CN1419012A - 控制性水泥灌浆工艺 - Google Patents

控制性水泥灌浆工艺 Download PDF

Info

Publication number
CN1419012A
CN1419012A CN 02159188 CN02159188A CN1419012A CN 1419012 A CN1419012 A CN 1419012A CN 02159188 CN02159188 CN 02159188 CN 02159188 A CN02159188 A CN 02159188A CN 1419012 A CN1419012 A CN 1419012A
Authority
CN
China
Prior art keywords
cement
grouting
steel pipe
controlled
chemical admixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02159188
Other languages
English (en)
Other versions
CN1185389C (zh
Inventor
李旺雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Wanglei
Zhang Jinsheng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB021591881A priority Critical patent/CN1185389C/zh
Publication of CN1419012A publication Critical patent/CN1419012A/zh
Application granted granted Critical
Publication of CN1185389C publication Critical patent/CN1185389C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种可解决水泥灌浆发生串冒、地层抬动和控制水泥浆液减少流失和流动扩散的太远的控制性水泥灌浆工艺。本发明的技术方案的步骤如下:a.首先在土层内打入带孔的钢管,再连续注入水泥浆;b.再注入化学外加剂经钢管加入至地层内;c.a步骤与b步骤反复进行至灌浆压力达到通常的压力值。本发明是化学外加剂与水泥浆是在地层内才流动中混合,只要适当控制了进入的水泥浆量和化学外加剂的比例(这是现有技术),则混合化学外加剂的水泥浆液的凝胶时间为20~40秒左右即可。本发明的操作简单,无须增加特殊设备,就可解决地层灌浆过程中的水泥浆流失,地面抬起等缺陷。

Description

控制性水泥灌浆工艺
技术领域:
本发明涉及一种对地层进行加固的工艺,特别是指一种与水泥灌浆相结合的对地层加固的灌浆工艺。
背景技术:
在建筑施工过程中或在很多特定的地质条件下,需对地层进行加固,如遇沙土层、软土层或渗土层,或建筑过高过重等情况,均需对对地层进行加固处理;目前常用的加固工艺是在地层上打多孔钢管,然后加注水泥浆,在加注过程中常出现串冒浆液,这时除了限压、现流和停灌待凝等措施外没有其它更好的措施;还有一种工艺是在水泥内加入化学外加剂(如速凝剂)混合后再注入钢管灌入地下,以促进水泥浆凝胶时间,或在水泥灌浆时要混凝土盖板和压重,对没有混凝土盖板和压重的浅层地基则不能进行加固。上述的工艺有时会出现水泥浆液流动扩散的很远造成大量水泥浆材流失。水泥灌浆还容易产生地面抬动。
发明内容:
本发明的发明目的是公开一种可解决水泥灌浆发生串冒、地层抬动和控制水泥浆液减少流失和流动扩散的太远的控制性水泥灌浆工艺。
实现本发明的技术方案的步骤如下:
a.首先在土层内打入带孔的钢管,再连续注入水泥浆;
b.再注入化学外加剂经钢管加入至地层内;
c,a步骤与b步骤反复进行至灌浆压力达到通常的压力值。
本发明的原理与现有技术的灌浆原理有本质区别,现有技术一般将化学外加剂与水泥浆混合后再注入地下,本发明是化学外加剂与水泥浆是在地层内才流动中混合,只要适当控制了进入的水泥浆量和化学外加剂的比例(这是现有技术),则混合化学外加剂的水泥浆液的凝胶时间为20~40秒左右即可,这里所述的化学外加剂是普通常用的速凝剂,如常用的玻璃水。本发明的操作简单,无须增加特殊设备,就可解决地层灌浆过程中的水泥浆流失,地面抬起等缺陷。
具体实施方式:
本发明的具体实施方式的步骤如下:
a.首先在土层内打入带孔的钢管,再连续注入水泥浆;
b.再注入化学外加剂经钢管加入至地层;
c.a步骤与b步骤反复进行至灌浆压力达到通常的压力值。
实施中,首先将通常使用的双液灌浆装置与钢管连接好,用压力泵将水泥浆注入钢管后进入地层,当出现下列情况:1水泥灌浆产生中冒浆,2水泥灌浆吃浆量一直较大,灌浆压力却在较长时间一直不变,3水泥灌浆时,水泥进浆率突然变大,随之却出现吃浆率越来越大,而灌浆压力反而越来越小,在上述三种情况下,实施b步骤在钢管内注入化学外加剂,如通常使用的玻璃水,加注的化学外加剂从孔内进入地层内与水泥浆液产生速凝化学作用,按常规的技术,控制适当的水泥浆与化学外加剂的混合比例,将速凝时间控制为20~40秒左右较好,最佳控制在30秒左右,灌浆加固过程中时间会有反复,如a步骤灌水泥浆,灌浆压力上升,如出现前述的三种情况,则加注化学外加剂至地层内与水泥浆混合,速凝后则上述三种情况会消失或大为缓解,则继续灌水泥浆,可能又会出现上述三种情况,则再注入化学外加剂,反复多次进行,则完成本工艺过程。
灌浆加固施工顺序:水泥灌浆产生挤压、劈裂、挤压、劈…,化学外加剂加注依水泥灌浆的挤压、劈裂、挤压、劈裂…的相应顺序控制为停、注入、停、注入…控制灌浆压力按挤压、劈裂、挤压、劈裂…顺序分阶段的不断提高上升,直到达到要求加固的灌浆压力目的为止。
本发明实质是应用软弱地基随灌浆的不断进行和灌浆压力不断升高,其地层本身的允许灌浆压力也是随灌浆的不断加强而不断提高,利用水泥浆液和化学外加剂(水泥浆液外加速凝剂)的不同流体特性及凝胶时间的关系特性,控制加注化学外加剂在水泥灌浆扩散过程中,只随部分的水泥浆液进地层内发生混合,产生速凝,其中灌水泥浆液是连续不间断的,灌浆压力是不断上升的,加注化学外加剂是间断不连续的,加注压力随水泥灌浆压力变化,而灌浆孔本身始终是畅通完好不会凝固而被堵死。控制灌浆压力不断升高,直到要求的加固目的为止。
利用本发明可以对浅层进行灌浆加固处理,可控制解决串冒浆问题和控制灌浆对地面产生抬动的问题,能解决软弱地基不能提升灌浆压力的问题,可控制浆液扩散范围。本发明处理软基加固地基具有很多优势,是一种很有应用价值和发展前景的施工方法。本发明在严格保密的条件下,试验性地应用本发明的技术在处理加固北京西客站路基和站台的沉降中,取得良好的技术效果。

Claims (4)

1.一种控制性水泥灌浆工艺,其步骤如下:
a.首先在土层内打入带孔的钢管,再连续注入水泥浆;
b.再注入化学外加剂经钢管加入至地层内;
c.a步骤与b步骤反复进行至灌浆压力达到通常的压力值。
2.按权利要求1所述的灌浆工艺,所述的化学外加剂为通常使用的速凝剂,如玻璃水。
3.按权利要求1或2所述的灌浆工艺,所述的注入化学外加剂与水泥浆的混合比例应使速凝时间控制为20~40秒左右。
4.按权利要求3所述的灌浆工艺,所述的速凝时间控制为30秒左右为最佳。
CNB021591881A 2002-12-30 2002-12-30 控制性水泥灌浆工艺 Expired - Fee Related CN1185389C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021591881A CN1185389C (zh) 2002-12-30 2002-12-30 控制性水泥灌浆工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021591881A CN1185389C (zh) 2002-12-30 2002-12-30 控制性水泥灌浆工艺

Publications (2)

Publication Number Publication Date
CN1419012A true CN1419012A (zh) 2003-05-21
CN1185389C CN1185389C (zh) 2005-01-19

Family

ID=4753260

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021591881A Expired - Fee Related CN1185389C (zh) 2002-12-30 2002-12-30 控制性水泥灌浆工艺

Country Status (1)

Country Link
CN (1) CN1185389C (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535472A (zh) * 2012-02-29 2012-07-04 中国水电顾问集团中南勘测设计研究院 一种孔管封填、高压冲挤灌浆的方法
CN103174428A (zh) * 2013-03-15 2013-06-26 金川集团股份有限公司 一种应用化学浆液对竖井井筒实施注浆堵水的方法
CN109024603A (zh) * 2018-08-09 2018-12-18 中国三峡建设管理有限公司 灌浆工艺状态切换方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100443669C (zh) * 2006-08-29 2008-12-17 李旺雷 水泥灌浆附加推剪挤压的地基处理方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535472A (zh) * 2012-02-29 2012-07-04 中国水电顾问集团中南勘测设计研究院 一种孔管封填、高压冲挤灌浆的方法
CN102535472B (zh) * 2012-02-29 2014-06-11 中国水电顾问集团中南勘测设计研究院 一种孔管封填、高压冲挤灌浆的方法
CN103174428A (zh) * 2013-03-15 2013-06-26 金川集团股份有限公司 一种应用化学浆液对竖井井筒实施注浆堵水的方法
CN103174428B (zh) * 2013-03-15 2015-10-28 金川集团股份有限公司 一种应用化学浆液对竖井井筒实施注浆堵水的方法
CN109024603A (zh) * 2018-08-09 2018-12-18 中国三峡建设管理有限公司 灌浆工艺状态切换方法
CN109024603B (zh) * 2018-08-09 2021-06-08 中国三峡建设管理有限公司 灌浆工艺状态切换方法

Also Published As

Publication number Publication date
CN1185389C (zh) 2005-01-19

Similar Documents

Publication Publication Date Title
CN105386433B (zh) 一种微生物固土cfg桩复合地基及施工方法
CN105332719A (zh) 一种快速堵水的水泥聚氨酯复合注浆工艺
CN101694096B (zh) 一种用于动水条件下砂层地基的注浆处理方法
CN101235632B (zh) 灌浆堵漏工艺
CN104988910A (zh) 变径旋喷搅拌桩
CN106368214A (zh) 一种护筒式水泥土搅拌桩的成桩操作方法
CN108166994A (zh) 一种应用于富水砂层盾构隧道的注浆加固圈的施工方法
CN102838325A (zh) 一种封孔止浆材料及灌浆封孔工艺
CN110387877A (zh) 一种劲性复合桩施工工艺
CN111170711A (zh) 一种凝结时间可控的壁后注浆浆液、注浆工艺及注浆装置
CN1419012A (zh) 控制性水泥灌浆工艺
CN107386267B (zh) 控制岩溶地基注浆浆液流失、污染地下水的方法
CN110230314A (zh) 一种桩基结构及其施工方法
CN113445527A (zh) 一种灌浆防水帷幕在轨道交通地下站台渗漏治理中的方法
CN103174428B (zh) 一种应用化学浆液对竖井井筒实施注浆堵水的方法
CN106245641A (zh) Phc管桩后压浆施工工艺及phc管桩复合桩
CN106013051A (zh) 一种特种粘土固化液深层搅拌方法
CN100374657C (zh) 利用螺纹搅拌轴降低周围地基变形的施工方法
CN214993929U (zh) 一种基坑支护土钉
CN100363562C (zh) 带扩散防止板及喷浆口的深层旋喷搅拌头
CN107447754A (zh) 预制管桩的新型植桩工艺及所形成的桩体
CN100425555C (zh) 管道淤泥固化处理方法
CN100443669C (zh) 水泥灌浆附加推剪挤压的地基处理方法
CN106082842A (zh) 一种用于深层搅拌施工的特种结构剂及特种粘土固化液
CN112065320A (zh) 采用水泥土浆进行工程钻孔封堵方法及水泥土浆的应用

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHANG JINSHENG

Effective date: 20050304

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20050304

Address after: 100055 No. 2, building 1, gate 51, village 302, water gate, Guang'an, Beijing

Co-patentee after: Zhang Jinsheng

Patentee after: Li Wanglei

Address before: 100055 No. 2, building 1, gate 51, village 302, water gate, Guang'an, Beijing

Patentee before: Li Wanglei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050119

Termination date: 20181230