CN1483526A - Mthod for controlling roller gap of precision rolling machine of band steel - Google Patents

Mthod for controlling roller gap of precision rolling machine of band steel Download PDF

Info

Publication number
CN1483526A
CN1483526A CNA021329745A CN02132974A CN1483526A CN 1483526 A CN1483526 A CN 1483526A CN A021329745 A CNA021329745 A CN A021329745A CN 02132974 A CN02132974 A CN 02132974A CN 1483526 A CN1483526 A CN 1483526A
Authority
CN
China
Prior art keywords
value
finish rolling
temperature
slab
gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021329745A
Other languages
Chinese (zh)
Other versions
CN1216699C (en
Inventor
凯 郑
郑凯
黄浩东
吴胜田
沙孝春
杨旭
杨大军
史乃安
谷春阳
刘威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang New Steel Co ltd
Angang Steel Co Ltd
Original Assignee
XINGANGTIE CO Ltd ANSHAN IRON AND STEEL GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGANGTIE CO Ltd ANSHAN IRON AND STEEL GROUP filed Critical XINGANGTIE CO Ltd ANSHAN IRON AND STEEL GROUP
Priority to CN 02132974 priority Critical patent/CN1216699C/en
Publication of CN1483526A publication Critical patent/CN1483526A/en
Application granted granted Critical
Publication of CN1216699C publication Critical patent/CN1216699C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a control method of roll gap of steel strip finishing rolling, mill, mainly including: using computer to successively calculate finishing rolling inlet temp. value, temp. values of all the machine frames of finishing rolling mill, rolling force values of all the machine frames and roll gap values of all the machine frames, setting and using computer to control PLC, and utilizing PLC to regulate screwdown motor and hydraulic device to regulate roll gap. Said invention also provides the mathematical model of finishing rolling inlet temperature, it can accurately control the accuracy of the roll gap, and can raise its production efficiency.

Description

The control method of band aluminium mill roll-gap
Affiliated field:
The present invention relates to a kind of automatic control system of milling train, especially a kind of control method with the aluminium mill roll-gap.
Background technology:
In the production process of hot rolled plate band, the control of finishing mill roll gap is mainly calculated by process computer and is finished.Temperature value, each frame roll-force value of finish rolling, each frame gap values between rollers of finish rolling to finish rolling inlet temperature value, each frame of finish rolling calculates successively, and send result of calculation to the one-level computer, by one-level computer control PLC, depress motor and hydraulic means adjustment roll gap by the PLC adjustment.Generally speaking, the calculating of finish rolling inlet temperature mainly is by the computer network control system, pyrometer by on-the-spot roughing exit detects the actual value feedback one-level computer of intermediate blank head temperature and sends process control computer to, calculate the running time of intermediate blank on this section roller-way by process control computer, calculate temperature drop according to cooling air mode, calculate the temperature of finish rolling porch at last.At present, owing to after having increased a Coil Box between roughing and the finish rolling, produced new problem again in order to aspect problems such as alleviation rolling line weak point, watermark temperature and de-scalings.Through after the conversion end to end of Coil Box, because variation has taken place in physical location, the intermediate slab that Coil Box is batched is conducted in heat, very big variation has also taken place in thermal-radiating mode, it is inaccurate that this just causes reducing the model accounting temperature with conventional temperature, thereby it is inaccurate to cause the finish rolling inlet temperature to be calculated, this also just makes the inlet temperature of each frame of finish rolling that calculates, outlet temperature is inaccurate, each frame roll-force is calculated inaccurate, the roll gap precomputation value of each frame is inaccurate, cause exit thickness inaccurate, influence the product quality of finished product band, the head hit rate of process control has only 72%.
Summary of the invention:
The object of the present invention is to provide a kind of control method with the aluminium mill roll-gap, by accurate Calculation to finish rolling inlet temperature (being the temperature of intermediate blank head), improve process control model head hit rate, help the precision control of finishing mill roll gap and the width control of hot rolled plate band, reach the thickness and precision of raising finished product band and the purpose of lumber recovery to the greatest extent.
The object of the present invention is achieved like this, the control method of this band aluminium mill roll-gap mainly comprises by computer successively to the calculating of the temperature value of finish rolling inlet temperature value, each frame of finish rolling, each frame roll-force value of finish rolling, each frame gap values between rollers of finish rolling, set and give the one-level computer, by one-level computer control PLC, depress motor and hydraulic means adjustment roll gap by the PLC adjustment, the Mathematical Modeling of wherein finish rolling inlet temperature is:
FET=RDT-αH-βGD-γL+δ
------finish rolling inlet temperature wherein: FET;
RDT------roughing mill R2 outlet afterbody actual temperature, its numerical value is by roughing exit pyrometer
Detect the actual value feedback one-level computer of intermediate blank head temperature and send process control computer to;
H---the thickness of roughing mill R2 outlet intermediate blank, its numerical value be by the width of finished product band,
The thickness decision, the width of finished product band, thickness then pass through the rolling scaduled transmission of three grades of controls;
GD------rolling steel grade calculated value, specifically calculate by following formula:
GD=C+Mn/6+Si/24
C, Si, Mn are the composition of continuous casting steel billet, and its numerical value is by rolling scaduled transmission;
The length of L------intermediate blank, its numerical value is calculated by following roughing model:
L=L Slab* H Slab/ H
Wherein: L SlabThe length of------continuous casting steel billet;
H SlabThe thickness of------continuous casting steel billet;
α, β, γ------intermediate variable coefficient;
δ------temperature compensation value.
The intermediate variable factor alpha of the Mathematical Modeling of the finish rolling inlet temperature among the present invention is 0.03~0.65, β is 0.612~0.92, γ is 0.000001~0.0000041, and temperature compensation value δ is-3 ℃~4 ℃.
The present invention is owing to having rebulid Mathematical Modeling in the production process of batching intermediate blank in the use Coil Box, finish rolling inlet temperature (being the temperature of intermediate blank head) has been carried out accurate calculating, make process control model head hit rate bring up to present 96% from original 72%, improve the precision of finishing mill roll gap and the width accuracy of hot rolled plate band effectively, reached the thickness and precision of raising finished product band and the purpose of lumber recovery to the greatest extent.
Description of drawings:
Fig. 1 is a control flow chart of the present invention.
The specific embodiment:
Below in conjunction with accompanying drawing the present invention is described in further detail.
As shown in Figure 1, the control method of band aluminium mill roll-gap of the present invention, mainly comprise by computer successively to the calculating of the temperature value of finish rolling inlet temperature value, each frame of finish rolling, each frame roll-force value of finish rolling, each frame gap values between rollers of finish rolling, set and give the one-level computer, by one-level computer control PLC, depress motor and hydraulic means adjustment roll gap by the PLC adjustment, the Mathematical Modeling of wherein finish rolling inlet temperature is:
FET=RDT-αH-βGD-γL+δ
------finish rolling inlet temperature wherein: FET;
RDT------roughing mill R2 outlet afterbody actual temperature, its numerical value is by roughing exit pyrometer
Detect the actual value feedback one-level computer of intermediate blank head temperature and send process control computer to;
The thickness of H------roughing mill R2 outlet intermediate blank, its numerical value be by the width of finished product band,
The thickness decision, the width of finished product band, thickness then pass through the rolling scaduled transmission of three grades of controls;
GD------rolling steel grade calculated value, specifically calculate by following formula:
GD=C+Mn/6+Si/24
C, Si, Mn are the composition of continuous casting steel billet, and its numerical value is by rolling scaduled transmission;
The length of L------intermediate blank, its numerical value is calculated by following roughing model:
L=L Slab* H Slab/ H
Wherein: L SlabThe length of------continuous casting steel billet;
H SlabThe thickness of------continuous casting steel billet;
α, β, γ------intermediate variable coefficient;
δ------temperature compensation value.
The intermediate variable factor alpha of calculating the Mathematical Modeling of finishing mill inlet temperature among the present invention is 0.03~0.65, β is 0.612~0.92, γ is 0.000001~0.0000041, and temperature compensation value δ is-3 ℃~4 ℃.
The temperature compensation value of Mathematical Modeling that calculates the finishing mill inlet temperature among the present invention is relevant with environment temperature, and during summer 1 ℃~4 ℃, during winter-3 ℃~-1 ℃.
The value of α, β, γ intermediate variable coefficient is relevant with intermediate blank thickness, steel grade and length respectively, sees table 1, table 2, table 3 for details.
Table 1: the intermediate blank thickness of different size and corresponding α value
Embodiment Thickness (mm) The α value
????1 ????23≤H<26 ????0.61
????2 ????26≤H<29 ????0.52
????3 ????29≤H<32 ????0.4
????4 ????32≤H<34 ????0.33
????5 ????34≤H<36 ????0.23
????6 More than 36 ????0.12
Table 2: the intermediate blank steel grade of different size and corresponding β value
Embodiment ????GD The β value
????1 ????0.1≤GD<0.22 ????0.62
????2 ????0.22≤GD<0.3 ????0.71
????3 ????0.3≤GD<0.36 ????0.75
????4 ????0.36≤GD<0.42 ????0.79
????5 ????0.42≤GD<0.6 ????0.85
????6 0.6 more than ????0.9
Table 3: the intermediate blank length of same specification and corresponding γ value
Embodiment Length (m) The γ value
????1 More than 80 ????0.0000012
????2 ????65≤L<80 ????0.0000019
????3 ????55≤L<65 ????0.0000023
????4 ????44≤L<55 ????0.0000032
????5 ????30≤L<44 ????0.0000035
????6 Below 30 ????0.000004
As shown in Figure 1, the present invention can select according to actual conditions in process of production: if use Coil Box to batch intermediate slab (being that Coil Box is not straight-through), then carry out the Mathematical Modeling (being hot rolling oven temperature, degree model) of finish rolling inlet temperature of the present invention; If do not use Coil Box to batch intermediate slab (being that Coil Box is straight-through), then carry out the Mathematical Modeling of existing finish rolling inlet temperature.

Claims (3)

1, a kind of control method with the aluminium mill roll-gap, mainly comprise by computer successively to the calculating of the temperature value of finish rolling inlet temperature value, each frame of finish rolling, each frame roll-force value of finish rolling, each frame gap values between rollers of finish rolling, set and give the one-level computer, by one-level computer control PLC, depress motor and hydraulic means adjustment roll gap by the PLC adjustment, it is characterized in that: the Mathematical Modeling of finish rolling inlet temperature is:
FET=RDT-αH-βGD-γL+δ
------finish rolling inlet temperature wherein: FET;
RDT------roughing mill R2 outlet afterbody actual temperature, its numerical value is by roughing exit pyrometer
Detect the actual value feedback one-level computer of intermediate blank head temperature and send process control computer to;
The thickness of H------roughing mill R2 outlet intermediate blank, its numerical value be by the width of finished product band,
The thickness decision, the width of finished product band, thickness then pass through the rolling scaduled transmission of three grades of controls;
GD---rolling steel grade calculated value, specifically calculate by following formula:
GD=C+Mn/6+Si/24
C, Si, Mn are the composition of continuous casting steel billet, and its value is by rolling scaduled transmission;
The length of L---intermediate blank, its numerical value is calculated by following roughing model:
L=L Slab* H Slab/ H
Wherein: L SlabThe length of------continuous casting steel billet;
H SlabThe thickness of------continuous casting steel billet;
α, β, γ------intermediate variable coefficient;
δ------temperature compensation value.
2, the control method of band aluminium mill roll-gap according to claim 1 is characterized in that the intermediate variable factor alpha is 0.03~0.65, β is 0.612~0.92, γ is 0.000001~0.0000041, and temperature compensation value δ is-3 ℃~4 ℃.
3, the control method of band aluminium mill roll-gap according to claim 2, when it is characterized in that temperature compensation value δ is summer 1 ℃~4 ℃, during winter-3 ℃~-1 ℃.
CN 02132974 2002-09-19 2002-09-19 Mthod for controlling roller gap of precision rolling machine of band steel Expired - Fee Related CN1216699C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02132974 CN1216699C (en) 2002-09-19 2002-09-19 Mthod for controlling roller gap of precision rolling machine of band steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02132974 CN1216699C (en) 2002-09-19 2002-09-19 Mthod for controlling roller gap of precision rolling machine of band steel

Publications (2)

Publication Number Publication Date
CN1483526A true CN1483526A (en) 2004-03-24
CN1216699C CN1216699C (en) 2005-08-31

Family

ID=34145393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02132974 Expired - Fee Related CN1216699C (en) 2002-09-19 2002-09-19 Mthod for controlling roller gap of precision rolling machine of band steel

Country Status (1)

Country Link
CN (1) CN1216699C (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100421839C (en) * 2005-06-30 2008-10-01 宝山钢铁股份有限公司 Double roller continuous thin-belt casting method
CN101588876B (en) * 2007-01-23 2011-08-17 西门子公司 Regulation device for a rolling stand and items corresponding thereto
CN102189102A (en) * 2010-03-09 2011-09-21 中冶东方工程技术有限公司上海分公司 Method for rolling liquid core under heavy reduction rate by virtue of online thickness regulating roll by utilizing continuous casting machine
CN102233358A (en) * 2010-04-20 2011-11-09 宝山钢铁股份有限公司 Adaptive strip threading correction method for roll gaps of hot finishing mill set
CN101869914B (en) * 2009-04-22 2012-03-28 宝山钢铁股份有限公司 Thickness control method of finish roller strip steel and device
CN101930225B (en) * 2009-06-23 2012-05-30 宝山钢铁股份有限公司 Hot rolling reeling width automatic control method and device thereof
CN102120224B (en) * 2010-01-08 2012-10-10 宝山钢铁股份有限公司 Control method of automatic deviation correction during rolling of hot continuous rolling mill
CN102896156A (en) * 2012-09-29 2013-01-30 鞍钢股份有限公司 Optimization method for hot rolled strip steel roll gap model
CN102921771A (en) * 2011-08-08 2013-02-13 宝山钢铁股份有限公司 Method for setting roller gap of coarse straightening machine
CN101829687B (en) * 2009-03-13 2013-04-03 鞍钢股份有限公司 Method for controlling roll gap of strip steel finishing mill to eliminate influence of specification change
CN103056168A (en) * 2013-01-10 2013-04-24 河北省首钢迁安钢铁有限责任公司 Method for controlling deviation of intermediate billet of coil box
CN103464473A (en) * 2013-08-23 2013-12-25 安阳钢铁股份有限公司 Automatic adjustment method of finishing roll gap level
CN103551398B (en) * 2013-11-06 2015-09-30 北京首钢股份有限公司 A kind of non-orientation silicon steel hot rolled coil Wedge Control
CN105013835A (en) * 2014-04-23 2015-11-04 宝山钢铁股份有限公司 Original roller seam setting method based on thermal crown in ultra-thin strip rolling conducted by cold continuous rolling unit
CN105665451A (en) * 2016-03-15 2016-06-15 山东钢铁股份有限公司 Calibration method for finishing mill
CN107583961A (en) * 2017-10-16 2018-01-16 辽宁科技大学 A kind of cold continuous rolling is without strip roll gap calibration control method
CN109604349A (en) * 2018-12-28 2019-04-12 中铝瑞闽股份有限公司 A kind of aluminum alloy hot rolling band method for controlling shape
CN110227721A (en) * 2019-05-31 2019-09-13 宝钢湛江钢铁有限公司 A kind of control method for mill roll-gap in speed-change process

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100421839C (en) * 2005-06-30 2008-10-01 宝山钢铁股份有限公司 Double roller continuous thin-belt casting method
CN101588876B (en) * 2007-01-23 2011-08-17 西门子公司 Regulation device for a rolling stand and items corresponding thereto
CN101829687B (en) * 2009-03-13 2013-04-03 鞍钢股份有限公司 Method for controlling roll gap of strip steel finishing mill to eliminate influence of specification change
CN101869914B (en) * 2009-04-22 2012-03-28 宝山钢铁股份有限公司 Thickness control method of finish roller strip steel and device
CN101930225B (en) * 2009-06-23 2012-05-30 宝山钢铁股份有限公司 Hot rolling reeling width automatic control method and device thereof
CN102120224B (en) * 2010-01-08 2012-10-10 宝山钢铁股份有限公司 Control method of automatic deviation correction during rolling of hot continuous rolling mill
CN102189102B (en) * 2010-03-09 2013-02-06 中冶东方工程技术有限公司秦皇岛研究设计院 Method for rolling liquid core under heavy reduction rate by virtue of online thickness regulating roll by utilizing continuous casting machine
CN102189102A (en) * 2010-03-09 2011-09-21 中冶东方工程技术有限公司上海分公司 Method for rolling liquid core under heavy reduction rate by virtue of online thickness regulating roll by utilizing continuous casting machine
CN102233358B (en) * 2010-04-20 2013-02-06 宝山钢铁股份有限公司 Method for correcting roll gaps of hot finishing mill set by threading self-adaption
CN102233358A (en) * 2010-04-20 2011-11-09 宝山钢铁股份有限公司 Adaptive strip threading correction method for roll gaps of hot finishing mill set
CN102921771B (en) * 2011-08-08 2014-12-24 宝山钢铁股份有限公司 Method for setting roller gap of coarse straightening machine
CN102921771A (en) * 2011-08-08 2013-02-13 宝山钢铁股份有限公司 Method for setting roller gap of coarse straightening machine
CN102896156A (en) * 2012-09-29 2013-01-30 鞍钢股份有限公司 Optimization method for hot rolled strip steel roll gap model
CN103056168A (en) * 2013-01-10 2013-04-24 河北省首钢迁安钢铁有限责任公司 Method for controlling deviation of intermediate billet of coil box
CN103056168B (en) * 2013-01-10 2015-09-30 北京首钢股份有限公司 A kind of method controlling deviation of intermediate billet of coil box
CN103464473A (en) * 2013-08-23 2013-12-25 安阳钢铁股份有限公司 Automatic adjustment method of finishing roll gap level
CN103551398B (en) * 2013-11-06 2015-09-30 北京首钢股份有限公司 A kind of non-orientation silicon steel hot rolled coil Wedge Control
CN105013835A (en) * 2014-04-23 2015-11-04 宝山钢铁股份有限公司 Original roller seam setting method based on thermal crown in ultra-thin strip rolling conducted by cold continuous rolling unit
CN105665451A (en) * 2016-03-15 2016-06-15 山东钢铁股份有限公司 Calibration method for finishing mill
CN105665451B (en) * 2016-03-15 2017-06-23 山东钢铁股份有限公司 Finishing mill scaling method
CN107583961A (en) * 2017-10-16 2018-01-16 辽宁科技大学 A kind of cold continuous rolling is without strip roll gap calibration control method
CN107583961B (en) * 2017-10-16 2018-11-16 辽宁科技大学 A kind of cold continuous rolling is without strip roll gap calibration control method
CN109604349A (en) * 2018-12-28 2019-04-12 中铝瑞闽股份有限公司 A kind of aluminum alloy hot rolling band method for controlling shape
CN109604349B (en) * 2018-12-28 2020-08-07 中铝瑞闽股份有限公司 Control method for plate shape of aluminum alloy hot rolled strip
CN110227721A (en) * 2019-05-31 2019-09-13 宝钢湛江钢铁有限公司 A kind of control method for mill roll-gap in speed-change process

Also Published As

Publication number Publication date
CN1216699C (en) 2005-08-31

Similar Documents

Publication Publication Date Title
CN1216699C (en) Mthod for controlling roller gap of precision rolling machine of band steel
CN100475369C (en) 6mm steel plate rolling technique
CN111014307B (en) Rolling mill speed control method for continuous rolling of furnace coil and finishing mill set
CN1850375A (en) Method for continuously rolling variable-thickness steel plate
CN104324948B (en) A kind of rougher of hot strip mill process rolled piece width control method
CN110614279B (en) Automatic head and tail pressing control method for single-stand roughing mill
CN1027426C (en) Method to set up gap values between rollers for rolling medium plates
CN1857808A (en) Control method for rolling thick head of thin strip steel
CN1483985A (en) Small cross steel tapping control method for continous steel billet neating furnace
CN1850374A (en) Method for rolling step-thickness steel plate
CN111842507A (en) Method for realizing deviation control of center line of plate blank
CN101422785B (en) Method for adjusting middle-roller drunkenness in double cold reduction shadow-mask strip-steel machine
CN102962253A (en) 5-millimeter steel plate rolling process
CN116020885A (en) Prediction method for hot continuous rolling finish rolling force of composite plate
CN109772894B (en) Strip steel width control method for hot rolling wedge-shaped blank
CN114029345B (en) Method for controlling tail plate shape of hot-rolled rough-rolled intermediate billet
CN112958633A (en) Incoming material camber-based fine rolling strip steel head pre-swing leveling control method
CN1261244C (en) Open-loop control method for suppressing shape waves in wide, thin, medium and heavy plate rolling
CN112439793B (en) Camber control method based on analysis of deviation of center line of plate blank
CN1753734A (en) Method for regulating the temperature of a metal strip, especially for rolling a metal hot strip in a finishing train
CN114713645B (en) Finish rolling threading leveling control method based on off tracking detection between racks
CN109047339B (en) Method for calculating finished product plate surface roughness characteristic parameters of double-stand temper mill
CN108787757B (en) Dynamic control method for roll gap of vertical roll in thick plate rolling production
CN112893462B (en) Comprehensive analysis method for head biting impact of strip steel based on hot continuous rolling
CN110961464B (en) Emulsion concentration optimization method of cold continuous rolling unit with vibration suppression as target

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ANGANG NEW STEEL ROLLING CO., LTD.

Free format text: FORMER OWNER: XINGANGTIE CO., LTD., ANSHAN IRON AND STEEL GROUP

Effective date: 20070316

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: ANGANG STOCK CO., LTD.

Free format text: FORMER NAME OR ADDRESS: ANGANG NEW STEEL ROLLING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 114009, No. 63, Wuyi Road, MTR Eastern District, Liaoning, Anshan

Patentee after: ANGANG STEEL Co.,Ltd.

Address before: 114009, No. 63, Wuyi Road, MTR Eastern District, Liaoning, Anshan

Patentee before: Angang New Steel Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20070316

Patentee after: Angang New Steel Co.,Ltd.

Patentee before: Angang Steel Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050831

Termination date: 20170919

CF01 Termination of patent right due to non-payment of annual fee