CN1424469A CN02136613.6A CN02136613A CN1424469A CN 1424469 A CN1424469 A CN 1424469A CN 02136613 A CN02136613 A CN 02136613A CN 1424469 A CN1424469 A CN 1424469A
Authority
CN
China
Prior art keywords
steel pipe
verticality
mould
pipe post
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN02136613.6A
Other languages
Chinese (zh)
Other versions
CN1215233C (en
Inventor
龚剑
顾华
袁家余
胡西焕
杨旭
黄路遥
阮则成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CN02136613.6A priority Critical patent/CN1215233C/en
Publication of CN1424469A publication Critical patent/CN1424469A/en
Application granted granted Critical
Publication of CN1215233C publication Critical patent/CN1215233C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Foundations (AREA)

Abstract

A method and equipment for controlling the verticality of steel pile is disclosed, which features that under the control of computer, all the operations are performed on the ground, resulting in high effect and convenient operation.

Description

Controlling verticality of steel pile method and device
Technical field
The present invention relates to building construction technology, particularly controlling verticality of steel pile method and device in the reverse construction.
Background technology
At present, growing along with building construction technology, institute's project of building is to the super Shenzhen Development Bank of super large, and reverse construction is employed more and more.The contrary sequence method and the advantages such as duration weak point, cost savings of having compared along the practice, but its construction technology content and difficulty increase greatly.Therefore, constantly carrying out the technological innovation invention, improve construction technology, strengthen management, is the reverse construction key of success.
In numerous technical barriers that reverse construction ran into, the location of piling bar post, verticality and absolute altitude control are particularly crucial, are the problems that reverse construction must solve.At present, few to the control method of piling bar post, these method construction control are not directly perceived, and Shi Gong composition is more by rule of thumb, and operation is complicated, the difficult control of precision, and effect is undesirable.
Summary of the invention
The present invention is directed to the problems referred to above, a kind of controlling verticality of steel pile method is provided, it can intuitively, accurately finish the adjustment control to piling bar post verticality.
According to controlling verticality of steel pile method of the present invention, may further comprise the steps:
1) steel pipe post is fixedlyed connected with connecting rod with mould, and fix one and survey straight tube on the steel pipe post outer wall, the length of connecting rod is set to when steel pipe post arrives its absolute altitude position mould still on terrace;
2) bury the base of a plurality of absolute altitude unanimities underground around in the stake position, and on base, be fixed for the pedestal of mounting support steel pipe post and mould;
3) mould is installed on the pedestal, and between mould and pedestal, many telescopic vertical adjusting bars is installed; And
4) sensor probe of measuring vertical degree is put into surveyed straight tube measuring the verticality of steel pipe post, and adjust the length of adjusting rod, make the verticality of steel pipe post reach preset value according to the verticality data that measure.
Comprise according to controlling verticality of steel pile device of the present invention:
The verticality monitoring system, it comprises:
By the mould that connecting rod is fixedlyed connected with steel pipe post, the length of connecting rod is set to
Mould was still on terrace when steel pipe post arrived its absolute altitude position;
By surveying straight tube and surveying the straight unit of survey that straight instrument is formed, survey the straight tube secured in parallel at the steel pipe post outer wall
Go up and close steel pipe post lower end, lower end; And
The verticality Adjustment System, it comprises:
A plurality of bases that are embedded in around the stake position and levelling device is housed;
Be fixedly mounted on the base and be used for the pedestal of support steel tube column and mould;
Be installed in level(l)ing device and discrepancy in elevation adjusting device on the pedestal;
The many telescopic vertical adjusting bars that are installed between mould and the pedestal.
Controlling verticality of steel pile method and apparatus of the present invention, all operate in more than the ground and finish, operating condition is good, and can be equipped with computer and carry out synchronization monitoring commander, the overall process that can reflect the regulation and control of piling bar post truly, intuitively, solved the difficult problem that prior art exists well, for contrary sequence method widely-used provides the reliable technique assurance.
Description of drawings
Fig. 1 is the principle schematic according to controlling verticality of steel pile method of the present invention;
Fig. 2 is the flow chart according to controlling verticality of steel pile method of the present invention.
The specific embodiment
Below by accompanying drawing preferred embodiment of the present invention is described.
Controlling verticality of steel pile device of the present invention comprises verticality monitoring system and verticality Adjustment System two parts.Wherein, the verticality monitoring system comprises mould, surveys straight tube and surveys straight instrument.The verticality Adjustment System comprises a plurality of bases, be installed in levelling device, pedestal on the base, be installed in level(l)ing device and discrepancy in elevation adjusting device and many verticality adjusting rods on the pedestal.
As shown in Figure 1, because steel pipe post top mark height below natural terrace, therefore needs to use connecting rod spreading steel pipe post, mould is basseted.Steel pipe post and mould are adjusted to concentric then installing and fixing with connecting rod.
Survey straight unit by surveying straight instrument and surveying straight tube and form.Survey straight tube and be installed in the steel pipe post outer wall, length decide with steel pipe post length, reasonablely is, its lower end is near bottom the steel pipe post, and the upper end exceeds the nature terrace.Survey straight instrument and select the common special-purpose straight instrument of surveying for use, sensor probe slips into along surveying straight tube during use, and the data of its collection are delivered to computer and carried out the data processing, to determine the deviation situation of steel pipe post verticality.Thus, the verticality Adjustment System can determine to adjust direction and size according to the deviation situation.
A plurality of bases are fixed on the terrace, are used for supporting pedestal, and have disposed levelling device, the absolute altitude that pedestal leveling to calculated in advance can be gone out, thereby the absolute altitude of control steel pipe post.
The pedestal that is installed on the base indicates the center control line, and has disposed level(l)ing device and discrepancy in elevation adjusting device, is used to adjust and control the plan-position and the absolute altitude of steel pipe post.
Many verticality adjusting rods are set connect moulds and pedestal, its length can telescopic adjustment, is used to adjust the direction and the size of steel pipe post verticality.
Below by Fig. 2 the technological process utilize controlling verticality of steel pile method construction of the present invention is described.Whether as shown in Figure 2, at first measure stake position, base embedded part position, it is accurate to check the stake position then, with its adjust to the position accurately till.Then lift the piling bar post, and carry out centering and check, adjust to centrally aligned.Utilize controlling verticality of steel pile method of the present invention that the verticality of piling bar post is tested subsequently, and adjust verticality, till adhering to specification according to test result.The adjustment of piling bar post verticality gets final product placing of concrete after finishing.In the process of placing of concrete, must monitor the verticality of piling bar post at any time, finely tuned, guarantee precision.
The present invention compares with conventional control method, and following characteristics are arranged:
At first, operation is carried out on ground fully, and working condition is stable, not restricted by the hole wall situation, more can guarantee construction quality.
Secondly, the present invention has utilized advanced Computerized monitor system to monitor, and can reflect the overall process of regulation and control, and is directly perceived, effective, can guarantee construction quality.
Once more, all movable parts of verticality regulator control system can be recycled the economic benefit height.
In addition, operation of the present invention is quite easy, and operating personnel just can be competent at through the short period training.

Claims (2)

1. a controlling verticality of steel pile method is characterized in that, may further comprise the steps:
1) steel pipe post is fixedlyed connected with connecting rod with mould, and fix one and survey straight tube on the steel pipe post outer wall, the length of connecting rod is set to when steel pipe post arrives its absolute altitude position mould still on terrace;
2) bury the base of a plurality of absolute altitude unanimities underground around in the stake position, and on base, be fixed for the pedestal of mounting support steel pipe post and mould;
3) mould is installed on the pedestal, and between mould and pedestal, many telescopic vertical adjusting bars is installed;
And
4) sensor probe of measuring vertical degree is put into the survey straight tube to measure the verticality of steel pipe post, adjusted adjusting rod, make the verticality of steel pipe post reach preset value according to the verticality data that measure.
2. a controlling verticality of steel pile device is characterized in that, comprising:
1) verticality monitoring system, it comprises:
By the mould that connecting rod and steel pipe post couple together, the length of connecting rod is set at steel pipe
Mould was still on terrace when column arrived its absolute altitude position;
By surveying straight tube and surveying the straight unit of survey that straight instrument is formed, survey the straight tube secured in parallel at the steel pipe post outer wall
Go up and close steel pipe post lower end, lower end; And
2) verticality Adjustment System, it comprises:
A plurality of bases that are embedded in around the stake position and levelling device is housed;
Be fixedly mounted on the base and be used for the pedestal of support steel tube column and mould;
Be installed in level(l)ing device and discrepancy in elevation adjusting device on the pedestal;
The many telescopic vertical adjusting bars that are installed between mould and the pedestal.
CN02136613.6A 2002-08-23 2002-08-23 Method and apparatus for controlling verticality of steel pile Expired - Lifetime CN1215233C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN02136613.6A CN1215233C (en) 2002-08-23 2002-08-23 Method and apparatus for controlling verticality of steel pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN02136613.6A CN1215233C (en) 2002-08-23 2002-08-23 Method and apparatus for controlling verticality of steel pile

Publications (2)

Publication Number Publication Date
CN1424469A true CN1424469A (en) 2003-06-18
CN1215233C CN1215233C (en) 2005-08-17

Family

ID=4748712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN02136613.6A Expired - Lifetime CN1215233C (en) 2002-08-23 2002-08-23 Method and apparatus for controlling verticality of steel pile

Country Status (1)

Country Link
CN (1) CN1215233C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102653943A (en) * 2012-05-08 2012-09-05 上海市基础工程有限公司 Underground embedded steel column straightening limiting device
CN102653947A (en) * 2012-05-08 2012-09-05 上海市基础工程有限公司 Underground embedded steel component limiting straightening construction method
CN102888865A (en) * 2012-05-29 2013-01-23 中国建筑第四工程局有限公司 Method and device for correcting perpendicularity of steel structural member in process of constructing vertical column pile
CN103562463A (en) * 2011-03-28 2014-02-05 Ihc荷兰Ie有限公司 Measurement system for a pile
CN112551395A (en) * 2020-11-30 2021-03-26 中天建设集团有限公司 Tower crane installation structure and correction method for installation inclination caused by foundation inclination

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103562463A (en) * 2011-03-28 2014-02-05 Ihc荷兰Ie有限公司 Measurement system for a pile
CN102653943A (en) * 2012-05-08 2012-09-05 上海市基础工程有限公司 Underground embedded steel column straightening limiting device
CN102653947A (en) * 2012-05-08 2012-09-05 上海市基础工程有限公司 Underground embedded steel component limiting straightening construction method
CN102653947B (en) * 2012-05-08 2015-02-18 上海市基础工程集团有限公司 Underground embedded steel component limiting straightening construction method
CN102653943B (en) * 2012-05-08 2015-02-18 上海市基础工程集团有限公司 Underground embedded steel column straightening limiting device
CN102888865A (en) * 2012-05-29 2013-01-23 中国建筑第四工程局有限公司 Method and device for correcting perpendicularity of steel structural member in process of constructing vertical column pile
CN102888865B (en) * 2012-05-29 2015-08-12 中国建筑第四工程局有限公司 The bearing calibration of steel beam column verticality and device in stand column pile construction
CN112551395A (en) * 2020-11-30 2021-03-26 中天建设集团有限公司 Tower crane installation structure and correction method for installation inclination caused by foundation inclination

Also Published As

Publication number Publication date
CN1215233C (en) 2005-08-17

Similar Documents

Publication Publication Date Title
CN201065533Y (en) Steel pile column perpendicularity regulating and controlling device
CN109269896B (en) Multi-angle load applying device and method
CN108279155B (en) Multidirectional loading structural surface strength measuring device and using method
CN208533586U (en) A kind of five layers of inverse method one-column one-pile one thousandth vertical adjustment precision plumbing device in underground
CN109115608A (en) A kind of more size adjustable rock cleavage test boxs and method
CN105569097A (en) Test device and method for drawing bucket foundation model at any angles
CN1215233C (en) Method and apparatus for controlling verticality of steel pile
CN104535045A (en) Wall-hanging hydrostatic level mounting device and wall-hanging hydrostatic level mounting method
CN112378381B (en) Slope gradient measuring device
CN204495333U (en) A kind of erecting device of wall-hanging hydrostatic level
CN111257586B (en) Leveling device for wind measuring instrument on large cable of large-span suspension bridge
CN206457859U (en) A kind of detachable apparatus for facilitating open caisson to observe skew and absolute altitude
CN216159888U (en) Fixing support for roadbed and pavement settlement observation scale
CN111322996B (en) Column template gradient control structure by laser pointing method and use method thereof
CN212779195U (en) Foundation pit settlement monitoring device
CN205205884U (en) Angle bucket foundation model test device of drawing wantonly
CN113267433A (en) Novel building settlement measuring device
CN108956180B (en) Test device and method for simulating influence of tunnel excavation on overlying buildings
CN214061720U (en) A quick centering device for foundation ditch horizontal displacement is surveyd
CN206905740U (en) A kind of absolute altitude leveling unit for high precision apparatus installation
CN105133673A (en) Loading force measuring device for slope model experiment and loading fixing method of loading force measuring device
CN210460637U (en) A but, rotation of shaft orientation is accurate appearance support that hangs down
CN219890448U (en) Civil engineering wall straightness check out test set that hangs down
CN220450933U (en) Precast pile construction straightness detection device that hangs down
CN215368789U (en) Slope finding tool for concrete surface in circular sedimentation tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 25-27 Floor, 33 Fushan Road, China (Shanghai) Free Trade Pilot Area, 200120

Patentee after: SHANGHAI CONSTRUCTION NO.1 (Group) Co.,Ltd.

Address before: 200082 No. 1198 Zhongshan North Second Road, Shanghai

Patentee before: Shanghai No.1 Construction Co.,Ltd.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20050817

CX01 Expiry of patent term