CN1472399A - 桥梁深水基础钢吊(套)箱浮运重型锚定位施工方案 - Google Patents

桥梁深水基础钢吊(套)箱浮运重型锚定位施工方案 Download PDF

Info

Publication number
CN1472399A
CN1472399A CNA031282245A CN03128224A CN1472399A CN 1472399 A CN1472399 A CN 1472399A CN A031282245 A CNA031282245 A CN A031282245A CN 03128224 A CN03128224 A CN 03128224A CN 1472399 A CN1472399 A CN 1472399A
Authority
CN
China
Prior art keywords
steel
cover
case
anchor
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031282245A
Other languages
English (en)
Other versions
CN1186502C (zh
Inventor
秦顺全
宋伟俊
粟杰
尤继勤
李德坤
涂满明
朱云翔
陈理平
邹焕华
汤利华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN 03128224 priority Critical patent/CN1186502C/zh
Publication of CN1472399A publication Critical patent/CN1472399A/zh
Application granted granted Critical
Publication of CN1186502C publication Critical patent/CN1186502C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

桥梁深水基础钢吊(套)箱浮运重型锚定位施工方案,涉及桥梁深水基础施工对钢吊(套)箱采用浮运及重型锚定位系统+定位桩定位的施工方案。本发明主要包括以下两部分:钢吊(套)箱浮运到墩位后,采用重型锚定位系统对钢吊(套)箱进行平面精确定位;采用结构钢护筒作为定位桩,对钢吊(套)箱进行竖向精确定位,并形成固定平台作为钻孔桩的施工平台。本发明通过重型锚定位系统、预拉系统和结构钢护筒定位桩对钢吊(套)箱进行满足设计要求的精确定位,形成固定平台,进行钻孔桩施工,确保钢护筒、桩中心平面位置及垂直度能满足设计要求所需的的精度。本施工方案对水深流急、水位涨落及水流速度变化频繁的河流(包括潮汐河流)具有很强的适应性。

Description

桥梁深水基础钢吊(套)箱浮运重型锚定位施工方案
技术领域  本发明涉及桥梁深水基础施工对钢吊(套)箱采用浮运及重型锚定位系统+定位桩定位的施工方案。
背景技术  随着我国经济的迅速发展,需要建设的桥梁日益增多,大型桥梁深水基础一般采用普通双壁钢围堰施工,这种施工方法存在以下3个方面的问题:1、工期长,双壁钢围堰需要在墩位处接高下沉至河床面以下一定深度,水上拼接工作量大,基础施工一般需要两个枯水期;2、成本高,水上拼接钢围堰要投入数量较多的大型起吊设备,施工风险大,而且要渡洪;3、钢围堰主要在水上拼接,施工安全质量保证的难度很大。
还有一种采用先建立固定平台,再在墩位处拼接钢吊(套)箱的施工方法,这种施工方法也存在以下3个方面的问题:1、工期长,固定平台的建立、拆除、钢吊(套)箱拼接必须在墩位处进行,不能平行作业;2、成本高,固定平台是临时结构,固定平台建立拆除和钢吊(套)箱拼接都是水上施工,成本很高;3、在水文条件复杂、桥位地质条件复杂的情况下,固定平台建立的难度大,施工期间平台的安全稳定性难以保证。
另一种是钢吊(套)箱浮运到墩位处,采用重型锚+定位船+导向船方案对钢吊(套)箱进行平面精确定位,然后根据计算插打一定数量的结构钢护筒作为定位桩,钢吊(套)箱与定位桩固结,形成固定平台进行钻孔桩施工。在水文条件变化复杂的情况下,采用重型锚定位系统对钢吊(套)箱进行平面精确定位具有很大的难度。
发明内容  本发明的目的是针对上述现状,旨在提供一种整体刚度大、适应水文条件变化的能力强、定位精度高、浮态各向稳定性好、占用水域范围小、施工工期短、安全可靠、质量易于保证且经济合理的桥梁深水基础钢吊(套)箱施工方案。
本发明目的的实现方式为,桥梁深水基础钢吊(套)箱浮运、重型锚定位施工方案,具体施工步骤为:
2)钢吊(套)箱制造,采用竖向分段、平面分块制造,
2)钢吊(套)箱在总装台上进行合拢焊接,采用适应滑道下滑入水,选择一艘主拖轮、2~4艘邦拖轮将钢吊(套)箱浮运至墩位,
3)钢吊(套)箱浮运后在浮态下初步定位,
4)钢吊(套)箱浮运后在浮态下精确定位,定位系统由导向船组、前后定位船及其重型锚碇组成,定位船上设置相应吨位的电动系泊绞车作为绞锚设备,锚碇有主锚、尾锚、边锚、各锚碇采用重型锚,并相应配备了大直径锚链和钢丝绳,
5)打结构钢护筒作为定位桩对钢吊(套)箱进行竖向精确定位,
6)钢吊(套)箱与定位桩固结后形成固定钻孔平台,兼作钻孔桩施工平台,
7)在钢吊(套)箱和定位桩钢护筒形成的固定平台上插打其它钢护筒,并先期进行钻孔桩施工,最后钻填定位桩钢护筒,
8)承台施工:钻孔桩施工完成后,先进行钢吊(套)箱封底混凝土施工,然后进行承台施工,
9)拆除钢吊(套)箱。
本方案主要包括以下2部分:①钢吊(套)箱浮运到墩位后采用重型锚定位系统对钢吊(套)箱浮态进行平面精确定位。②采用结构钢护筒作为定位桩对钢吊(套)箱进行竖向精确定位并形成固定平台作为钻孔桩施工平台。
具体施工流程为:钢吊(套)箱在工厂进行竖向分段、平面分块制造,在总装台上进行合拢焊接,定位系统施工,钢吊(套)箱滑移下水自浮,并浮运至墩位;调整钢吊(套)箱平面位置,进行初定位;主尾锚及导向船边锚施加预拉力,对钢吊(套)箱进行平面精确定位;插打定位桩钢护筒,钢吊(套)箱与定位桩固结,形成固定平台;在平台上进行钻孔桩施工;钢吊(套)箱内封底、抽水,进行承台施工;拆除钢吊(套)箱。
钢吊(套)箱采用竖向分段、平面分块制造,每块重量控制在起吊设备起重曲线范围内。钢吊箱所用板材、型材在胎架上焊拼成型,所有焊缝进行探伤检查,确保水密性良好。各段、块在总装台上进行合拢焊接。拼装、检测后,选择适应滑道和航运条件,确保吊箱下水和浮拖过程的安全可靠,其措施主要有:滑道前端水深应满足要求;钢吊箱在滑道上刚浮起时,因后端支点受力较大,钢吊箱后端的强度和刚度应加强;浮拖时除航道水深条件应满足要求外,还应有监督船只前后护船航行;选择4级风以下的小潮期进行浮拖。浮拖选择一艘主拖轮、2~4艘邦拖轮,以保证浮拖的稳定性。
钢吊(套)箱浮运后在浮态下精确定位,定位系统由导向船1、14、定位船6、13、15、前后定位船8、9、定位船边锚3、6、导向船边锚4、11、主锚7、20、尾锚10、21、锚绳16、锚链17、18、19、钢吊箱5等组成(见图1)。
定位系统的作用是保证钢套箱2在水流5流力、风力等外荷载作用下,其平面位移能满足插打定位钢护筒时,轴线偏差小于±5cm的精度要求。定位船6、13、15起到确定、调整导向船1、14和钢套箱2、钢吊箱5的位置,调节尾锚10、21、主锚7、20受力的作用,并对钢套箱、钢吊箱具有安全防护作用。定位船上还设有相应吨位的电动系泊绞车作为绞锚设备。导向船1、14由2艘大型工程铁驳组成,两铁驳通过两组联结梁连成整体,导向船体系既作为调整、确定钢套箱、钢吊箱位置的约束体系,又作为基础施工的辅助工作平台。在墩位上下游及两侧抛设重型锚碇,并选配大直径锚绳16和锚链17、18、19。主锚7、20、尾锚10、21和导向船边锚4、11采用重锚,锚碇数量少、受力明确,调锚作业量少;与重锚相配套,相应采用大直径锚链17、18、19和锚绳16,锚绳单位长度重量较重,有效减小水文条件变化对锚绳垂度的影响。尾锚10、21主要作用是承受定位系统预拉力和风力。
锚碇系统的计算公式与系数选定,主要依据《公路工程施工技术手册·桥涵》中有关锚碇计算部分。
导向船组将钢吊(套)箱浮运至墩位处,将后定位船上的锚绳及拉缆分别过至导向船组上,导向船组下游侧的两根边锚锚绳暂不交叉,两根尾锚锚绳暂过至导向船尾部系结,后定位船暂系泊于导向船组一侧。
本发明还(1)设置大吨位预拉力,选择适当水位(潮位)施加预拉力有效减小锚绳的非弹性变形,大大减小流速变化、水位变化对钢吊(套)箱平面定位精度影响;(2)发挥重锚抗上拔力能力强的优点,有效缩短锚绳长度,减小水文条件变化产生的弹性变形与非弹性变形,从而减少锚绳调整的频率,提高定位的精度与效率;(3)配置大吨位绞锚设备,使绞锚操作简便易行,提高调锚效率;(4)将钢吊(套)箱通过牛腿均匀支承于导向船组上,有效增加了整个体系的稳定性与刚度,并可实施精确调整;(5)根据实测的钢吊(套)箱平面位置随水文条件的变化规律微调定位系统或调整拉缆,将钢吊(套)箱定位于紧靠设计墩位的一理想位置。
钢吊(套)箱5、2与定位桩固结形成固定钻孔平台(见图2),在钢吊(套)箱和定位桩钢护筒形成的固定平台上插打其它钢护筒25,并先期进行钻孔桩施工,最后钻填定位桩钢护筒。由于钢吊(套)箱加长了钢护筒的导向、减少了钢护筒承受的水流冲击力,同时钢护筒上方有护筒上导向架22,因此能有效保证钢护筒的垂直度要求。钻孔桩施工完成后,先进行钢吊(套)箱封底混凝土施工,然后进行承台施工。
本发明钢吊(套)箱采用浮运及重锚定位系统+定位桩的施工方案,具有整体刚度大、定位稳定性好、适应水文条件变化的能力强、定位精度高、占用水域范围小、施工周期短、安全可靠、抗施工风险能力强、质量易于保证、经济合理等独到的优点。
附图说明
图1定位系统平面布置图
图2、3定位桩及固定平台纵向、水平向示意图
图2中23船、24河床面、26基岩
具体实施方式本发明的施工方案主要包括以下2部分:①钢吊(套)箱浮运到墩位后采用重锚定位系统对钢吊(套)箱浮态进行平面精确定位。②采用结构钢护筒作为定位桩对钢吊(套)箱进行竖向精确定位并形成固定平台作为钻孔桩施工平台。
具体施工流程为:钢吊(套)箱在工厂进行竖向分段、平面分块制造,在总装台上进行合拢焊接,定位系统施工,钢吊(套)箱滑移下水自浮,并浮运至墩位;调整钢吊(套)箱平面位置,进行初定位;主尾锚及导向船边锚施加预拉力,对钢吊(套)箱进行平面精确定位;插打定位桩钢护筒,钢吊(套)箱与定位桩固结,形成固定平台;在平台带上进行钻孔桩施工;钢吊(套)箱内封底、抽水,进行承台施工;拆除钢吊(套)箱。

Claims (2)

1、桥梁深水基础钢吊(套)箱浮运重型锚定位施工方案,具体施工步骤为:
1)钢吊(套)箱制造,采用竖向分段、平面分块制造,
2)钢吊(套)箱在总装台上进行合拢焊接,采用适应滑道下滑入水,选择一艘主拖轮、2~4艘邦拖轮将钢吊(套)箱浮运至墩位,
3)钢吊(套)箱浮运后在浮态下初步定位,
4)钢吊(套)箱浮运后在浮态下精确定位,定位系统由导向船组、前后定位船及其重型锚碇组成,定位船上设置相应吨位的电动系泊绞车作为绞锚设备,锚碇有主锚、尾锚、边锚、各锚碇采用重型锚,并相应配备了大直径锚链和钢丝绳,
5)打结构钢护筒作为定位桩对钢吊(套)箱进行竖向精确定位,
6)钢吊(套)箱与定位桩固结后形成固定钻孔平台,兼作钻孔桩施工平台,
7)在钢吊(套)箱和定位桩钢护筒形成的固定平台上插打其它钢护筒,并先期进行钻孔桩施工,最后钻填定位桩钢护筒,
8)承台施工:钻孔桩施工完成后,先进行钢吊(套)箱封底混凝土施工,然后进行承台施工,
9)拆除钢吊(套)箱。
2、根据权利要求1所述的施工方案,其特征在于采用竖向分段、平面分块制造,每块重量控制在起吊设备起重曲线范围内。
CN 03128224 2003-06-27 2003-06-27 桥梁深水基础钢吊箱、钢套箱浮运重型锚定位施工方法 Expired - Lifetime CN1186502C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03128224 CN1186502C (zh) 2003-06-27 2003-06-27 桥梁深水基础钢吊箱、钢套箱浮运重型锚定位施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03128224 CN1186502C (zh) 2003-06-27 2003-06-27 桥梁深水基础钢吊箱、钢套箱浮运重型锚定位施工方法

Publications (2)

Publication Number Publication Date
CN1472399A true CN1472399A (zh) 2004-02-04
CN1186502C CN1186502C (zh) 2005-01-26

Family

ID=34153281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03128224 Expired - Lifetime CN1186502C (zh) 2003-06-27 2003-06-27 桥梁深水基础钢吊箱、钢套箱浮运重型锚定位施工方法

Country Status (1)

Country Link
CN (1) CN1186502C (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666097B (zh) * 2009-08-04 2011-10-26 中交第二航务工程局有限公司 大型钢吊箱定位方法
CN102359116A (zh) * 2011-07-19 2012-02-22 中铁大桥局股份有限公司 一种围堰转向马口及其应用
CN103215957A (zh) * 2012-03-15 2013-07-24 厦门国新世纪科技股份有限公司 大型物件水下施工方法及所使用的装置
CN103452117A (zh) * 2013-09-10 2013-12-18 中交上航局航道建设有限公司 一种深水袋装砂施工装置及工艺
CN103758142A (zh) * 2013-12-30 2014-04-30 中铁大桥局股份有限公司 一种围堰定位系统
CN104762965A (zh) * 2015-03-23 2015-07-08 中铁大桥局集团有限公司 一种用于大型钢沉井基础定位的混凝土蛙式锚及施工方法
CN105113508A (zh) * 2015-09-11 2015-12-02 中交公路长大桥建设国家工程研究中心有限公司 大型桥梁深水预制基础定位沉放控制系统
CN105256780A (zh) * 2015-09-09 2016-01-20 中铁大桥局集团有限公司 一种多用途水上施工平台及施工方法
CN105926628A (zh) * 2016-06-12 2016-09-07 中交公局第三工程有限公司 一种浮动、固定可转换的水中桩基施工平台装置
CN106759407A (zh) * 2017-03-01 2017-05-31 中国五冶集团有限公司 一种围堰浮运定位的方法
WO2021232484A1 (zh) * 2020-05-19 2021-11-25 中交第四航务工程局有限公司 一种大直径超长hdpe管道水下定位方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666097B (zh) * 2009-08-04 2011-10-26 中交第二航务工程局有限公司 大型钢吊箱定位方法
CN102359116A (zh) * 2011-07-19 2012-02-22 中铁大桥局股份有限公司 一种围堰转向马口及其应用
CN103215957B (zh) * 2012-03-15 2015-08-05 厦门国新世纪科技股份有限公司 大型物件水下施工方法及所使用的装置
CN103215957A (zh) * 2012-03-15 2013-07-24 厦门国新世纪科技股份有限公司 大型物件水下施工方法及所使用的装置
CN103452117A (zh) * 2013-09-10 2013-12-18 中交上航局航道建设有限公司 一种深水袋装砂施工装置及工艺
CN103758142A (zh) * 2013-12-30 2014-04-30 中铁大桥局股份有限公司 一种围堰定位系统
CN103758142B (zh) * 2013-12-30 2016-02-17 中铁大桥局集团有限公司 一种围堰定位系统
CN104762965A (zh) * 2015-03-23 2015-07-08 中铁大桥局集团有限公司 一种用于大型钢沉井基础定位的混凝土蛙式锚及施工方法
CN105256780A (zh) * 2015-09-09 2016-01-20 中铁大桥局集团有限公司 一种多用途水上施工平台及施工方法
CN105113508A (zh) * 2015-09-11 2015-12-02 中交公路长大桥建设国家工程研究中心有限公司 大型桥梁深水预制基础定位沉放控制系统
CN105926628A (zh) * 2016-06-12 2016-09-07 中交公局第三工程有限公司 一种浮动、固定可转换的水中桩基施工平台装置
CN106759407A (zh) * 2017-03-01 2017-05-31 中国五冶集团有限公司 一种围堰浮运定位的方法
WO2021232484A1 (zh) * 2020-05-19 2021-11-25 中交第四航务工程局有限公司 一种大直径超长hdpe管道水下定位方法

Also Published As

Publication number Publication date
CN1186502C (zh) 2005-01-26

Similar Documents

Publication Publication Date Title
CN105121270B (zh) 具有用于减少垂荡运动的连接至浮筒的延伸板的浮式海上平台
KR101512596B1 (ko) Fpso 계류라인의 변형률 측정 장치
CN1186502C (zh) 桥梁深水基础钢吊箱、钢套箱浮运重型锚定位施工方法
CN104727336A (zh) 浅海风电场大型单管桩基础施工方法
CN104480865A (zh) 一种大型钢沉井精确定位方法
CN101389526A (zh) 半潜船、操作半潜船的方法和制造半潜船的方法
CN101078211A (zh) 水中锚碇系统辅助的板凳结构平台及其施工方法
CN1442342A (zh) 水下软体排铺设工程船及水下软体排铺设工艺
CN1186503C (zh) 钢吊箱整体浮运锚墩预施拉力定位、兼作钻孔平台方法
CN109707002B (zh) 大型取水头精确定位沉放安装装置及方法
CN103015442A (zh) 分体围堰施工方法
CN212715000U (zh) 在深水中的钢围堰定位系统
CN104002936B (zh) 一种滨海浅滩钻探平台
Agostoni et al. TSG-integrated storage platform for early production in the North Sea
CN111764418A (zh) 在深水中的钢围堰定位系统
CN204690772U (zh) 一种深水桩基定位、导向结构
CN201685988U (zh) 1600吨起重船主船体水上合拢高度定位装置
CN211815983U (zh) 一种用于智能系靠泊系统的水位适应调节基础安装组件
JP6928381B2 (ja) 浮体装置
CN103397623B (zh) 一种海上平台
CN102877476B (zh) 一种钢围堰的定位施工方法
CN206233230U (zh) 一种桥墩管桩桩基施工装置
CN207060338U (zh) 一种用于水上作业平台辅助定位的动力船
Chakrabarti et al. Design, construction, and installation of a floating caisson used as a bridge pier
CN201685989U (zh) 1600吨起重船主船体水上合拢横向定位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY BRIDGE BUREAU GROUP CO., LTD.; CHIN

Free format text: FORMER OWNER: CHINA RAILWAY BRIDGE BUREAU GROUP CO., LTD.

Effective date: 20081017

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081017

Address after: No. 38, Hanyang Avenue, Hubei, Wuhan Province, China: 430050

Co-patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Address before: No. 38, Hanyang Avenue, Hubei, Wuhan Province, China: 430050

Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

ASS Succession or assignment of patent right

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150420

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150420

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Address before: 430050 No. 38, Hanyang Avenue, Wuhan, Hubei

Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd.

Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20050126

CX01 Expiry of patent term