CN1337918A - Gantray crane having circulating trolleys - Google Patents

Gantray crane having circulating trolleys Download PDF

Info

Publication number
CN1337918A
CN1337918A CN99816466A CN99816466A CN1337918A CN 1337918 A CN1337918 A CN 1337918A CN 99816466 A CN99816466 A CN 99816466A CN 99816466 A CN99816466 A CN 99816466A CN 1337918 A CN1337918 A CN 1337918A
Authority
CN
China
Prior art keywords
crane
winch
bundle
circulating
hanging beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN99816466A
Other languages
Chinese (zh)
Inventor
韩万烨
孙承尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREATECH Co Inc
Original Assignee
CREATECH Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREATECH Co Inc filed Critical CREATECH Co Inc
Publication of CN1337918A publication Critical patent/CN1337918A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Jib Cranes (AREA)
  • Ship Loading And Unloading (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

A Gantry crane having circulating trolleys (102), including a movable main tower pillar (56), a circulating boom, at least one trolley (102), at least one spreader (60), two hoists (106, 108), and a hook (116). The circulating boom is installed on the main tower pillar (56). The trolley (102) is installed to be capable of circulating along the circulating boom (100). The spreader (60) can be attached to and detached from the lower surface of the trolley (102), is combined with the trolley (102) when the trolley (102) moves, and is separated from the trolley (102) and descends to pick up a container (50). Two hoists (106, 108) are installed to be capable of moving along the circulating boom (100), each having a hoist motor (110) and a hoist wheel (112). The hook (116) is connected to the hoist motor (110), and combined with the spreader (104) by descending while vertically passing through the trolley (102) and is separated from the spreader (104) by ascending, so that the hook (116) descends with the spreader (104) combined with the hook (116) in order to pick up a container (150).

