CN1309209A - 一种扩底空心桩的施工方法 - Google Patents

一种扩底空心桩的施工方法 Download PDF

Info

Publication number
CN1309209A
CN1309209A CN 01105785 CN01105785A CN1309209A CN 1309209 A CN1309209 A CN 1309209A CN 01105785 CN01105785 CN 01105785 CN 01105785 A CN01105785 A CN 01105785A CN 1309209 A CN1309209 A CN 1309209A
Authority
CN
China
Prior art keywords
hollow pile
mandrel
pile
concrete
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 01105785
Other languages
English (en)
Other versions
CN1128906C (zh
Inventor
应义淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01105785 priority Critical patent/CN1128906C/zh
Publication of CN1309209A publication Critical patent/CN1309209A/zh
Application granted granted Critical
Publication of CN1128906C publication Critical patent/CN1128906C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种扩底空心桩的施工方法,主要包括以下步骤:将空心桩定位后打入地基中,向空心桩内投入一定量的混凝土,再将芯轴放入空腔内,静压或锤击芯轴,将混凝土从空心桩下端挤出形成扩大头。本施工方法能有效地将空心桩与夯扩灌注桩的优点结合在一起,具有高强度及高承载力的特性,同时成本较低。

Description

一种扩底空心桩的施工方法
本发明涉及一种扩底空心桩的施工方法。
目前所用的夯扩灌注桩由于其扩大头能充分利用桩端持力层加承载力,从而可减小桩长,降低成本。但夯扩灌注桩的沉管长度有限,其桩身长度较短,扩大头很难利用较深的持力层;其次桩身混凝土由于是在地下灌注并受拔管、挤土等因素的影响,桩身易产生缩颈、断桩等质量问题,其强度有限;另外,夯扩灌注桩在施工过程中,产生的噪声振动对环境造成污染,对周边建筑物易造成损害,夯扩灌注桩对环境的不利影响也是有侍解决的问题。现在大部分城市都明令禁止使用夯扩灌注桩,这对地质条件适合采用夯扩灌注桩的广大地区来说就造成了巨大的损失。而预制的空心桩,有预应力空心管桩、预制空心方桩、钢管桩等,这类空心桩制造时质量容易保证,桩身强度高,但是造价也相对较高,不利于广泛采用。
本发明的目的在于提供一种扩底空心桩的施工方法,使桩体具有高强度及高承载力,并且成本低廉。
为实现上述目的,本发明采用以下技术方案:
一种扩底空心桩的施工方法,包括以下步骤:
(1)将空心桩的桩端装上预制砼桩尖或封闭式钢板桩头;
(2)将桩定位后打入地基中;
(3)向空心桩的空腔内投入一定量的混凝土;
(4)将芯轴放入空腔内,用桩机静压或锤击芯轴,通过芯轴将混凝土从空心桩下端挤出形成扩大头;
(5)拔出芯轴。
本发明是在空心桩的基础上增加一扩大头,增加空心桩的承载力,空心桩的长度就可相应减短,这就使整体成本下降,既利用了空心桩高强度的特性,又利用了夯扩桩的扩大头。本发明可以采用静压或锤击法将空心桩打入地下,采用静压或锤击法将混凝土打入地下形成扩大头。由于可以采用静压形成扩大头,无噪音和振动,使本发明施工方法的应用范围更广,更有利于该方法的推广使用。同时与夯扩灌注桩相比,少了一个拔管过程,使施工艺更加简单、快捷。再者,在相同桩长的情况下,采用本发明施工方法形成的扩底桩,具有更高的承载力,因而可以减小工程使用的桩数量。
上述的扩底空心桩的施工方法,在第四步骤之后增加一步骤:用桩机将空心桩和芯轴同时下沉一定高度,使扩大头受二次挤压形成更大的直径,同时能使空心桩与扩大头的结合更加紧密。使空心桩的基础承载更大,在实际中可以使空心桩的长度进一步缩短,成本进一步下降。
以下结合附图与实施例对本实用新型作进一步的描述:
图1为本发明实施例1施工全过程示意图;
图2为本发明实施例2施工全过程示意图。
参照附图,图中标号与部件为:空心桩1、混凝土2、桩尖3、芯轴4、扩大头5。
实施例1:
参照附图1,一种扩底空心桩的施工方法,包括以下步骤:
(1)将空心桩1的桩端装上预制砼桩尖3或封闭式钢板桩头3;
(2)将空心桩1定位后打入地基中;其特征在于还包括以下步骤:
(3)向空心桩1的空腔内投入混凝土2;
(4)将芯轴4放入空腔内,用桩机静压或锤击芯轴4,通过芯轴4将混凝2土从空心桩1下端挤出形成扩大头5;
(5)拔出芯轴4,形成扩底空心桩。
实施例2:
与实施例1不同的是在第四步骤之后增加一步骤:用桩机将空心桩1和芯轴4同时下沉一定高度。使混凝土2在地下形成更大的直径的扩大头5。

Claims (2)

1、一种扩底空心桩的施工方法,包括以下步骤:
(1)将空心桩的桩端装上预制砼桩尖或封闭式钢板桩头;
(2)将空心桩定位后打入地基中;其特征在于还包括以下步骤:
(3)向空心桩的空腔内投入一定量的混凝土;
(4)将芯轴放入空腔内,用桩机静压或锤击芯轴,通过芯轴将混凝土从空心桩下端挤出形成扩大头;
(5)拔出芯轴。
2、如权利要求1所述的扩底空心桩的施工方法,其特征在于在第(4)步骤之后增加一步骤:用桩机将空心桩和芯轴同时下沉一定高度。
CN 01105785 2001-03-22 2001-03-22 一种扩底空心桩的施工方法 Expired - Fee Related CN1128906C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01105785 CN1128906C (zh) 2001-03-22 2001-03-22 一种扩底空心桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01105785 CN1128906C (zh) 2001-03-22 2001-03-22 一种扩底空心桩的施工方法

Publications (2)

Publication Number Publication Date
CN1309209A true CN1309209A (zh) 2001-08-22
CN1128906C CN1128906C (zh) 2003-11-26

Family

ID=4654853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01105785 Expired - Fee Related CN1128906C (zh) 2001-03-22 2001-03-22 一种扩底空心桩的施工方法

Country Status (1)

Country Link
CN (1) CN1128906C (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100334304C (zh) * 2004-12-06 2007-08-29 雷玉华 一种在空心桩底部扩孔现浇混凝土扩大头的施工方法
CN101831908A (zh) * 2010-05-11 2010-09-15 武汉华威建筑桩工机械有限责任公司 大直径超深度静压单管沉管夯扩灌注桩施工工艺及设备
CN104779158A (zh) * 2014-01-09 2015-07-15 北大方正集团有限公司 场效应管的制造方法
CN105019432A (zh) * 2013-10-24 2015-11-04 叶香雄 一种扩孔端承桩的施工方法
CN110004946A (zh) * 2019-03-27 2019-07-12 河海大学 后注浆微型钢管桩的桩尖及其土质边坡快速抢险加固结构、施工方法
CN115305912A (zh) * 2022-02-14 2022-11-08 高云飞 一种管桩灌浆夯振扩底施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100334304C (zh) * 2004-12-06 2007-08-29 雷玉华 一种在空心桩底部扩孔现浇混凝土扩大头的施工方法
CN101831908A (zh) * 2010-05-11 2010-09-15 武汉华威建筑桩工机械有限责任公司 大直径超深度静压单管沉管夯扩灌注桩施工工艺及设备
CN105019432A (zh) * 2013-10-24 2015-11-04 叶香雄 一种扩孔端承桩的施工方法
CN105019432B (zh) * 2013-10-24 2018-01-30 叶香雄 一种扩孔端承桩的施工方法
CN104779158A (zh) * 2014-01-09 2015-07-15 北大方正集团有限公司 场效应管的制造方法
CN110004946A (zh) * 2019-03-27 2019-07-12 河海大学 后注浆微型钢管桩的桩尖及其土质边坡快速抢险加固结构、施工方法
CN115305912A (zh) * 2022-02-14 2022-11-08 高云飞 一种管桩灌浆夯振扩底施工方法

Also Published As

Publication number Publication date
CN1128906C (zh) 2003-11-26

Similar Documents

Publication Publication Date Title
CN109440762B (zh) 一种排水泵站用灌注桩的施工方法
CN108842791B (zh) 一种可卸荷桩锚多级支护结构及施工方法
CN101974905A (zh) 一种空心桩的植桩方法及实施该方法的螺旋钻
CN105421445A (zh) 非预应力离心高强混凝土桩植桩施工方法
CN109024562A (zh) 一种分级推进的大直径长预制管桩及其施工方法
CN104153357A (zh) 复合桩的施工方法
CN101914915A (zh) 一种抗浮锚杆的施工方法及专用长螺旋钻机
CN1128906C (zh) 一种扩底空心桩的施工方法
CN2370066Y (zh) 通道注浆钢筋砼空心预制桩
CN109469055B (zh) 一种局部管缝式端扩型吸能锚杆及其施工方法
CN209243732U (zh) 一种高效微型钢管桩施工结构
CN2753797Y (zh) 长螺旋压灌混凝土插芯组合桩
CN108049401A (zh) 一种螺纹夯扩桩及其施工方法
CN109056747A (zh) 一种高效微型钢管桩施工结构、方法
CN209025070U (zh) 一种分级推进的大直径长预制管桩
CN1243184A (zh) 高压旋喷扩底桩的施工方法
CN208023566U (zh) 一种螺纹夯扩桩
CN201747261U (zh) 一种抗浮锚杆施工用长螺旋钻机
CN1076064C (zh) 地基处理方法
CN2511782Y (zh) 螺旋桩桩机钻杆
CN2747278Y (zh) 一种底部有混凝土扩大头的组合式空心桩
CN2294997Y (zh) 无桩靴振动静压沉管扩底灌注桩成桩设备
CN103074897A (zh) 加筋约束土复合支护结构及其施工方法
CN2436554Y (zh) 非挤土桩护壁管振动沉拔机
CN221321025U (zh) 一种拉结式外扩放大脚桩基础

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1041381

Country of ref document: HK

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee