CN1407184A - Water penetrating pipe with strip projected parts and connection methods - Google Patents

Water penetrating pipe with strip projected parts and connection methods Download PDF

Info

Publication number
CN1407184A
CN1407184A CN 01127848 CN01127848A CN1407184A CN 1407184 A CN1407184 A CN 1407184A CN 01127848 CN01127848 CN 01127848 CN 01127848 A CN01127848 A CN 01127848A CN 1407184 A CN1407184 A CN 1407184A
Authority
CN
China
Prior art keywords
projected parts
strip projected
water
pipe
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01127848
Other languages
Chinese (zh)
Inventor
李兰英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01127848 priority Critical patent/CN1407184A/en
Publication of CN1407184A publication Critical patent/CN1407184A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A pervious pipe for dewatering from soft foundation, soil, or earth structure is composed of the osmotic filer layer and the pipe with pervious holes or slits, and features that on said pipe there are convex strips for forming the drainage channels between adjacent convex strips. Its advantages are high water permeability and high dewatering efficiency.

Description

Water penetrating pipe with strip projected parts and attaching method thereof
One), technical field
The present invention relates to a kind of water-permeable pipe of getting rid of infiltration.
Two), background technology
At present, in engineerings such as building, agricultural, often must carry out the draining of the soil body or structure inside, as dewatering, the row's of cutting underground water, soft basic draining or the like.In these drainage workss, relatively commonly used have a kind of draining central layer that has rhone, the outsourcing permeatable filter layer is formed band drain (as shown in Figure 1, Fig. 1-1 is the schematic cross-section of Fig. 1), the shortcoming of this band drain is: under extraneous soil pressure or other Construction traffics act on pressure effect on the soil, drainage channel between the rhone often is compressed, shown in Fig. 1-2, band drain is embedding dark more, extraneous load action is big more, compress greatly more, the drainage space of rhone is just more little, and its drainability is also just more little.
The water-permeable pipe that other is made up of a kind of ported sub outsourcing geotextile, as shown in Figure 2.Its drainage principle is: extraneous infiltration is infiltrated in the water-permeable pipe by the hole on the water-permeable pipe and is come draining, water-permeable pipe with holes is in order to guarantee the intensity of pipe itself, the general less than 10% of its percent opening, therefore, extraneous infiltration is extremely low by the efficient that permeable pore infiltrates in the water-permeable pipe, although bigger gutter cavity is arranged, do not bring into play its due effect.Be provided with more permeable hole or seam owing to water-permeable pipe with holes in addition, so its intensity reduction, vertically the bend resistance ability on descends greatly.
Three), summary of the invention
The object of the present invention is to provide a kind of overcome above band drain and water-permeable pipe shortcoming, make up the high water penetrating pipe with strip projected parts of permeability rate height, drainage efficiency of its advantage.
The object of the present invention is achieved like this: the water-permeable pipe that comprises permeatable filter layer and band permeable hole or seam, it is characterized in that described band permeable hole or seam water-permeable pipe are provided with and the strip projected parts of pipe ring to the direction that intersects, and form permeable rhone between the strip projected parts.
The cross sectional shape of described strip projected parts can be rectangle, arc, cast;
Can be provided with permeable hole on the described strip projected parts;
Can also be provided with the strip projected parts of endless tube on the described water-permeable pipe;
Strip projected parts on the described water-permeable pipe can be formed lattice shape;
Be provided with horizontal stiffener in the described water-permeable pipe, also can be the bellows that hoop is strengthened;
Can swathe on the described water-permeable pipe and support the outer thread that covers permeatable filter layer, thread can be formed lattice pattern earlier and wrap up;
Described water-permeable pipe can be tubular type, and the rectangle cast also can be the cast that a plurality of drainage pipes are combined in a formation;
Can clog dank material in the described water-permeable pipe;
The material of described permeatable filter layer can be geotextile;
Water penetrating pipe with strip projected parts of the present invention can be provided with impervious barrier according to actual conditions on the part area, and makes the part area of water-permeable pipe of the present invention permeable.
The present invention compared with prior art has the following advantages: 1, strip projected parts plays the reinforcing rib effect: strip projected parts vertically plays reinforcing rib to water-permeable pipe, and vertical bend resistance ability of water-permeable pipe is strengthened greatly; 2, form permeable rhone effect between the strip projected parts: form rhone between strip projected parts and the strip projected parts, play the effect of band drain; 3, strip projected parts improves permeability rate greatly: strip projected parts supports the permeatable filter layer of outsourcing, the permeability rate of water-permeable pipe is greatly improved, and band drain with drainage channels for certain width, when band drain is rolled into when tubular, its water permeable area is bigger than the water permeable area of plate band drain, this is that the pipe radius that the plate of the radius ratio rhone bottom surface of the formed pipe of rhone end face forms grows the height of a strip projected parts rhone because the strip projected parts of rhone has certain altitude; 4, water penetrating pipe with strip projected parts has overcome the shortcoming separately of band drain and water-permeable pipe, brought into play advantage separately: because the rhone that strip projected parts forms on the tube wall has bigger water permeable ability, can be in short distance enter and drain in the pipe and advance water in the rhone thoroughly by permeable hole on the tube wall or seam, given full play to the high advantage separately of water permeable ability of the high and rhone of the big draining cavity drainability of pipe, and overcome the water permeable ability of water-permeable pipe with holes low with the low shortcoming of drainability of band drain with drainage channels; 5, increased infiltration pressure reduction, improved drainage efficiency: the permeable efficient of well-known water-permeable pipe is to be decided by the inside and outside water pressure difference of pipe, because advancing water in the rhone thoroughly can be in short distance enter in the pipe by permeable hole discrete on the tube wall or seam and drains, therefore can there be pressure differential in the outer infiltration of the rhone of raised item formation and permeatable filter layer all the time, extraneous infiltration can be infiltrated in the rhone endlessly and enter in the water-permeable pipe and be drained, certainly rhone also can be arranged part water, thereby permeable efficient and drainage efficiency are further improved; 6, quicken the infiltration effect: when the water in the rhone flows in the gutter by permeable hole or seam, can form certain suction around hole or the seam, quicken the infiltration of extraneous infiltration; 7, drainability is insensitive to compressive strain: when the permeatable filter layer that covers on the rhone that raised item forms is compressed, to the almost not influence of its drainability, not only there is not any influence, on the contrary owing to water permeable ability slightly being strengthened, because draining mainly is at the pipe internal drainage with increasing of extraneous contact area.And for drainage channels band drain, how many permeatable filter layers is compressed between rhone, and how many its drainabilities just reduces, if permeatable filter layer is compressed to and is attached on the rhone base plate, then its drainability will total loss; 8, cost can reduce significantly: the present invention can effectively utilize bamboo to make water penetrating pipe with strip projected parts, thereby the cost of water-permeable pipe is reduced significantly; 9, help the connection of water-permeable pipe; 10, the loaded down with trivial details operation that original water-permeable pipe needs a lot of connectors has been saved in method of attachment of the present invention, and body itself can directly connect, and is very convenient.
Four), description of drawings
The present invention is further illustrated below in conjunction with the drawings and specific embodiments.
Fig. 1 is a band drain perspective view with drainage channels;
Fig. 1-1 is a band drain sectional view with drainage channels;
Sectional view when Fig. 1-2 is subjected to outer force compresses for drainage channels band drain;
Fig. 2 is the perspective view of water-permeable pipe with holes;
Fig. 3 is the perspective view of the embodiment of the invention one;
Fig. 3-1 is the cross sectional view of the embodiment of the invention one;
Fig. 4 is the connection diagram of the water penetrating pipe with strip projected parts of the embodiment of the invention one;
Fig. 5 is the perspective view of the embodiment of the invention two;
The thread schematic diagram of Fig. 5-1 for swathing in the embodiment of the invention two;
Fig. 6 is the perspective view of the embodiment of the invention three;
Fig. 7 is the cross sectional view of the embodiment of the invention four;
Fig. 8 is the cross sectional view of the embodiment of the invention five;
Fig. 9 is the cross sectional view of the embodiment of the invention six;
Fig. 9-1 is a hoop and perpendicular to the expansion schematic diagram of the raised item of hoop in the embodiment of the invention six;
Figure 10 is the cross sectional view of the embodiment of the invention seven;
Figure 11 is the cross sectional view of the embodiment of the invention eight;
Figure 12 is the cross sectional view of the embodiment of the invention nine;
Five), the specific embodiment
Shown in Fig. 3, Fig. 3-1, present embodiment one comprises geotextile layer 5, has the water-permeable pipe 1 of permeable hole 2, and the raised item 3 that intersects vertically with the water-permeable pipe hoop, and raised item 3 is arranged in parallel in twos, and has formed rhone 4 between the raised item 3 in twos.The water-permeable pipe 1 of present embodiment and raised item 3 are made by plastic pvc, and raised item 3 is welded on the outer wall of water-permeable pipe 1, and geotextile 5 is bonded in the end face of raised item 3.Can outside water penetrating pipe with strip projected parts, only wrap up layer of geotextile; Also wrapped multiple geotextile as required, the geotextile joint of adjacent layer staggers mutually; Also can wrap up as required after the layer of geotextile, guarantee that all the other areas are provided with one deck geomembrane again under the permeable prerequisite of water-permeable pipe part area.Above PVC water-permeable pipe 1 is by the extruder extrusion modling, and hole on the PVC water-permeable pipe or seam can be through the secondary operations moulding of plastics.
As shown in Figure 4, this figure is the connection diagram of the water penetrating pipe with strip projected parts of embodiment one, one end water-permeable pipe 1 of water penetrating pipe with strip projected parts stretches out with respect to strip projected parts 3, and imbeds the part that the strip projected parts 3 of another water penetrating pipe with strip projected parts stretches out with respect to water-permeable pipe 1.For the purpose of clear, the outer permeatable filter layer that covers not shown in the figures, during actual the connection, cover outward permeatable filter layer in the junction an overlapped part so that be connected firmly, and prevent entering of fine particle.
As shown in Figure 5, present embodiment two is basic identical with embodiment one, and difference is to have twined Support Level 71 in the raised item inner rotary of the water-permeable pipe length direction of band raised item, and line 71 is the glass fiber silk thread, and glass fiber silk thread Pasting is on raised item 3.Glass fiber silk thread and raised item 3 are formed lattice shape, and the geotextile that can externally cover has supporting role preferably.Fig. 5-1 is for being wrapped in the glass fiber wire shaped schematic diagram on the water-permeable pipe.
As shown in Figure 6, present embodiment three is basic identical with embodiment two, difference is that Support Level 71 knitted earlier into latticed 72, be wrapped in again outside the raised item 3, be provided with hoop reinforcing rib 6 in the water-permeable pipe with holes, also the helical spring of available antirust processing carries out hoop support reinforcement, and with holes 2 water-permeable pipe 1 also can be used bellows with holes certainly.
As shown in Figure 7, present embodiment four is by the water-permeable pipe 1 that has hole 2, and arc convex bar 3 that connects on water-permeable pipe 1 outer wall and the outer geotextile that covers 5 are formed.The water-permeable pipe 1 that has hole 2 is made for bamboo trunk, arc convex bar 3 is composited for bamboo trunk digs to open and be coated with one deck plastic coating on the surface, raised item 3 is connected firmly by the hole that nylon wire 8 passes on raised item 3 and the water-permeable pipe 1, so, not only formed rhone 4 between raised item and the raised item, and each arc convex bar itself also forms rhone 4.
As shown in Figure 8, present embodiment five is by with holes 2 bamboo trunk 1 outsourcing layer of geotextile 5, with geotextile outer 1 circle spacing of water-permeable pipe eight tubular type raised items 3 are set again, the tubular type raised item is the little bamboo trunk 3 of internal diameter less than water-permeable pipe 1 internal diameter, little bamboo trunk 3 comes colligation firm by the hole 2 that nylon wire 8 passes on the water-permeable pipe, and earthing worker fabric 5 outside, also permeable hole can be set on the little bamboo trunk 3, but each not only draining of little bamboo trunk 3 like this, and also can form rhone 4 between bamboo trunk 3 and the bamboo trunk 3.
As shown in Figure 9, present embodiment six is for being provided with raised item 31 in the perpendicular direction of water-permeable pipe 1 outer wall upper edge and water-permeable pipe 1 hoop, also be provided with raised item 32 in raised item 31 outsides along water-permeable pipe 1 hoop in addition, raised item 31 has intersected to form lattice shape with raised item 32, again in outside parcel geotextile 5,2 is perforate on the water-permeable pipe 1 among the figure, and perforate 2 is positioned at the capable centre of lattice that raised item 31 and raised item 32 are formed.Fig. 9-1 is that the lattice type that Fig. 9 protrusions bar 31 and raised item 32 are formed launches schematic diagram.
As shown in figure 10, present embodiment seven has hole 2, and coats geotextile 5 outside for the water-permeable pipe that raised item 3 and water-permeable pipe 1 are connected as a single entity on the permeable tube wall.
As shown in figure 11, present embodiment eight is basic identical with embodiment seven, difference is setting up one with holes 2 water-permeable pipe 1 again on the basis of embodiment seven in the water-permeable pipe that raised item and water-permeable pipe are connected as a single entity, and has clogged dank material rubble 9 simultaneously in water-permeable pipe 1.
As shown in figure 12, present embodiment nine has been formed template for raised item 3 is connected in one, has hole 2 on the template raised item, and water-permeable pipe is the rectangle water-permeable pipe 1 with a plurality of draining cavitys, has permeable hole 2 on the water-permeable pipe 1.The outside coats geotextile 5.

Claims (10)

1, water penetrating pipe with strip projected parts comprises permeatable filter layer and the water-permeable pipe of being with permeable hole or seam, and it is characterized in that: the water-permeable pipe of described band permeable hole or seam is provided with and the strip projected parts of pipe ring to the direction that intersects, and forms permeable rhone between the strip projected parts.
2, a kind of method of attachment of water penetrating pipe with strip projected parts, it is characterized in that: an end water-permeable pipe (1) of described water penetrating pipe with strip projected parts stretches out with respect to strip projected parts (3), and imbeds the part that the strip projected parts (3) of another water penetrating pipe with strip projected parts stretches out with respect to water-permeable pipe (1).
3, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: the cross section of described strip projected parts is an arc.
4, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: the cross section of described strip projected parts is tubular.
5, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: also be provided with on the described water penetrating pipe with strip projected parts along pipe ring to strip projected parts.
6, according to claim 1 or 3 to 5 described arbitrary water penetrating pipe with strip projected parts, it is characterized in that: described strip projected parts is submitted fork at permeable tube wall and is arranged in lattice shape.
7, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: described water penetrating pipe with strip projected parts is made by bamboo.
8, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: described water penetrating pipe with strip projected parts is by bamboo and plastics are compound makes.
9, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: swathed Support Level on the described water penetrating pipe with strip projected parts.
10, water penetrating pipe with strip projected parts according to claim 1 is characterized in that: be filled with dank material in the described water-permeable pipe.
CN 01127848 2001-09-13 2001-09-13 Water penetrating pipe with strip projected parts and connection methods Pending CN1407184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01127848 CN1407184A (en) 2001-09-13 2001-09-13 Water penetrating pipe with strip projected parts and connection methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01127848 CN1407184A (en) 2001-09-13 2001-09-13 Water penetrating pipe with strip projected parts and connection methods

Publications (1)

Publication Number Publication Date
CN1407184A true CN1407184A (en) 2003-04-02

Family

ID=4667758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01127848 Pending CN1407184A (en) 2001-09-13 2001-09-13 Water penetrating pipe with strip projected parts and connection methods

Country Status (1)

Country Link
CN (1) CN1407184A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008138218A1 (en) * 2007-05-10 2008-11-20 Yiutak Leung Water draining method and the draining pipe therefore
CN103861459A (en) * 2014-03-25 2014-06-18 湖州森诺氟材料科技有限公司 Filtering device with polytetrafluoroethylene membrane
CN105350515A (en) * 2015-11-27 2016-02-24 上海长凯岩土工程有限公司 Ribbed dewatering well tube
CN110396949A (en) * 2019-07-31 2019-11-01 余荣芳 A kind of PE bellows
CN113003861A (en) * 2021-02-24 2021-06-22 郑州正荣环保科技有限公司 Municipal sewage treatment method and system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008138218A1 (en) * 2007-05-10 2008-11-20 Yiutak Leung Water draining method and the draining pipe therefore
CN103861459A (en) * 2014-03-25 2014-06-18 湖州森诺氟材料科技有限公司 Filtering device with polytetrafluoroethylene membrane
CN105350515A (en) * 2015-11-27 2016-02-24 上海长凯岩土工程有限公司 Ribbed dewatering well tube
CN110396949A (en) * 2019-07-31 2019-11-01 余荣芳 A kind of PE bellows
CN110396949B (en) * 2019-07-31 2021-08-10 云南益华管道科技有限公司 PE corrugated pipe
CN113003861A (en) * 2021-02-24 2021-06-22 郑州正荣环保科技有限公司 Municipal sewage treatment method and system

Similar Documents

Publication Publication Date Title
CN1136364C (en) Drainage method and drain pipe using said method
CN103266724A (en) Drainage structure of planted roof
CN2931575Y (en) Composite reinforcement water-absorbing well tube
CN107956221B (en) Precipitation well pipeline protection device and construction method
CN1407184A (en) Water penetrating pipe with strip projected parts and connection methods
CN2504317Y (en) Strip hump permeable tube
JP3796379B2 (en) Underground water storage tank and method for forming the same
US8182174B2 (en) Drainage system for directing surface water to underground strata
CN206800821U (en) A kind of roof drain for building roof draining
CN2504318Y (en) Dispersed hump permeable tube
CN1407185A (en) Penetrating pipe with discrete projecting parts
CN2485343Y (en) Assembled drainage
CN1425832A (en) Combined water draining device and its connecting method
CN2533157Y (en) Water permeable pipe
CN2485361Y (en) Drainage with vertical passage
KR100795695B1 (en) Drainage system for draining surface and sub-surface water in top layer of soft ground and improvement method for top layer of soft ground using the same
CN2591093Y (en) Vertical water-permeable pipe core pipe
CN2525123Y (en) Water permeable plate
CN2541513Y (en) Flexible pervious pipe
CN1442583A (en) Interlinked water permeable pipe and its connection method
EP0933477B1 (en) Drainage method and strap draining materials therefor
CN2541512Y (en) Lodging-resistant flexible pervious pipe
CN2528800Y (en) Bent-type permeable board with groove
CN215519101U (en) Blind drain drainage structure
CN2581514Y (en) Water permeable coreboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication