CN1399040A - 地面开挖工程控制变形工法 - Google Patents

地面开挖工程控制变形工法 Download PDF

Info

Publication number
CN1399040A
CN1399040A CN 02124984 CN02124984A CN1399040A CN 1399040 A CN1399040 A CN 1399040A CN 02124984 CN02124984 CN 02124984 CN 02124984 A CN02124984 A CN 02124984A CN 1399040 A CN1399040 A CN 1399040A
Authority
CN
China
Prior art keywords
anchor
advance support
ground
anchor cable
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02124984
Other languages
English (en)
Other versions
CN1177111C (zh
Inventor
孙学毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB021249849A priority Critical patent/CN1177111C/zh
Publication of CN1399040A publication Critical patent/CN1399040A/zh
Application granted granted Critical
Publication of CN1177111C publication Critical patent/CN1177111C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明的地面开挖工程控制变形工法,其特征在于:地面开挖工程控制变形工法是在地面开挖之前先施工超前支护1,分层开挖时施工复合锚索或锚杆、复合注浆锚管,通过壁面的锚梁、钢筋网、加强钢筋、喷射砼将其连结成一个整体;下一层开挖之前施工超前支护2,再施工本层支护的复合锚索或锚杆等,同样用锚梁、钢筋网、加强钢筋、喷射砼将其连结成一个整体。

Description

地面开挖工程控制变形工法
本发明是属于一种用于地面开挖工程的支护体系。
目前地面开挖设计是一次性完成,支护目的是支挡土压力。现有技术设计、施工分开,安全监测仅仅用来检验设计、施工效果。由于工程的地质条件复杂、开挖工程周边环境各异,传统的设计、施工方法会造成成本浪费、安全系数小。
本发明的目的是提供一种地面开挖工程的施工方法。它把设计、施工和安全监测综合成一个整体,即提供一套信息化动态设计、施工方法。
本发明是这样实现的:现有的方法支护体系是用来支挡土体压力。本发明支护体系是用来加固土体、提高土体自身强度使土体稳定。地面开挖之前先施工超前支护1,分层开挖时施工复合锚索或锚杆、复合注浆锚管,通过壁面的锚梁、钢筋网、加强钢筋、喷射砼将其连结成一个整体。下一层开挖之前施工超前支护2,再施工本层支护的复合锚索或锚杆等,同样用锚梁、钢筋网、加强钢筋、喷射砼将其连结成一个整体。复合锚索、锚杆是由应力锚索、非应力锚索或锚杆与钢管、型钢、木杆、竹杆中的一种的组合;超前支护1:钢管砼树根桩、木桩、钻孔灌注桩、制钢筋砼桩;超前支护1是与复合锚索或锚索杆组成上部控制结构,两者由锚梁连结成组合结构;复合注浆锚管是由注浆锚管与钢筋、木杆、竹杆中的一种组合;超前支护2是木桩、钢管、型钢;超前支护2与复合注浆锚管组成底部加强支护结构,两者由锚梁或连结钢筋连结组合结构;支护面由钢筋网与喷射砼构成。
本发明的地面开挖工程控制变形工法能支护开挖土墙压力,施工方法简单,结构简单,土体中置入锚索、锚杆、锚管,形成支护体系、土体复合材料,提高了土体强度。在土体变形过程中支护体系限制土体变形、相互作用产生的约束力改变了土体受力状态。
下面结合附图对本发明作进一步说明:
图1是直壁开挖结构图;
图2是斜面开挖结构图;
图3是直壁与斜面组合开挖结构图。
地面开挖之前先施工超前支护(1),分层开挖时施工复合锚索(2),通过壁面(3)的锚梁(4)和钢筋网、加强钢筋、喷射砼组成的壁面(3)将其连结成一个整体。下一层开挖之前施工超前支护2(5),再施工本层支护的复合注浆锚管(6),同样用锚梁(4)和钢筋网、加强钢筋、喷射砼组成的壁面(3)将其连结成一个整体。

Claims (2)

1、面开挖工程控制变形工法,其特征在于:地面开挖工程控制变形工法是在地面开挖之前先施工超前支护1,分层开挖时施工复合锚索或锚杆、复合注浆锚管,通过壁面的锚梁、钢筋网、加强钢筋、喷射砼将其连结成一个整体;下一层开挖之前施工超前支护2,再施工本层支护的复合锚索或锚杆等,同样用锚梁、钢筋网、加强钢筋、喷射砼将其连结成一个整体;超前支护1:钢管砼树根桩、木桩、钻孔灌注桩、制钢筋砼桩;超前支护2是木桩、钢管、型钢。
2、根据权利要求1所述的地面开挖工程控制变形工法,其特征在于:复合锚索、锚杆是由应力锚索、非应力锚索或锚杆与钢管、型钢、木杆、竹杆中的一种的组合;超前支护1是与复合锚索或锚索杆组成上部控制结构;两者由锚梁连结成组合结构;复合注浆锚管是由注浆锚管与钢筋、木杆、竹杆中的一种组合;超前支护2与复合注浆锚管组成底部加强支护结构,两者由锚梁或连结钢筋连结组合结构;支护面由钢筋网与喷射砼构成。
CNB021249849A 2002-06-25 2002-06-25 地面开挖工程控制变形工法 Expired - Fee Related CN1177111C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021249849A CN1177111C (zh) 2002-06-25 2002-06-25 地面开挖工程控制变形工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021249849A CN1177111C (zh) 2002-06-25 2002-06-25 地面开挖工程控制变形工法

Publications (2)

Publication Number Publication Date
CN1399040A true CN1399040A (zh) 2003-02-26
CN1177111C CN1177111C (zh) 2004-11-24

Family

ID=4745442

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021249849A Expired - Fee Related CN1177111C (zh) 2002-06-25 2002-06-25 地面开挖工程控制变形工法

Country Status (1)

Country Link
CN (1) CN1177111C (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806068A (zh) * 2010-03-26 2010-08-18 重庆钢铁(集团)有限责任公司 一种支护深基坑侧壁的方法
CN101906779A (zh) * 2010-08-11 2010-12-08 余闯 一种门架式锚管土钉喷网支护工艺及其所用的改性加固水泥浆
CN102493460A (zh) * 2011-12-12 2012-06-13 中国建筑西南勘察设计研究院有限公司 土层挖孔圆形暗肋锚杆与软岩土钉复合支护结构
CN103061347A (zh) * 2013-01-15 2013-04-24 中冶沈勘工程技术有限公司 土与支护结构相互作用的深基坑支护结构
CN103132530A (zh) * 2011-11-29 2013-06-05 上海市基础工程有限公司 土岩结合地质条件下围护接力桩的施工方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806068A (zh) * 2010-03-26 2010-08-18 重庆钢铁(集团)有限责任公司 一种支护深基坑侧壁的方法
CN101906779A (zh) * 2010-08-11 2010-12-08 余闯 一种门架式锚管土钉喷网支护工艺及其所用的改性加固水泥浆
CN101906779B (zh) * 2010-08-11 2012-05-23 余闯 一种门架式锚管土钉喷网支护工艺及其所用的改性加固水泥浆
CN103132530A (zh) * 2011-11-29 2013-06-05 上海市基础工程有限公司 土岩结合地质条件下围护接力桩的施工方法
CN103132530B (zh) * 2011-11-29 2015-10-14 上海市基础工程集团有限公司 土岩结合地质条件下围护接力桩的施工方法
CN102493460A (zh) * 2011-12-12 2012-06-13 中国建筑西南勘察设计研究院有限公司 土层挖孔圆形暗肋锚杆与软岩土钉复合支护结构
CN102493460B (zh) * 2011-12-12 2015-12-09 中国建筑西南勘察设计研究院有限公司 土层挖孔圆形暗肋锚杆与软岩土钉复合支护结构
CN103061347A (zh) * 2013-01-15 2013-04-24 中冶沈勘工程技术有限公司 土与支护结构相互作用的深基坑支护结构

Also Published As

Publication number Publication date
CN1177111C (zh) 2004-11-24

Similar Documents

Publication Publication Date Title
CN102996149B (zh) 一种高预应力锚索锚注复合破碎动压巷道软岩顶板支护方法
CN102337903B (zh) 深井巷道控制围岩最小变形时空耦合主动支护方法
CN101614125A (zh) V级围岩隧道施工方法
CN101967984A (zh) 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法
CN209510334U (zh) 一种上软下硬大断面隧道双侧洞核心土法施工结构
US20210388724A1 (en) Method of treating tunnel collapse using pavilion support
CN106498950A (zh) 锚头置于桩身的深基坑桩锚支护体系及其实施方法
CN103032080A (zh) 软弱破碎围岩隧道的支护方法
CN208966352U (zh) 一种软弱岩质区域隧道的支护结构
CN109882205A (zh) 一种穿越大型无充填溶洞隧道的悬吊回填结构及构筑方法
CN109235490B (zh) 挡土墙及其施工方法
CN109209389A (zh) 半明半暗隧道进洞施工方法
CN105378222A (zh) 用加固杆加固邻接构造的平行隧道的立柱部件的方法和挖掘方法
CN106677192A (zh) 一种排桩锚拉水泥土桩连续墙支护结构及其施工工艺
CN103628886A (zh) 富水高地应力条件下软弱围岩隧道的开挖方法
CN208899527U (zh) 一种支护与管廊结构一体化的体系
CN103485794B (zh) 马头门复合支护结构及其施工方法
CN110230497A (zh) 一种线隧道正洞身双侧壁导坑施工方法
CN203229955U (zh) 可随挖随护基坑围护结构
CN114352358A (zh) 高地应力深埋软岩隧道大变形动态分级控制方法及系统
CN206408630U (zh) 锚头置于桩身的深基坑桩锚支护体系
CN206220978U (zh) 公路隧道初衬钢拱架与预应力锚杆一体化支护结构
CN1177111C (zh) 地面开挖工程控制变形工法
CN107012874A (zh) 一种上软下硬地层地铁车站围护结构
CN114483081A (zh) 地形偏压下连拱隧道曲中墙防偏转结构施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20041124