to each other the rocking arm except that cantilever tank 20 with cantilever tank 20, scraper bowl, each oil cylinder hydraulic hose 43 of auxiliary activities utensil etc., 44 and 45 by being formed on the 2nd pipeline laying path 48 on the rocking bracket 16, and near the cantilever installation shaft 17a of cantilever installation portion 33 and respectively with rocking arm 18, each oil cylinder 21 of scraper bowl 19 and auxiliary activities utensil etc., 22 link to each other.
Be fixed on the rocking bracket 16 of described Work machine at hydraulic hose after, along with swinging of the rocking bracket 16 of Work machine, hydraulic hose is subjected to tractive or pushing effect, therefore, lay hydraulic hose with prebending, and can absorb above-mentioned tractive or compression external force by the displacement of this bend.The desired location of this hydraulic hose bend is located in the piping erection space of upper rotating body inside.
Below, illustrate by improving a kind of piping erection structure that being provided with of this sweep constituted with Fig. 6,7.Fig. 6 is the lateral view of the hydraulic piping structure of expression apparatus for work, and Fig. 7 is the vertical view of Fig. 6.
Upper rotating body 12, between the spirogyrate bearing 35 and concave shaped bearing 36 be located to the rotary body leading section that supports described Work machine rocking bracket 16, the hydraulic hose that has towards the inner space of rocking bracket 16 38 openings stretches out hole 61, simultaneously, stretch out the behind in hole 61 at this hydraulic hose, have the crooked piping erection space 62 of laying of the hydraulic hose that is used for upper rotating body inside.In the piping erection space 62 of this upper rotating body inside, have pipeline geometrical clamp parts 67 and pipeline guiding part 68, these pipeline geometrical clamp parts 67, be used to tie up respectively two of fixed hydraulic flexible pipes 40,43,44,45, these hydraulic hoses link to each other with control transfer valve 66 with oil cylinder control transfer valve 65, auxiliary activities utensil oil cylinder with control transfer valve 64, scraper bowl with control transfer valve 63, rocking arm oil cylinder with the cantilever tank of the inside 60 of being located at upper rotating body 12 respectively; This pipeline guiding part 68, what be positioned at described hydraulic hose stretches out 61 places, hole, is used to make each hydraulic hose 40,43,44,45 to penetrate the inner space 38 of described rocking bracket 16.Therefore, described each hydraulic hose 40,43,44,45 is laid between described pipeline geometrical clamp parts 67 and the described pipeline guiding part 68 agley, and passes through the inner space 38 of described rocking bracket 16.
Fig. 8 is the front view of expression pipeline guiding part, and Fig. 9 is the front view of expression pipeline geometrical clamp parts.
As shown in Figure 8, described pipeline guiding part 68, have can a line 2 insertion sections 70,71 up and down of inserting hydraulic hose, ground, in the present embodiment, be divided into two insertion sections 70,71 up and down by the tubing of horizontal direction.In addition, as shown in Figure 9, have a plurality of hydraulic hose patchholes that are the distribution of 2 files on the rubber buffer 72 of described pipeline geometrical clamp parts 67, and the peripheral part of this cushion pad is fixing by tying up clamping part 73.
Therefore, the flexible pipe of described bending is laid in the following manner: crooked distolateral pipeline geometrical clamp parts 67 by described 2 files at curved spout position grip with the interval of regulation along the vertical direction, simultaneously, in crooked distolateral two insertion sections 70,71 that a line respectively arranged up and down by being scattered in of described pipeline guiding part 68 of another of curved spout position.Therefore, when being configured in the piping erection space with this vacant state, each crooked flexible pipe position can not overlap.
Described pipeline geometrical clamp parts 67 and pipeline guiding part 68, owing to be to bring in the case of bending that keeps flexible pipe, therefore can suppress bending springback ground, the curved spout position is remained in the piping erection space 62 with the state that is bent at two of described each hydraulic hose crooked position.Therefore, when swing along with rocking bracket 16, when described each hydraulic hose is subjected to tractive or pushing, 68 channeling conducts of pipeline guiding part, to suppress described each hydraulic hose causes crooked radius of curvature along radial direction displacement (lateral shift) variation, described each hydraulic hose is moved along axis direction, increase or reduce the deflection at curved spout position.Thereby absorb the displacement that causes hydraulic hose because of the swing of rocking bracket 16.
In addition, described pipeline geometrical clamp parts 67 are placed on the aerial bearing 69 within the piping erection space 62 of being located at described upper rotating body inside built on stiltsly, make between and described pipeline guiding part 68 between the curved spout position be in vacant state.Therefore, although hydraulic hose moves because of the curved spout displacement, can not touch the last lower wall surface of upper rotating body internal pipeline installing space 62 yet.
In addition, in described each hydraulic hose, have only cantilever tank with hydraulic hose 40 by the upper/lower positions place of clamping at 2 file clamping parts of described pipeline geometrical clamp parts 67, and insert in the following insertion section 71 of described pipeline guiding part 68, these are different with the laying of each oil cylinder usefulness hydraulic hose in rocking arm, scraper bowl, the auxiliary activities utensil.Therefore, cantilever tank is used the also different of hydraulic hose 43,44,45 with the laying path that hydraulic hose 40 passes through with other each oil cylinder except that cantilever tank, like this, even when its displacement is big in swing, can not enwind other each oil cylinder hydraulic hose yet.
In addition, constitute as described above, fixedly in rocking arm, scraper bowl, the auxiliary activities utensil each oil cylinder with the geometrical clamp of hydraulic hose and cantilever mounted oil cylinder geometrical clamp with hydraulic hose, lay respectively at by the diverse location place of oscillation center along radial direction, therefore, along with the swing of rocking bracket, the shift motion of hydraulic hose produces difference, causes cantilever tank to use the different of hydraulic hose 43,44,45 with each oil cylinder in mobile and rocking arm, scraper bowl, the auxiliary activities utensil of hydraulic hose 40.Yet, even this different moving arranged, but because cantilever tank is inserted into the following insertion section 71 of described pipeline guiding part 68 with hydraulic hose 40, and be fixed on upper/lower positions place in the piping erection space 62 by pipeline geometrical clamp parts 67, arranged apart with other each oil cylinder with hydraulic hose 43,44,45, therefore, cantilever tank with each oil cylinder of hydraulic hose 40 and rocking arm, scraper bowl, auxiliary activities utensil with not producing friction between the hydraulic hose 43,44,45.
In addition, as shown in Figure 9, described pipeline geometrical clamp parts 67 can be positioned on the aerial bearing 69 for the center by axis of rotation 75 with freely swinging, this axis of rotation have be located at described pipeline geometrical clamp parts 67 bottoms roughly be upper and lower to the axle center.Like this, along with the carriage swing, and putting under the tractive deflection at curved spout position, the effect of pushing deflection counter-force, pipeline geometrical clamp parts 67 swing, therefore, be easy to make each flexible pipe at curved spout position to remain on this case of bending and swing, snarl each other not between flexible pipe with whole flexible pipes.
As mentioned above, inside in upper rotating body, dispose cantilever by hypomere successively overlappingly to epimere; rocking arm; scraper bowl; the auxiliary activities utensil respectively control transfer valve 63; 64; 65; 66; from this overlapping; the described transfer valve 63 of respectively controlling of arranged in order; 64; 65; 66 each 2 hydraulic hose 40 that comes out; 43; 44; 45; 2 files by described pipeline geometrical clamp parts 67 are tied up clamping part 73, clamp cantilever successively according to hypomere to epimere; rocking arm; scraper bowl from this clamping part; each oil cylinder of auxiliary activities utensil with the fixed order of hydraulic hose within piping erection space 62.And then each oil cylinder of rocking arm, scraper bowl, auxiliary activities utensil deflected into bending with hydraulic hose 43,44,45, and laterally insert abreast in the last insertion section 70 of described pipeline guiding part 68 by the tab order that described 2 files are tied up clamping part 73, simultaneously, cantilever tank is deflected into bending with hydraulic hose 40, laterally insert abreast in the following insertion section 71 of described pipeline guiding part 68, so that penetrate the inner space 38 of described rocking bracket 16.
Then; each oil cylinder is with hydraulic hose 43,44,45 in rocking arm, scraper bowl, the auxiliary activities utensil; lay path 46, be fixed and be positioned near the cantilever installation shaft 17a of cantilever installation portion 33, by the 2nd pipelines in the described rocking bracket 16 then respectively with rocking arm oil cylinder 21, bucket cylinder 22, and other operating apparatus oil cylinder (not shown) be connected.In addition, cantilever tank is with hydraulic hose 40, lays to be fixed behind the path 42 and to be positioned by the 1st pipelines in the rocking bracket 16 to be connected with cantilever tank 20 near the connecting pin 32 of cantilever tank installation portion 32.
More than the present invention of Gou Chenging has following effect.
Compared with prior art, has the effect that can shorten hose length, this be since with the cantilever tank of rocking bracket with the mounting arrangements of hydraulic hose, with the different paths of other oil cylinder with hydraulic hose, by being located at the laying path in the rocking bracket and after near the cantilever tank connecting pin, directly linking on the cantilever tank.In addition because the cantilever tank hydraulic hose is fixed near the cantilever tank connecting pin by geometrical clamp, so can reduce this flexible pipe with cantilever tank swing up and down and the deflection of deflection can also prevent because of contacting the damage that produces with the outer barrie thing.
And, with hydraulic hose agley mounting arrangements to rocking bracket, be to keep this case of bending by pipeline geometrical clamp parts that are located at both ends, hose bending position and pipeline guiding part, therefore can suppress crooked resilience, simultaneously, can also in the piping erection space, keep the curved spout position with the state that is bent.
In addition, when the swing of rocking bracket makes described each hydraulic hose be subjected to tractive, pushing and is mobile, the effect of pipeline guiding part is: can guide described each hydraulic hose, so that they move towards the roughly axis direction of flexible pipe, can also increase and decrease the deflection at curved spout position, absorb the displacement that hydraulic hose produces because of the rocking bracket swing.Therefore, the piping erection space of described upper rotating body inside only needs to hold the space of increase and decrease scope of the deflection at curved spout position, compared with prior art, can dwindle the pipe arrangement space.
In addition, pipeline geometrical clamp rack for assembly unit vacant lot is arranged in the piping erection space of upper rotating body inside, make the curved spout position arrange with suspension status, therefore, even hydraulic hose moves because of the displacement of crooked position, hydraulic hose also can not touch the last lower wall surface in the piping erection space of upper rotating body inside, thus can prevent owing to this on the flexible pipe damage that causes of lower wall surface friction.
The curved spout position that hangs is connected across tying up on clamping part and the 1 line pipeline guiding part of 2 files, and each curved spout position can not overlap, and can make flexible pipe not have resistance like this when carrying out displacement with case of bending, can also prevent snarl.
Because each oil cylinder of rocking arm, scraper bowl, auxiliary activities utensil is laid up and down with hydraulic hose dividually with hydraulic hose and cantilever tank, therefore, even the amount of movement of two flexible pipes creates a difference because of the swing of rocking bracket, can not contact between the two yet, damage can avoid friction.
In addition, when the crooked position at hydraulic hose applies flexural force, under the effect of this flexible pipe counter-force, pipeline geometrical clamp parts are to swing about the center with the axis of vertical direction, therefore, the case of bending of hydraulic hose can be kept at an easy rate, snarl each other can also be prevented between hydraulic hose.
In addition, each hydraulic hose that is arrived each oil cylinder by each control transfer valve can not reported to the leadship after accomplishing a task halfway yet, can fitly be arranged by pipeline geometrical clamp parts and pipeline guiding part.

Claims (7)

1. the conduit under fluid pressure laying structure of a left-right swing type apparatus for work, wherein at the leading section of the upper rotating body (12) of rotary operation car, can rocking bracket (16) swingingly be installed around the longitudinal axis, on this rocking bracket, install and have cantilever (17); rocking arm (18) and operating apparatus (19) and drive this cantilever respectively; the apparatus for work (11) of the hydraulic jack of rocking arm and operating apparatus (20; 21; 22); from being located at a plurality of control transfer valves (63; 64; 65,66) of upper rotating body inside; behind described rocking bracket, each hydraulic hose links to each other with described each hydraulic jack respectively; it is characterized in that
Described rocking bracket has the 1st pipeline and lays path (42), and this path is used for cantilever tank (20) is deployed to from its inner space (38) with hydraulic hose (40) space outerpace of cantilever tank installation portion (32); And the 2nd pipeline lay path (48), this path is used for waiting usefulness hydraulic hose (43,44) to be deployed to the space outerpace of its cantilever installation portion (33) from its inner space (38) rocking arm oil cylinder (21) and operating apparatus oil cylinder (22).
2. according to the conduit under fluid pressure laying structure of the described left-right swing type apparatus for work of claim 1, it is characterized in that, lay the cantilever tank hydraulic hose (40) that path (42) is laid by inner inner space (38) and described the 1st pipeline of upper rotating body through described rocking bracket (16), be fixed near the pin (39) that connects cantilever tank (20) and rocking bracket by the 1st geometrical clamp (49), inner space (38) and described the 2nd pipeline through described rocking bracket are laid the described rocking arm oil cylinder (21) of path (48) laying and the hydraulic hose (43 of operating apparatus oil cylinder usefulness such as (22), 44), be fixed near the axle (17a) that connects cantilever (17) and rocking bracket (16) by the 2nd geometrical clamp (50), and be connected with described each hydraulic jack.
3. according to the conduit under fluid pressure laying structure of the described left-right swing type apparatus for work of claim 2, it is characterized in that, also have pipeline geometrical clamp parts (67), being used for will be from described a plurality of control transfer valve (63,64,65) each hydraulic hose (40,43,44) is tied up the piping erection space (62) that is fixed to upper rotating body inside; And pipeline guiding part (68), be used to make the inner space (38) that penetrates described rocking bracket (16) by fixing described each hydraulic hose of this pipeline geometrical clamp, limit the moving of length direction of laterally moving and guide this flexible pipe of this flexible pipe.
4. according to the conduit under fluid pressure laying structure of the described left-right swing type apparatus for work of claim 3, it is characterized in that, described pipeline geometrical clamp parts (67) are set on the aerial bearing (69), this aerial bearing is configured in the piping erection space (62) of described upper rotating body inside vacantly, and flexible pipe, the state below top the reaching of leaving described piping erection space (62) that will be between the described pipeline guiding part (68) are fixed.
5. according to the conduit under fluid pressure laying structure of the described left-right swing type apparatus for work of claim 4, it is characterized in that, described pipeline guiding part (68) has 2 insertion portions (70 up and down that insert 1 line hydraulic hose respectively, 71), what described pipeline geometrical clamp parts (67) had clamping 2 file hydraulic hoses ties up clamping part (73), thereby cloth is set as described pipeline guiding part (68) can not overlapped with flexible pipe between the described pipeline geometrical clamp parts.
6. according to the conduit under fluid pressure laying structure of the described left-right swing type apparatus for work of claim 5, it is characterized in that, only with described each hydraulic hose (40,43,44) cantilever tank in is with the upper/lower positions place of hydraulic hose (40) clamping in 2 files of tying up clamping part (73) of described pipeline geometrical clamp parts (67), simultaneously, insert in the following insertion portion (71) of described pipeline guiding part (68), so that differently lay with hydraulic hose (43,44) with rocking arm oil cylinder (21) and operating apparatus oil cylinder (22) etc.
7. according to the conduit under fluid pressure laying structure of any described left-right swing type apparatus for work in the claim 3~6, it is characterized in that, described pipeline geometrical clamp parts (67) are installed, make it can be according to described hydraulic hose (40,43,44) deflection displacement, with have roughly be upper and lower to the axis of rotation (75) in axle center be that rotate at the center.
CNB031556957A 2002-09-05 2003-09-03 Hydraulic pipeline laying structure for left-right oscillating operation apparatus Expired - Fee Related CN1262714C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2002260680A JP4004041B2 (en) 2002-09-05 2002-09-05 Hydraulic piping structure of left and right swing type work equipment
JP2002260680 2002-09-05

Publications (2)

Publication Number Publication Date
CN1488821A true CN1488821A (en) 2004-04-14
CN1262714C CN1262714C (en) 2006-07-05

Family

ID=32261260

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031556957A Expired - Fee Related CN1262714C (en) 2002-09-05 2003-09-03 Hydraulic pipeline laying structure for left-right oscillating operation apparatus

Country Status (3)

Country Link
JP (1) JP4004041B2 (en)
KR (1) KR100969909B1 (en)
CN (1) CN1262714C (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101589200B (en) * 2007-02-27 2011-11-23 卡特彼勒Sarl公司 Hydraulic piping arrangement structure for construction machine
CN102677728A (en) * 2011-03-10 2012-09-19 住友建机株式会社 Construction machine
CN103261531A (en) * 2010-12-16 2013-08-21 沃尔沃建造设备有限公司 Device for fixing hydraulic pipe of boom swing type excavator
CN103603406A (en) * 2013-10-22 2014-02-26 徐州五洋科技股份有限公司 Adjustable hinge-joint steering device for explosion-proof type crawler-type rock raking machine
CN104480838A (en) * 2014-11-14 2015-04-01 湖南三一路面机械有限公司 Road roller and combination tube clamp
CN105051290A (en) * 2013-05-09 2015-11-11 日立建机株式会社 Construction equipment
CN107128258A (en) * 2016-02-29 2017-09-05 迪尔公司 Machine control unit for working truck
CN107142989A (en) * 2016-03-01 2017-09-08 神钢建机株式会社 The valve configuration structure of engineering machinery
CN110226009A (en) * 2017-03-01 2019-09-10 株式会社日立建机Tierra Hydraulic crawler excavator

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5525488B2 (en) * 2011-06-24 2014-06-18 日立建機株式会社 Swivel construction machine
EP3006629A4 (en) 2013-05-30 2017-01-11 Volvo Construction Equipment AB Pipe fixing device for construction machine
JP7183116B2 (en) * 2019-06-04 2022-12-05 株式会社クボタ work machine
JP7166306B2 (en) * 2020-03-26 2022-11-07 株式会社日立建機ティエラ construction machinery

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59160654U (en) * 1983-04-11 1984-10-27 株式会社クボタ Hose clamp structure of backhoe work vehicle
JP2563788Y2 (en) * 1992-10-29 1998-02-25 株式会社クボタ Backhoe hydraulic piping structure
JP2570199Y2 (en) * 1992-12-14 1998-05-06 日立建機株式会社 Support structure for front hose of construction machinery

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101589200B (en) * 2007-02-27 2011-11-23 卡特彼勒Sarl公司 Hydraulic piping arrangement structure for construction machine
CN103261531A (en) * 2010-12-16 2013-08-21 沃尔沃建造设备有限公司 Device for fixing hydraulic pipe of boom swing type excavator
CN102677728A (en) * 2011-03-10 2012-09-19 住友建机株式会社 Construction machine
CN102677728B (en) * 2011-03-10 2014-12-17 住友建机株式会社 Construction machine
CN105051290A (en) * 2013-05-09 2015-11-11 日立建机株式会社 Construction equipment
CN105051290B (en) * 2013-05-09 2017-05-10 株式会社日立建机Tierra Construction equipment
CN103603406A (en) * 2013-10-22 2014-02-26 徐州五洋科技股份有限公司 Adjustable hinge-joint steering device for explosion-proof type crawler-type rock raking machine
CN103603406B (en) * 2013-10-22 2016-10-26 徐州五洋科技股份有限公司 A kind of scalable articulated steering device taking off rock machine for explosion-proof type crawler type
CN104480838A (en) * 2014-11-14 2015-04-01 湖南三一路面机械有限公司 Road roller and combination tube clamp
CN107128258A (en) * 2016-02-29 2017-09-05 迪尔公司 Machine control unit for working truck
CN107142989A (en) * 2016-03-01 2017-09-08 神钢建机株式会社 The valve configuration structure of engineering machinery
CN110226009A (en) * 2017-03-01 2019-09-10 株式会社日立建机Tierra Hydraulic crawler excavator
CN110226009B (en) * 2017-03-01 2021-07-09 株式会社日立建机Tierra Hydraulic excavator

Also Published As

Publication number Publication date
JP2004100173A (en) 2004-04-02
JP4004041B2 (en) 2007-11-07
KR20040022162A (en) 2004-03-11
CN1262714C (en) 2006-07-05
KR100969909B1 (en) 2010-07-13

Similar Documents

Publication Publication Date Title
CN1262714C (en) Hydraulic pipeline laying structure for left-right oscillating operation apparatus
CN101183774B (en) Cable pulling machine for use in removing underground cables
CN1706603A (en) Managing structure comprising a flexible conduit for an umbilical member of an industrial robot
EP2146009A1 (en) Actuator for construction machines
CN104379842A (en) Conduit support structure for an industrial machine
KR20090118866A (en) Handling device of hydraulic hose of hanging type grapple
CN104250982A (en) Reel system within boom
CN103774704A (en) Conduit support system
JP4082587B2 (en) Piping structure in construction machinery
CN105247140A (en) Pipe fixing device for construction machine
JP4687683B2 (en) Hydraulic piping structure of crawler type work machine
CN107306494A (en) Working truck
CN1209536C (en) Pipeline fitting device for sliding arm
CN204852604U (en) Operation car is laid to electric power pipe
JP3790441B2 (en) Guard structure for hydraulic piping in construction machinery
JP7405718B2 (en) working machine
JPH09209399A (en) Front pipeline holding device of construction equipment
JP5184391B2 (en) Backhoe offset boom structure
JP4305824B2 (en) Piping structure in construction machinery
JPH1088616A (en) Construction machine
CN104617520B (en) Wire clamping device and method for clamping wire-shaped body by using wire clamping device
JP5373312B2 (en) Piping mounting structure for work vehicles
JP3762137B2 (en) Construction machinery
JP2002013159A (en) Piping structure of control valve unit
JP2001323494A (en) Offset boom type construction machinery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060705

Termination date: 20130903