CN1318680A - 冷却塔人字形柱更换施工方法 - Google Patents
冷却塔人字形柱更换施工方法 Download PDFInfo
- Publication number
- CN1318680A CN1318680A CN 00110330 CN00110330A CN1318680A CN 1318680 A CN1318680 A CN 1318680A CN 00110330 CN00110330 CN 00110330 CN 00110330 A CN00110330 A CN 00110330A CN 1318680 A CN1318680 A CN 1318680A
- Authority
- CN
- China
- Prior art keywords
- column
- cooling tower
- gable
- herringbone column
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明属于冷却塔更换人字柱施工方法,它是每次拆除至少一根人字柱,然后,浇注被拆除的人字柱,每次也可以间隔拆除或间隔拆除对称的人字柱。采用本发明可对冷却塔人字柱不被腐蚀,几乎不能作为上部结构物的承重构件,须报废重建,为节省推倒重建资金,使老塔能重新发挥作用。
Description
本发明涉及一种冷却塔人字形柱更换施工方法。
冷却塔是发电厂、化工厂等工厂进行循环水冷却的一种钢筋混凝结构物,上部结构为双曲线形薄壁钢筋混凝土结构风筒,下部受力构件为钢筋混凝土人字形柱结构,由于长期受循环水的作用,特别是寒冷地区,由于季节气温变化,在冻融交替的循环作用下,许多冷却塔人字形柱已被腐蚀,几乎不能作为上部结构物的承重构件,须报废重建。
本发明的目的在于提供一种在不须报废重建已有的冷却塔情况下,更换人字形柱的施工方法。
为了达到上述目的,本发明采用的技术方案是:每次拆除至少一根人字柱,然后,浇注被拆除的人字柱,每次也可以间隔拆除或间隔拆除对称的人字柱。
本发明的优点是:
施工方法简单,施工速度快,不需推倒原冷却塔,即可重新更换冷却塔下部安装的人字形柱,省时、省料,综合成本低。
附图说明:
图1是拆换冷却塔人字形柱顺序布置图;
图2是工艺流程框图。
下面对本发明的实施例作进一步详细描述。
每次拆除至少一根人字柱,然后,浇注被拆除的人字柱,每次也可以间隔拆除或间隔拆除对称的人字柱。
所述的拆除第1根人字柱之前应采用一组钢支柱,在拟拆除的人字柱的两侧顶住冷却塔上环梁,待被拆除人字柱浇筑完成混完成混凝达到设计强度后再除去钢支柱2。
目前,对冷却塔的人字柱进行更换,一般是进行加固、补强或是推倒进行重建,这样不但是浪费了大量的资金,就是进行补强后的结构影响正常使用,本发明能在短时间内达到预定的强度,使之能代替原人字柱1,达到逐根(组)拆换的目的,然后逐根交替拆换新人字柱1,直至全部完成全部更换人字柱1。
为了使拆换施工能顺利进行,首先对原塔应作准确的结构调查和上部荷载计算,并制定周密的施工方案,以防恶性事故的发生。
计算并试验新浇混凝土两天、三天的抗压强度,要求混凝土三天内的抗压强度要大于人字柱所需抗压强度的2倍。
使用微膨胀混凝土试验膨胀剂的用量,使混凝土的膨胀率控制在0.2-0.4%之间。
本发明每次拆换人字柱1顺序的制定应考虑混凝土强度增长所需时间的因素,这也是保证拆换成功的重要环节,其顺序应保证相邻两柱拆换具有一定的时间差(一般应在3天以上),即保证所浇的人字柱1的强度具有足够的承栽能力后方可拆除相邻的柱见拆换顺序布置图。
拆换应严格按照预先制定的拆换顺序进行,一般以每天一根的速度进行(经准确计算后亦可以每天多根速度进行),第一天拆除第一根人字柱1或2-3根人字柱1,并及时浇筑被拆除人字柱1,第二天拆除第二根人字柱1或间隔拆2-3根人字柱1,如此循环,直至全部拆换完成。
为保证施工安全在拆除前应用一组钢支柱,在拟拆除的柱的两侧顶住上环梁,待该柱浇筑完成混凝土达到设计强度后拆除,如图。
钢筋:原人字柱1的混凝土拆除后原有钢筋保留,并在原有钢筋的基础上加设一组结构加强钢筋,其两端应与上下环梁3焊接(若原柱钢筋保持完好可利用原钢筋,不设加强筋)。
模板:采用钢制双半圆形,施工时先将底模要安装牢固,顶模随浇混凝土随安装,且在柱顶端处为保证混凝土能与上环梁3紧密接触,所以在顶处应设高出上环梁15-20cm的浇注口,待浇后混凝土终凝再凿去多余的混凝土。
混凝土:混凝土标号一般应选用大于C30的微膨胀混凝土,坍落度可选用3-5cm,浇筑要密实,保证所浇人字柱顶端能顶紧上环梁,如图。
为保证所浇人字柱的稳定,浇完人字柱后,人字柱的两端增设上下环梁。
Claims (1)
1、一种冷却塔人字柱更换施工方法,其特征在于:每次拆除至少一根人字柱,然后,浇注被拆除的人字柱,每次也可以间隔拆除或间隔拆除对称的人字柱。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00110330 CN1318680A (zh) | 2000-04-19 | 2000-04-19 | 冷却塔人字形柱更换施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00110330 CN1318680A (zh) | 2000-04-19 | 2000-04-19 | 冷却塔人字形柱更换施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1318680A true CN1318680A (zh) | 2001-10-24 |
Family
ID=4580330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00110330 Pending CN1318680A (zh) | 2000-04-19 | 2000-04-19 | 冷却塔人字形柱更换施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1318680A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040362A (zh) * | 2014-04-17 | 2015-11-11 | Lg电子株式会社 | 衣物处理装置及其控制方法 |
-
2000
- 2000-04-19 CN CN 00110330 patent/CN1318680A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040362A (zh) * | 2014-04-17 | 2015-11-11 | Lg电子株式会社 | 衣物处理装置及其控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887702B (zh) | 一种预应力碳纤维板与钢‑混凝土加固混凝土梁的方法 | |
CN204608619U (zh) | 一种在既有桥梁上拓宽加固的新结构 | |
CN100513696C (zh) | 墩身帽开裂体外予应力加固方法 | |
CN109468958A (zh) | 一种主塔塔柱施工工艺 | |
CN207714108U (zh) | 一种大跨度多连拱拱式渡槽或桥梁的支撑系统 | |
CN204703380U (zh) | 自张式形状记忆合金筋预应力混凝土结构 | |
CN1318680A (zh) | 冷却塔人字形柱更换施工方法 | |
CN109098094A (zh) | 无支架横向拼装波形钢腹板组合箱梁的施工方法 | |
CN210713517U (zh) | 一种装配式叠合梁结构 | |
CN103790385B (zh) | 预应力结构张拉的施工方法 | |
CN115434366A (zh) | 一种地下工程的永临结合装配式结构及施工方法 | |
CN102116027A (zh) | 框架式组合换撑体系及其施工方法 | |
CN104032741A (zh) | 一种水利工程大体积温控的快速施工方法 | |
CN2858770Y (zh) | 混凝土大坝用的钢骨架结构 | |
CN209686342U (zh) | 一种高强度的渡槽 | |
CN209584837U (zh) | 采用分层槽钢连接件的钢-混凝土部分预制叠合梁结构 | |
CN2630263Y (zh) | 玻璃钢格栅树脂混凝土电解槽 | |
CN208415074U (zh) | 一种大跨度上承式拱桥拱上构造 | |
CN207988496U (zh) | 一种简单的混凝土反边工具式模板加固装置 | |
CN203050737U (zh) | 拱形地铁车站新旧建筑衔接结构 | |
CN207959128U (zh) | 开口式悬浇梁 | |
CN209466399U (zh) | 一种装配式钢结构制梁台座 | |
CN218373387U (zh) | 一种跨南水北调干渠转体桥梁中跨合龙吊架结构 | |
CN107355036A (zh) | 预制装配式空心楼盖及其施工方法 | |
CN217629734U (zh) | 一种用于悬挑闸墩斜面及牛腿斜面浇筑施工的免拆模板结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |