CN1457382A - 井眼的完井井段内的不同深度地层的压裂 - Google Patents

井眼的完井井段内的不同深度地层的压裂 Download PDF

Info

Publication number
CN1457382A
CN1457382A CN01813724A CN01813724A CN1457382A CN 1457382 A CN1457382 A CN 1457382A CN 01813724 A CN01813724 A CN 01813724A CN 01813724 A CN01813724 A CN 01813724A CN 1457382 A CN1457382 A CN 1457382A
Authority
CN
China
Prior art keywords
well
holes
completion interval
isocon
parent tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN01813724A
Other languages
English (en)
Other versions
CN1263940C (zh
Inventor
劳埃德·G·琼斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Oil Corp
Original Assignee
ExxonMobil Oil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ExxonMobil Oil Corp filed Critical ExxonMobil Oil Corp
Publication of CN1457382A publication Critical patent/CN1457382A/zh
Application granted granted Critical
Publication of CN1263940C publication Critical patent/CN1263940C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/10Polarisation diversity; Directional diversity
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B43/088Wire screens
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q21/00Antenna arrays or systems
    • H01Q21/24Combinations of antenna units polarised in different directions for transmitting or receiving circularly and elliptically polarised waves or waves linearly polarised in any direction
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q3/00Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system
    • H01Q3/26Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system varying the relative phase or relative amplitude of energisation between two or more active radiating elements; varying the distribution of energy across a radiating aperture
    • H01Q3/2605Array of radiating elements provided with a feedback control over the element weights, e.g. adaptive arrays
    • H01Q3/2611Means for null steering; Adaptive interference nulling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/08Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
    • H04B7/0837Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station using pre-detection combining
    • H04B7/0842Weighted combining
    • H04B7/0848Joint weighting
    • H04B7/0857Joint weighting using maximum ratio combining techniques, e.g. signal-to- interference ratio [SIR], received signal strenght indication [RSS]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/08Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station
    • H04B7/0837Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the receiving station using pre-detection combining
    • H04B7/0842Weighted combining
    • H04B7/086Weighted combining using weights depending on external parameters, e.g. direction of arrival [DOA], predetermined weights or beamforming

Abstract

用于压裂井眼内的完井井段的不同深度地层的方法和装置。一个工作管柱(14)下入一个压裂管柱(15),压裂管柱由一个基管(20)构成;基管是空白的,但是沿着其长度方向具有带孔管段。筛装置(31)可以设置在所述的带孔管段上,以阻止砂流入到基管内。一个备用流道(24)(亦即分流管)沿着基管延伸,沿着其长度方向具有一个或者多个出口(25)。压裂浆液流入到压裂管柱周围的环形空间。当流体从浆液中漏失时,来自压裂浆液内的砂将形成砂桥(45),砂桥作为带孔管段的迷你砾石充填,隔离环形空间的一部分。压裂浆液穿过所述的分流管(24),然后进入到隔离的部分,以压裂完井井段的不同深度地层。

Description

井眼的完井井段内的不同深度地层的压裂
背景技术
本发明涉及完井一个地下地层,根据本发明的一个方面,它涉及一种用于在一次作业过程中完成压裂一个地下地层的一个完井井段不同深度地层进行的方法和设备。
在对生产烃或者类似物的井完井时,为了改进流体流入到地层内或者从地层内流出的效率,通常需要“水力压裂”生产/注射地层的至少某些井段。正如本领域所理解的那样,水力压裂通常通过将一个工作管柱下入到井眼内并通过安放封隔器或者类似物来隔离靠近需要压裂的井眼部分。然后,压裂液或者浆液(例如,一种包括或者不包括支撑剂的重质胶)沿着工作管柱被向下泵送进入到隔离的井段,其压力足以分离或者“压裂”地层,因此在地层内形成渗透性的通道。
在薄或者相对较短的各向同性的井段,标准的压裂技术例如上面所述的技术通常能在完井井段的整个长度上产生一个裂缝或者多个裂缝。然而,当这些标准的压裂技术用于长的或者厚的各向异性(亦即,由几个在不同压力下压裂的不同深度地层或者区块构成的)井段时会产生问题。例如,在这样的井段内,一旦一个第一区块已经开始压裂,即使压裂第二区块是可能的,它也是非常困难的。当在隔离的井眼部分内的压力增加时,压裂浆液将继续流入并扩大原来的裂缝,而不是在压裂几点的其他区块或者深度的地层产生另外的裂缝。
而且,压裂浆液内的液体通常会通过最初的裂缝而“漏失”到地层内,这导致支撑剂(例如沙子)重浆液重沉降出来,从而在井眼靠近最初裂缝的部分形成桥堵或者堵塞。即使一些区块已经产生某些坍塌亦即压裂,这些堵塞仍然阻止浆液继续流动到压裂井段内的其他区块。这导致裂缝在整个压裂井段内分布不均,因为只有具有最低坍塌压力的区块被压裂和支撑。
由于这些问题,压裂长和/或各向异性井段时,通常需要执行一系列的单个的(如上所述的)常规压裂作业。这就是说,先压裂一个第一区块,然后工作管柱重新定位到井眼内,再压裂第二区块;依此类推,直到整个井段都被压裂。当然,正如本领域的普通技术人员所意识到的那样,这种重复的作业造价昂贵并且费时间,大大影响所完井的井眼的整体经济性。
为了克服在压裂长和/或各向异性的井段时出现的问题,人们提出了几种方法,在这些方法中,这些井段的压裂可以通过只是执行一次工作管柱安放即可完成压裂,并且在压裂的过程中,压裂浆液同时通过备用流道被输送到该井段的不同深度或者区块;例如,授权给Jones以及其他人的美国专利US5161618就公开这种技术。另外一种这样的方法公开在美国专利5435391中,该专利于1995年7月25日授权。在该方法中,备用的凝胶段塞和一个支撑剂浆液沿着一个单一工作管柱向下泵送,穿过所述的备用流道压裂和支撑该压裂井段内的不同深度的地层。
另外一种这样的方法公开在美国专利US5417284中,于1995年5月23日授权;在该方法中,压裂凝胶沿着一个工作管柱向下泵送进入到隔离井眼的一个端部,而支撑剂同时穿过井眼环形空间泵送进入到隔离的环形空间的另外一端,以在隔离井段内的不同深度上进行压裂。如果发送堵塞,压裂凝胶和/或浆液穿过备用流道继续输送到整个压裂井段以完成该井段的压裂。
一个类似的方法公开在美国专利US5560427中,不同之处在于:一个浆液隔离器放置于井下工作管柱内;其中,一部分凝胶与压裂浆液分离,流入到隔离井段的底部以在该井段内进行压裂。其余的浆液流动到隔离井段的上端以在形成裂缝时支撑这些裂缝。备用通道用于保证,如果在井眼环形空间完成压裂之前发生堵塞,凝胶和/或浆液将被输送道井段内的不同深度。
技术方案
本发明提供一种用于压裂一个地下地层完井井段的不同深度地层的方法和装置,该地层由一个井眼穿过。基本上,一个由具有一个油流会合装置的油管柱和一个压裂管柱构成的工作管柱下入到井眼内,直到压裂管柱定位到需要压裂的完井井段附近。压裂管柱由一个基管构成。基管的大部分为为空白的(亦即:非渗透的),但是沿着基管的长度方向互相隔开设置有多个带孔管段。每一个带孔管段有多个穿过基管的壁的开口(例如:圆形开口、沟槽等等),这些开口围绕所述的带孔管段周围以及整个长度上分布。各个带孔管段的长度可以变化(例如1到300英尺);另外带孔管段互相隔开不同距离(例如:从10到1000英尺)。
在对无颗粒材料(例如:砂)随着地层流体产生或者产生的颗粒材料很少的地层进行压裂时,在带孔管段上的开口可以是穿过基管的无筛开口,类似于常规的“沟槽衬管”内的沟槽。在大量出砂的地层,一个筛装置(例如:绕线)定位在每一个带孔管段上开口,以允许流体穿过这些开口流动到基管内,而同时阻止大量的砂流过这些开口。至少一个备用流道(例如:分流管)设置是压裂管柱上,他们沿着所述的基管的纵向延伸;所述的备用流道具有一个入口和至少一个或者多个互相隔开的出口。绕线可以缠绕在每一个带孔管段的分流管上;或者当绕线已经定位在基管上时,分流管可以弯曲而穿过绕线。在分流管位于绕线外部时,一个带孔套筒或者外罩可以被定位在每一个带孔管段的分流管上,以在安装过程中保护分流管。
为了执行本发明的压裂方法,工作管柱定位在井眼内,从而使得压裂管柱基本上穿过所述的完井井段,并与所述的井眼一起形成一个完井井段环形空间,反过来该环形空间与井眼上方的环形空间分隔开。一个由压裂液(例如:较高粘度凝胶)和支撑剂(例如:砂)沿着油管柱向下流动,穿过油流会合装置进入到完井井段环形空间的顶部。正如在常规的压裂作业中那样,根据需要,在压裂浆液在地层内产生裂缝之前,一个无支撑剂的压裂液段塞可以被泵送到完井井段环形空间内。
正如在本领域中公知的那样,当回流穿过井眼环形空间时,来自压裂浆液的流体即漏失到所述的完井井段内的地层内,又穿过沿着基管的带孔管段上的开口。这导致来自压裂浆液的支撑剂(砂)在带孔管段的完井井段环形空间处形成“出砂”,以形成砂桥,反过来砂桥阻止压裂浆液进一步向下流动穿过完井井段环形空间。
这些砂桥或者堵塞作为有效的封隔器,这些封隔器隔离各个临近的带孔管段之间的完井井段环形空间。压裂浆液继续泵送到完井井段环形空间的顶部,但是压裂浆液只能向下流动穿过备用流道(亦即:分流管)。压裂浆液进入到管子的顶部,并向下流动以穿过完井井段环形空间内的不同深度的互相隔开的出口;这就是说,压裂浆液进入到完井井段环形空间的隔离部分。压裂浆液继续泵送将导致在这些隔离部分内集聚压力,直到完井井段内的不同深度被压裂并且由支撑剂支撑为止。如果任何完井井段的深度不需要压裂,在该深度的分流管不设置出口;因此,无压裂浆液排出到靠近无须压裂的深度的地层的完井井段环形空间隔离部分。
在回流不是通过环形空间的情况下,流体进入或者穿过基管的流动被中止,井眼环形空间充满不可压缩完井液。因此,不会有大量的压裂液流体漏失穿过任何带孔管段,但是将漏失到地层内。最后,地层井在完井井段的某个深度地层压裂。一旦形成了最初的裂缝,流体现在不但可以流入到裂缝内,而且可以穿过某些带孔管段上而进入到距离裂缝最近的基管内。
在压裂浆液流体的带孔管段漏失形成砂桥。这些砂桥形成“封隔器”,反过来,这些封隔器隔离位于封隔器之间的完井井段环形空间。压裂浆液现在只能穿过备用流道流动;备用流道将压裂浆液输送到完井井段环形空间的隔离部分,以完成压裂作业。
一旦完井井段被压裂和支撑,压裂浆液的流动中止,井眼投产。来自完井井段的流体流入到完井井段环形空间;由于压裂浆液的粘度(例如:大约100厘泊)和产液的粘度(例如:1厘泊)之间的差别,产液很容易穿过砂桥而通过基管的带孔管段上的开口进入到基管内。在随着地层流体大量出砂时,在带孔管段上的开口将被装置一个筛装置(例如:绕线),该筛装置允许产液穿过,但是阻止大量的颗粒的流动。
附图描述
参照附图,本发明的实际构造、操作过程和明显的优点将更加容易理解,但是这些附图不一定成比例;附图中,类似的数字表示类似的部件。这些附图包括:
图1是一个井眼一部分的立式图,部分为剖面图;该井眼具有一个根据本发明的压裂管柱,该压裂管柱靠近被压裂的完井井段的一个可作业位置;
图2是图1中的压裂管柱的一部分的放大的立式图,部分为剖面图;
图3是沿着图2中的3-3线的剖面图;
图4是本发明的压裂管柱的另外一个实施例的立式图,部分为剖面图;
图5是本发明的压裂管柱的另外一个实施例的立式图,部分为剖面图;以及
图6是一个井眼的一部分的立式图,部分为剖面图;该井眼具有本发明的一个压裂管柱的另外一个实施例,该压裂管柱靠近被压裂的完井井段的一个可作业位置。
尽管本发明将参照它的优选实施例进行描述,应该能够理解,本发明不限于此。相反,本发明欲覆盖各种替换方式、改进和等同物,它们包括在根据所附的权利要求所定义的本发明的精神和范围内。
发明的详细描述
参考附图,图1说明了一个生产和/或注射井10的井眼11的一部分。井眼11从地面(未示出)穿过一个长完井井段12(亦即生产和/注射井井段)。所述的井眼10具有一个垂直的“裸眼”井眼,但是本领域的普通技术人员应该能够意识到,本发明同样适用于:(a)下套管井眼,该井眼在靠近需要压裂的区块附件具有射孔;(b)斜井和/或水平井。由于本发明适用于水平井和斜井以及垂直井眼,这里所使用的“上和下”、“顶部和底部”均是相对概念,应该认为适用于某个特定的井眼内的各个位置;而术语“深度”或者“区块”意指沿着完井井段12的两个端部之间的的井眼的各个位置。
如图所示,完井井段12是一个具有一定长度或者厚度的地层,这些地层沿着井眼11延伸并且由多个(图中表示为3个)不同的深度或者区块13A、13B和13C构成;这些区块可能是各向异性的(亦即,每一个区块在不同破裂压力下坍塌)。一个工作管柱14定位在井眼11内并且从地面(未示出)开始延伸而基本上穿过完井井段12。如图所示,工作管柱14包括一个压裂管柱15,该压裂管柱15通过一个常规的“油流会合装置”16连接到油管柱17的下端,该压裂管柱15在处于作业位置时靠近所述的完井井段。
压裂管柱15由一定长度的基管或者管路20构成,该基管20沿着需要压裂的整个完井井段12延伸。基管20沿着其大多数长度是空白(无孔)的,但是基管20还包括多个互相隔开的带孔管段21a、21b、21c和21d;这些带孔管段形成有多个开口(例如图2中位于21a的孔22a,位于21b的沟槽22b),这些开口围绕基管沿着径向互相隔开,并且沿着基管20的各个长度“L”按照列延伸排列。开口22可以直接设置在基管20或者每一个带孔管段上;或者这些开口22可以形成在独立的接头或者一定长度的管子上,然后这些接头或者管子按照恰当的间隔连接到基管20上。开口22允许流体从环绕完井井段的环形空间(30a)流入到基管20内。每一个带孔管段21a-d的长度(例如1到300英尺)和带孔管段21之间的纵向间距(例如从10英尺到1000英尺,最好为10英尺)可以随所需压裂的具体井段12的特性而在一个基管20内变化。
一个或者多个(例如图3中所示为4个)相对较小的分流管24(亦即1到1.5英寸或者更小)径向间隔的沿着压裂管柱15的一定长度上延伸。这些分流管可以为圆形横截面(例如图3中的24a)或者采用其他横截面形状(例如:图3中的24b基本上为矩形)。每一个分流管24沿着一定的长度上具有一个或者多个出口(例如互相隔开的开口25);这些出口提供“备用流道”,用于将流体输送到完井井段12内的不同深度,下面还要进行详细描述。
每一个分流管可以在上端开口以允许流体进入到分流管内;或者当分流管具有多个出口25时,流体的入口可以设置为穿过某些开口25本身(例如靠近每一个分流管的的顶部的开口25)。另外,尽管每一个分流管的出口25可以开口在分流管的前端,这些出口也可以设置在分流管的每一侧。这种类型的分流管已经能够在各种类型的油井作业中提供备用流道,参见美国专利、US4945991、US5082052、US5113935、US5161613和5161618。
尽管每一个带孔管段21上的开口22(图4)设计为允许流体流入到基管20内,重要的是,颗粒材料被挡住(例如:支撑剂,产出的砂,等等)。当随着压裂地层的地层流体产生的颗粒材料不是太多时这不是一个问题。因此无筛开口(图5中的沟槽22c)可以按照公知、商用的“沟槽衬管”中相同的方式进行设置。然而,当随着压裂地层的地层流体产生的颗粒材料太多时,需要提供一个大于每一个带孔管段21长度“L”的筛装置,其尺寸允许流体穿过,但是阻止任何颗粒的大量流过,正如在油井筛技术中所公知的那样。
筛装置可以由任何公知的材料构成,这些材料过滤颗粒材料但允许流体穿过。例如,如图1-4所示,筛装置由连续的绕线31构成,该绕线31可以是“梯形”截面(未示出)。绕线31缠绕在基管20周围,以覆盖各个带孔管段21的开口20;该绕线31还可以焊接或者固定到基管20上。每一圈绕线31与临近的圈隔开一定距离,因此在各个圈之间形成流体通道(未示出)。这种技术与在许多用于油井完井作业的商用绕线筛的制造过程中使用的技术相同。在本发明的一个实施例中(图1-3),在分流管定位和固定到基管上之前,绕线31首先缠绕在位于每一个带孔管段21的基管20周围。每一个分流管然后在每一个带孔管段21略微弯曲,以在通过绕线31时配合绕线31的外表面。
另外,在该实施例中,一个射孔的套筒火或者外罩33(在图2中只是在21b显示一个)可以放置在整个带孔管段21上,以在将分流管安装到井眼11内时保护分流管24;并且根据需要该外罩33还可以作为压裂管柱15的扶正。外罩33可以制造为两片,然后在两片安装在带孔管段21周围上后再焊接或者固定到一起。
在另外一个实施例中(图4),分流管24首先定位穿过带孔管段21,然后绕线31缠绕到基管20和分流管24上方。在该实施例中,绕线31包括位于每一个带孔管段21的分流管。应该能够理解,在大部分的油井完井作业中,井眼11和压裂管柱15(特别是带孔管段21)之间的间隙(亦即图1中的井眼环形空间30)将会很小(亦即1-1.5英寸)。
在作业时(图1-2),如果井眼11延伸到完井井段12下方一定距离,靠近完井井段12的下端的井眼被一个塞子或者封隔器34封闭,正如本领域所公知的那样。在井眼10投产后压裂井段12随着地层流体产生较多的颗粒材料时,图1中的其底端具有油流会合装置16和压裂管柱15的工作管柱14下入到井眼11中,因此在工作管柱14和井眼11之间形成一个井眼环形空间30。压裂管柱15定位靠近完井井段12和封隔器34,封隔器34由工作管柱挟带,并且设置为隔离靠近完井井段12的完井井段环形空间30a和井眼环形空间的其余部分。正如本领域所公知的那样,当工作管柱14下入到井眼内时,井眼11和工作管柱14将充满完井液;在井眼11内也有完井液。
工作管柱14安放到位后,压裂浆液(图1、2中的箭头40)沿着工作管柱14亦即油管柱17向下泵送从油流会合装置16的出口18出来,进入到完井井段环形空间30a的顶部。压裂浆液可以由任何公知的用于压裂地层的挟带液(例如水)和支撑剂(例如砂)构成;但是作为优选的压裂浆液,在本发明的压裂浆液40中使用的挟带液最好为常用于常规压裂作业的相对高粘的商用“凝胶”(例如大于100厘泊)(例如,versagel,哈里伯顿公司,邓肯,阿克拉荷马州)当然,正如在压裂技术中公知的那样,根据需要,一个压裂流体段塞(无支撑剂的凝胶)可以在压裂浆液产生裂缝之前下入到井眼内。
当压裂浆液40流入到环形空间30a的顶部然后向下穿过该环形空间30a时,该压裂浆液40开始漏失流体到完井井段(例如区块13A)和位于带孔管段21的基管20内。来自压裂浆液的流体将流动穿过绕线31的各圈之间的通道和穿过开口22进入到基管内,再穿过油流会合装置16的返回管16a,进入到位于封隔器34之上的环形空间30内。为了保证流体快速漏失穿过每一个带孔管段21,油流会合装置16上方的井眼环形空间30开口在地面,从而通过井眼环形空间30接纳来自基管20的回流。
当流体从井眼漏失-亦即“出砂”-后,砂桥或者堵塞45先后形成在每一个带孔管段上。由于来自浆液的流体快速渗漏到完井井段的区块和基管20内,这些堵塞快速形成。这些砂桥形成有效的障碍,这些障碍将阻止流动通过完井井段环形空间30a内的这些点。这就是说,一旦砂桥形成,由于凝胶的较高粘度(例如:大于100厘泊),来自浆液的流体不可能很容易地流过砂桥45。只有少量来自浆液的流体通过各个砂桥,因此缓慢地增加砂桥的尺寸。
由于除了在带孔管段21上的空白基管20上没有开口,并且一旦在各个带孔管段形成砂桥45由于来自浆液的流体不可能沿着井眼环形空间30a流动,浆液40只能穿过分流管24流动。浆液进入到分流管24的顶部并且向下进入到分流管内并且从完井井段环形空间30a的不同深度排出。在图1-5所示的实施例中,浆液穿过并离开(位于临近的带孔管段21)分流管24上的多个垂直隔开的出口25。在图6所示的实施例中,每一个分流管24c具有不同的长度并且在分流管的底部具有一个单一出口,浆液穿过该出口从完井井段12的不同深度排出。
砂桥45作为有效的封隔器,该封隔器反过来隔离各个完井井段环形空间30之间的部分。连续地泵送浆液穿过分流管24c,并且从完井井段30a的各个深度排出将增加环形空间30a的隔离部分的浆液压力,直到在各个完井区块产生裂缝为止。在环形空间30a的任何具体的隔离部分内的裂缝“出砂”后,并且/或者如果隔离部分的压力上升到分流管内的压力水平,浆液继续穿过分流管输送到下游;该方法不断重复直到压裂作业完成。因此,只是通过泵送压裂浆液直到完井井段内的所有所需的区块被压裂和支撑,所有的所需的完井区块基本上被压裂。
在某些完井作业中,有时需要留出一段具体的区块(例如图1中的13B)不压裂。在这种完井作业中,每一个分流管24长度的一部分为空白或者无孔(亦即无开口25);其中,当压裂管柱在井眼内处于可操作位置时,分流管的空白部分将靠近区块13B。砂桥45还是会形成在带孔管段21,如上所述,但是现在浆液只能流动到靠近区块13A和13C的环形空间的隔离部分,而不能进入到区块13B,因此留出区块13B不压裂。
在许多情况下,在压裂作业过程中不需要穿过井眼环形空间30回流。参考图6,井眼环形空间30在地面处封闭,而井眼11和工作管柱14充满不可压缩的完井液;该完井液通常在钻井井眼完成后就已经存在在井眼中。压裂浆液40向下穿过油管柱17从油流会合装置16排出进入到完井井段环形空间16的顶部。由于来自浆液的流体不可能流动穿过带孔管段21,它只能向下流动穿过完井井段环形空间30a,进入到最弱或者最具渗透性的深度的地层内。当浆液流动进入到地层内,它迫使环形空间30a内的至少部分的完井液向前进入到地层内。
一旦地层(可以为完井井段12内的任何部分)产生了一个裂缝50(图6),由于泵送进入到环形空间30a内的压裂浆液的压力,来自浆液40的流体和来自完井井段环形空间30a内的完井液(图6中的箭头55)流动进入到裂缝内。当完井液55从环形空间30a中驱替后,来自浆液的液体40开始穿过离裂缝50最远的带孔管段(例如21a,21b和21d)进入到基管内。当液体40进入到基管内时,它迫使完井液55穿过离裂缝50最近的带孔管段(例如21c)排出。来自浆液40的流体持续漏失穿过这些带孔管段将在各个带孔管段上形成砂桥,以隔离环形空间30a的一部分,如上所述。一旦这些砂桥形成,浆液40只能流动穿过分流管24c,并且穿过各个分流管输送到井眼环形空间的隔离部分,以完成完井井段12的压裂作业。
一旦所需的区块压裂完成后,井眼可以投产。油管柱17和油流会合装置16可以取出,波能够一个生产管柱(未示出)代替;该生产管柱反过来可以剌入或者连接到压裂管柱15,后者通常被留在其位置上。流体将从完井井段12内的生产区块流动到完井井段环形空间30a内。尽管砂桥45基本上对高粘度的流体(具有大于100厘泊的压裂凝胶)是不深透的,这些砂桥对于较低粘度的产出液(例如:石油和天然气的粘度为大约1厘泊)是可深透的。因此,生产流体可以自由流动穿过砂桥45、绕线筛(如果存在)带孔管段21上的开口22然后进入到基管20内用于开采到地面;该砂桥45作为一个迷你砾石充填。

Claims (20)

1.一种用于压裂一个地下地层的完井井段的不同深度地层的方法,该地下地层由一个井眼穿过,所述的方法包括:
定位一个工作管柱到所述的井眼内,所述的工作管柱包括一个油流会合装置和一个压裂管柱;所述的压裂管柱基本上延伸穿过所述的完井井段,并且当所述的工作管柱在井眼内处于可作业位置时与所述的井眼一起形成一个完井井段环形空间;所述的压裂管柱包括:
一个空白的基管柱,该基管具有多个沿着长度方向隔开的带孔管段;和
至少一个沿着所述的基管延伸的备用流道;
使得包括压裂液和支撑剂的一个压裂浆液流动到所述的完井井段环形空间,然后,来自压裂浆液的流体漏失进入到所述的完井井段,并且穿过所述的带孔管段后进入到所述的基管内,以允许所述的支撑剂在所述的带孔管段形成堵塞,所述的堵塞有效地隔离所述的完井井段环形空间靠近所述的各个带孔管段的部分;和
在所述的堵塞已经形成后继续使得所述的压裂浆液流入到所述的完井井段环形空间内,穿过所述的至少一个备用流道将所述的压裂浆液输送到所述的完井井段环形空间的所述的隔离部分,以压裂所述的完井井段靠近所述的完井井段环形空间的各个隔离部分的不同深度地层。
2.根据权利要求1所述的方法,其中,所述的压裂液是一种较高粘度凝胶,而所述的浆液内的所述的支撑剂是砂。
3.根据权利要求1所述的方法,其中,在所述的压裂液注入之前先注入不带支撑剂的较高粘度凝胶。
4.根据权利要求1所述的方法,其中,所述的至少一个备用流道由分流管构成,这些分流管径向隔开地分布在所述的压裂管柱周围,所述的分流管穿过所述的完井井段,每一个所述的分流管具有入口和沿着其长度方向间隔设置的多个出口。
5.根据权利要求1所述的方法,其中,所述的至少一个备用流道由分流管构成,这些分流管径向隔开地分布在所述的压裂管柱周围,所述的分流管穿过所述的完井井段而具有不同的长度,每一个所述的分流管具有入口和至少一个沿着其长度方向间隔的出口。
6.根据权利要求3所述的方法,还包括:
在将压裂液泵送到所述的完井井段环形空间内之前,将所述的完井井段环形空间与所述的油井环形空间的其余部分隔离;以及
在地面打开所述的井眼环形空间的其余部分,以允许流动。
7.根据权利要求3所述的方法,所述的压裂浆液向下沿着所述的工作管柱流动,流出所述的油流会合装置,然后进入到所述的完井井段环形空间的顶部。
8.根据权利要求1所述的方法,还包括:
当所述的完井井段的所述的不同深度的地层压裂时,停止让所述的压裂浆液流入到所述的完井井段环形空间;以及
通过让来自所述的完井井段的生产流体流动到所述的完井井段环形空间然后再穿过所述的带孔管段进入到所述的基管内而利用该井进行生产。
9.一种用于压裂一个地下地层的完井井段的不同深度地层的装置,该地下地层由一个井眼穿过,所述的装置包括:
一个工作管柱,所述的工作管柱包括:
一个油管柱;
一个油流会合装置,连接到所述的油管柱的下端;和
一个压裂管柱,连接到所述的油流会合装置;所述的压裂管柱包括:
一个空白的基管柱,该基管具有多个沿着长度方向隔开的带孔管段,每一个所述的带孔管段具有多个穿过所述的基管的开口,所述的带孔管段沿着所述的基管的所述的长度方向延伸;和
至少一个沿着所述的基管延伸的备用流道;所述的至少一个备用流道具有一个入口和至少一个出口。
10.根据权利要求9所述的装置,还包括:
筛装置,定位在所述的基管上并覆盖所述的带孔管段上的所述的多个开口,以允许穿过所述的带孔管段流入到所述的基管内,同时防止颗粒材料穿过所述的开口流入到所述的基管内。
11.根据权利要求9所述的装置,其中,所述的备用流道包括:
一个分流管,沿着所述的基管纵向延伸,并且具有一个入口和至少一个沿着其长度方向隔开的出口。
12.根据权利要求9所述的装置,其中,所述的备用流道包括:
多个围绕所述的压裂管柱径向隔开设置的分流管,这些分流管沿着所述的基管纵向延伸,每一个所述的分流管具有一个入口和多个沿着其各个长度方向隔开分布的出口。
13.根据权利要求9所述的装置,其中,每一个沿着所述的基管设置的所述的带孔管段的每一个长度大约为1到300英尺。
14.根据权利要求9所述的装置,其中,每一个沿着所述的基管的带孔管段为5英尺到30英尺。
15.根据权利要求9所述的装置,其中,所述的带孔管段距离其他基管的距离为大约为10到1000英尺。
16.根据权利要求10所述的装置,其中,筛装置包括:
绕线,缠绕在所述的基管上和所述的带孔管段上的开口上,所述的绕线的各圈之间具有间隙以形成通道,这些通道允许流体通过但是防止颗粒材料流过。
17.根据权利要求16所述的装置,其中,所述的绕线缠绕在所述的带孔管段的所述的至少一个分流管上。
18.根据权利要求16所述的装置,其中,所述的至少一个分流管通过至少一个所述的带孔管段。
19.根据权利要求18所述的装置,还包括:
一个带孔套筒,定位在所述的至少一个分流管和位于至少一个所述的带孔管段上的绕线上。
20.根据权利要求10所述的装置,其中,所述的一定长度的分流管为空白管,无任何出口定位在所述的分流管的空白部分上,因此,没有来自分流管的流体流过所述的分流管的所述的全部空白部分。
CNB018137245A 2000-07-31 2001-07-23 井眼的完井井段内的不同深度地层的压裂的方法和装置 Expired - Lifetime CN1263940C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US09/629,203 US6644406B1 (en) 2000-07-31 2000-07-31 Fracturing different levels within a completion interval of a well
US09/629,203 2000-07-31

Publications (2)

Publication Number Publication Date
CN1457382A true CN1457382A (zh) 2003-11-19
CN1263940C CN1263940C (zh) 2006-07-12

Family

ID=24522018

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB018137245A Expired - Lifetime CN1263940C (zh) 2000-07-31 2001-07-23 井眼的完井井段内的不同深度地层的压裂的方法和装置

Country Status (15)

Country Link
US (2) US6644406B1 (zh)
EP (1) EP1305503B1 (zh)
CN (1) CN1263940C (zh)
AR (1) AR030078A1 (zh)
AU (2) AU2001278984B2 (zh)
BR (1) BR0112934B1 (zh)
CA (1) CA2417431C (zh)
DE (1) DE60125545T2 (zh)
EA (1) EA005190B1 (zh)
MX (1) MXPA03000915A (zh)
MY (1) MY128907A (zh)
NO (1) NO336380B1 (zh)
OA (1) OA12341A (zh)
PE (1) PE20020242A1 (zh)
WO (1) WO2002010554A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100572747C (zh) * 2003-12-30 2009-12-23 乔西拉公司 不牢固和脆弱粘结的沉积物中的竖直液压裂缝的多方位控制
CN104364463A (zh) * 2012-06-11 2015-02-18 哈利伯顿能源服务公司 分流管连接和分配组件及方法
CN104471183A (zh) * 2012-06-11 2015-03-25 哈里伯顿能源服务公司 分流管连接组件和方法
CN105484721A (zh) * 2016-01-14 2016-04-13 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 一种水平井高效压裂施工工艺管柱及压裂施工工艺
CN102817583B (zh) * 2007-12-03 2016-04-20 贝克休斯公司 用于压裂和防砂的多位阀及相关完井方法
CN109415936A (zh) * 2016-05-03 2019-03-01 斯伦贝谢技术有限公司 用于在插塞研磨出或清理/修井操作期间建立井性能的方法和系统
CN111963111A (zh) * 2020-07-08 2020-11-20 中国海洋石油集团有限公司 疏松低渗裸眼水平井充填防砂和分段压裂一体化工艺方法

Families Citing this family (72)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7100690B2 (en) 2000-07-13 2006-09-05 Halliburton Energy Services, Inc. Gravel packing apparatus having an integrated sensor and method for use of same
US6644406B1 (en) * 2000-07-31 2003-11-11 Mobil Oil Corporation Fracturing different levels within a completion interval of a well
US7152677B2 (en) * 2000-09-20 2006-12-26 Schlumberger Technology Corporation Method and gravel packing open holes above fracturing pressure
US6789624B2 (en) 2002-05-31 2004-09-14 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6557634B2 (en) * 2001-03-06 2003-05-06 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6516881B2 (en) 2001-06-27 2003-02-11 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6601646B2 (en) 2001-06-28 2003-08-05 Halliburton Energy Services, Inc. Apparatus and method for sequentially packing an interval of a wellbore
US6581689B2 (en) 2001-06-28 2003-06-24 Halliburton Energy Services, Inc. Screen assembly and method for gravel packing an interval of a wellbore
US6588507B2 (en) 2001-06-28 2003-07-08 Halliburton Energy Services, Inc. Apparatus and method for progressively gravel packing an interval of a wellbore
US6516882B2 (en) 2001-07-16 2003-02-11 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6830104B2 (en) * 2001-08-14 2004-12-14 Halliburton Energy Services, Inc. Well shroud and sand control screen apparatus and completion method
US6702019B2 (en) 2001-10-22 2004-03-09 Halliburton Energy Services, Inc. Apparatus and method for progressively treating an interval of a wellbore
US6772837B2 (en) 2001-10-22 2004-08-10 Halliburton Energy Services, Inc. Screen assembly having diverter members and method for progressively treating an interval of a welibore
US6907936B2 (en) 2001-11-19 2005-06-21 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US7032665B1 (en) * 2001-11-21 2006-04-25 Berrier Mark L System and method for gravel packaging a well
US6899176B2 (en) 2002-01-25 2005-05-31 Halliburton Energy Services, Inc. Sand control screen assembly and treatment method using the same
US6719051B2 (en) 2002-01-25 2004-04-13 Halliburton Energy Services, Inc. Sand control screen assembly and treatment method using the same
US7207383B2 (en) * 2002-02-25 2007-04-24 Schlumberger Technology Corporation Multiple entrance shunt
US6715545B2 (en) 2002-03-27 2004-04-06 Halliburton Energy Services, Inc. Transition member for maintaining for fluid slurry velocity therethrough and method for use of same
US6776238B2 (en) 2002-04-09 2004-08-17 Halliburton Energy Services, Inc. Single trip method for selectively fracture packing multiple formations traversed by a wellbore
US6793017B2 (en) * 2002-07-24 2004-09-21 Halliburton Energy Services, Inc. Method and apparatus for transferring material in a wellbore
US8167047B2 (en) 2002-08-21 2012-05-01 Packers Plus Energy Services Inc. Method and apparatus for wellbore fluid treatment
US6814139B2 (en) 2002-10-17 2004-11-09 Halliburton Energy Services, Inc. Gravel packing apparatus having an integrated joint connection and method for use of same
US6814144B2 (en) * 2002-11-18 2004-11-09 Exxonmobil Upstream Research Company Well treating process and system
US6857476B2 (en) 2003-01-15 2005-02-22 Halliburton Energy Services, Inc. Sand control screen assembly having an internal seal element and treatment method using the same
US6886634B2 (en) 2003-01-15 2005-05-03 Halliburton Energy Services, Inc. Sand control screen assembly having an internal isolation member and treatment method using the same
US20040140089A1 (en) * 2003-01-21 2004-07-22 Terje Gunneroed Well screen with internal shunt tubes, exit nozzles and connectors with manifold
US6978840B2 (en) * 2003-02-05 2005-12-27 Halliburton Energy Services, Inc. Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production
CN100362207C (zh) * 2003-03-31 2008-01-16 埃克森美孚上游研究公司 用于完井、生产和注入的井筒装置和方法
US7870898B2 (en) 2003-03-31 2011-01-18 Exxonmobil Upstream Research Company Well flow control systems and methods
US6994170B2 (en) 2003-05-29 2006-02-07 Halliburton Energy Services, Inc. Expandable sand control screen assembly having fluid flow control capabilities and method for use of same
US7140437B2 (en) 2003-07-21 2006-11-28 Halliburton Energy Services, Inc. Apparatus and method for monitoring a treatment process in a production interval
EA008643B1 (ru) * 2003-12-03 2007-06-29 Эксонмобил Апстрим Рисерч Компани Устройство и способ для гравийной набивки ствола скважины
US7066266B2 (en) * 2004-04-16 2006-06-27 Key Energy Services Method of treating oil and gas wells
US7243723B2 (en) * 2004-06-18 2007-07-17 Halliburton Energy Services, Inc. System and method for fracturing and gravel packing a borehole
WO2006014951A2 (en) * 2004-07-30 2006-02-09 Key Energy Services, Inc. Method of pumping an “in-the formation” diverting agent in a lateral section of an oil or gas well
US7721801B2 (en) * 2004-08-19 2010-05-25 Schlumberger Technology Corporation Conveyance device and method of use in gravel pack operation
US20060037752A1 (en) * 2004-08-20 2006-02-23 Penno Andrew D Rat hole bypass for gravel packing assembly
US8505632B2 (en) 2004-12-14 2013-08-13 Schlumberger Technology Corporation Method and apparatus for deploying and using self-locating downhole devices
US7322417B2 (en) * 2004-12-14 2008-01-29 Schlumberger Technology Corporation Technique and apparatus for completing multiple zones
US7387165B2 (en) * 2004-12-14 2008-06-17 Schlumberger Technology Corporation System for completing multiple well intervals
US7926571B2 (en) * 2005-03-15 2011-04-19 Raymond A. Hofman Cemented open hole selective fracing system
US7267172B2 (en) * 2005-03-15 2007-09-11 Peak Completion Technologies, Inc. Cemented open hole selective fracing system
US7461695B2 (en) * 2005-04-01 2008-12-09 Schlumberger Technology Corporation System and method for creating packers in a wellbore
NO325506B1 (no) * 2005-12-27 2008-05-26 Rune Freyer Fremgangsmate og anordning for stimulering av en undergrunnsbronn
US7661476B2 (en) * 2006-11-15 2010-02-16 Exxonmobil Upstream Research Company Gravel packing methods
US8757273B2 (en) 2008-04-29 2014-06-24 Packers Plus Energy Services Inc. Downhole sub with hydraulically actuable sleeve valve
US7819193B2 (en) 2008-06-10 2010-10-26 Baker Hughes Incorporated Parallel fracturing system for wellbores
BRPI0803646B1 (pt) * 2008-08-29 2019-05-14 Petróleo Brasileiro S/A - Petrobras Sistema de despressurização de anulares entre revestimentos em poços produtores
MX2011003280A (es) 2008-11-03 2011-04-28 Exxonmobil Upstream Res Co Sistemas y metodos de control de flujo de pozos.
CA2755252C (en) 2009-04-14 2016-06-21 Charles S. Yeh Systems and methods for providing zonal isolation in wells
US8297358B2 (en) 2010-07-16 2012-10-30 Baker Hughes Incorporated Auto-production frac tool
US8448706B2 (en) 2010-08-25 2013-05-28 Schlumberger Technology Corporation Delivery of particulate material below ground
US8662177B2 (en) * 2011-02-28 2014-03-04 Baker Hughes Incorporated Hydraulic fracture diverter apparatus and method thereof
US8869898B2 (en) 2011-05-17 2014-10-28 Baker Hughes Incorporated System and method for pinpoint fracturing initiation using acids in open hole wellbores
US9574433B2 (en) * 2011-08-05 2017-02-21 Petrohawk Properties, Lp System and method for quantifying stimulated rock quality in a wellbore
WO2013052033A1 (en) * 2011-10-03 2013-04-11 Halliburton Energy Services, Inc. Methods of preventing premature fracturing of a subterrranean formation using a sheath
US8448705B2 (en) 2011-10-03 2013-05-28 Halliburton Energy Services, Inc. Methods of preventing premature fracturing of a subterranean formation using a sheath
US9593559B2 (en) 2011-10-12 2017-03-14 Exxonmobil Upstream Research Company Fluid filtering device for a wellbore and method for completing a wellbore
US9238953B2 (en) 2011-11-08 2016-01-19 Schlumberger Technology Corporation Completion method for stimulation of multiple intervals
EP2607616A1 (en) * 2011-12-23 2013-06-26 Welltec A/S Production system for producing hydrocarbons from a well
US9650851B2 (en) 2012-06-18 2017-05-16 Schlumberger Technology Corporation Autonomous untethered well object
CA2885581C (en) 2012-10-26 2017-05-30 Exxonmobil Upstream Research Company Downhole joint assembly for flow control, and method for completing a wellbore
BR112015006970A2 (pt) * 2012-10-26 2017-07-04 Exxonmobil Upstream Res Co aparelhagem e método para furo de poço voltado ao controle de areia utilizando reservas de cascalho
WO2014149396A2 (en) 2013-03-15 2014-09-25 Exxonmobil Upstream Research Company Apparatus and methods for well control
WO2014149395A2 (en) 2013-03-15 2014-09-25 Exxonmobil Upstream Research Company Sand control screen having improved reliability
EP3388618B1 (en) * 2013-03-26 2020-10-21 Halliburton Energy Services Inc. Exterior drain tube for well screen assemblies
US9631468B2 (en) 2013-09-03 2017-04-25 Schlumberger Technology Corporation Well treatment
US9441455B2 (en) * 2013-09-27 2016-09-13 Baker Hughes Incorporated Cement masking system and method thereof
US9670756B2 (en) * 2014-04-08 2017-06-06 Exxonmobil Upstream Research Company Wellbore apparatus and method for sand control using gravel reserve
CN110617046B (zh) * 2019-10-17 2021-07-30 中国石油大学(华东) 一种用于水平井多级分段压裂物理模拟实验的井筒装置
CN113431560A (zh) * 2021-07-09 2021-09-24 中国地质科学院地质力学研究所 一种适用于水压致裂地应力测量的等径双通路压裂器

Family Cites Families (96)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US125007A (en) * 1872-03-26 Improvement in metallic fasteners for leather
US700A (en) * 1838-04-21 Photo-litho
US699A (en) * 1838-04-21 stone
US66560A (en) * 1867-07-09 Dbxtbe h
US701A (en) * 1838-04-21 Seth gkaham
US702A (en) * 1838-04-21 Improved process of dyeing wool
US10496A (en) * 1854-02-07 batoheldee
US189809A (en) * 1877-04-17 Improvement in burial-caskets
US2224630A (en) 1939-09-11 1940-12-10 Socony Vacuum Oil Co Inc Screen pipe with fragile lining
US3153451A (en) 1963-02-07 1964-10-20 Forrest E Chancellor Apparatus for completing a well
US3548935A (en) 1968-10-10 1970-12-22 Acie Darrel Harkins Apparatus for development and completion of wells
US3637010A (en) 1970-03-04 1972-01-25 Union Oil Co Apparatus for gravel-packing inclined wells
US3830294A (en) 1972-10-24 1974-08-20 Baker Oil Tools Inc Pulsing gravel pack tool
CA975291A (en) 1973-03-23 1975-09-30 Union Oil Company Of California Gravel packing tool and removable fluid diverting baffles therefor
US3963076A (en) 1975-03-07 1976-06-15 Baker Oil Tools, Inc. Method and apparatus for gravel packing well bores
US3999608A (en) 1975-09-22 1976-12-28 Smith Donald M Oil well gravel packing method and apparatus
US4046198A (en) 1976-02-26 1977-09-06 Exxon Production Research Company Method and apparatus for gravel packing wells
US4018282A (en) 1976-02-26 1977-04-19 Exxon Production Research Company Method and apparatus for gravel packing wells
US4018283A (en) 1976-03-25 1977-04-19 Exxon Production Research Company Method and apparatus for gravel packing wells
US4044832A (en) 1976-08-27 1977-08-30 Baker International Corporation Concentric gravel pack with crossover tool and method of gravel packing
US4127173A (en) 1977-07-28 1978-11-28 Exxon Production Research Company Method of gravel packing a well
US4192375A (en) 1978-12-11 1980-03-11 Union Oil Company Of California Gravel-packing tool assembly
US4253522A (en) 1979-05-21 1981-03-03 Otis Engineering Corporation Gravel pack tool
JPS5832275B2 (ja) 1980-12-11 1983-07-12 永岡金網株式会社 スクリ−ン
US4393932A (en) 1981-03-16 1983-07-19 Bodine Albert G Method and apparatus for uniformly packing gravel around a well casing or liner
US4418754A (en) 1981-12-02 1983-12-06 Halliburton Company Method and apparatus for gravel packing a zone in a well
US4469178A (en) 1983-04-29 1984-09-04 Solum James R Well gravel packing method
US4522264A (en) 1983-09-02 1985-06-11 Otis Engineering Corporation Apparatus and method for treating wells
US4570714A (en) 1983-12-22 1986-02-18 Geo Vann, Inc. Gravel pack assembly
US4553595A (en) 1984-06-01 1985-11-19 Texaco Inc. Method for forming a gravel packed horizontal well
US4558742A (en) 1984-07-13 1985-12-17 Texaco Inc. Method and apparatus for gravel packing horizontal wells
US4685519A (en) * 1985-05-02 1987-08-11 Mobil Oil Corporation Hydraulic fracturing and gravel packing method employing special sand control technique
US4681163A (en) 1985-11-12 1987-07-21 Well Improvement Specialists, Inc. Sand control system
JPS62156493A (ja) 1985-12-27 1987-07-11 永岡金網株式会社 二重筒スクリ−ン
US4700777A (en) 1986-04-10 1987-10-20 Halliburton Company Gravel packing apparatus and method
DE3614537A1 (de) 1986-04-29 1987-11-12 Otis Engineering Gmbh Filtereinrichtung fuer oelfoerdereinrichtungen
US4733723A (en) 1986-07-18 1988-03-29 Callegari Sr Stephen R Gravel pack assembly
US4858691A (en) 1988-06-13 1989-08-22 Baker Hughes Incorporated Gravel packing apparatus and method
US4856591A (en) 1988-03-23 1989-08-15 Baker Hughes Incorporated Method and apparatus for completing a non-vertical portion of a subterranean well bore
US4915172A (en) 1988-03-23 1990-04-10 Baker Hughes Incorporated Method for completing a non-vertical portion of a subterranean well bore
US4932474A (en) 1988-07-14 1990-06-12 Marathon Oil Company Staged screen assembly for gravel packing
US4915173A (en) 1988-12-07 1990-04-10 Dowell Schlumberger Incorporated Method for staged placement of gravel packs
US4969522A (en) 1988-12-21 1990-11-13 Mobil Oil Corporation Polymer-coated support and its use as sand pack in enhanced oil recovery
US4969523A (en) 1989-06-12 1990-11-13 Dowell Schlumberger Incorporated Method for gravel packing a well
US4945991A (en) 1989-08-23 1990-08-07 Mobile Oil Corporation Method for gravel packing wells
US4969524A (en) 1989-10-17 1990-11-13 Halliburton Company Well completion assembly
US4964464A (en) 1989-10-31 1990-10-23 Mobil Oil Corporation Anti-sand bridge tool and method for dislodging sand bridges
US5069279A (en) 1990-07-05 1991-12-03 Nagaoka Kanaami Kabushiki Kaisha Well structure having a screen element with wire supporting rods
US5082052A (en) 1991-01-31 1992-01-21 Mobil Oil Corporation Apparatus for gravel packing wells
US5113935A (en) 1991-05-01 1992-05-19 Mobil Oil Corporation Gravel packing of wells
JP2891568B2 (ja) 1991-08-09 1999-05-17 株式会社ナガオカ 水平井戸または斜傾井戸用保護枠付きスクリーン
US5161613A (en) 1991-08-16 1992-11-10 Mobil Oil Corporation Apparatus for treating formations using alternate flowpaths
US5161618A (en) 1991-08-16 1992-11-10 Mobil Oil Corporation Multiple fractures from a single workstring
JP2891582B2 (ja) 1991-12-27 1999-05-17 株式会社ナガオカ 選択的隔離スクリーンの製造方法
JP2891583B2 (ja) 1991-12-27 1999-05-17 株式会社ナガオカ 選択的隔離スクリーンの製造方法
US5333688A (en) 1993-01-07 1994-08-02 Mobil Oil Corporation Method and apparatus for gravel packing of wells
US5333689A (en) 1993-02-26 1994-08-02 Mobil Oil Corporation Gravel packing of wells with fluid-loss control
US5390966A (en) 1993-10-22 1995-02-21 Mobil Oil Corporation Single connector for shunt conduits on well tool
US5419394A (en) 1993-11-22 1995-05-30 Mobil Oil Corporation Tools for delivering fluid to spaced levels in a wellbore
JPH07158124A (ja) 1993-12-02 1995-06-20 Nagaoka:Kk 均一外径を有する井戸用スクリーン
US5476143A (en) 1994-04-28 1995-12-19 Nagaoka International Corporation Well screen having slurry flow paths
US5417284A (en) 1994-06-06 1995-05-23 Mobil Oil Corporation Method for fracturing and propping a formation
US5435391A (en) 1994-08-05 1995-07-25 Mobil Oil Corporation Method for fracturing and propping a formation
US5515915A (en) 1995-04-10 1996-05-14 Mobil Oil Corporation Well screen having internal shunt tubes
US6355715B1 (en) 1995-06-07 2002-03-12 Acushnet Company Multi-layered golf ball and composition
US5875843A (en) * 1995-07-14 1999-03-02 Hill; Gilman A. Method for vertically extending a well
US5560427A (en) 1995-07-24 1996-10-01 Mobil Oil Corporation Fracturing and propping a formation using a downhole slurry splitter
US5588487A (en) 1995-09-12 1996-12-31 Mobil Oil Corporation Tool for blocking axial flow in gravel-packed well annulus
US5690175A (en) 1996-03-04 1997-11-25 Mobil Oil Corporation Well tool for gravel packing a well using low viscosity fluids
US5848645A (en) 1996-09-05 1998-12-15 Mobil Oil Corporation Method for fracturing and gravel-packing a well
US5842516A (en) 1997-04-04 1998-12-01 Mobil Oil Corporation Erosion-resistant inserts for fluid outlets in a well tool and method for installing same
US5868200A (en) 1997-04-17 1999-02-09 Mobil Oil Corporation Alternate-path well screen having protected shunt connection
US5890533A (en) 1997-07-29 1999-04-06 Mobil Oil Corporation Alternate path well tool having an internal shunt tube
US6003600A (en) 1997-10-16 1999-12-21 Halliburton Energy Services, Inc. Methods of completing wells in unconsolidated subterranean zones
US6481494B1 (en) 1997-10-16 2002-11-19 Halliburton Energy Services, Inc. Method and apparatus for frac/gravel packs
AU738914C (en) 1997-10-16 2002-04-11 Halliburton Energy Services, Inc. Methods and apparatus for completing wells in unconsolidated subterranean zones
US6427775B1 (en) 1997-10-16 2002-08-06 Halliburton Energy Services, Inc. Methods and apparatus for completing wells in unconsolidated subterranean zones
US6059032A (en) 1997-12-10 2000-05-09 Mobil Oil Corporation Method and apparatus for treating long formation intervals
US6230803B1 (en) 1998-12-03 2001-05-15 Baker Hughes Incorporated Apparatus and method for treating and gravel-packing closely spaced zones
US6405800B1 (en) 1999-01-21 2002-06-18 Osca, Inc. Method and apparatus for controlling fluid flow in a well
US6227303B1 (en) 1999-04-13 2001-05-08 Mobil Oil Corporation Well screen having an internal alternate flowpath
NO20003619L (no) 1999-07-27 2001-01-29 Halliburton Energy Serv Inc Fremgangsmåte og anordning for komplettering av brönner i ukonsoliderte soner under bakken
US6220345B1 (en) 1999-08-19 2001-04-24 Mobil Oil Corporation Well screen having an internal alternate flowpath
US6286598B1 (en) 1999-09-29 2001-09-11 Halliburton Energy Services, Inc. Single trip perforating and fracturing/gravel packing
US6409219B1 (en) 1999-11-12 2002-06-25 Baker Hughes Incorporated Downhole screen with tubular bypass
US6298916B1 (en) 1999-12-17 2001-10-09 Schlumberger Technology Corporation Method and apparatus for controlling fluid flow in conduits
US6302207B1 (en) 2000-02-15 2001-10-16 Halliburton Energy Services, Inc. Methods of completing unconsolidated subterranean producing zones
US6644406B1 (en) * 2000-07-31 2003-11-11 Mobil Oil Corporation Fracturing different levels within a completion interval of a well
US6409211B1 (en) 2000-10-10 2002-06-25 Trw Vehicle Safety Systems Inc. Inflatable side curtain
US6557634B2 (en) 2001-03-06 2003-05-06 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6749023B2 (en) 2001-06-13 2004-06-15 Halliburton Energy Services, Inc. Methods and apparatus for gravel packing, fracturing or frac packing wells
US6516881B2 (en) 2001-06-27 2003-02-11 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore
US6581689B2 (en) 2001-06-28 2003-06-24 Halliburton Energy Services, Inc. Screen assembly and method for gravel packing an interval of a wellbore
US6588507B2 (en) 2001-06-28 2003-07-08 Halliburton Energy Services, Inc. Apparatus and method for progressively gravel packing an interval of a wellbore
US6601646B2 (en) 2001-06-28 2003-08-05 Halliburton Energy Services, Inc. Apparatus and method for sequentially packing an interval of a wellbore
US6516882B2 (en) 2001-07-16 2003-02-11 Halliburton Energy Services, Inc. Apparatus and method for gravel packing an interval of a wellbore

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100572747C (zh) * 2003-12-30 2009-12-23 乔西拉公司 不牢固和脆弱粘结的沉积物中的竖直液压裂缝的多方位控制
CN102817583B (zh) * 2007-12-03 2016-04-20 贝克休斯公司 用于压裂和防砂的多位阀及相关完井方法
CN104364463A (zh) * 2012-06-11 2015-02-18 哈利伯顿能源服务公司 分流管连接和分配组件及方法
CN104471183A (zh) * 2012-06-11 2015-03-25 哈里伯顿能源服务公司 分流管连接组件和方法
CN104471183B (zh) * 2012-06-11 2016-10-19 哈里伯顿能源服务公司 分流管连接组件和方法
CN105484721A (zh) * 2016-01-14 2016-04-13 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 一种水平井高效压裂施工工艺管柱及压裂施工工艺
CN109415936A (zh) * 2016-05-03 2019-03-01 斯伦贝谢技术有限公司 用于在插塞研磨出或清理/修井操作期间建立井性能的方法和系统
CN109415936B (zh) * 2016-05-03 2023-05-16 斯伦贝谢技术有限公司 用于在插塞研磨出或清理/修井操作期间建立井性能的方法和系统
CN111963111A (zh) * 2020-07-08 2020-11-20 中国海洋石油集团有限公司 疏松低渗裸眼水平井充填防砂和分段压裂一体化工艺方法

Also Published As

Publication number Publication date
OA12341A (en) 2006-05-15
EP1305503B1 (en) 2006-12-27
NO20030470L (no) 2003-03-11
AU7898401A (en) 2002-02-13
MXPA03000915A (es) 2003-06-24
AU2001278984B2 (en) 2006-07-27
CA2417431A1 (en) 2002-02-07
CA2417431C (en) 2008-09-30
AR030078A1 (es) 2003-08-13
US20040050551A1 (en) 2004-03-18
NO20030470D0 (no) 2003-01-30
PE20020242A1 (es) 2002-05-07
BR0112934A (pt) 2004-06-08
US6644406B1 (en) 2003-11-11
DE60125545T2 (de) 2007-10-04
EA005190B1 (ru) 2004-12-30
EA200300207A1 (ru) 2003-12-25
WO2002010554A1 (en) 2002-02-07
US7108060B2 (en) 2006-09-19
MY128907A (en) 2007-02-28
NO336380B1 (no) 2015-08-10
DE60125545D1 (de) 2007-02-08
BR0112934B1 (pt) 2009-12-01
CN1263940C (zh) 2006-07-12
EP1305503A1 (en) 2003-05-02

Similar Documents

Publication Publication Date Title
CN1263940C (zh) 井眼的完井井段内的不同深度地层的压裂的方法和装置
CN100342118C (zh) 井的处理方法和系统
US6601648B2 (en) Well completion method
US7841398B2 (en) Gravel packing apparatus utilizing diverter valves
EP0764235B1 (en) Method for fracturing and propping a subterranean formation
US6220345B1 (en) Well screen having an internal alternate flowpath
US5036920A (en) Gravel pack well completion with auger-screen
US9187986B2 (en) Fracturing/gravel packing tool system with dual flow capabilities
CN105358793A (zh) 使用多次诱导裂缝的改进的烃类采收方法
CN1141661A (zh) 封堵地下流体的方法
US5145004A (en) Multiple gravel pack well completions
CA2493901C (en) Method for construction and completion of injection wells
US7478674B2 (en) System and method for fracturing and gravel packing a wellbore
US20120305679A1 (en) Hydrajetting nozzle and method
US20090301708A1 (en) Parallel fracturing system for wellbores
RU2410517C2 (ru) Бурение и заканчивание скважин с малыми боковыми стволами
RU2191886C2 (ru) Способ изоляции водопроявляющих пластов
RU2630514C1 (ru) Способ эксплуатации продуктивного и водоносного пластов, разделённых непроницаемым пропластком, скважиной с горизонтальными стволами и с трещинами гидравлического разрыва пласта
US7958937B1 (en) Process for hydrofracturing an underground aquifer from a water well borehole for increasing water flow production from Denver Basin aquifers
RU2464410C1 (ru) Способ крепления призабойной зоны пласта с неустойчивыми породами
US20240117707A1 (en) Production sub including a fluid flow assembly having a pair of radial burst discs
US20240117708A1 (en) Production sub including degradable orifice
RU2053357C1 (ru) Способ ремонтно-изоляционных работ в скважинах
CN115807653A (zh) 用于在油井结构周围的地层中建立流体屏障的方法
CA2047627C (en) Gravel pack well completions with auger-screen

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20060712

CX01 Expiry of patent term