CN1277291A - 人控泥石流施工方法 - Google Patents

人控泥石流施工方法 Download PDF

Info

Publication number
CN1277291A
CN1277291A CN 99115415 CN99115415A CN1277291A CN 1277291 A CN1277291 A CN 1277291A CN 99115415 CN99115415 CN 99115415 CN 99115415 A CN99115415 A CN 99115415A CN 1277291 A CN1277291 A CN 1277291A
Authority
CN
China
Prior art keywords
water channel
construction method
construction
method utilizing
decanting zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 99115415
Other languages
English (en)
Inventor
周展开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99115415 priority Critical patent/CN1277291A/zh
Publication of CN1277291A publication Critical patent/CN1277291A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

一种人控泥石流施工方法,其特征在于它在施工区域建立由蓄能水库、采水道、导向水道和沉降区组成的施工系统,所述蓄能水库入口与采水道相接,位于施工区上方,出口通过导向水道与沉降区相接,通过蓄能水库中水的大流量、大高差、超大高差冲击力将物料导入江河湖海或所需处,或拦截固定于所需处,并将施工后迫出之水源沉降后导流或循环使用。本发明技术简单,工效较高,成本超大幅降低,能使大规模的改造自然工程得以实现。

Description

人控泥石流施工方法
本发明涉及一种建设工程中土石方开挖、搬运的施工方法。
人类为了生存和发展,需要改善其生存的环境,索取更多的资源及其寻求后备资源,同时需要发达的交通运输网络,更迫切地需要水、旱无忧的生存环境。因此,开山造田,重新安排江河湖海,改造自然,离不开超巨量的土石方开挖及搬运,并且需要将这些石头和泥土搬运至很远的地方堆集、固定并利用。显然,采用机械开采、搬运需要大量的人力、物力和时间,且难以胜任这类巨型工程。
本发明的目的是克服上述现有技术的缺陷,提供一种能超巨量开挖、搬运土石方,可大幅降低成本,缩短工程建设周期的人控泥石流施工方法。
本发明的目的是通过下面的技术方案实现的。其特征在于它在施工区域建立由蓄能水库、采水道、导向水道和沉降区组成的施工系统,所述蓄能水库入口与采水道相接,位于施工区上方,出口通过导向水道与沉降区相接,通过蓄能水库中水的冲击力将物料经导向水道带到指定的位置,从而实现了本发明的目的。
本发明利用大流量、大高差、超大高差将物料导入江河湖海或所需处,或拦截固定于所需处,并将施工后迫出之水源沉降后导流或循环使用。本发明技术简单,工效较高,成本超大幅降低,能使大规模的改造自然工程得以实现,适用于开通山体,改造自然环境,水库、电站建库工程,交通通道工程,运河工程,岛屿工程及利用运河改造沙漠、戈壁工程,大型矿床建矿、开采工程等等。
附图说明:
图1为本发明物料直输施工方案示意图;
图2为本发明拦截式施工方案示意图。
下面结合附图对本发明作进一步详述。
本发明根据能量、动量守衡原理、重力加速度原理来设计。如图1所示,本发明在其施工区域建立了由蓄能水库2、采水道1、导向水道5和沉降区8组成的施工系统,所述蓄能水库2入口与采水道1相接,建于施工区7上方,施工区7为直接经自然江河或人造运河导入的施工物料堆积处,其上可设闸门4,通过采水或拦截江河来水经泵站6由泵采水通道3进入蓄能水库2中,蓄能水库2出口与导向水道5相通,导向水道5建于施工区7旁边及施工区域上方,与沉降区8相接。施工时,可开启闸门组4,经导向水道5冲击、导走施工区7中已被爆破或被机械拉松的土石方,流入沉降区8,该沉降区8可与要填平的沟壑或江河湖海相连。
如图2所示,本发明在导向水道5和沉降区8之间设阻截区9,该阻截区9由前坝16、中间坝组17、后坝10组成,构成超厚型坝区,其内外压差较小,可抗击较大的冲击。阻截区9后面所设的沉降区8由前沉降水库11和后沉降水库13组成,前沉降水库11入口接后坝10,出口与后沉降水库13相接,其上设前库闸门12,后沉降水库13出口设后库闸门14,与排水道15连通。这样,进入阻截区9的泥石流经多级大坝阻截后其速度明显降低,含有泥沙的水流进入前沉降水库11慢慢沉降还清,再流入后沉降水库13继续沉降,经排水道导走后可循环使用或排入江河湖海。

Claims (4)

1、一种人控泥石流施工方法,其特征在于在施工区域建立由蓄能水库、采水道、导向水道和沉降区组成的施工系统,所述蓄能水库入口与采水道相接,位于堆积施工物料的施工区上方,出口通过导向水道与沉降区相接。
2、根据权利要求1所述的人控泥石流施工方法,其特征在于在导向水道和沉降区之间设阻截区。
3、根据权利要求1所述的人控泥石流施工方法,其特征在于沉降区设前沉降区和后沉降区。
4、根据权利要求1所述的人控泥石流施工方法,其特征在于施工物料可直接经自然江河或人造运河导入指定堆积处。
CN 99115415 1999-06-11 1999-06-11 人控泥石流施工方法 Pending CN1277291A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99115415 CN1277291A (zh) 1999-06-11 1999-06-11 人控泥石流施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99115415 CN1277291A (zh) 1999-06-11 1999-06-11 人控泥石流施工方法

Publications (1)

Publication Number Publication Date
CN1277291A true CN1277291A (zh) 2000-12-20

Family

ID=5278375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99115415 Pending CN1277291A (zh) 1999-06-11 1999-06-11 人控泥石流施工方法

Country Status (1)

Country Link
CN (1) CN1277291A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100464027C (zh) * 2001-05-02 2009-02-25 汤姆·雅各布森 用于从拦砂阱中除去沉积物的方法
CN102535384A (zh) * 2012-02-21 2012-07-04 浙江大学 一种沟内水石分离虹吸排水防治泥石流方法
WO2012088775A1 (zh) * 2010-12-31 2012-07-05 中国科学院水利部成都山地灾害与环境研究所 一种主河输移控制型泥石流防治方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100464027C (zh) * 2001-05-02 2009-02-25 汤姆·雅各布森 用于从拦砂阱中除去沉积物的方法
WO2012088775A1 (zh) * 2010-12-31 2012-07-05 中国科学院水利部成都山地灾害与环境研究所 一种主河输移控制型泥石流防治方法
CN102535384A (zh) * 2012-02-21 2012-07-04 浙江大学 一种沟内水石分离虹吸排水防治泥石流方法
CN102535384B (zh) * 2012-02-21 2014-06-04 浙江大学 一种沟内水石分离虹吸排水防治泥石流方法

Similar Documents

Publication Publication Date Title
CN103306250B (zh) 一种隧道内引水式梯级水电站及其建设方法
CN100469980C (zh) 一种自流式地下水库的取水廊道
CN103354766B (zh) 用于矿井的地下水管理系统
CN101054948A (zh) 流水发电站
CN201874614U (zh) 引水隧洞放空检修排水结构
CN107165129A (zh) 峡谷区高坝水电工程渣场沟水导流系统
CN212077859U (zh) 一种可用于导流、泄洪和放空的隧洞结构
CN105257454B (zh) 一种引水式漩涡水流发电系统
CN109267549A (zh) 一种引水隧洞结构
CN1263952C (zh) 用于产生动力的系统
CN101289843A (zh) 漏斗型电站
CN1277291A (zh) 人控泥石流施工方法
CN204644106U (zh) 疏浚土脱水固化一体装置
CN104912091B (zh) 一种岩溶水导水装置及导水方法
CN216240796U (zh) 一种隧道清污分流施工结构
CN210315445U (zh) 一种城市抽水蓄能电站
CN209873741U (zh) 一种多功能水库
CN104829089A (zh) 一种疏浚土脱水固化装置
CN111305172A (zh) 一种引水排涝双向有压隧洞
CN101585605A (zh) 水质自净能力递增器
CN205934874U (zh) 一种引水式发电厂房布置结构
CN218115036U (zh) 一种井下均质岩层自净化污水处理结构
CN215165365U (zh) 结合导流隧洞布置的生态流量取水结构
CN114109395B (zh) 一种隧道清污分流施工方法及结构
CN202440804U (zh) 厂坝分离式水电站

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication