CN1238417A - Method and apparatus for adding ribs to building - Google Patents

Method and apparatus for adding ribs to building Download PDF

Info

Publication number
CN1238417A
CN1238417A CN 98109568 CN98109568A CN1238417A CN 1238417 A CN1238417 A CN 1238417A CN 98109568 CN98109568 CN 98109568 CN 98109568 A CN98109568 A CN 98109568A CN 1238417 A CN1238417 A CN 1238417A
Authority
CN
China
Prior art keywords
concrete
bar
template
preset
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 98109568
Other languages
Chinese (zh)
Other versions
CN1126850C (en
Inventor
李国安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98109568 priority Critical patent/CN1126850C/en
Publication of CN1238417A publication Critical patent/CN1238417A/en
Application granted granted Critical
Publication of CN1126850C publication Critical patent/CN1126850C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A method for inserling reinforcing bars to building and its apparatus are disclosed. An exchangeable temporary rod passes through the shuttering at the position where the reinforcing bar is to be added and is divided into temporarily embedded segment in grouting space inside the shuttering and holding segment outside the shuttering. After concrete is poured into the pouring space and before the concrete is at the initial setting stage, the exchangeable rod is drawn out to form a preserved hole. Finally, the reinforcing bar is inserted into the preserved hole, leading to quick, safe and convenient addition of reinforcing bars.

Description

Adding ribs to building method and device thereof
The invention relates to a kind of adding ribs to building method and device thereof, particularly relate to and to make building in quick, convenient, the clean more and safety of the bar planting work in the secondary construction.
Press, in the fortification of general group shuttering concrete perfusion with formation reinforced concrete buildings body, for easy construction, its main structure is the main body wall for example, floor building version .... etc., all elder generation organizes upright with common template layer by layer according to the normal specifications mode and is in the milk and the formation agent structure; " aggregated(particle) structure body " as for some non-main structure bodies, then must in so-called " secondary construction ", be in the milk in addition and be finished, the for example two-layer stair corner face between the version downstairs of going up, or as " flying beam " of non-main structure beam, or not the partial structurtes body in agent structure such as railing, enclosure wall, local wall, beam, post and building version etc., all need to finish Hou, just carry out the secondary construction in agent structure.
Because the structure of these secondary constructions all must be combined into one with the main structure body, must link with reinforcing bar between the new-old concrete structure of therefore preceding Hou time construction, set-up modes of these binding reinforcing bars have two:
One is pre-buried type, see also shown in Figure 1, be when the first time, the agent structure body was in the milk, to link reinforcing bar 11 is embedded in the concrete 10 in advance, its pre-buried mode is embedded in the concrete for the connected section 12 that will link reinforcing bar 11 bends whole in advance in advance, when waiting to desire to carry out the secondary construction, be about near the connected section 12 13 dozens of concrete divided by exposing connected section 12, pull the connected section 12 of bending straight again and it is directly stretched expose, shown in label 12 ', wrap up in knot for new (secondary construction) concrete 10 ' perfusion and use.If the reinforcing bar that the binding reinforcing bar of this kind pre-buried type 11 is thicker then in bending and pull in the straight work very effort, even can't bend.
Another plants formula after being, see also shown in Figure 2, it is that the grouting of in advance finishing agent structure concrete 20 is shaped, when waiting to desire to carry out the secondary construction, promptly link the reinforcing bar place and carry out the work of heeling-in reinforcing bar at needs, it is prior to get out the bar planting hole 21 of desired depth on the concrete wall with electric drill substantially, and perfusion anchor knot is wrapped up in the chemical agent 22 (sticking together cream) that share in this hole, to link reinforcing bar 23 again implants in the bar planting hole 21, utilize the condense knot power of wrapping up in of Hou of medicament to make and link reinforcing bar 23 and plant admittedly in concrete 20, its revealed section 24 can be wrapped up in knot usefulness for new (secondary construction) concrete spouting.
The bar planting construction method that this Hou is planted formula has the place of its inconvenience, when boring, can produce noise first, and the concrete powder that boring the time flies out from the hole also can cause air pollution, moreover boring the time might be got into pipeline pre-buried in the concrete, and the work of boring is one by one taken a lot of work and time-consuming, because of boring work above-mentioned trouble existence is arranged again, during therefore actual boring, the staff often is reluctant or is undrillable too dark, so promptly cause the bar planting hole too shallow, it is too short to wrap up in knot length, even the knot of wrapping up in of chemical agent is arranged, still less certain, and must improve the bar planting number.
Main purpose of the present invention is to provide a kind of adding ribs to building method and device thereof, its can make the bar planting work of building in secondary construction more fast, convenient, clean and safety.
The present invention is for reaching above-mentioned purpose, its method mainly be before grouting on template the position of predetermined bar planting wear one and preset and substitute bar, preset substitute bar have the position the section of burying temporarily of template inner space and the template outer space means; And the Hou concrete perfusion is in grouting space, the section of burying temporarily buried stay in the concrete of template inner space; During the stage, substitute the concrete that bar is extracted the template inner space in concrete initial set again, make and form a preformed hole that is used for the heeling-in reinforcing bar herein presetting; And Hou cooperates programming again, and reinforcing bar is implanted in the preformed hole.
In the method for this shaping preformed hole, promptly have clean, convenient and safe advantage, and extract and preset the action of substituting bar because of exempting to hole, also boring is more quick.
And adding ribs to building device of the present invention is characterized in: some groups of shutterings, template have inner space and outer space, form the concrete grouting space in its inner space, so that concrete perfusion in the grouting space; Preset and substitute bar, be arranged on the template predetermined bar planting position, preset substitute bar have the section of burying temporarily that is positioned at the template inner space and be positioned at the template outer space means; And clamping device is located to preset and substitutes bar and be arranged in the template place, substitutes bar for releasably being clamped on the template in order to presetting; The mat said apparatus, when concrete perfusion in grouting space, make and preset the section of burying temporarily of substituting bar and temporarily bury and stay in the concrete of template inner space, and in concrete initial set during the stage, substitute bar and extract in the concrete of template inner space presetting, make to form to be used for the preformed hole of heeling-in reinforcing bar herein.
The present invention is described in detail below in conjunction with drawings and Examples:
Fig. 1 is the structural representation of the reinforcing bar of pre-buried type binding in the past;
Fig. 2 is that Hou was planted the structural representation that formula links reinforcing bar in the past;
Fig. 3 is the exploded view of bar planting device of the present invention;
Fig. 4 is the first step schematic diagram of bar planting construction method of the present invention;
Fig. 5 is the second step schematic diagram of bar planting construction method of the present invention;
Fig. 6 is the third step schematic diagram of bar planting construction method of the present invention.
For convenience of description, following embodiment, similar elements is represented with identical label.
See also shown in third and fourth figure, adding ribs to building device of the present invention consists predominantly of:
The some group found the template of finishing 3, can be the system template of punching block material in the present embodiment, template 3 has inner space 31 and outer space 32, form the concrete grouting space in its inner space 31, so that concrete perfusion 4 (as shown in Figure 5) in the grouting space, predetermined bar planting position is formed with perforation 33 on the template 3; Preset and substitute bar 5, be arranged in the perforation 33 of template 3, its diameter is greater than the diameter of desiring to plant reinforcing bar, preset substitute bar 5 have the section of burying temporarily 51 that can be positioned at template inner space 31 and be positioned at the template outer space means 52; And, clamping device 6, it includes: holder 60, weldering is located on the lateral surface at template 3 perforation 33 places, there is locating convex block 61 its outer end, wherein form the locating hole 62 of aiming at perforation 33, locating convex block 61 is provided with positioning bolt and revolves in the 63 spiral shells screw 64 provided thereon, positioning bolt revolve 63 and can stretch and locating hole 62 in, to preset and substitute bar 5 and be arranged in wherein, mat perforation 33 and locating hole 62 and can stablize to set up to preset and substitute bar 5 are again for desiring to set earlier the length of the section of burying 51 temporarily, be the degree of depth of bar planting, can be in means 52 places are set firmly block 53.
According to above device, when the present invention uses, with system's punching block is example, owing to need the place of secondary construction all definite, therefore in the design of system template, clamping device 6 and to bore a hole 33 be to finish in advance and be one with template 3, therefore stand in template group and finish Hou, only need to preset and substitute bar 5 and pass clamping device 6 and bore a hole 33, make its block 53 run into locating convex block 61, and revolve to preset 63 with bolt and substitute bar 5 and push against and get final product; Be with, bar planting method of the present invention promptly comprises:
Consult Fig. 4, the perforation 33 of predetermined bar planting position wears to preset and substitutes bar 5 on template 3, preset and substitute bar 5 and therefore the section of burying temporarily 51 that is positioned at the template inner space is arranged, and be positioned at the template outer space means 52, and will preset with clamping device 6 and to substitute bar 5 and fix;
As shown in Figure 5, concrete perfusion 4 makes temporarily the section of burying 51 temporarily bury and stays in the concrete 4 of template 3 inner spaces in grouting space;
To preset during the stage in concrete 4 initial sets and to substitute the concrete 4 that bar 5 is extracted the template inner space, as shown in Figure 6, this moment is because concrete is to be in not solidify fully as yet but be unlikely the initial set stage of caving in, normally be in the milk to two hour of Hou, therefore substituting bar 5 only needs a little turn-knob to extract out, makes to form to be used for the preformed hole 40 of heeling-in reinforcing bar herein;
Then, treat that so concrete coagulates solid back form removal, cooperate programming required again, to link reinforcing bar implants in the preformed hole 40 according to aforementioned manner, that is perfusion anchor knot is wrapped up in the chemical agent that share in this hole, to link reinforcing bar again and implant in the hole, and utilize the condense knot power of wrapping up in of Hou of medicament to make and link reinforcing bar and plant admittedly in concrete 4, the revealed section that links reinforcing bar can be wrapped up in knot usefulness for new (secondary construction) concrete spouting.
In sum, the present invention has following effect and advantage really:
1. speed and convenience
Bar planting of the present invention hole is a reservation mode, need not hole, and establishes in advance before bar 5 only need be in the milk and extracts out when being in the milk the Hou initial set and substitute, and is compared to the boring fortification, very speed and convenience.
2. clean and safety
Therefore the present invention does not have extra noise and powder and produces owing to need not hole, and gets into pre-buried pipeline pipeline in the concrete also can not hole the time accidentally.
3. can satisfy the required knot length of wrapping up in easily
The present invention need not hole, and wraps up in knot length by 51 decisions of the section of burying temporarily, so safety factor wraps up in knot length and can satisfy, and does not need to establish the binding reinforcing bar more, and is both safe and can reduce cost.

Claims (2)

1. adding ribs to building method, building are to form the concrete grouting space by the template inner space at some groups of shutterings, and in grouting space concrete perfusion and forming; It is characterized in that the adding ribs to building method includes:
Predetermined bar planting position is equipped with to preset and substitutes bar on template, preset substitute bar have the section of burying temporarily that is positioned at the template inner space and be positioned at the template outer space means; Concrete perfusion makes temporarily the section of burying temporarily bury and stays in the concrete of template inner space in grouting space;
To preset in the concrete initial set stage and to substitute bar and from the concrete of template inner space, extract, and make to form to be used for the preformed hole of heeling-in reinforcing bar herein;
Treat the form removal of concrete setting Hou; And,
Cooperate programming, reinforcing bar is implanted in the preformed hole.
2. adding ribs to building device is characterized in that including:
The group shuttering, template has inner space and outer space, forms in its inner space
The concrete grouting space is so that concrete perfusion in the grouting space;
Preset and substitute bar, be arranged on the template predetermined bar planting position, preset substitute bar have the section of burying temporarily that is positioned at the template inner space and be positioned at the template outer space means; And clamping device is located to preset and is substituted bar and be arranged in the template place, substitutes bar for releasably being clamped on the template in order to presetting;
The mat said apparatus, when concrete perfusion in grouting space, make and preset the section of burying temporarily of substituting bar and temporarily bury and stay in the concrete of template inner space, substitute bar and extract in the concrete of template inner space and will preset during the stage, make to form to be used for the preformed hole of heeling-in reinforcing bar herein in concrete initial set.
CN 98109568 1998-06-05 1998-06-05 Method and apparatus for adding ribs to building Expired - Fee Related CN1126850C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98109568 CN1126850C (en) 1998-06-05 1998-06-05 Method and apparatus for adding ribs to building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98109568 CN1126850C (en) 1998-06-05 1998-06-05 Method and apparatus for adding ribs to building

Publications (2)

Publication Number Publication Date
CN1238417A true CN1238417A (en) 1999-12-15
CN1126850C CN1126850C (en) 2003-11-05

Family

ID=5220031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98109568 Expired - Fee Related CN1126850C (en) 1998-06-05 1998-06-05 Method and apparatus for adding ribs to building

Country Status (1)

Country Link
CN (1) CN1126850C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101748899B (en) * 2010-01-14 2011-03-30 中天建设集团有限公司 Method for pore forming by embedding assistant bonded rebar in reinforced concrete structure
CN103306487A (en) * 2013-06-27 2013-09-18 中建五局第三建设有限公司 Multi-row beam steel bar PVC tube reserved steel bar embedding process
CN112343181A (en) * 2020-11-12 2021-02-09 中冶建工集团有限公司 Planting bar fixing device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101748899B (en) * 2010-01-14 2011-03-30 中天建设集团有限公司 Method for pore forming by embedding assistant bonded rebar in reinforced concrete structure
CN103306487A (en) * 2013-06-27 2013-09-18 中建五局第三建设有限公司 Multi-row beam steel bar PVC tube reserved steel bar embedding process
CN112343181A (en) * 2020-11-12 2021-02-09 中冶建工集团有限公司 Planting bar fixing device and method

Also Published As

Publication number Publication date
CN1126850C (en) 2003-11-05

Similar Documents

Publication Publication Date Title
EP2807317B1 (en) Hybrid tower
FR2811978B1 (en) JOINT COATING FOR A CONSTRUCTION ELEMENT, METHOD FOR PREPARING SAME AND METHOD FOR PRODUCING A STRUCTURE
WO2006012082A2 (en) Anchor wedge for post tension anchor system and anchor system made therewith
WO2003036085A1 (en) Structural unit for constructing a tower of a wind turbine
CN1126850C (en) Method and apparatus for adding ribs to building
DE10063049C2 (en) Process for the production of an underground pipeline according to the pipe jacking method with manholes
CN106826052A (en) Modern assembled architecture engineering reinforcing cage stirrup cuts termination alignment means
CN107363194A (en) Reserved steel bar means for correcting and its application construction method
CN201099982Y (en) Rotating arc stairway joist assembly model
CN206873924U (en) Assembly concrete Vierendeel girder Hou Jiao areas tool-typed formwork
CN210439695U (en) Aluminum template reinforcing apparatus
CN219219343U (en) Assembly type concrete invisible frame connecting node
WO1996025038A1 (en) Wireclamp
CN109138397B (en) Overhanging type scaffold and building method thereof
DE2645910A1 (en) FORMWORK AND PROCEDURES FOR ERECTING FUNNEL OR CONE-SHAPED CONCRETE BUILDINGS
CN104912235B (en) Exempt to tear open the formwork erecting structure of outer wall template
CN214696545U (en) Wood-like railing
DE2758489B2 (en) Process for the production of a pre-stressed ground pile as well as a ground pile manufactured according to the process
CN215691169U (en) Safety auxiliary device for building work
EP0337392A2 (en) Storey-high concrete staircase element with a U-section
CN211666269U (en) Through-wall bolt and template system
CN1241670A (en) In-situ concrete depositing method for hollow floor board with built-in pipes
JPH0536569B2 (en)
JPH1193162A (en) Pile with node and manufacture of the same
JP2003090048A (en) Reinforcing structure of concrete foundation, anchor bolt, and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1024279

Country of ref document: HK

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee