CN1310699C - Integrated smoke desulfurizer of smoothing absorbing tower - Google Patents

Integrated smoke desulfurizer of smoothing absorbing tower Download PDF

Info

Publication number
CN1310699C
CN1310699C CNB2005100414915A CN200510041491A CN1310699C CN 1310699 C CN1310699 C CN 1310699C CN B2005100414915 A CNB2005100414915 A CN B2005100414915A CN 200510041491 A CN200510041491 A CN 200510041491A CN 1310699 C CN1310699 C CN 1310699C
Authority
CN
China
Prior art keywords
flue
flue gas
tower
gas
absorption tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100414915A
Other languages
Chinese (zh)
Other versions
CN1745876A (en
Inventor
孙克勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Suyuan Environment Protection Engineering Co Ltd
Original Assignee
Jiangsu Suyuan Environment Protection Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suyuan Environment Protection Engineering Co Ltd filed Critical Jiangsu Suyuan Environment Protection Engineering Co Ltd
Priority to CNB2005100414915A priority Critical patent/CN1310699C/en
Publication of CN1745876A publication Critical patent/CN1745876A/en
Application granted granted Critical
Publication of CN1310699C publication Critical patent/CN1310699C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The present invention relates to an integrated flue gas desulfurizing apparatus of a horizontal flow type absorption column, which is the improved technical scheme of a limestone-gypsum wetting method for the flue gas desulfurizing or relevant fields for electric power plants, wherein the centre of a flue (1) is provided with a by-pass baffle plate door (7), the flue (1) is divided into a flue inlet end and a flue outlet end, and the inlet end of the flue (1) is connected with an original flue gas baffle plate door (2) and is communicated with a horizontal flow type absorption column (4) through a flue gas heat-releasing apparatus (31); the outlet end of the horizontal flow type absorption column (4) is connected with the inlet end of a demister (5) through a flue gas heat absorber (32), and the outlet end of the demister (5) is connected with the flue outlet end of the flue (1) through a clean flue gas baffle plate door (6). Because flue gas inlets and outlets of a boiler flue, an absorption column and a flue gas reheater have consistent standard height, the main functional units have direct connection and smooth arrangement; the length of the flue is shortened so that the present invention can save large amounts of materials; the present invention has low pressure loss, and can largely reduce manufacturing cost and operating cost.

Description

Integrated smoke desulfurizer of smoothing absorbing tower
Technical field
The present invention relates to a kind of improvement technical scheme that is used for the limestone-gypsum wet process of FGD (WFGD) of means of flue gas desulfurization of power plant or association area, belong to the technical field of flue gas desulfurization device.
Background technology
Whole desulphurization system is positioned at after flue end, the electric cleaner in known this field at present, and generally, former flue gas is earlier through entering the absorption tower after smoke re-heater (GGH) cooling.The kind on absorption tower is a lot, but the main flow tower of wet processing is a spray column, and adopts reflux type to arrange more.Flue gas enters the absorption tower from bottom, spray district, upwards with absorption slurries counter current contacting; Flue gas after the desulfurization is discharged from top of tower.The clean flue gas of discharging enters smoke stack emission after the heat again by GGH again.Because there are several meters to the tens meters differences that do not wait in the smoke entrance of boiler flue, absorption tower and GGH on absolute altitude, so between the connection flue long and complicated, system layout is loose, cause the resistance of flue gas system bigger, need to be equipped with special desulfurization blower fan and overcome this part resistance, also make cost and operating cost than higher.
Summary of the invention
Technical problem: in order to overcome the problem that existing design exists, the invention provides a kind of integrated smoke desulfurizer of smoothing absorbing tower, the compact conformation of this desulfurizer can reduce cost and operating cost significantly.
Technical scheme: the present invention be contour with the flue gas homonymy that has the anti-return gas approach, has a flow field adaptive faculty, put down the flat flow absorption tower of into clearing and substitute the core apparatus of spray column as flue gas desulphurization system, this device is made up of flue, former gas baffle door, flue gas radiator, flat flow absorption tower, demister, flue gas heat dump, clean gas baffle door, by-pass damper door; Wherein, be provided with a by-pass damper door in the centre of flue, flue be divided into flue inlet side and flue go out end, be connected with former gas baffle door in the inlet side of flue and be connected with the flat flow absorption tower by the flue gas radiator; The end that goes out on flat flow absorption tower passes through the inlet side that the flue gas heat dump connects demister, and the end that goes out of demister goes out end by the flue that clean gas baffle door connects flue.
Uptake zone, flat flow absorption tower is horizontal U type, flue gas is realized the break-in of U type in tower, the smoke entrance on absorption tower is in the same side of tower, and the gas approach on flat flow absorption tower and exhanst gas outlet are on sustained height, flue gas does not have perpendicular flow from advancing tower to going out tower, does not have height change.
The flue gas level on flat flow absorption tower is passed through, and its flue gas flow rate is several times as much as spray column.After former flue gas was drawn from boiler back end ductwork, level entered GGH heat release side, almost at the uniform velocity, flatly entered the flat flow absorption tower after the heat release, contact with absorbing the slurries cross-current, after the desulfurization again level pass through the GGH heat absorbing side, enter smoke stack emission after the heat again.The crushing of whole desulphurization system is little than conventional design, and being expected to all provides pressure head by steam generator system, and no longer increases special desulfurization blower fan.
Beneficial effect: the flat flow absorption tower reduces so its height and diameter all have significantly because the absolute altitude of the flue gas flow rate height in the tower, import and export is identical, and equipment manufacturing cost reduces.Because the smoke entrance absolute altitude unanimity of boiler flue, absorption tower and GGH, the major function unit directly connects, and arranges smooth and easy; The contraction in length of flue can be saved lot of materials; The pressure loss is also less, is expected to rely on the pressure head more than needed of steam generator system self to overcome, and does not need to increase special desulfurization blower fan, relatively has simplified equipment, arranges compact characteristics with the WFGD of routine, can reduce cost and operating cost significantly.
Description of drawings
The present invention is further described below in conjunction with accompanying drawing.
Fig. 1 is a general structure schematic diagram of the present invention.Fig. 2 is Fig. 1 plan structure schematic diagram.
Have among the figure: flue 1, former gas baffle door 2, flue gas radiator 3 1, flat flow absorption tower 4, demister 5, flue gas heat dump 3 2, clean gas baffle door 6, by-pass damper door 7.
The specific embodiment
Device of the present invention is by flue 1, former gas baffle door 2, flue gas radiator 3 1, flat flow absorption tower 4, demister 5, flue gas heat dump 3 2, clean gas baffle door 6, by-pass damper door 7 form; Wherein, be provided with a by-pass damper door 7 in the centre of flue 1, flue 1 be divided into flue inlet side and flue go out end, be connected with former gas baffle door 2 in the inlet side of flue 1 and by flue gas radiator 3 1Be connected with flat flow absorption tower 4; The end that goes out on flat flow absorption tower 4 passes through flue gas heat dump 3 2The inlet side that connects demister 5, the end that goes out of demister 5 goes out end by the flue that clean gas baffle door 6 connects flue 1.
4 uptake zones, flat flow absorption tower are horizontal U type, flue gas is realized the break-in of U type in tower, the smoke entrance on absorption tower is in the same side of tower, and the gas approach on flat flow absorption tower 4 and exhanst gas outlet are on sustained height, flue gas does not have perpendicular flow from advancing tower to going out tower, does not have height change.
When former gas baffle door 2 and clean gas baffle door 6 are closed, when by-pass damper door 7 is opened, the unprocessed direct discharging of boiler smoke; Close and former gas baffle door 2 and clean gas baffle door 6 when opening when by-pass damper door 7, boiler smoke enters flat flow absorption tower WFGD device.
Former flue gas is at first at flue gas radiator 3 1In emit clean flue gas after heat is used for adding thermally desulfurizing, enter the core apparatus of flue gas desulphurization system after temperature reduces---the flue gas homonymy that have the anti-return gas approach, has a flow field adaptive faculty is contour, put down the flat flow absorption tower 4 of into clearing.The vertical spray of the absorbent slurry that atomizes in tower falls, and the former flue gas of horizontal flow warp is carried out washing, purifying, makes flue gas reduce to saturation temperature.The clean flue gas that flows out from the absorption tower then by two-stage demister 5, is used for removing the water smoke that flue gas is taken out of in washing process.Clean flue gas is at flue gas heat dump 3 2In be reheated the back discharge from chimney.
In this embodiment, whole desulphurization system is arranged according to the U type, connects the center line absolute altitude unanimity of flue everywhere, flue gas radiator 3 1, flue gas heat dump 3 2, demister 5 integrated being arranged on the flat flow absorption tower 4.Whole system is arranged smooth and easy, compact conformation, and floor space is few.Owing to reduced turning round and length of flue, the pressure loss of whole flue gas flow field is also less, is expected to rely on the pressure head more than needed of steam generator system self to overcome, and does not need to increase special desulfurization blower fan, can reduce cost and operating cost significantly.
Smoke re-heater (GGH) adopts heat pipe-type GGH or other can guarantee the type of smoke entrance absolute altitude unanimity, also can not establish GGH.

Claims (2)

1, a kind of integrated smoke desulfurizer of smoothing absorbing tower is characterized in that this device is by flue (1), former gas baffle door (2), flue gas radiator (3 1), flat flow absorption tower (4), demister (5), flue gas heat dump (3 2), clean gas baffle door (6), by-pass damper door (7) form; Wherein, be provided with a by-pass damper door (7) in the centre of flue (1), flue (1) be divided into flue inlet side and flue go out end, be connected with former gas baffle door (2) in the flue inlet side of flue (1), former gas baffle door (2) is by flue gas radiator (3 1) be connected with flat flow absorption tower (4); The end that goes out on flat flow absorption tower (4) passes through flue gas heat dump (3 2) connecting the inlet side of demister (5), the end that goes out of demister (5) goes out to hold by the flue that clean gas baffle door (6) connects flue (1).
2, integrated smoke desulfurizer of smoothing absorbing tower according to claim 1, it is characterized in that uptake zone, flat flow absorption tower (4) is horizontal U type, flue gas is realized the break-in of U type in tower, the smoke entrance on absorption tower is in the same side of tower, the gas approach on flat flow absorption tower (4) and exhanst gas outlet are on sustained height, flue gas does not have perpendicular flow from advancing tower to going out tower, does not have height change.
CNB2005100414915A 2005-08-16 2005-08-16 Integrated smoke desulfurizer of smoothing absorbing tower Expired - Fee Related CN1310699C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100414915A CN1310699C (en) 2005-08-16 2005-08-16 Integrated smoke desulfurizer of smoothing absorbing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100414915A CN1310699C (en) 2005-08-16 2005-08-16 Integrated smoke desulfurizer of smoothing absorbing tower

Publications (2)

Publication Number Publication Date
CN1745876A CN1745876A (en) 2006-03-15
CN1310699C true CN1310699C (en) 2007-04-18

Family

ID=36165693

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100414915A Expired - Fee Related CN1310699C (en) 2005-08-16 2005-08-16 Integrated smoke desulfurizer of smoothing absorbing tower

Country Status (1)

Country Link
CN (1) CN1310699C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101028578B (en) * 2007-01-17 2010-05-26 孙克勤 Advection absorbing tower in U-shaped absorbing area

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1408464A (en) * 2002-09-09 2003-04-09 华东理工大学 Removing and recovering process and device for SO2 in flue gas
CN2838731Y (en) * 2005-08-16 2006-11-22 孙克勤 Horizontal flow absorption column integrated flue gas desulfurization apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1408464A (en) * 2002-09-09 2003-04-09 华东理工大学 Removing and recovering process and device for SO2 in flue gas
CN2838731Y (en) * 2005-08-16 2006-11-22 孙克勤 Horizontal flow absorption column integrated flue gas desulfurization apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
OI2-WFGD烟气脱硫技术介绍 孙克勤,张东平,电力环境保护,第20卷第3期 2004 *

Also Published As

Publication number Publication date
CN1745876A (en) 2006-03-15

Similar Documents

Publication Publication Date Title
CN110567290B (en) Unsaturated high-humidity tail gas white smoke eliminating device and method
CN105148667A (en) High-efficiency desulfuration and dedusting system for flue gas purification
CN101406804A (en) High-efficient purification treatment device for flue tail gas of fuel oil cremator
CN105233657A (en) Flue gas desulphurization and dedusting advanced treatment technology and apparatus thereof
CN203525501U (en) Baffle plate type demister
CN101342455A (en) Rotational flow and spray combined desulfurizing device
CN207270943U (en) A kind of cooperative control system of coal steam-electric plant smoke flue dust
CN203777877U (en) Electrostatic composite fume dedusting and demisting device
CN111558294B (en) Wet flue gas purification system and method with energy-saving function
CN2813072Y (en) Combined flue gas denitrating dust cleaning and desulfurizing apparatus
CN1310699C (en) Integrated smoke desulfurizer of smoothing absorbing tower
CN1745878A (en) Assembled smoke gas desulfurizer with denitration and dust-proof functions
CN2577939Y (en) Multi-stage parallel scaleless flue gas desulfurizing tower
CN2838731Y (en) Horizontal flow absorption column integrated flue gas desulfurization apparatus
CN104971610B (en) Flexible high-efficiency demisting dust pelletizing system and its technique
CN204746086U (en) High -efficient flexible defogging dust collector
CN201300034Y (en) Vortex-sprinkling combined desulphurizing device
CN207025058U (en) A kind of heat and power system desulfurizer
CN2642391Y (en) Mixed-flow grid plate type water film dedusting desulfurizing equipment
CN205988668U (en) A kind of flue gas condensing tower
CN101716456A (en) Double-stage desulfurizing and dust-removing equipment
CN212188317U (en) Waste gas treatment device suitable for biomass fuel
CN201006390Y (en) Oil-containing smoke purifying installation
CN205392024U (en) Horizontal membrane wet dedusting device of high -efficient condensation
CN205102148U (en) Coal fired power plant's boiler purifier that discharges fume

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070418