CN1278520A - Cement, flyash and steel slag pile and its production process - Google Patents

Cement, flyash and steel slag pile and its production process Download PDF

Info

Publication number
CN1278520A
CN1278520A CN00115934A CN00115934A CN1278520A CN 1278520 A CN1278520 A CN 1278520A CN 00115934 A CN00115934 A CN 00115934A CN 00115934 A CN00115934 A CN 00115934A CN 1278520 A CN1278520 A CN 1278520A
Authority
CN
China
Prior art keywords
flyash
pile
cement
slag
steel slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN00115934A
Other languages
Chinese (zh)
Other versions
CN1102550C (en
Inventor
黄涛
王小章
刘敬先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN EXPLORATION RESEARCH INST MINISTRY OF METALLURGICAL INDUSTRY
Original Assignee
WUHAN EXPLORATION RESEARCH INST MINISTRY OF METALLURGICAL INDUSTRY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN EXPLORATION RESEARCH INST MINISTRY OF METALLURGICAL INDUSTRY filed Critical WUHAN EXPLORATION RESEARCH INST MINISTRY OF METALLURGICAL INDUSTRY
Priority to CN00115934A priority Critical patent/CN1102550C/en
Publication of CN1278520A publication Critical patent/CN1278520A/en
Application granted granted Critical
Publication of CN1102550C publication Critical patent/CN1102550C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a cement flyash slag pile and its pile-forming process. It uses cement, flyash and slag as raw material, adds water according to a certain proportion, and its water demand is controlled in that the slump of its mixture 7 is equal to 1-3cm.. Its pile-forming process includes the following steps: measuring and setting out, setting pile position and checking, pile machine levelling, aligning pile position, pipe sinking to designed level, checking raw materials, preparing mixture, synchronously hammering internal and external pipes to pile bottom designed level, synchronously drawing out internal and external pipes to a certain height, pouring pile body, sectionally drawing pipe, filling in layer and compacting in layer to obtain the invented cement flyash slag pile.

Description

A kind of cement, flyash and steel slag pile and manufacture craft thereof
The present invention relates to usefulness material and manufacture craft thereof that a kind of ground is handled, particularly a kind of cement, flyash and steel slag pile and manufacture craft thereof.It is mainly used in the ground process field of the geotechnical engineering specialty of civil engineering work subject, and process object is generally weak foundation soils such as collapsible loess, plain fill and mud, mucky soil.
Chinese patent CN1113985A disclosed " a kind of filler formulation of making pile by grouting into and pile-formation process thereof ", its basic technology is, in grout, mix the flyash of 7%-70% or screening, ground slag ashes, in pile-formation process, adopt long tube formula vibrator to vibrate, and propose stratum not of the same race slip casting, mend the suitable pressure of slurry, can make material cost decline 30%-50% thus, thereby reach the construction costs that descends significantly.The utilization again of flyash, slag ashes both can be turned waste into wealth, and had reduced environmental pollution again.Pile strength, the Bearing Capacity of Composite Foundation of relevant CFG (CFG stake) studied in the article of " CFG stake pile shaft material Test Study on Strength " that " geologic hazard and environment protection " magazine (in March, 1998) is published; proposing big parameter III a level flyash plain concrete is pile shaft material; under the condition that breaks through conventional limited flyash replacement cement rate, still can reach the imagination of the ultimate compression strength of design requirements.In addition, " application of lime pile-pulverized-coal-ash pile in Deep Thick Soft Ground ground " article of delivering of " building structure " magazine (1997 the 4th phases) has been done introduction to the situation of lime, pulverized-coal-ash pile or slag lime pile Ground Treatment soil.Existing method all do not consider flyash, slag waste material used simultaneously and cost slightly higher.According to the knowledge of the applicant, existing industrial waste, pile up like a mountain in some power plant, steel mill as flyash, slag, is difficult to handle, and both taken a large amount of soils, contaminate environment, the resident's productive life around giving is again brought inconvenience.And some foundation soils such as non-self weight collapse loess have Q because self characteristics can not satisfy the requirement of large scale industry building foundation to foundation soil far away as peace steel area, Chinese Henan widespread distribution 4 2a1And Q 4 1a1I-non-self weight collapse loess of II level, full depth is in 9 meters of the below grounds, water content w=18%-24%, void ratio e=0.75-1.10, compression factor standard value (a 100-200) greater than 0.5MPa -1, collapse initial compression standard value P Sh, kBetween 100kPa-145kPa, both all can not satisfy the requirement of large scale industry buildings or structures basis to foundation soil its intensity and modification, need handle it.Foundation soil is handled, and method in common is the piling compacting at present, with bearing capacity and the modulus of compression that increases processed foundation soil.
The objective of the invention is; the practical problems of foundation soil being handled at the existing building requirement of engineering; and the big steel slag that produces of blast furnace steel-making, a large amount of flyash that thermal power generation produces need be handled the difficulty that is faced; a kind of cement, flyash and steel slag pile and manufacture craft thereof are proposed; guaranteeing to satisfy under the prerequisite of standard and design requirements; gather materials on the spot; make full use of power plant, the existing industrial waste flyash of steel mill and slag; turn waste into wealth; both reduced investment outlay; reduce construction costs, protect environment again.
Technical solution of the present invention is, with cement, flyash, slag is raw material, add entry behind the mix in proportion, it is characterized in that, in 1 cubic metre of mixed material, the weight ratio of cement, flyash, slag is 220 kilograms: 450 kilograms: 1800 kilograms, the consumption of water is controlled at slump T=1-3 centimetre of mixed material.
It is characterized in that slag is made up of coarse fodder and fines, the coarse fodder of slag, the weight ratio of fines are 7: 3.
It is characterized in that the particle diameter of coarse fodder is greater than 20 millimeters, less than 100 millimeters.
It is characterized in that the fill factor of mixed material is 1.6-1.8.
It is characterized in that slag system is through the slag of open-air ageing at least three months or a year.
It is characterized in that flyash is defined as the III level by " being used for cement and concrete flyash " GB1596-91.
Manufacture craft of the present invention is, measure unwrapping wire, put stake position and check, the leveling of stake machine, the align piles position, immersed tube is to designed elevation, it is characterized in that, to making raw material-cement, flyash, slag is tested, and according to the preparation of design mix part by weight, water filling is stirred, stir, the qualified mixed material of preparation is used to pour into pile body, the segmentation tube drawing, the layering filler, tamping in layers, the step of its pile is, stake pipe vertical centering is in place, in the hammering synchronously, outer tube is to stake end designed elevation, in synchronization onwards is pulled out, outer tube is to certain altitude, stopped pulling out outer tube only pull out in pipe expose up to the filler window, and from the window filler, pipe overlaps until the inner and outer pipes top in the hammering, repeats above pile step, until a pile beaten and material filling to design more than the top mark height 0.5 meter.
Advantage of the present invention is, satisfies under the prerequisite of standard and design requirements guaranteeing, gathers materials on the spot, and makes full use of power plant, the existing industrial waste flyash of steel mill and slag, turns waste into wealth, and both reduces investment outlay, and reduces construction costs, protects environment again.Ground through the present invention's processing, its bearing capacity can reach more than the 300kPa, modulus of deformation can reach more than the 10Mpa, about doubling than natural foundation bearing capacity, modulus of deformation, the long 9 meters bearing capacity of single pile standard value of stake can reach about 200kN, eliminated the collapsibility of inter-pile soil simultaneously, ground is handled and is reduced investment outlay about 30%.
Fig. 1, process flow sheet of the present invention
Below, describe embodiments of the invention with reference to the accompanying drawings in detail.
Making material category of the present invention is mainly cement, flyash, slag, also has water.To the requirement of making material be: hydromining is with ordinary tap water or process water; Cement adopts common No. 425 silicate cements; Flyash is defined as the III level by " being used for cement and concrete flyash " GB1596-91; Slag adopts the slag of the natural grading of steelworks production, by coarse fodder m gFines m sForm coarse fodder m gParticle diameter d>20 millimeter, but should not be above 100 millimeters.Fines m sParticle diameter d≤20 millimeter.Slag need perhaps be washed vexedization more than 10 hours through open-air ageing 1 year or more than at least three months, guarantees wherein active calcium oxide f CaOContent ≯ 5%, or between 3-5%.The proportioning of making material is that in 1 cubic metre the mixed material, the weight ratio of cement, flyash and slag is followed successively by 220 kilograms: 450 kilograms: 1800 kilograms, wherein, slag is by coarse fodder m gWith fines m sForm coarse fodder m gWith fines m sWeight ratio be 7: 3.The consumption of water is controlled at slump T=1-3 centimetre of mixed material and is advisable.Control Indexes in Construction, the layering filler, the fill factor of mixed material is 1.6-1.8, guarantees it by compacted, and fully glued.The pile making equipment adopts DDJ-25 type or the construction of DDJ-30 type diesel oil hammer hidden pipe caisson pile machine, is made up of interior pipe (core pipe) two parts that seal the outer tube (sleeve pipe) and the bottom of bottom end opening.Outer tube wall (is generally 1.5 meters) at a certain distance opening filler.As shown in Figure 1, manufacture craft of the present invention is, measure unwrapping wire, put stake position and check, the leveling of stake machine, the align piles position, immersed tube is to designed elevation, to making raw material-cement, flyash, slag is tested, according to the preparation of design mix part by weight, water filling is stirred, and stirs, the qualified mixed material of preparation is used to pour into pile body, adopt the segmentation tube drawing, the layering filler, the tamping in layers mode is carried out, in synchronization onwards is pulled out, the outer tube certain altitude, stopped pulling out outer tube only pull out in pipe expose until the filler window, and from the window filler, pipe overlaps until the inner and outer pipes top in the hammering.Need particularly point out the step of pile: 1, stake pipe vertical centering is in place.2, synchronous hammering inner and outer pipe is to a stake end designed elevation.3, synchronization onwards is pulled out inner and outer pipe to certain altitude (being generally 1.0 meters), stopped pulling out outer tube only pull out in pipe expose up to the filler window, and from the window filler.4, pipe overlaps until the inner and outer pipes top in the hammering.5, repeat the 1-4 operation, until a pile beaten and material filling to design more than the top mark height 0.5 meter.Subject range of the present invention: the 1) processing of steel mill, power plant or its surrounding area foundation soil.2) processing of foundation soil under industrial buildings or structures or the covil construction basis.3) processing of weak foundation soils such as collapsible loess, plain fill and mud, mucky soil.4) processing of above, the following regional foundation soil of ground water table, but its pH value slightly equals 7, is neutral substantially.
In the application of the present invention's processing of foundation soil under the covil construction basis, the work of should doing experiment is earlier collected bearing capacity of single pile, material mixture ratio and stress test data.In the application of the processing of weak foundation soils such as mud, mucky soil, should strengthen the collection of test work and testing data, comprising compiling of bearing capacity of single pile, material mixture ratio and stress test data.So that instruct large-area construction.Guarantee the quality of engineering.

Claims (7)

1, a kind of cement, flyash and steel slag pile, with cement, flyash, slag is raw material, add entry behind the mix in proportion, it is characterized in that, in 1 cubic metre of mixed material, the weight ratio of cement, flyash, slag is 220 kilograms: 450 kilograms: 1800 kilograms, the consumption of water is controlled at trembles slump T=1-3 centimetre that closes material.
2, a kind of cement, flyash and steel slag pile according to claim 1 is characterized in that, slag is made up of coarse fodder and fines, and the coarse fodder of slag, the weight ratio of fines are 7: 3.
3, a kind of cement, flyash and steel slag pile according to claim 1 is characterized in that, the particle diameter of coarse fodder is greater than 20 millimeters, less than 100 millimeters.
4, a kind of cement, flyash and steel slag pile according to claim 1 is characterized in that, the fill factor of mixed material is 1.6-1.8.
5, a kind of cement, flyash and steel slag pile according to claim 1 is characterized in that, slag system is through the slag of open-air ageing at least three months or a year.
6, a kind of cement, flyash and steel slag pile according to claim 1 is characterized in that, flyash is defined as the III level by " being used for cement and concrete flyash " GB1596-91.
7, the manufacture craft of a kind of cement, flyash and steel slag pile according to claim 1, measure unwrapping wire, put stake position and check, the leveling of stake machine, the align piles position, immersed tube is to designed elevation, it is characterized in that, to making raw material-cement, flyash, slag is tested, and according to the preparation of design mix part by weight, water filling is stirred, stir, the qualified mixed material of preparation is used to pour into pile body, the segmentation tube drawing, the layering filler, tamping in layers, the step of its pile is, stake pipe vertical centering is in place, in the hammering synchronously, outer tube is to stake end designed elevation, in synchronization onwards is pulled out, outer tube is to certain altitude, stopped pulling out outer tube only pull out in pipe expose up to the filler window, and from the window filler, pipe overlaps until the inner and outer pipes top in the hammering, repeats above pile step, until a pile beaten and material filling to design more than the top mark height 0.5 meter.
CN00115934A 2000-08-02 2000-08-02 Cement, flyash and steel slag pile and its production process Expired - Fee Related CN1102550C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN00115934A CN1102550C (en) 2000-08-02 2000-08-02 Cement, flyash and steel slag pile and its production process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN00115934A CN1102550C (en) 2000-08-02 2000-08-02 Cement, flyash and steel slag pile and its production process

Publications (2)

Publication Number Publication Date
CN1278520A true CN1278520A (en) 2001-01-03
CN1102550C CN1102550C (en) 2003-03-05

Family

ID=4585374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN00115934A Expired - Fee Related CN1102550C (en) 2000-08-02 2000-08-02 Cement, flyash and steel slag pile and its production process

Country Status (1)

Country Link
CN (1) CN1102550C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104591643A (en) * 2014-12-25 2015-05-06 安徽工业大学 Preparation method of expansion rate-controllable steel pipe and steel-slag concrete column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104591643A (en) * 2014-12-25 2015-05-06 安徽工业大学 Preparation method of expansion rate-controllable steel pipe and steel-slag concrete column

Also Published As

Publication number Publication date
CN1102550C (en) 2003-03-05

Similar Documents

Publication Publication Date Title
CN101538852B (en) Compacting grouting and reinforcing technology for floor foundation of fly ash soil layer and backfilled stone layer in smelting workshop
US20090304457A1 (en) Plastic Gel Grouting Material and Method for Strengthening Ground
CN102021906A (en) Method for reinforcing soft soil foundation at deep mixing pile
CN110318394B (en) Construction method of composite pile
CN108166994A (en) A kind of construction method of grouting reinforced region applied to water-rich sand layer shield tunnel
CN102226336A (en) Foundation reinforcement method
CN113929365B (en) Self-compacting solidified soil and use method thereof
CN110387877A (en) A kind of stiff composite pile construction technology
CN1718937A (en) Technology of non soil taking hole guiding prestressed pipe pile or premade square sunk pile
CN205348160U (en) Novel cement flour spouts two -way stirring stake machine construction equipment
CN101532291A (en) Variable diameter plastic sleeve mixed pile for reinforcing thick-covering and deep-burying soft soil layer and piling method
CN104762957A (en) Construction method for spiral hole forming ram-expanded CFG pile
CN100513708C (en) Method for transversal reinforcement and grouting underpinning of ready construction foundation
CN106906836A (en) A kind of CFG pile composite foundations and its construction method for ferruginous laterite area
CN108623253A (en) A kind of full constituent steel slag concrete stake and its processing soft base construction technology
CN1102550C (en) Cement, flyash and steel slag pile and its production process
CN1030581C (en) Working method of building refuse pile with heavy-hammer ramming
CN113914304A (en) CFG pile long spiral drill hole core pipe pumping mixture pouring pile-forming construction method
CN209923944U (en) Novel backfill soil geotechnique reinforcement
CN109826176B (en) Pipe trench engineering construction process for coastal special silt geology
CN103306278A (en) Method for processing soft soil foundation with environment-friendly light pile
CN112195909A (en) Method for reinforcing soft foundation of road and parking lot
CN114032887B (en) Grouting reinforcement material for in-service pile foundation of weak stratum and grouting process thereof
CN101906779B (en) Supporting process of portal frame type anchor pipe soil nail spraying net and modified reinforcing cement mortar employed by same
CN101704649A (en) Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile

Legal Events

Date Code Title Description
C06 Publication
C10 Entry into substantive examination
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20030305

Termination date: 20160802

CF01 Termination of patent right due to non-payment of annual fee