CN1410630A - 封底人工挖孔桶桩处理桥头地基的方法 - Google Patents

封底人工挖孔桶桩处理桥头地基的方法 Download PDF

Info

Publication number
CN1410630A
CN1410630A CN 02145173 CN02145173A CN1410630A CN 1410630 A CN1410630 A CN 1410630A CN 02145173 CN02145173 CN 02145173 CN 02145173 A CN02145173 A CN 02145173A CN 1410630 A CN1410630 A CN 1410630A
Authority
CN
China
Prior art keywords
pile
stake
back cover
piles
certain amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 02145173
Other languages
English (en)
Inventor
王奎华
谢康和
阙仁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN 02145173 priority Critical patent/CN1410630A/zh
Publication of CN1410630A publication Critical patent/CN1410630A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种封底人工挖孔桶桩处理桥头地基的方法。在桩台与路堤衔接处的软土层中,施工一定量的封底人工挖孔桶桩,其施工方法与普通人工挖孔桩做护壁的方法相同,但浇注混凝土时要使桩身厚度比普通人工挖孔桩的护壁厚,且应配一定量的主筋和箍筋,桩内孔不浇注混凝土而保留空心。桩底采用钢筋混凝土封底。在填土前用盖板将桩口封好或通过承台将单个桩口联起来成为群桩。本发明采用空心桩处理桥头地基,受力特性同其他桩一样,但由于桩身重量轻,因此能有效地减少对软弱下卧层的附加应力,从而从根本上减少沉降,该项技术将能有效地解决目前广泛存在的桥头跳车问题。

Description

封底人工挖孔桶桩处理桥头地基的方法
                          技术领域
本发明涉及桥头地基的处理方法。
                          背景技术
桥头跳车一直是困扰软土地区公路建设和养护的难题。如图2所示,这主要是由桥台8与路堤10衔接处存在沉降差异而引起的。桥梁9特别是软土地段的桥梁一般都采用桩基础7,桥台沉降量很小,而桥头地基中的软土层土质相对较差,在路堤填料和车辆等荷载作用下,附加应力大,沉降量较大,从而在刚性桥台与柔性路堤衔接处产生沉降差异,引起桥头跳车。附加应力是引起沉降的主要原因,因此,减少附加应力就可以减少桥头地基的沉降量。目前采用的桥头地基处理方法有粉体喷射搅拌法、砂桩复合地基法、碎石桩法等,这些复合地基处理方法虽能提高地基强度,起到加固地基的作用,但只是起到了加固被处理层,使被处理层的压缩量减少的效果,并不能减少作用于未处理的软弱下卧层5的附加应力,而这种附加应力正是使下卧层产生较大沉降,从而产生差异沉降的主要原因。
                          发明内容
本发明的目的是提供一种封底人工挖孔桶桩处理桥头地基的方法,该方法通过减轻桩身重量来减少对下卧层的附加应力,从而减少沉降量。
本发明采用的技术方案是:
在桩台与路堤衔接处的软土层中,施工一定量的封底人工挖孔桶桩,其施工方法与普通人工挖孔桩做护壁的方法相同,但浇注混凝土时要使桩身厚度比普通人工挖孔桩的护壁厚,且应配一定量的主筋和箍筋,桩内孔不浇注混凝土而保留空心。桩底采用钢筋混凝土封底。在填土前用盖板将桩口封好或通过承台将单个桩口联起来成为群桩。
本发明具有的有益效果是:采用空心桩处理桥头地基,受力特性同其他桩一样,但由于桩身重量轻,因此能有效地减少对软弱下卧层的附加应力,从而从根本上减少沉降,该项技术将能有效地解决目前广泛存在的桥头跳车问题。
                          附图说明
图1是封底人工挖孔桶桩的结构示意图;
图2是本发明处理桥头地基示意图。
                      具体实施方式
如图1、2所示,在桩台8与路堤10衔接处的软土层中,施工一定量的封底人工挖孔桶桩6,其施工方法与普通人工挖孔桩做护壁的方法相同,但浇注混凝土3时要使桩身厚度比普通人工挖孔桩的护壁厚,且应配一定量的主筋2和箍筋1,桩内孔不浇注混凝土而保留空心。桩底采用钢筋混凝土封底。在填土前用盖板4将桩口封好或通过承台将单个桩口联起来成为群桩。随着与桥头距离的增加,桩长可逐渐变短,以产生刚柔过渡带。
若桩内径为1.2m,混凝土容重按24KN/m3计算,则与实心桩相比,每根桩每延米长度范围内就可减少对下卧层约27KN的压力,并节省约2.7吨的混凝土,这一技术不仅可以解决桥头差异沉降问题,而且还具有较好的经济效益,在大兴道桥建设的今天,它将会有广阔的应用前景和开发潜力。

Claims (1)

1.封底人工挖孔桶桩处理桥头地基的方法,其特征在于:在桩台(8)与路堤(10)衔接处的软土层中,施工一定量的封底人工挖孔桶桩(6),其施工方法与普通人工挖孔桩做护壁的方法相同,但浇注混凝土(3)时要使桩身厚度比普通人工挖孔桩的护壁厚,且应配一定量的主筋(2)和箍筋(1),桩内孔不浇注混凝土而保留空心,桩底采用钢筋混凝土封底。在填土前用盖板(4)将桩口封好或通过承台将单个桩口联起来成为群桩。
CN 02145173 2002-11-08 2002-11-08 封底人工挖孔桶桩处理桥头地基的方法 Pending CN1410630A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02145173 CN1410630A (zh) 2002-11-08 2002-11-08 封底人工挖孔桶桩处理桥头地基的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02145173 CN1410630A (zh) 2002-11-08 2002-11-08 封底人工挖孔桶桩处理桥头地基的方法

Publications (1)

Publication Number Publication Date
CN1410630A true CN1410630A (zh) 2003-04-16

Family

ID=4750796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02145173 Pending CN1410630A (zh) 2002-11-08 2002-11-08 封底人工挖孔桶桩处理桥头地基的方法

Country Status (1)

Country Link
CN (1) CN1410630A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967824A (zh) * 2010-09-27 2011-02-09 浙江大学 一种带桩帽大直径薄壁筒桩网复合结构及其施工方法
CN102619216A (zh) * 2011-09-09 2012-08-01 温州长城基础工程公司 地基处理用取土圆环桩及其施工方法
CN103774700A (zh) * 2014-01-07 2014-05-07 浙江大学 泛频响函数法检测既有建构筑物下高承台桩完整性的方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967824A (zh) * 2010-09-27 2011-02-09 浙江大学 一种带桩帽大直径薄壁筒桩网复合结构及其施工方法
CN102619216A (zh) * 2011-09-09 2012-08-01 温州长城基础工程公司 地基处理用取土圆环桩及其施工方法
CN103774700A (zh) * 2014-01-07 2014-05-07 浙江大学 泛频响函数法检测既有建构筑物下高承台桩完整性的方法

Similar Documents

Publication Publication Date Title
CN103074891B (zh) 双层塑料套管散体材料与混凝土劲芯组合桩及施工方法
CN108411889B (zh) 一种结构化胶结碎石桩及其施工方法
WO2021082767A1 (zh) 一种基于增强纤维和偏高岭土的加压灌注桩的施工方法
CN107419630A (zh) 一种有效控制工后沉降的软土地基高填方路堤及施工方法
CN1896383A (zh) 一种预钻孔嵌岩钢管混凝土组合桩及其施工方法
CN101487254A (zh) 一种振动沉管碎石注浆桩施工方法
CN108560542A (zh) 一种废旧轮胎包覆建渣的双向增强体及其施工方法
CN107513994A (zh) 一种分段变径自支护旋挖桩及其施工方法
CN101736738A (zh) 一种抗压、抗拔两用型注浆碎石桩
CN110387877A (zh) 一种劲性复合桩施工工艺
CN104005404A (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN1718942A (zh) 陆地沉箱施工工艺及陆地沉箱
CN111676987A (zh) 振冲浆夯法建筑肥槽回填施工方法
CN102839683B (zh) 散体桩-透水性混凝土桩二元复合地基及处理方法
CN114990955A (zh) 城市软土地基地带的市政道路结构及其施工方法
CN105484230A (zh) 桩土混凝一体化复合桩及其施工方法
CN201339186Y (zh) 软岩混凝土置换桩复合地基
CN212001226U (zh) 一种回填杂土复合地基结构
CN111254909B (zh) 一种软土地区地基复合桩基施工工艺
CN105421446B (zh) 一种用于软基处理的混合土挤压固化预制桩的施工方法
CN203066064U (zh) 双层塑料套管散体材料与混凝土劲芯组合桩
CN1410630A (zh) 封底人工挖孔桶桩处理桥头地基的方法
CN208472713U (zh) 一种治理小型滑坡的组合结构微型桩
CN208379572U (zh) 一种基于刃口式推进法的防沉降处理施工装置
CN201254728Y (zh) 桩与土工格室复合地基

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication