CN1266137A CN 99118266 CN99118266A CN1266137A CN 1266137 A CN1266137 A CN 1266137A CN 99118266 CN99118266 CN 99118266 CN 99118266 A CN99118266 A CN 99118266A CN 1266137 A CN1266137 A CN 1266137A
Authority
CN
China
Prior art keywords
air bag
air
bag
liner
bag form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 99118266
Other languages
Chinese (zh)
Inventor
任松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99118266 priority Critical patent/CN1266137A/en
Publication of CN1266137A publication Critical patent/CN1266137A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The air-bag form for placing concrete is characterized by that its external form is cublic box, and its interior possesses several circular air-bag inner linings; after the high-pressure air is charged, the form shape is stable, and the entire form does not change, if its a part is subjected to pressure intensity. After the air is pumped out, it is soft., and can be folded, and the wall poured by using said air-bag form is level and smooth. As compared with traditional form, it is light in weight, small in volume for handling, convenient for mounting and dismounting, and can greatly reduce building cost and shorten construction period.

Description

Air bag form for building
The invention belongs to building large formwork construction field.
The cast-in-place house of large form is to adopt large-scale template, and in corresponding construction machinery, by rational construction organization, with industrial mode of production cast in situs steel concrete.It is the industrialized important system of novel building, and is not only a kind of common templates individual works.The present large form that adopts in the large formwork construction method that occurs, all by inner rigid trestle outward thick china form or the rigidity sheet material that fuses of inner principal rod and panel.For example the template of introducing among patent documentation CN2049653U, the CN1038268C all is that inner rigid trestle and panel are formed.Have that volume is big, weight is big, carrying, install, the time-consuming problem of taking a lot of work of dismounting.
The purpose of this invention is to provide a kind of in light weight, volume is little, is convenient to the template that mounts and dismounts, carries.
So the present invention possesses above advantage, be because break through the notion of template rigidity structure in design first, adopt flexible airbag structure.The profile of air bag form is a cube, and specification is the same big with the room space size that will build, and it is that internal mold as a room uses, and it is the trapezoidal geometrical body that waits that its profile also can design needs according to construction drawing.The inside of air bag form is that a plurality of spheroids or cylindrical air bag liner are formed, for example shown in accompanying drawing 1,2,3 sectional drawings.
The liner air bag fills gases at high pressure, makes the integral gasbag template can bear respective external pressure and indeformable.Because the air bag liner adopts the very big material (for example glass fiber rubberized fabric) of stretch modulus, so when pressure was born in the air bag part, the change of shape of air bag was also very small, balloon surface is smooth smooth, and the metope of being built is also smooth smooth, need not to plaster.
High-quality gesture of the present invention: 1, remove the steel bracket of heaviness of traditional large form or principal rod and adopt the high-pressure gasbag liner, formwork integral weight is alleviated greatly.When 2, this air bag form being installed, a room only needs once the inflation of position, school, and does not need position, traditional rigidity template block-by-block school to connect.Only need start shooting during dismounting and bleed automatically, and empty air bag form is collapsible, convenient carrying, traditional rigidity template then needs block-by-block to take apart, all needs Special Hoisting Equipment when dismounting and carrying, and speed is slow, the cost height.By contrast, this patent method has been saved the time greatly, has improved benefit.
Description of drawings:
Fig. 1: the sectional drawing of air bag form
A-liner air bag
B-liner air bag
C-liner air bag
D-liner air bag
Fig. 2: the sectional drawing of air bag form
Fig. 3: the sectional drawing of air bag form
Fig. 4: liner air bag and profile die profile
The e-mould
Embodiment: now need manufacture specification and be 2.8 * 4 * 5 air bag form, the air valve position is at 2.8 * 4 meters side diagonal crossover location.Maximum pressure is 4.8 tons/square metre when at first smashing according to 2.8 meters height gauge concretings shake, is multiplied by safety factor, determine to hold in the air bag air pressure at last and be the 7.5-10 ton/square metre.According to template specification, (Fig. 1-a), 134 centimetres (Fig. 1-b), 44.5 centimetres (Fig. 1-c), 25.2 centimetres (the Cylinder liner air bag of the two ends sphere of Fig. 1-d) is formed to determine mainly to be respectively 274 centimetres by diameter by air bag form liner air bag at last.Material adopts non-twist plain weave rubberized fabric to make, and presses in holding greater than 10 tons/square metre, and the air bag length overall must not change above 10 millimeters between interior pressure is from 2 tons to 7 tons, and diameter must not surpass 0.2%.The liner air bag after the assay was approved, in square five Tooling Warehouses that do not have an end face (the dies cavity specification should be 2.78 * 3.97 * 4.97 meters), the liner air bag that air pressure is charged to 7 tons/square metre bonds together according to the order of sequence, and is shown in Figure 4 as section.The gas port of each air bag is connected side total air valve and air gauge, easing valve.Pave end face with latex, confirming to stick 8 millimeters weather surface layer rubber tiles under the smooth condition, the inverted liner pneumatophore is laid the surface layer offset plate of other 5 faces then.

Claims (2)

1, the used internal mold in the cast-in-place house of a kind of large form, the side's of being shaped as body or other solid, specification is the same with the room of being built, surfacing is smooth, body of wall and end face are disposable cast-in-place during construction, it is characterized in that: integral mold plate is an inflatable bladder, fills dimensionally stable behind the gases at high pressure, volume contraction after the gas bleeding and softness.
2, air bag form according to claim 1 is characterized in that: there are spheroid and cylinder air bag liner in inside.
CN 99118266 1999-09-11 1999-09-11 Air bag form for building Pending CN1266137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99118266 CN1266137A (en) 1999-09-11 1999-09-11 Air bag form for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99118266 CN1266137A (en) 1999-09-11 1999-09-11 Air bag form for building

Publications (1)

Publication Number Publication Date
CN1266137A true CN1266137A (en) 2000-09-13

Family

ID=5280415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99118266 Pending CN1266137A (en) 1999-09-11 1999-09-11 Air bag form for building

Country Status (1)

Country Link
CN (1) CN1266137A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1325829C (en) * 2002-07-30 2007-07-11 王书理 Method for continuous casting delivery pipeline with soft gas-pocket and soft gas-pocket thereof
CN1800545B (en) * 2004-12-31 2010-05-05 邱则有 Reinforced bar concrete hollow slab
CN101787767A (en) * 2010-03-22 2010-07-28 徐焱 Inflatable bag being embedded in concrete
CN1854432B (en) * 2005-04-20 2010-12-29 孙长顺 Building template
CN1955430B (en) * 2005-10-24 2011-01-26 孙长顺 Building shuttering
CN1955429B (en) * 2005-10-30 2011-09-14 孙长顺 Building shuttering
CN1955428B (en) * 2005-10-28 2011-12-14 孙长顺 Building shuttering
CN105863259A (en) * 2016-05-19 2016-08-17 江苏科技大学 Concrete cylinder inflatable formwork and use method thereof
CN107060320A (en) * 2017-01-24 2017-08-18 丽水山居文化发展有限公司 A kind of utilization elastic inflated bag is environmental and ecological building of mould and preparation method thereof
WO2018113654A1 (en) * 2016-12-21 2018-06-28 清华大学 Flexible casting mold and construction method
CN108908666A (en) * 2018-05-18 2018-11-30 苏州诺瑞达新材料科技有限公司 A kind of prefabricated component internal model
CN111469252A (en) * 2020-04-17 2020-07-31 罗智 Double-layer inflatable membrane concrete formwork system and construction method thereof
CN113417488A (en) * 2021-07-28 2021-09-21 中冶建工集团有限公司 Outer wall hole plugging device and outer wall hole plugging method
CN113417488B (en) * 2021-07-28 2024-05-28 中冶建工集团有限公司 Outer wall hole blocking device and outer wall hole blocking method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1325829C (en) * 2002-07-30 2007-07-11 王书理 Method for continuous casting delivery pipeline with soft gas-pocket and soft gas-pocket thereof
CN1800545B (en) * 2004-12-31 2010-05-05 邱则有 Reinforced bar concrete hollow slab
CN1854432B (en) * 2005-04-20 2010-12-29 孙长顺 Building template
CN1955430B (en) * 2005-10-24 2011-01-26 孙长顺 Building shuttering
CN1955428B (en) * 2005-10-28 2011-12-14 孙长顺 Building shuttering
CN1955429B (en) * 2005-10-30 2011-09-14 孙长顺 Building shuttering
CN101787767A (en) * 2010-03-22 2010-07-28 徐焱 Inflatable bag being embedded in concrete
CN105863259A (en) * 2016-05-19 2016-08-17 江苏科技大学 Concrete cylinder inflatable formwork and use method thereof
CN105863259B (en) * 2016-05-19 2018-04-17 江苏科技大学 A kind of concrete cylindrical inflatable template and its application method
WO2018113654A1 (en) * 2016-12-21 2018-06-28 清华大学 Flexible casting mold and construction method
CN107060320A (en) * 2017-01-24 2017-08-18 丽水山居文化发展有限公司 A kind of utilization elastic inflated bag is environmental and ecological building of mould and preparation method thereof
CN108908666A (en) * 2018-05-18 2018-11-30 苏州诺瑞达新材料科技有限公司 A kind of prefabricated component internal model
CN111469252A (en) * 2020-04-17 2020-07-31 罗智 Double-layer inflatable membrane concrete formwork system and construction method thereof
CN111469252B (en) * 2020-04-17 2022-03-01 罗智 Double-layer inflatable membrane concrete formwork system and construction method thereof
CN113417488A (en) * 2021-07-28 2021-09-21 中冶建工集团有限公司 Outer wall hole plugging device and outer wall hole plugging method
CN113417488B (en) * 2021-07-28 2024-05-28 中冶建工集团有限公司 Outer wall hole blocking device and outer wall hole blocking method

Similar Documents

Publication Publication Date Title
CN1266137A (en) Air bag form for building
US3619432A (en) Method and apparatus for construction of concrete shells
CN103993750B (en) A kind of reinforcement means of engineering hollow unit
CN1194155C (en) Cast-in-place concrete dense-rib floor shaping form
CN100429375C (en) Formworkfor elevator well of high rising building and construction method thereof
CN101319539A (en) Mould component for concrete filling
CN214687120U (en) Novel prefabricated box culvert mould
CN111946055B (en) Construction method of shear walls on two sides of deformation joint
CN102251620A (en) Inflatable mould component for concrete filling
CN210458925U (en) Temporary support for bridge structural system conversion
CN211597707U (en) A design built-up plate for expansion joint department shear force wall
CN206070876U (en) A kind of ultra-high performance concrete post permanent template
CN109339089A (en) A kind of rim of a cup isolated footing cup core forming method
CN214658771U (en) Telescopic template
CN213115482U (en) Template supporting system for shear walls on two sides of deformation joint
CN111172897B (en) Reinforcing method of hollow slab beam bridge
CN211993468U (en) Special forming die of prefabricated bridge beam slab
CN210342665U (en) Rubber inflation angle-dividing and angle-narrowing die for inner template of core barrel
CN110344543B (en) Concrete floor steel truss structure
CN210343360U (en) Air bag template for tunnel blind ditch construction
CN219638390U (en) Shear wall template in structural joint
CN101319534B (en) Inflation mould component for concrete filling
CN1184393C (en) Round column formwork of GRP plate and its producing method and construction process
CN1512026A (en) Full fexible formwork for casting concrete circular column
CN220313692U (en) Large box culvert hoisting penetrating pore-forming device

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication