CN104971610B - Flexible high-efficiency demisting dust pelletizing system and its technique - Google Patents
Flexible high-efficiency demisting dust pelletizing system and its technique Download PDFInfo
- Publication number
- CN104971610B CN104971610B CN201510363025.2A CN201510363025A CN104971610B CN 104971610 B CN104971610 B CN 104971610B CN 201510363025 A CN201510363025 A CN 201510363025A CN 104971610 B CN104971610 B CN 104971610B
- Authority
- CN
- China
- Prior art keywords
- demister
- flue
- flexible blade
- flexible
- demister body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Separating Particles In Gases By Inertia (AREA)
- Gas Separation By Absorption (AREA)
- Filtering Of Dispersed Particles In Gases (AREA)
- Treating Waste Gases (AREA)
Abstract
Description
Claims (8)
- A kind of 1. flexible high-efficiency demisting dust pelletizing system, it is characterised in that:Including being arranged at absorption tower and the demister sheet in flue Body and the spray equipment for rinsing the demister body, the demister body includes flexible blade and fixed mount, described Flexible blade is fixedly installed on the fixed mount;The flexible blade is shaggy wear resistant corrosion resistant soft fibre fabric leaf Piece;The flexible blade is corrugated sheet, and the entrance angle of the corrugated sheet is 48-52 °, and exit angle is 38-43 °, waveform Piece middle part is streamlined.
- 2. flexible high-efficiency demisting dust pelletizing system according to claim 1, it is characterised in that:The demister body includes setting Demister body and the flue demister body being arranged in net flue at least in the tower of two-stage are placed in above sulphur removal spraying layer.
- 3. flexible high-efficiency demisting dust pelletizing system according to claim 2, it is characterised in that:Demister body bag in the tower Include the first order demister vertically set gradually, second level demister and third level demister, the first order demisting Device and second level demister are abutted and shifted to install, and it is empty that diffusion is provided between the second level demister and third level demister Between and shift to install.
- 4. flexible high-efficiency demisting dust pelletizing system according to claim 1, it is characterised in that:The spray irrigation device includes Multiple nozzles and for the spray irrigation pipeline for the nozzle supplies water, demister body and flue demister in the tower per one-level The both sides of body are provided with multiple nozzles.
- 5. flexible high-efficiency demisting dust pelletizing system according to claim 1, it is characterised in that:Use is provided with the fixed mount In the slurry pool that the collecting tank for collecting flexible blade sizing liquor, the slurry collecting groove will be simultaneously flow in absorption tower certainly in slurries.
- 6. a kind of flexible high-efficiency demisting dust pelletizing system using as described in claim any one of 1-5 carries out demisting dedusting to flue gas The technique of processing, it is characterised in that:Comprise the following steps:A, joined according to gas approach dust concentration, droplet concentration, flue gas flow rate, flue-gas temperature, local atmospheric pressure, environment temperature Number, calculate the import and export angle for determining flexible blade;B, the flue gas after desulfurization process successively is carried out into demisting by demister body in tower and flue demister body to remove Dirt processing.
- 7. the technique that demisting dust removal process is carried out to flue gas as claimed in claim 6, it is characterised in that:In the step b, lead to The flue gas flow rate for crossing demister body in tower is 4.3-4.5m/s, and the flue gas flow rate by flue demister body is 5.1- 5.3m/s;The entrance angle of flexible blade is 48-52 °, and exit angle is 38-43 °.
- 8. the technique that demisting dust removal process is carried out to flue gas as claimed in claim 7, it is characterised in that:Periodically turn on spray dress Put and rinse demister body, flushing water pressure is 0.2-0.25MPa.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510363025.2A CN104971610B (en) | 2015-06-26 | 2015-06-26 | Flexible high-efficiency demisting dust pelletizing system and its technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510363025.2A CN104971610B (en) | 2015-06-26 | 2015-06-26 | Flexible high-efficiency demisting dust pelletizing system and its technique |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104971610A CN104971610A (en) | 2015-10-14 |
CN104971610B true CN104971610B (en) | 2017-12-05 |
Family
ID=54268908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510363025.2A Active CN104971610B (en) | 2015-06-26 | 2015-06-26 | Flexible high-efficiency demisting dust pelletizing system and its technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104971610B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105536391A (en) * | 2015-12-31 | 2016-05-04 | 河北唯沃环境工程科技有限公司 | High-pressure self-rotation centrifugal air washer |
CN113209769A (en) * | 2021-05-31 | 2021-08-06 | 攀钢集团研究院有限公司 | Deep dedusting and demisting process for desulfurized flue gas in low-temperature flue gas ultralow emission treatment system |
CN113413735A (en) * | 2021-07-30 | 2021-09-21 | 西安西热锅炉环保工程有限公司 | Demister washing water recycling system and method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101121091B (en) * | 2006-08-10 | 2011-08-31 | 嘉园环保股份有限公司 | Composite type filter |
CN102961943B (en) * | 2012-11-27 | 2015-03-11 | 上海龙净环保科技工程有限公司 | Method and device for synergistically removing fine particles via wet-process flue gas desulfurization |
CN103933813A (en) * | 2014-04-01 | 2014-07-23 | 国电环境保护研究院 | Combined dust removing and defogging device for smoke |
CN204746086U (en) * | 2015-06-26 | 2015-11-11 | 中电投远达环保工程有限公司 | High -efficient flexible defogging dust collector |
-
2015
- 2015-06-26 CN CN201510363025.2A patent/CN104971610B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104971610A (en) | 2015-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103480223B (en) | Wet-type fume purification system and purification method for high smoke speed PM2.5 and pollutant | |
CN103721548B (en) | PM in a kind of promotion wet desulphurization neat stress 2.5the desulfurizer removed and method thereof | |
CN105597477A (en) | Device and method for removing ultrafine particles in flue gas of coal boiler | |
CN106621680A (en) | Method and system for deeply removing dust from flue gas after wet desulfurization | |
CN104384023A (en) | Deep purifying device and method for flue gas of large coal-fired power plant | |
CN104971610B (en) | Flexible high-efficiency demisting dust pelletizing system and its technique | |
CN103447151A (en) | Compound type electric demister as well as process and use thereof | |
CN108786398B (en) | Flue gas desulfurization and regeneration integrated tower and renewable wet flue gas desulfurization method | |
CN206587554U (en) | The synergy of acoustic agglomeration combination flue demisting removes the device of fine particulates | |
CN206295748U (en) | Desulfurization and dedusting demisting minimum discharge device | |
CN1899675A (en) | Reverse flow type seawater desulfurizing and absorption tower | |
CN203469746U (en) | Wet-process desulphurization system with multi-stage humidifying demisting device | |
CN204746086U (en) | High -efficient flexible defogging dust collector | |
CN103933813A (en) | Combined dust removing and defogging device for smoke | |
CN207270943U (en) | A kind of cooperative control system of coal steam-electric plant smoke flue dust | |
CN204182256U (en) | A kind of washing degree of depth dust arrester | |
CN210057763U (en) | Smoke dust removing, desulfurizing and white smoke eliminating tower | |
CN203777877U (en) | Electrostatic composite fume dedusting and demisting device | |
CN203437004U (en) | High-flue gas-velocity PM2.5 flue gas and pollutant wet flue gas purification system | |
CN104258668B (en) | A kind of washing degree of depth dust arrester | |
CN207614605U (en) | A kind of coal-burning power plant is solidifying to become the compound flue gas advanced purification system that dehumidifies | |
CN212348206U (en) | Dust and mist eliminator with negative ion generator | |
CN205360936U (en) | A condensing takes off dirt defogging device for wet flue gas desulfurization system | |
CN202410458U (en) | Combined pollutant removing device | |
CN103446839B (en) | Wet desulphurization system with multi-stage humidification demisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 401122 Chongqing City, the new North District, Yu Jin Road, No. 96 Applicant after: National electric investment group Yuanda Environmental Protection Engineering Co Ltd Address before: 401122 Chongqing City, the new North District, Yu Jin Road, No. 96 Applicant before: CPI Yuanda Environmental-Protection Engineering Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200417 Address after: 401122, 96 Jin Yu Road, new North District, Chongqing, Yubei District Co-patentee after: INNER MONGOLIA HMHJ ALUMINUM ELECTRICITY Co.,Ltd. Patentee after: National electric investment group Yuanda Environmental Protection Engineering Co.,Ltd. Address before: 401122 96 Jin Yu Road, North New District, Chongqing Patentee before: National electric investment group Yuanda Environmental Protection Engineering Co.,Ltd. |