Description

Pylon hoisting crane with circulating crane
Technical field
The present invention relates to the pylon hoisting crane, specifically, relate to pylon hoisting crane with circulating crane.
Background technology
Use the goods transport of freight container to start from nineteen fifty-seven by extra large land service company (Sea-Land Service Co.), and since Ma Tesong navigation company (Matson Navigation Co.) beginning in 1958 is carried out freight container traffic along the Atlantic Ocean, obtained broad development.At present except that liquid and powder goods, 80% or more goods transport all adopt freight container traffic, estimate that this percentum is higher in the future.Along with increasing that freight container is used, because the increase of CD-ROM drive motor capacity, the development that crane and bundle are hung the rope hanging beam, and the introducing of autonomous cruise speed system or the like make also existing improvement of processing capacity of container handling crane.
As shown in Figure 1, the crane arm 14 in the conventional pylon hoisting crane is coupled on the king-tower post 12 by on even keel, comprises the crane 22 that Machine Room 16 and bundle are hung rope hanging beam 24, is made into the structure that can move back and forth along crane arm 14.Pylon hoisting crane with structure like this utilizes the whereabouts that hangs rope hanging beam 24 with crane 22 bonded assemblys bundle, picks up freight container 18, promptly in the motion of crane 22 from the harbour to the ship or from the ship to the harbour, loading and unloading container 18.
But this conventional pylon hoisting crane is to put down bundle extension rope hanging beam 24 at crane 22 when crane arm 14 moves to pick up freight container, like this, just requires some times, so that bundle is hung the top that rope hanging beam 24 accurately is positioned the freight container 18 of as ready.Therefore, the transportation of freight container is delayed.In addition, pick up freight container and it is transported at it and adorn/when unloading the place, play even bundle is hung rope hanging beam 24, so owing to the motion of crane 22, freight container may wave with steel cable 20.Therefore, be difficult to make freight container to be positioned accurate place, this just makes the speed of loading and unloading and efficient greatly reduce.
Summary of the invention
For addressing the above problem, the object of the present invention is to provide a kind of pylon hoisting crane with circulating crane, utilize this hoisting crane, in the unloading process, freight container can not shake, and can realize the quick transfer of freight container, by a plurality of cranes and bundle extension rope hanging beam are installed on crane arm, and make them along this crane arm circular flow, the efficient of unloading is improved.
For achieving the above object, the invention provides a kind of pylon hoisting crane with circulating crane, it comprises: king-tower post movably; Be installed in the circulating crane arm of king-tower post predetermined height parallel to the groundly; At least one can be along the crane of this circulating crane arm circular flow; At least one can be attached to the lower surface of crane or the bundle of disengaging on it is hung the rope hanging beam, and when crane moved, bundle was hung the rope hanging beam and crane combines, and bundle extension rope hanging beam separates with crane and descends, and picks up freight container; A plurality of winches that can follow the motion of ring type crane arm, each winch has winch motor and winch flywheel; And suspension hook, it is connected with winch motor, and is descending when vertically passing through crane, combine and hang the rope hanging beam, during rising, then hang the rope hanging beam and separate with bundle with bundle, thereby, make suspension hook along with the bundle that combines with it is hung the decline of rope hanging beam, so that pick up freight container.
In addition, on the lower surface of each crane and suspension hook, form four protrusions at least.The upper surface of hanging the rope hanging beam in bundle forms crane hole and hook on hole, and they join with the protrusion of crane and the protrusion coupling of suspension hook respectively.When suspension hook and bundle were hung the rope hanging beam and combined, bundle was hung the rope hanging beam and is separated with crane, when bundle is hung the rope hanging beam and is combined with crane, suspension hook with tie extension rope hanging beam and separate.
Suspension hook links to each other with winch motor in steel cable and the winch, by the action of winch, adjusts steel cable length, makes suspension hook be able to lifting; The winch that is installed on the crane arm comprises bank winch that is positioned at the bank and the seashore winch that is positioned at the seashore.Crane is separately made at winch, so that crane and winch can move along actuating arm independently.
Description of drawings
Fig. 1 is a pylon hoisting crane scheme drawing commonly used;
Fig. 2 is the circulating pylon hoisting crane scheme drawing that the applicant had proposed;
Fig. 3 is the pylon hoisting crane lateral sectional view of being got along the III-III line among Fig. 2;
Fig. 4 is the scheme drawing of the pylon crane structure with circulating crane of explanation an embodiment of the present invention;
Fig. 5 and Fig. 6 are the part scheme drawings of the pylon crane structure with circulating crane of statement an embodiment of the present invention, in order to explain the service condition of pylon hoisting crane;
Fig. 7 is a kind of scheme drawing of giving an example of pylon hoisting crane that the present invention has circulating crane.
The specific embodiment
With reference to figure 2, be depicted as the vertical circulation formula pylon crane of the applicant's invention, the first Weighing arm 70 is installed in the movably predetermined height of king-tower post 56, second parallel to the groundly Weighing arm 78 is installed in the preset distance place of the first weighing arm 70 tops, and with it parallel. Tie-bar 54 Be connected with second crane arm 78, sagging to prevent first and second crane arms 70 and 78, first He Second crane arm 70 and 78 is connected to each other by Connection Element 72, forms thus truss structure.
A plurality of cranes 80 with bundle hanging cable hanging beam 60 are installed in first and second movably On the weighing arm 70 and 78. The first and second circulating crane arm jockeys 66 and 64 are loaded into One and second crane arm 70 and 78 two ends separately make the crane 35 can be at first and second crane arms Circular flow between 70 and 78. The machinery that is used for control first and second crane arms 70 and 78 is established Standby chamber 52, a plurality of cranes 80 with bundle hanging cable hanging beam, and the first and second circulating crane arms Jockey 66 and 64 all is installed on the king-tower post 56.
When the work of the vertical circulation formula pylon crane with this structure, when container from code When head loads on the container ship (not shown), at first be included in the bundle hanging cable hanging beam in the crane 80 Descend, to pick up container 50. Crane 80 moves to container ship along the first weighing arm 70, collection Vanning 50 is discharged at the appropriate location 76 of container ship. In the process of container shipment, the collection dress The movement locus of case 50 is not straight line, but curvilinear path 74.
After unloading container 50, it is tight that crane 80 sucks bundle hanging cable hanging beam 60 as much as possible Invest self, towards 68 motions of the end of the first weighing arm 70, then, circulating by first Crane arm jockey 66 is shifted to second crane arm 78 that is installed in the first weighing arm top. Mobile Move to its end 62 to the crane 80 of second crane arm 78 along second crane arm 78, then, Move to the first weighing arm 70 by the second circulating crane arm jockey 64, finish thus and hang A circulation of car 80. The first and second circulating crane arm jockeys 66 and 64 can be Gear or oil gear with drive unit.
When container 50 being unshiped toward harbour, concerning crane 80, direction of motion nature Opposite direction with above-mentioned same path.
Fig. 3 is the pylon crane drawing in side sectional elevation of getting along the III-III line among Fig. 2. With reference to figure 3, First and second crane arms 70 and 78 are connected to each other by Connection Element 72, form thus the truss knot Structure. The truss structure that is formed by first and second crane arms 70 and 78 strengthens the rigidity of total, Improve significantly thus first and second crane arms 70 and 78 counter-bending delivered payload capabilities. Therefore, namely Make the big container ship of vertical Panama (Postpanamax) type rest in port and pier, loading the collection dress During case problem can not take place yet. As shown in Figure 3, has the crane 80 of bundle hanging cable hanging beam 60, only Hanging container 50 when the first weighing arm 70 moves, therefore, crane 80 is along second crane arm 78 motions only take because tightly inhaling bundle hanging cable hanging beam 60 formed minimums by the zone.
In addition, up-to-date pylon crane major part comprises the high-performance motor, like this, even picking up When getting container 50 and lifting bundle hanging cable hanging beam 60, they are rapid movement effectively also. Therefore, when crane 80 moved along second crane arm 78, the bundle of adhering to that only cost is very short was hung The time of rope hanging beam 60 makes by the zone and reduces to minimum, like this, until whole cyclic process finishes, Do not need additional period.
Fig. 4 represents the pylon crane structure with circulating crane according to the embodiment of the invention. As shown in Figure 4, pylon crane of the present invention comprises: king-tower post 152, it can be supported on ground 123 Upper movement; Crane arm 100 flatly is installed on the king-tower post 152; Crane 102, it is along lifting Arm 100 circular flows turn to the loading/unloading place with container 150; Land and ocean winch 106 With 108, they be installed in crane arm 100 above, be used for lifting hook 116.
The size of each parts depends on the capacity that berths and the access height of harbour, and nature can add Strengthen post, stably to support weighing arm 100. Certain space is arranged below king-tower post 152, with Just the container 150 of being transported arrives in advance and wait transports.
Crane arm 100 flatly is installed on the king-tower post 152. In the present embodiment, such as Fig. 7 institute Show that crane arm 100 is made into closed annular, so that in crane arm 100 continuous circulations, A plurality of cranes 102 carry out cargo operation.
But if crane arm 100 has the structure that can make the crane circulation, then it can have difference Shape. Far and away, according to the invention (Korean Patent No.143699) of being announced by the applicant in the past, Be applied to the crane arm of vertical circulation formula pylon crane, and (Korea S was special according to former invention Sharp No.134235), is applied to the crane arm of horizontal-circulating car pylon crane, all can be used as Crane arm. Specifically, preferably crane arm is applied to the vertical circulation formula shown in Fig. 2 and 3 The pylon crane.
Two winches 106 and 108 are installed in the top of crane arm 100. Winch 106 is location Winch on the bank on bank, and winch 108 is the seashore winches that are positioned at the seashore. Each bank Can both moved along crane arm 100 by the indicated direction of arrow with seashore winch 106 and 108, To adjust their position.
Each winch 106 and 108 comprises winch motor 110, winch flywheel 112, and various have The electronic equipment (not shown) of device for converting electric energy, and control device (not shown). Each winch 106 With the 108 motor (not shown) that all comprise for the reciprocal operation of driving winch. Seashore winch 108 Reciprocal scope is more much bigger than bank winch 106, so container 150 can be broad Be discharged to a suitable position in the loading/unloading place under the quilt.
In the winch 106 and 108 with structure like this, each except winch flywheel 112 Parts, can be installed in one with winch 106 and 108 irrelevant separate machine chamber (not shown). In this case, each winch 106 and 108 only comprises winch flywheel 112, makes winch 106 and 108 Can move fast and easily.
Be installed in the winch flywheel 112 guiding steel cables 114 in winch 106 and 108, be used for and twist Vehicle and horse reach 110 and link to each other with suspension hook 116. Steel cable 114 is connected to winch motor 110, and makes and hang Hook 116 liftings, described suspension hook are subjected to 112 guiding of winch flywheel and are attached to the steel cable end. In addition, Steel cable 114 has enough length, so that it can be transferred container 150 to ship 130 fully Bottom (referring to Fig. 6). If by driving winch motor 110, make as far as possible highland of suspension hook 116 Raised, then suspension hook 116 is positioned under the basal surface of winch 106 and 108. Therefore, when Along crane arm 100 circular flows, crane 102 hangs below winch 106 and 108 time Car can nondestructively pass through below suspension hook 116.
By being coupled of suspension hook 116 and bundle hanging cable hanging beam 104, from top support bundle hanging cable hanging beam 104, wherein form protuberance 125 at (suspension hook 116) lower surface, this protuberance 125 will be inserted Enter in the formed hook on hole 128 of described bundle hanging cable hanging beam 104 upper surfaces (seeing Fig. 5), and twine The pulley 132 (seeing Fig. 5) of steel cable is installed in upper surface. Therefore, hang when suspension hook 116 and bundle hanging cable In the time of beam 104 combination, suspension hook is suspended on the steel cable, by winch motor 110 can make progress and Move downward.
Along many cranes 102 that crane arm 100 moves, comprise wheel 140 and be used for wheels 140 motor (not shown). Wheel 140 supported by crane arm 100, and makes the crane 102 can the edge Crane arm 100 motions. The motion of crane 102 is subjected to independent operating room (not shown) with remote control system Control.
The lower surface of each crane 102 forms protuberance 124 (seeing Fig. 5), and with bundle hanging cable hanging beam 104 The crane hole 126 (seeing Fig. 5) that upper surface forms is coupled, and makes crane 102 with hanging over crane 102 times The bundle hanging cable hanging beam 104 of face moves along crane arm 100. In other words, at bundle hanging cable hanging beam 104 Upper surface forms the hook on hole 128 that is coupled to suspension hook 116 and the crane that is coupled to crane 102 Hole 126. Crane 102 is parked in below the bank winch 106, lifting container 150, and also be parked in Below the seashore winch 108, this illustrates the back.
Be not to realize simultaneously crane 102 and the combination of tying hanging cable hanging beam 104 and suspension hook 116 and bundle extension The combination of rope hanging beam 104, but the side that is designed to select by various known control device Formula realizes. With the mode combination of selecting, refer to when bundle hanging cable hanging beam 104 fresh with suspension hook 116 When being coupled, bundle hanging cable hanging beam 104 separates with crane 102, and when bundle hanging cable hanging beam 104 and crane 102 when being coupled, and bundle hanging cable hanging beam 104 separates with suspension hook 116. Can pass through several known instrument The device Device element is realized the combination of this selection with diverse ways.
In addition, make bundle hanging cable hanging beam and crane and bundle hanging cable hanging beam and blackwall hitch machinery altogether Device not only can be applied to according to circulating pylon crane of the present invention, and can be answered Be used for various types of cranes, comprise transshipment crane, they are installed in open storage field Perhaps other material supply base.
Fig. 5 and 6 schematically illustrates the moving with pylon crane hanging component container of the embodiment of the invention Make process. For explaining conveniently, several winches 106 and 108 are shown, but in fact as previously mentioned, One that settles is that 106, one in bank winch is seashore winch 108.
Fig. 5 represents to arrive the crane 102 under the bank winch 106 and ties the behaviour of hanging cable hanging beam 104 Make process. Above-mentioned those identical identical parts of reference number indication.
With reference to figure 5, crane 102 and bundle hanging cable hanging beam 104 edges that are coupled to crane 102 lower surfaces When moving along the direction shown in the arrow b, be maintained at bank winch 106 below. As previously mentioned, The protuberance 124 of crane 102 inserts and is coupled to formed the hanging of bundle hanging cable hanging beam 104 upper surfaces In the car hole 126, like this, even the movement velocity of crane 102 changes, bundle hanging cable hanging beam 104 also Can be not safe being positioned under the crane 102 unsteadily.
Bank winch 106 is by pre-aligned, and waits straight above container 150. At this moment, Suspension hook 116 is attached to the lower surface of winch 106, and remains on eminence as far as possible. Pass through the operator Direct control be arranged on each winch 106 and 108 in independent control room (not shown), the bank and Seashore winch 106 and 108 namely is moveable to certain position. Perhaps in another way, by far Process control makes winch 106 and 108 move to certain position.
Bank winch 106 waits straight above container 150, and the seashore winch 108 of Fig. 6 Wait straight above certain position on the ship 130 of Fig. 6, container there is to prepare to be hung Dress. Therefore, preferably should be according to the position of the container that is loaded by container carrier in advance The position of control bank winch 106, and wait below crane arm; Should make the seashore winch equally 108 are located in the top, position that container will be lifted.
When crane 102 arrive the bank winch 106 waited in certain position below the time, as far as possible The suspension hook 116 that is attached on the winch 106 begins to descend. Suspension hook 116 is by 100 of crane arms The crane 102 of supporting descends along vertical, and arrives bundle hanging cable hanging beam 104. When suspension hook 116 arrives During bundle hanging cable hanging beam 104, as previously mentioned, the formed protuberance 125 of suspension hook 116 lower surfaces is inserted Enter to tie the formed hook on hole 128 of hanging cable hanging beam 104 upper surfaces. Like this, suspension hook 116 is coupled To bundle hanging cable hanging beam 104.
Meanwhile, along with suspension hook 116 is incorporated in to bundle hanging cable hanging beam 104, by crane 102 On the separating of protuberance 124 and bundle hanging cable hanging beam 104 upper surfaces formed crane hole 126, Bundle hanging cable hanging beam 104 from crane 102 separately. Therefore, along with the decline of suspension hook 116, bundle is hung The holding power that rope hanging beam 104 is draped is transferred to suspension hook 116 from crane 102. At this moment, bundle hanging cable Hanging beam 104 is maintained at sustained height.
By top said various known effective ways, can realize turning to of described holding power Move. For example, signal transmssion line is not (arbitrarily to install one between crane hole 126 and hook on hole 128 Illustrate). When protuberance 124 was inserted into and is locked in the crane hole 126, a signal was sent out To hook on hole 128, the protuberance 125 that control had been inserted into and had been locked in hook on hole 128 therefrom Be unlocked. On the contrary, when protuberance 125 is inserted into and is locked in the hook on hole 128, with above-mentioned Same method, be inserted into and be locked in the crane hole 126 protuberance 124 will be therefrom by Discharge. Protuberance 124 and 125 comprises several known door bolt bolts.
As mentioned above, descend and be coupled to bundle hanging cable hanging beam 104 at suspension hook 116, tie simultaneously hanging cable Hanging beam 104 is by under the state of release from crane 102, by winch motor 110 and winch flywheel 112 continuous operation, suspension hook 116 descends towards container 150, accompanies by bundle hanging cable hanging beam 104 Lifting. Pulley 132 is installed in the upper surface of suspension hook 116, and is twined by steel cable 114, hangs Hook 116 is therefore supported. By the driving of winch motor 110, steel cable 114 is from pulley 132 On be released, therefore suspension hook 116 descends.
Lower surface at bundle hanging cable hanging beam 104 forms container suspension hook 120, at container 150 Upper surface forms known conjugate foramen 122, is used to engage with container suspension hook 120.
When bundle hanging cable hanging beam 104 descends and arrives container 150, the collection of bundle hanging cable hanging beam 104 Vanning suspension hook 120 is inserted into and is locked in the formed conjugate foramen 122 of container 150 upper surfaces. At this moment, suspension hook 116 straight lines land downwards, so it can not wave on both sides. In this state, When suspension hook 116 rose, bundle hanging cable hanging beam 104 rose container because being attached to suspension hook 116 150 are raised thereupon.
When suspension hook 116 rises continuously, when bundle hanging cable hanging beam 104 arrives the lower surface of cranes 102, Protuberance 124 on crane 102 lower surfaces is inserted in the crane hole 126 of bundle hanging cable hanging beam 104, Therefore crane 102 and 104 combinations of bundle hanging cable hanging beam. At this moment, suspension hook 116 is from bundle hanging cable hanging beam 104 Throw off, continue to rise to the lower surface of bank winch 106, and the lower surface place there waits. At last, bundle hanging cable hanging beam 104 and container 150 are coupled to by crane arm 100 supports and move Crane 102 lower surfaces, thereby make the container 150 can be to container 150 with the place that is loaded Motion is indicated this direction of motion with the arrow C that represents crane 102 motions.
Fig. 6 represents to arrive crane below the winch of seashore and the course of action of bundle hanging cable hanging beam. Ginseng Examine Fig. 6, container 150 is transported to seashore winch 108 by the arrow C indicated direction from the bank Following standby, and seashore winch 108 is pre-aligned on the position that container will be loaded The side. Can be by being included in the control of the operator in the operation room (not shown) in the winch 108, Make seashore winch 108 in advance passive movement to the loading point. Thereby it can install to container the suitable of it Work as the place, and irrelevant with the zone of loading point. Seashore winch 108 also can be by separately operation Between Long-distance Control, this is similar to the situation of bank winch 106.
When crane 102 arrive seashore winches 108 below the time, bundle hanging cable hanging beam 104 and container 150 just be positioned in seashore winch 108 below, be in the suspension hook 116 of wait state by strand Vehicle and horse reach 110 operation and descend, and are coupled to bundle hanging cable hanging beam 104. As top with reference to figure 5 Said like that, when suspension hook 116 is coupled to bundle hanging cable hanging beam 104, bundle hanging cable hanging beam 104 from Crane 102 is thrown off. Therefore, when suspension hook 116 continues to descend under this state, bundle hanging cable hanging beam 104 from crane 102 disengagements, and container 150 drops to the loading point, and for example ship 130.
The container 150 that arrives the loading point takes off from bundle hanging cable hanging beam 104 by known method Open, and be loaded on the ship 130, bundle hanging cable hanging beam 104 vertically rises again, and coupling Be coupled to crane 102. Simultaneously, suspension hook 116 separates from bundle hanging cable hanging beam 104, towards winch 108 Rise, and wait under winch 108 lower surfaces by the sea. The suspension hook 116 crane 102 theres Through throwing off, bundle hanging cable hanging beam 104 is coupled to crane 102, and crane 102 is from seashore winch 108 times The three unities of face moves by the arrow d indicated direction along crane arm 100, and is positioned in Initial position. Simultaneously, seashore winch 108 moves to next container along crane arm 100 and wants The place that is loaded, and that local wait.
Fig. 7 is that plane of giving an example of pylon crane that explanation the present invention has a circulating crane shows Intention. As shown in Figure 7, crane arm circularizes, so that crane 102 is along this crane arm shuttling movement. Because crane 102 circulates along crane arm in a direction, thus carry out continuously the loading of container, The pylon crane has very fast disposal ability.
But the crane arm of pylon crane of the present invention can have various shape, as long as its tool The structure that crane is circulated is therein arranged. Therefore, except annular crane arm, various shapes Crane arm can both be applied to the vertical circulation formula pylon crane shown in Fig. 2 and Fig. 3.
In the pylon crane that contains above-mentioned crane arm according to the present invention, a plurality of cranes are along rising Loading container in the time of the weighing arm shuttling movement, so loading/unloading speed is very fast, treatment effeciency also very High. In addition, during trolley movement be the bundle hanging cable hanging beam that combines with it, rather than Overhanging the bundle hanging cable hanging beam under the crane, so, can not take place because the trolley movement velocity variations is drawn Play the situation that bundle hanging cable hanging beam waves, thereby can make bundle hanging cable hanging beam be positioned fast accurate place. Even bundle hanging cable hanging beam moves when picking up container, and container can not wave yet, and has therefore improved The movement velocity of crane. Therefore, can realize fast and stably the loading/unloading of container.
Although described the present invention with reference to specific embodiment, clearly, common for this area The technical staff can do multiple remodeling to described embodiment, and unlikelyly departs from essence of the present invention God and scope.

Claims (6)

1. pylon hoisting crane with circulating crane comprises:
King-tower post movably;
Be installed in the circulating crane arm on the described king-tower post;
At least one can be along the crane of described circulating crane arm circular flow;
At least one bundle extension rope hanging beam, they can be attached to the lower surface of described crane or disengaging from it, and when trolley movement, described bundle is hung the rope hanging beam and crane combines, and bundle is hung the rope hanging beam again from crane disengagement and decline, picks up freight container;
Two winches that energy moves along described circulating crane arm, each winch has winch motor and winch flywheel; And
Suspension hook, it is connected with winch motor, and hangs the rope hanging beam descending along vertically by crane the time with bundle and combine, and then hangs the rope hanging beam with bundle during rising to throw off, and makes suspension hook hang the rope hanging beam and descend along with the bundle that combines with it, to pick up freight container.
2. the pylon hoisting crane with circulating crane according to claim 1, it is characterized in that, on the lower surface of each crane and suspension hook, form four protrusions at least, wherein, the upper surface of hanging the rope hanging beam in bundle forms crane hole and hook on hole, and they join with the protrusion of crane and the protrusion coupling of suspension hook respectively, wherein, when suspension hook and bundle are hung the rope hanging beam and are combined, bundle extension rope hanging beam separates with crane, and when bundle extension rope hanging beam combined with crane, suspension hook was hung the rope hanging beam with bundle and separated.
3. the pylon hoisting crane with circulating crane according to claim 2, it is characterized in that, described suspension hook links to each other with winch motor in steel cable and the winch, work by winch, adjust steel cable length, suspension hook is promoted, and the winch that is installed on the crane arm comprises bank winch that is positioned at the bank and the seashore winch that is positioned at the seashore.
4. the pylon hoisting crane with circulating crane according to claim 1 is characterized in that, described crane forms separately outside winch, and described crane and winch can be moved along crane arm independently.
5. the pylon hoisting crane with circulating crane according to claim 1 is characterized in that, described circulating crane arm is vertical circulating crane arm.
6. the pylon hoisting crane with circulating crane according to claim 1 is characterized in that, described circulating crane arm is the circulating crane arm of level.
CN99816466A 1999-02-20 1999-11-12 Gantray crane having circulating trolleys Pending CN1337918A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR5683/99 1999-02-20
KR1019990005683A KR100306296B1 (en) 1999-02-20 1999-02-20 Gentry crane having circulating trolley

Publications (1)

Publication Number Publication Date
CN1337918A true CN1337918A (en) 2002-02-27

Family

ID=19574671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN99816466A Pending CN1337918A (en) 1999-02-20 1999-11-12 Gantray crane having circulating trolleys

Country Status (6)

Country Link
JP (1) JP2003528783A (en)
KR (1) KR100306296B1 (en)
CN (1) CN1337918A (en)
AU (1) AU1082200A (en)
DE (1) DE19983937T1 (en)
WO (1) WO2000048937A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005110908A1 (en) * 2004-05-13 2005-11-24 Weihua Huang A ship unloader for landing/unloading containers continuously
CN1309652C (en) * 2002-05-03 2007-04-11 诺尔起重系统有限公司 Bunker vehicle on crane
CN101880018A (en) * 2009-05-04 2010-11-10 张铁忠 Circular rail operation type container continuous handling bridge
CN102320521A (en) * 2011-05-27 2012-01-18 上海海事大学 Continuous circular shoreside container loading bridge of port
CN102616667A (en) * 2011-01-31 2012-08-01 上海振华重工(集团)股份有限公司 Double-upper trolley gantry crane
CN103395699A (en) * 2013-07-30 2013-11-20 华电重工股份有限公司 Double-layer quay crane with vertical lifting device
CN103803433A (en) * 2012-11-06 2014-05-21 青岛理工大学琴岛学院 Handling device
CN110877865A (en) * 2019-11-27 2020-03-13 武汉理工大学 Cyclically-loaded and unloaded shore bridge and cyclically-loaded and unloaded method
CN113753761A (en) * 2021-08-09 2021-12-07 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030006012A (en) * 2001-07-11 2003-01-23 한만엽 Gantry crane having circulating spreader
DE10313769B4 (en) * 2003-03-22 2005-10-06 Noell Crane Systems Gmbh More Katz container crane
KR100624007B1 (en) * 2004-03-08 2006-09-18 부산대학교 산학협력단 Container crane possible rotating of level and vertical
DE102010053430B3 (en) 2010-12-06 2012-01-19 Rainer Kapelski Container bridge for the loading of shipping containers
EP3368463B1 (en) 2015-10-27 2021-06-09 Vladimir Nevsimal-Weidenhoffer Sts multi-trolley portal gantry container crane

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3630390A (en) * 1969-02-07 1971-12-28 Hans Tax Container-loading crane arrangement
NL8302716A (en) * 1983-07-29 1985-02-18 Jongh Michiel Marnix De TRANSPORTING DEVICE FOR THE PENDANT TRANSPORT OF LOADS, SUCH AS A BRIDGE CRANE FOR THE LOADING AND UNLOADING OF CONTAINERS.
US4897012A (en) * 1987-11-06 1990-01-30 Custom Technologies, Inc. Cargo handling system
DE3816988A1 (en) * 1988-05-18 1989-11-30 Tax Ingenieurgesellschaft Mbh CONTAINER CRANE SYSTEM
NL1001548C2 (en) * 1995-11-01 1997-05-02 Iv Consult B V Container crane for ship loading

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1309652C (en) * 2002-05-03 2007-04-11 诺尔起重系统有限公司 Bunker vehicle on crane
WO2005110908A1 (en) * 2004-05-13 2005-11-24 Weihua Huang A ship unloader for landing/unloading containers continuously
CN101880018A (en) * 2009-05-04 2010-11-10 张铁忠 Circular rail operation type container continuous handling bridge
CN102616667A (en) * 2011-01-31 2012-08-01 上海振华重工(集团)股份有限公司 Double-upper trolley gantry crane
CN102320521A (en) * 2011-05-27 2012-01-18 上海海事大学 Continuous circular shoreside container loading bridge of port
CN102320521B (en) * 2011-05-27 2014-03-12 上海海事大学 Continuous circular shoreside container loading bridge of port
CN103803433A (en) * 2012-11-06 2014-05-21 青岛理工大学琴岛学院 Handling device
CN103395699A (en) * 2013-07-30 2013-11-20 华电重工股份有限公司 Double-layer quay crane with vertical lifting device
CN103395699B (en) * 2013-07-30 2015-08-05 华电重工股份有限公司 A kind of double-deck bank bridge with vertical lift device
CN110877865A (en) * 2019-11-27 2020-03-13 武汉理工大学 Cyclically-loaded and unloaded shore bridge and cyclically-loaded and unloaded method
CN113753761A (en) * 2021-08-09 2021-12-07 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems
CN113753761B (en) * 2021-08-09 2024-02-13 浙江省建设工程机械集团有限公司 Tower crane with main and auxiliary hoisting systems

Also Published As

Publication number Publication date
JP2003528783A (en) 2003-09-30
AU1082200A (en) 2000-09-04
WO2000048937A1 (en) 2000-08-24
DE19983937T1 (en) 2002-04-11
KR100306296B1 (en) 2001-09-24
KR20000056397A (en) 2000-09-15

Similar Documents

Publication Publication Date Title
CN1337918A (en) Gantray crane having circulating trolleys
US7389888B2 (en) Mobile crane with ballasting
US7731041B2 (en) Gantry stacker with two side-by-side spreaders
CN1096409C (en) Method and apparatus for controlling crane
US5538382A (en) Variable level lifting platform for a cargo container handling crane
CN100436300C (en) Wire rope reeving support system for cargo container handling gantry cranes
US3945503A (en) Crane with a variable center rope suspension system
KR20120049874A (en) A wire rope reeving system for tandem lift cargo container handling
US3825128A (en) Sway-arrest system
CN111908348A (en) Gantry crane with anti-shaking function
CN102730158A (en) Ship quay container handling system
CN107344697A (en) Cable boom hoisting
US4872798A (en) Vessel to dock cargo transfer apparatus
CN107406239A (en) Standdle carrier device for ISO containers
US4610594A (en) Container conveyor system
CN102639425A (en) Container crane apparatus and container loading/unloading method using same
CN1544307A (en) Multifunctional engineering installation vehicle
CN102730575A (en) Quayside cable crane
CN210914011U (en) High-efficient goods lifting machine
CN100556792C (en) A kind of running trolley of double-hoisting container crane and anchorage method thereof
CN114408106A (en) Offshore working platform for fishing and fishing method
CN1810622A (en) Double pony truck container crane capable of hoisting two 40-feet containers simultaneously
CN207090834U (en) Cable boom hoisting
US3739922A (en) Sway-arrest system improvement
CN2737768Y (en) Multifunction engineering mounting vehicle

Legal Events

Date Code Title Description
C06 Publication
C10 Entry into substantive examination
PB01 Publication
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
C20 Patent right or utility model deemed to be abandoned or is abandoned