CN1355355A - Construction method of concrete pile - Google Patents

Construction method of concrete pile Download PDF

Info

Publication number
CN1355355A
CN1355355A CN 02100102 CN02100102A CN1355355A CN 1355355 A CN1355355 A CN 1355355A CN 02100102 CN02100102 CN 02100102 CN 02100102 A CN02100102 A CN 02100102A CN 1355355 A CN1355355 A CN 1355355A
Authority
CN
China
Prior art keywords
pipe
concrete
job practices
prefabricated
mentioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02100102
Other languages
Chinese (zh)
Other versions
CN1296568C (en
Inventor
张国梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHIPAN DIGONG TECHNOLOGY DEVELOPMENT CENTER
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB021001022A priority Critical patent/CN1296568C/en
Publication of CN1355355A publication Critical patent/CN1355355A/en
Application granted granted Critical
Publication of CN1296568C publication Critical patent/CN1296568C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A construction technology for concrete pile features that a precast concrete pipe is sunk to the predefined position in foundation by the vibration method and the soil squeezed into the pipe is discharged through the pipe to outside. Its advantages include no damage to road or underground pipeline, and high quality of pile.

Description

The job practices of concrete pile
Technical field
The present invention relates to the technology of civil engineering, particularly relate to the job practices of stake.
Background technology
The present invention relates to the technology of civil engineering, particularly relate to the job practices of stake.
Traditional concrete pile comprises preformed pile and in situ pile, the construction technology of above-mentioned preformed pile is to be pressed in the ground in the static pressure mode by pile driver, its advantage is that noise is little, but it is extrusion soil in construction works, thereby cause the ground protuberance, or will around pipeline in the ground, the perhaps destruction of surrounding buildings thing.The construction technology of in situ pile generally is to hole, in the bigger area of water content, carry out mud off, its advantage is not to the surrounding area, pipeline, road damages, but this technology often has because of fluid concrete in mud, thus the problem that concrete pile body quality can't guarantee.
The content of invention
The object of the present invention is to provide a kind of job practices of concrete pile, this job practices not only can be avoided foundation soil body, the destruction of pipeline or road, and can guarantee the stake quality.
To achieve these goals, the job practices of concrete pile of the present invention comprises the steps: with mode of vibration prefabricated concrete pipe to be sunk to assigned position in the ground, in this course of action, the foundation soil body that is squeezed into prefabricated concrete pipe inside upwards is discharged to outside this prefabricated concrete pipe by this prefabricated concrete pipe.
In the job practices of above-mentioned concrete pile, the above-mentioned foundation soil body that is squeezed in the prefabricated concrete pipe is to discharge by the earth discharging hole of offering on this tube wall.
In the job practices of above-mentioned concrete pile, above-mentioned prefabricated concrete pipe is formed by the more piece pipe, offers earth discharging hole on the tube wall of every pipe joint.
In the job practices of above-mentioned concrete pile, above-mentioned prefabricated concrete pipe is a prestressed concrete pipe.
In the job practices of above-mentioned concrete pile, above-mentioned prefabricated concrete pipe is a concrete reinforced pipe.
In the job practices of above-mentioned concrete pile, above-mentioned earth discharging hole is opened in the top of prefabricated concrete pipe.
In the job practices of above-mentioned concrete pile, the bottom side portion cross section of above-mentioned prefabricated concrete pipe is the inboard taper that tilts of deflection more, the taper that tilts of biased outward more, or in the middle of this bottom surface the inside equal taper of inclination in the outside.
In the job practices of above-mentioned concrete pile, after sinking to above-mentioned prefabricated concrete pipe in the ground, the foundation soil body in the pipe is got rid of fully concrete perfusion in pipe, or after putting into reinforcing bar concrete perfusion, perhaps concrete perfusion after prestressed reinforcement is set.
In the job practices of above-mentioned concrete pile, after sinking to above-mentioned prefabricated concrete pipe in the ground, the foundation soil body in the pipe is got rid of fully, to prefabricated concrete pipe bottom, promptly the soil body of stake bottom pushes, and makes stake end concrete load dish then, or steel concrete load dish.
In the job practices of above-mentioned concrete pile, form larger-diameter prefabricated thin wall concrete pipe, so that impel the foundation soil body in the pipe outside pipe, to discharge.
Owing to adopt hollow precast concrete pipe, when sinking to this pipe in the ground, by adopting light-wall pipe, perforate on pipe, particularly this pipe is applied vibration force,, foundation soil body is entered in the pipe so can reduce this pipe and enter the frictional force of managing between the interior soil body, move up, finally be discharged to outside this pipe, in the case, pipe entered in the process of ground, reduced extruding greatly to surrounding soil, thereby make the surrounding buildings thing, the road surface, the pipeline destroyed possibility reduces greatly, also overcome the undergauge in the castinplace pile simultaneously, the defective of broken pile.Because prefabricated pipe is simultaneously as retaining wall, can higher quality, make a stake end load dish in the pipe bottom, also can form high-quality concrete pile body.
The specific embodiment
Fig. 1 is the sectional view that is in the concrete prefabricated pipe of construction state;
Fig. 2 is the sectional view of part of another kind of form of the bottom side portion of concrete prefabricated pipe;
Fig. 3 is the sectional view of part of another form of the bottom side portion of concrete prefabricated pipe;
As shown in Figure 1, the construction of concrete pile of the present invention is performed such, promptly by vibrator 5, with mode of vibration prefabricated concrete pipe 1 is sunk to assigned position in the ground, in this course of action, the foundation soil body that is squeezed into prefabricated concrete pipe 1 inside moves up, and it is discharged to outside this prefabricated concrete pipe 1 by the earth discharging hole 2 that is opened in this prefabricated concrete pipe arm top.Above-mentioned vibrator 5 is to be arranged on the top of above-mentioned prefabricated concrete pipe 1 by vibrator seat 4.After above-mentioned prefabricated concrete pipe is vibrated assigned position, can take off vibrator 5 and vibrator seat 4, foundation soil body in the prefabricated concrete pipe 1 is drawn out fully, such as, adopt the mode of auger boring, or the mode of employing shoveling, then, form concrete force-bearing disc hole in the bottom of this prefabricated concrete pipe 1, fluid concrete forms the major part that enlarges in the bottom of this prefabricated concrete pipe 1, or the force-bearing disc hole in the middle of certain absolute altitude place of pipe 1 sidewall makes, or branched hole, fluid concrete forms middle concrete load dish or branch within it.Because above-mentioned prefabricated concrete pipe 1 in the work progress of stake, constitutes retaining wall, and,, guaranteed the quality of pile body, and can guarantee the quality of load dish and branch so when the cast stake, do not have the phenomenon of undergauge not with its proposition.
The cross section of the bottom side portion 3 of above-mentioned prefabricated concrete pipe 1 is in the middle of this bottom surface the taper that the inside outside tilts symmetrically, as shown in Figure 1, this shape can be balancedly with foundation soil body to manage arm inside and outside squeeze.In addition, the cross sectional shape of above-mentioned bottom side portion also can be the more taper of the inboard inclination of deflection, as shown in Figure 2.In addition, the cross sectional shape of the bottom side portion 3 of above-mentioned prefabricated concrete pipe 1 also can be the taper that biased outward more tilts, as shown in Figure 3.The cross sectional shape of three kinds of bottom side portion that Fig. 1~3 provide can be corresponding to different geological conditions, condition of construction and changing.

Claims (10)

1. the job practices of a concrete pile, its step comprises: with mode of vibration prefabricated concrete pipe is sunk to assigned position in the ground, in this course of action, the foundation soil body that is squeezed into prefabricated concrete pipe inside upwards is discharged to outside this prefabricated concrete pipe by this pipe.
2. the job practices of concrete pile according to claim 1 is characterized in that the above-mentioned foundation soil body that is squeezed in the prefabricated concrete pipe is to discharge by the earth discharging hole of offering on this tube wall.
3. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned prefabricated concrete pipe is formed by the more piece pipe, offers earth discharging hole on the tube wall of every pipe joint.
4. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned prefabricated concrete pipe is for answering the ground concrete pipe in advance.
5. the job practices of concrete pile according to claim 1 is characterized in that above-mentioned prefabricated concrete pipe is a concrete reinforced pipe.
6. the job practices of concrete pile according to claim 2 is characterized in that above-mentioned earth discharging hole is opened in the top of prefabricated concrete pipe.
7. the job practices of concrete pile according to claim 1, the bottom side portion cross section that it is characterized in that above-mentioned prefabricated concrete pipe is the inboard taper that tilts of deflection more, the more taper of biased outward inclination, or the taper that the middle inwardly outside all tilts from this bottom surface.
8. the job practices of concrete pile according to claim 1, it is characterized in that after sinking to above-mentioned prefabricated concrete pipe in the ground, foundation soil body in the pipe is got rid of fully, concrete perfusion in pipe, or after putting into reinforcing bar concrete perfusion, perhaps concrete perfusion after prestressed reinforcement is set.
9. the job practices of concrete pile according to claim 1, it is characterized in that after sinking to above-mentioned prefabricated concrete pipe in the ground, foundation soil body in the pipe is got rid of fully, to prefabricated concrete pipe bottom, promptly the soil body of stake bottom pushes, make stake end concrete load dish then, or steel concrete load dish.
10. the job practices of concrete pile according to claim 1 is characterized in that forming larger-diameter prefabricated thin wall concrete pipe, so that impel the foundation soil body in the pipe to discharge outside pipe.
CNB021001022A 2002-01-04 2002-01-04 Construction method of concrete pile Expired - Lifetime CN1296568C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB021001022A CN1296568C (en) 2002-01-04 2002-01-04 Construction method of concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB021001022A CN1296568C (en) 2002-01-04 2002-01-04 Construction method of concrete pile

Publications (2)

Publication Number Publication Date
CN1355355A true CN1355355A (en) 2002-06-26
CN1296568C CN1296568C (en) 2007-01-24

Family

ID=4739185

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021001022A Expired - Lifetime CN1296568C (en) 2002-01-04 2002-01-04 Construction method of concrete pile

Country Status (1)

Country Link
CN (1) CN1296568C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302762B (en) * 2007-05-10 2010-09-29 包尔机械有限公司 Construction machine
CN102268870A (en) * 2011-04-15 2011-12-07 傅健 Driven cast-in-place pile with soil discharge pipe
CN103732830A (en) * 2011-08-18 2014-04-16 白圭浩 Complex pile with improved end bearing capacity and piling method of complex pile using the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191778A (en) * 2011-04-15 2011-09-21 傅健 Construction method of immersed-tube compress soil-free underground continuous wall

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1104280A (en) * 1993-10-19 1995-06-28 俞晓 Pre-poured composite tube pile and pile-making technology and apparatus thereof
CN1089393C (en) * 1998-11-24 2002-08-21 谢庆道 Construction method for concrete barrel embedded in subgrade and press-in type disposable holing apparatus
CN1265439A (en) * 2000-04-04 2000-09-06 吕怀民 Anti-seeping hollow pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302762B (en) * 2007-05-10 2010-09-29 包尔机械有限公司 Construction machine
CN102268870A (en) * 2011-04-15 2011-12-07 傅健 Driven cast-in-place pile with soil discharge pipe
CN103732830A (en) * 2011-08-18 2014-04-16 白圭浩 Complex pile with improved end bearing capacity and piling method of complex pile using the same
CN103732830B (en) * 2011-08-18 2016-10-19 白圭浩 Composite pile that bearing capacity of pile tip is strengthened and utilize this composite pile embedment method

Also Published As

Publication number Publication date
CN1296568C (en) 2007-01-24

Similar Documents

Publication Publication Date Title
US11214938B2 (en) Construction method for pouring concrete in karst cave
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
JP5520347B2 (en) Pile digging method
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN101255691A (en) Construction method for complete casing tube thin wall filling pile and movable internal mold
CN101705682B (en) Valve pile tip structure device of cast-in-place X-shaped concrete pile and using method thereof
JP4817156B2 (en) Ready-made pile
CN1296568C (en) Construction method of concrete pile
CN1138897C (en) Underground walls for cast-in-situ concrete piles and constructioning process therefor
CN1438389A (en) Flapper type pile-shoe barrel-pile pore-forming device and prefabricated-pile-shoe free barrel-pile construction method
JP4724879B2 (en) Foundation pile structure
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
KR20070014547A (en) Support reinforcement-machine fot tip of still pile pipe
CN113322939B (en) PTC (Positive temperature coefficient) tubular pile based on CPDB (compact peripheral component interconnect data) technology and movable anti-blocking device and construction method thereof
CN200946269Y (en) Sinking pipe perfusion bottom-expanding pile
CN2730940Y (en) Cast in situ pile of prefabricated reinforced concrete
CN100453741C (en) Block-type steel pipe pile
JP4724878B2 (en) Foundation pile structure
CN209584855U (en) Bridge major diameter precast concrete tubular column basis
CN100510275C (en) Immersed tube prefabricated multistage under-reamed pile
CN200955146Y (en) Multi-stage sink-pipe bored concrete pile
JP2001073358A (en) Method for embedding precast pile into pile-pit
CN209854732U (en) A recoverable supporting construction for loess area municipal foundation ditch
CN200955147Y (en) High-rise building sink-pipe bored concrete pile
JPH0711638A (en) Pile provided with bag

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Zhang Guoliang

Document name: Notification to Pay the Fees

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 100038 Beijing city Haidian District Yu Xueqing Road No. 41 building room 322

Patentee after: Zhang Guoliang

Address before: 100093 Beijing City, Changping District Xisanqi Ryugo cell area 5-2-101

Patentee before: Zhang Guoliang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210106

Address after: 100049 114 / F, building 10, courtyard a 69, Fushi Road, Haidian District, Beijing

Patentee after: BEIJING ZHIPAN DIGONG TECHNOLOGY DEVELOPMENT CENTER

Address before: 100038 room 322, Yujing building, 41 Xueqing Road, Haidian District, Beijing

Patentee before: Zhang Guoliang

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20070124