CN1419037A - 矿井气化炉 - Google Patents
矿井气化炉 Download PDFInfo
- Publication number
- CN1419037A CN1419037A CN 02158972 CN02158972A CN1419037A CN 1419037 A CN1419037 A CN 1419037A CN 02158972 CN02158972 CN 02158972 CN 02158972 A CN02158972 A CN 02158972A CN 1419037 A CN1419037 A CN 1419037A
- Authority
- CN
- China
- Prior art keywords
- gas
- gas injection
- coal
- tunnel
- gasification
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Air Bags (AREA)
Abstract
本发明公开了煤矿矿井于煤层直接生产煤气的矿井气化炉,由煤气巷道和煤层内的气化反应通道构成气化产气与煤气运输系统,由注气巷道与注气钻孔构成气化剂注入系统。生产煤气时,人员在注气巷道内操作,将气化剂由封入注气钻孔内的注气管注入气化反应通道生产煤气,所产煤气进入煤气巷道流至矿井煤气井下运输井巷系统。
Description
技术领域 本发明涉及于煤层直接生产煤气,属采矿技术。
背景技术 现有于煤层直接生产煤气的技术称为“煤炭地下气化”,如图1(取自《煤炭地下气化过程》一书,中国矿业大学出版社,2002年10月出版),其技术特征是:不建设生产矿井,由地面向气化煤层内的气化通道施工进气孔注入气化剂(空气、氧气、蒸汽),气化通道所产煤气进入排气孔流至地面。由附图1可见,其1个显著缺点是进气孔与排气孔随煤层埋藏深度的增加而增长,气化深部煤层时,施工钻孔困难、工程量大、投资与成本增加。
发明内容
本发明为现有生产矿井内于煤层直接生产煤气,目的是解决现有煤炭地下气化技术难以气化深部煤层的问题。
为达到上述目的,本发明的内容如附图2所示:在煤层内,掘进通风的注气巷道1,内有气化剂管线2。由注气巷道1向煤层3内的气化反应通道4(本申请所有文件中“通道”一词,指巷道、钻孔、煤壁前方或燃烧等方式形成的长条状气体流动空间)施工注气钻孔5,孔5内封入与气化剂管线2相连通的注气管6,注气管6的出气口位于气化反应通道4的注气点7处。生产煤气时,人员在注气巷道1内操作,将气化剂由注气管6注入气化反应通道4生产煤气,生成的煤气由气化反应通道4的反应末端8进入由煤气巷道9、煤气石门10和煤气井11构成的煤气运输井巷系统,流至地面12。
本发明的注气巷道1和注气钻孔5亦可布置在煤层3内气化反应通道4的反应末端8的外侧,如附图3所示:封入注气钻孔5的注气管6,由反应末端8进入气化反应通道,而注气管口位于注气点7处,注气管6内气流方向与气化反应通道4内的气流方向相反。
本发明的注气巷道1和注气钻孔5还可布置在煤层底板的岩(煤)层内,如附图4所示,注气钻孔5内的末端连同封入其内的注气管6的注气管口位于气化反应通道4的注气点7处。
当注气巷道1布置在煤层底板的岩(煤)层时,亦可如附图5所示,注气钻孔5直通煤气巷道9,封入注气钻孔5内的注气管6经 煤气巷道9和气化反应通道4的末端8而注气管口位于气化反应通道4的注气点7处。
当注气巷道1布置在煤层底板的岩(煤)层内时,还可如图6所示,将气化反应通道4分为2个或2个以上的气化分段4-1、4-2、4-3、4-4……,由注气巷道1分别向各气化分段的注气点7-1、7-2、7-3……施工注气钻孔5-1、5-2、5-3……。生产煤气时,相邻注气钻孔5-1、5-2、5-3、……接替注气,使相邻气化分段4-1、4-2、4-3……接替生产。
实施本发明的必要安全措施,是如图4所示的组合密闭,用以隔离注气巷道1和煤气巷道9,防止煤气泄漏,其结构为:密闭墙13-1、13-2之间,充填泥浆、水、氮气等流体14。
实施本发明的另一项必要安全措施,是防止煤气井11的支护井壁15与井内的高热煤气流接触而膨胀损坏,其技术措施如图6所示:支护井壁15加装水(气)冷壁16以隔离煤气井11内的热煤气流。
附图说明 下面结合附图,对本发明做进一步说明。
图1 现有地下煤炭气化炉
图2 煤层内注气巷道——注气钻孔正向注气方法剖面图
图3 煤层内注气巷道——注气钻孔逆向注气方法剖面图
图4 煤层底板岩(煤)层内注气巷道——岩层注气钻孔直线注气管
注气方法剖面图
图5 煤层底板岩(煤)注气巷道——岩层注气钻孔弯曲注气管注气方法剖面图
图6 气化反应通道内多气化分段接替生产方法剖面图
图7 煤气井内衬水冷壁剖面图
图8 多气化反应通道共用注气巷道剖面图
图9 壁式气化采煤方法
本发明的有益效果在于:注气钻孔长度不随煤层埋深变化,从而生产稳定、投资与成本减少。
具体实施方式
实施例1 多气化反应通道共用注气巷道生产方法
如图8所示,2条或2条以上(图中所画为4条)气化反应通道4由1条煤层底板的岩(煤)层内注气巷道1实施注气,所产煤气均流入一条煤气巷道9。
实施例2 壁式气化采煤方法
如图9所示,煤层3内布置煤气巷道9和2条或2条以上的气化分段4-1、4-2……(图中为2条气化分段);由煤层底板的岩(煤)层内的注气巷道1向煤层3对应气化分段4-1、4-2……各钻1排注气钻孔5-1-1、5-1-2、5-1-3……和5-2-1、5-2-2、5-2-3……,其与煤层的交点7-1-1、7-1-2、7-1-3和7-2-1、7-2-2、7-2-3……即为注气点。生产煤气时,气化分段4-1由注气点7-1-1注气生产,至煤层的气化煤壁后退至W-1-1,再由注气点7-1-2接替注气生产,气化煤壁相应后退至W-1-2。重复这一生产过程,注气点7-1-3、7-1-4……依次接替注气生产,气化煤壁依次后退至W-1-3、W-1-4……。气化分段4-2采用与气化分段4-1相同的接替生产程序,则气化煤壁依次后退至W-2-1、W-2-2、W-2-3……。
Claims (10)
1.煤矿矿井内于煤层直接生产煤气的矿井气化炉,其特征为:由煤气巷道9和煤层内的气化反应通道4构成煤气系统;由注气巷道1及其向气化反应通道4施工的注气钻孔5构成气化剂注气系统,气化剂由注气钻孔5内封入的注气管6注入气化反应通道4生产煤气,人员在注气巷道1内作业。
2.根据权利要求1的一种矿井气化炉,其特征是:巷道1和注气钻孔5位于煤层3内气化反应通道4的注气点8外侧,气化剂在注气管6内的流动方向与煤气在气化反应通道4内的流动方向相同。
3.根据权利要求1的一种矿井气化炉,其特征是:操作巷道1和注气钻孔5位于煤层3内气化反应通道4的反应末端8外侧,注气管6穿过气化反应通道4,使出气管口位于注气点8处,气化剂在注气管6内的流动方向和煤气在气化反应通道4内的流动方向相反。
4.根据权利要求1的一种矿井气化炉,其特征是:操作巷道1和注气钻孔5位于煤层3底板岩(煤)层内,注气钻孔5与气化反应通道4在注气点8处相连通。
5.根据权利要求1的一种矿井气化炉,其特征是:操作巷道1位于煤层底板的岩(煤)层内,煤气巷道9位于煤层内,注气钻孔5与煤气巷道9相通,封入注气钻孔5内的注气管6经煤气巷道9和气化反应通道4的反应末端8敷设至出气管口位于注气点8处。
6.应用权利要求2、3、4、5的一种多矿井气化炉生产接替方法:气化反应通道4划分为多个反应分段4-1、4-2、4-3、......;由注气巷道1对应各反应分段的注气点8-1、8-2、8-3、......施工注气钻孔5-1、5-2、5-3......,相邻注气钻孔接替注气,实现相邻气化反应分段的接替生产。
7.实施权利要求1的一种矿井运输煤气系统,其特征为:由煤气巷道10和煤气井11构成收集、运输矿井内多个气化反应通道4生产的煤气。
8.实施权利要求7的一种保护煤气井11的支护井圈15的方法,其特征为:以沿支护井圈15密集排列的充满流体的管线16-1或中空弧形板16-2隔离支护井圈15与井内的热煤气流。
9.一种权利要求2、3、4、5、6的实施方法:由1条注气巷道1向2条或2条以上的气化反应通道4施工注气钻孔5注气。
10.一种应用权利要求4的多矿井气化炉接替生产的方法,其特征为:由注气巷道1向煤层3施工一排注气钻孔5-1-1、5-1-2、5-1-3......,其与煤层相交的孔底7-1-1、7-1-2、7-1-3、7-1-4......的连线与煤层内的煤气巷道9平行,由注气钻孔5-1-1向气化反应通道4-2注气生产使气化煤壁后退至W-1-1,此时相邻注气钻孔5-1-2注气使其孔底7-1-2与W-1-1相贯通而接替注气生产;之后,个注气钻孔5-1-3、5-1-4、......依次接替注气生产。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02158972 CN1419037B (zh) | 2002-12-31 | 2002-12-31 | 矿井气化炉 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02158972 CN1419037B (zh) | 2002-12-31 | 2002-12-31 | 矿井气化炉 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1419037A true CN1419037A (zh) | 2003-05-21 |
CN1419037B CN1419037B (zh) | 2010-09-08 |
Family
ID=4753216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02158972 Expired - Fee Related CN1419037B (zh) | 2002-12-31 | 2002-12-31 | 矿井气化炉 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1419037B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100340738C (zh) * | 2003-10-08 | 2007-10-03 | 新汶矿业集团有限责任公司 | 地下气化炉水封堵漏工艺 |
CN104295282A (zh) * | 2014-08-12 | 2015-01-21 | 新奥气化采煤有限公司 | 后退式煤层气化方法 |
CN110821544A (zh) * | 2018-08-14 | 2020-02-21 | 柴乔森 | 矿井内自点火煤孔煤层气化炉式采区 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE818898A (fr) * | 1974-08-14 | 1974-12-02 | Nouveau procede d'exploitation d'un gisement de houille ou de schistes bitumineux par degazage | |
NL9000426A (nl) * | 1990-02-22 | 1991-09-16 | Maria Johanna Francien Voskamp | Werkwijze en stelsel voor ondergrondse vergassing van steen- of bruinkool. |
CN1320253C (zh) * | 1998-05-29 | 2007-06-06 | 柴兆喜 | 于煤层直接生产煤气的矿井 |
CN1117917C (zh) * | 1999-11-26 | 2003-08-13 | 柴兆喜 | 一种于矿井内生产煤气的地下气化炉 |
-
2002
- 2002-12-31 CN CN 02158972 patent/CN1419037B/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100340738C (zh) * | 2003-10-08 | 2007-10-03 | 新汶矿业集团有限责任公司 | 地下气化炉水封堵漏工艺 |
CN104295282A (zh) * | 2014-08-12 | 2015-01-21 | 新奥气化采煤有限公司 | 后退式煤层气化方法 |
CN110821544A (zh) * | 2018-08-14 | 2020-02-21 | 柴乔森 | 矿井内自点火煤孔煤层气化炉式采区 |
Also Published As
Publication number | Publication date |
---|---|
CN1419037B (zh) | 2010-09-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102031950B (zh) | 煤层顶板梳状瓦斯抽采钻孔的成孔工艺方法 | |
US20070044957A1 (en) | Method for underground recovery of hydrocarbons | |
US20230126834A1 (en) | Integrated method and structure for in-situ hydrogen production from coal seams and coalbed methane exploitation | |
CN1320253C (zh) | 于煤层直接生产煤气的矿井 | |
CN103670496A (zh) | 单一低透气性突出煤层沿空留巷与预抽区段煤层瓦斯方法 | |
CN101832149A (zh) | 一种井下注热抽采煤层瓦斯的方法 | |
CN113803104B (zh) | 上采区埋管与下向钻孔一体化布置及全周期瓦斯抽采方法 | |
CN1854459A (zh) | 深层地下煤炭气化工艺方法 | |
CN1055332C (zh) | 拉管注气点后退式煤层气化方法 | |
CN113006867B (zh) | 一种高瓦斯低洼孤岛工作面煤层采前多灾害联合防治方法 | |
CN101915118A (zh) | 高瓦斯中硬煤层递进式瓦斯抽放方法 | |
CN110159245A (zh) | 分布式注排气通道窄条带煤炭地下气化炉生产系统及方法 | |
CN111441817A (zh) | 煤层钻孔喷射压裂与采动压力协同作用强化瓦斯抽采方法 | |
CN1061733C (zh) | 换管注气点后退式煤层气化方法 | |
CN107152261A (zh) | 煤层气抽采系统及建造方法 | |
CN116220648A (zh) | 一种地下残余煤炭气化与固废回填一体化的装置及方法 | |
CN1317483C (zh) | 进入目标地质体的方法和系统 | |
CN116357383A (zh) | 一种多层位-多角度老采空区注浆充填的方法 | |
CN106014345B (zh) | 一种下部垮落法开采形成的复合老空区煤层气的抽采方法 | |
CN108798758A (zh) | 沿顶大直径顺层钻孔抽采采空区及上隅角瓦斯工艺 | |
CN1419037A (zh) | 矿井气化炉 | |
CN112431582B (zh) | 能够实现多种介质并输的煤炭地下气化系统及气化方法 | |
CN112796730B (zh) | 一种多水平跨采区地面钻井井网布设方法 | |
WO2021179684A1 (zh) | 一种地下气化炉的预控结构、气化炉及气化方法 | |
CN1117917C (zh) | 一种于矿井内生产煤气的地下气化炉 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 100713 Beijing city Dongcheng District District No. 13 small Huangzhuang building room 6206 Patentee after: Chai Zhaoxi Address before: 100713 Beijing Dongcheng District Andingmen small Huangzhuang District No. 4 Building 4 402 Patentee before: Chai Zhaoxi |
|