CN1229892A CN 99113442 CN99113442A CN1229892A CN 1229892 A CN1229892 A CN 1229892A CN 99113442 CN99113442 CN 99113442 CN 99113442 A CN99113442 A CN 99113442A CN 1229892 A CN1229892 A CN 1229892A
Authority
CN
China
Prior art keywords
aluminium bar
agent
annealing
aluminium
minutes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 99113442
Other languages
Chinese (zh)
Other versions
CN1098987C (en
Inventor
周福海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YATAL ALUMINUM CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99113442 priority Critical patent/CN1098987C/en
Publication of CN1229892A publication Critical patent/CN1229892A/en
Application granted granted Critical
Publication of CN1098987C publication Critical patent/CN1098987C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

A method for manufacturing Al-alloy tube used as the heat radiating part of car's water tank, air conditioner and air warmer includes smelting, homogenization, drilling, turnkng, squeezing, annealing, processing finished tube, cleaning and heat treatment. The Al-alloy tube features softer both ends and hard central part, no need of welding, beautiful appearance, and high strength.

Description

A kind of production method of Al-alloy pipe
The present invention relates to a kind of metal tube manufacture method, is the Al-alloy pipe production method of a kind of radiator, motorcar air conditioner, automobile warm-air device heat transmission specifically.
At present, the tubing of radiator, motorcar air conditioner, automobile warm-air device heat transmission mostly is copper pipe.Adopt copper pipe, though also can play thermolysis, because copper pipe hardness is higher, be difficult to bending, meeting the corner when installing and using needs welding, not only is difficult to install, and the radiator profile of making is not attractive in appearance yet.For this reason, abroad some manufacturers have developed a kind of Al-alloy pipe, and whole of this Al-alloy pipe is soft state.When this tubing is installed, meet that turn round can be crooked, need not weld, easily install.But because its whole be soft state, make that the product bulk strength of making is not high, easily deform and damage.
The object of the present invention is to provide a kind of production method of Al-alloy pipe, the Al-alloy pipe that utilizes this method to produce need not weld during installation, easily installation, beautiful shape, bulk strength height, not yielding and damage.For achieving the above object, the present invention adopts following technical solution:
The production method of Al-alloy pipe of the present invention may further comprise the steps:
(1) melting
Earlier aluminium ingot is placed smelting furnace to make its fusing, when stirring, take dregs off; Then, add manganese, iron, titanium valve, wait for and stirring after 20~30 minutes; When evenly stirring, add refine agent and titanium boron line again, and static 10~20 minutes; At last, under 650~750 ℃ temperature, be cast into aluminium bar;
Wherein, the weight portion proportioning of aluminium ingot, manganese powder, iron powder, titanium valve, refine agent and the agent of titanium boron is: 95~105 parts of aluminium ingots, 0.8~1.6 part of manganese powder, 0.3~1.2 part of iron powder, titanium valve .0.04~0.06 part, 0.01~0.025 part of refine agent, 0.02~0.08 part of titanium boron agent;
(2) homogenization is handled
Aluminium bar is placed 550~650 ℃ oven, be incubated 360~900 minutes;
(3) boring
Aluminium bar after the homogenization is holed, make it become hollow aluminium bar;
(4) railway carriage
Car goes the oxide layer on hollow aluminium bar surface;
(5) extruding
The hollow aluminium bar of car deoxidation layer inserted in the oven it is heated, meanwhile extrusion press mould tube is heated, when the temperature of hollow aluminium bar in the oven and extrusion press mould tube is respectively 350~450 ℃ and 300~480 ℃, hollow aluminium bar sent in the extrusion press push, make it form the base pipe;
(6) annealing
It is in 300~650 ℃ the oven that the base pipe is inserted temperature, keeps 20~720 minutes, carries out annealing in process;
(7) production tube processing
Adopt the metal extension method, the base pipe of annealed processing is drawn into production tube;
(8) clean
Production tube is cleaned, remove its inside and outside aluminium bits and residue;
(9) heat treatment
Under 400~650 ℃ furnace temperature,, make its two ends and centre be soft, hard state respectively with annealing furnace to annealing through the production tube two ends of cleaning.
Because the aluminum pipe two ends and the centre that utilize method of the present invention to produce are soft, hard state respectively, meet the corner during installation, can make its bending by hand, need weld, easily install, beautiful shape; In addition, because the centre of this tubing still is hard state, the bulk strength height, not yielding and damage.
Below in conjunction with embodiment the present invention is described in further detail:
Al-alloy pipe production method of the present invention is:
(1) melting.Earlier aluminium ingot is placed in the smelting furnace, electricity consumption or fuel oil heat, and make its fusing.When stirring, take dregs off.Then, add manganese, iron, titanium valve, wait for and stirring after 20 minutes.When evenly stirring, add refine agent (6A that nonferrous metallurgy Materials Co., Ltd of Fushi section of Shenzhen gold section produces, 6B type gold Kent refine agent) and titanium boron agent (the II titanium boron fining agent that Shenzhen Jin Kefu ± nonferrous metallurgy Materials Co., Ltd of section produces) again, and static 15 minutes.At last, when reaching 700 ℃, the aluminium coolant-temperature gage is cast into aluminium bar.
Wherein, the weight portion proportioning of aluminium ingot, manganese powder, iron powder, titanium valve, refine agent and the agent of titanium boron is: 95~105 parts of aluminium ingots, 0.8~1.6 part of manganese powder, 0.3~1.2 part of iron powder, 0.04~0.06 part of titanium valve, 0.01~0.025 part of refine agent, 0.02~0.08 part of titanium boron agent; Their preferred weight ratio range is: 98~104 parts of aluminium ingots, 0.8~1.4 part of manganese powder, 0.5~1.0 part of iron powder, 0.03~0.05 part of titanium valve, 0.01~0.023 part of refine agent, 0.03~0.06 part of titanium boron agent; Their optimum weight part proportioning is: 100 parts of aluminium ingots, 1.3 parts of manganese powders, 0.8 part of iron powder, 0.05 part of titanium valve, 0.02 part of refine agent, 0.05 part of titanium boron agent.
(2) homogenization is handled.Aluminium bar is packed in the cabinet-type electric furnace (also useable fuel stove or induction furnace), when furnace temperature is 600 ℃, constant temperature 600 minutes.
(3) boring.Use drilling machine that the aluminium bar through homogenization is holed (if direct pouring becomes hollow aluminium bar during melting, the boring step can be omitted), make it become hollow aluminium bar.
(4) railway carriage.Go the oxide layer on hollow aluminium bar surface with the lathe car.
(5) extruding.The hollow aluminium bar of car deoxidation layer is put into cabinet-type electric furnace (also useable fuel stove or induction furnace), and it is heated.Simultaneously, also extrusion press mould tube is heated.When the temperature of the temperature of hollow aluminium bar and the letter of extrusion press mould is respectively 400 ℃ and 390 ℃, hollow aluminium bar is taken out from cabinet-type electric furnace, put into extrusion press mould tube, it is pushed, make it form the base pipe.
(6) annealing.The base pipe is put into cabinet-type electric furnace, when furnace temperature reaches 500 ℃, be incubated 20~720 minutes.The length of holding time is decided on base external diameter of pipe, wall thickness.Base external diameter of pipe in the present embodiment is that φ 15mm, wall thickness are 0.8mm, and holding time is 360 minutes.
(7) production tube processing.Adopt the metal extension method, the base pipe after annealing in process is made production tube.Metal extension method wherein can be a pulling method, also cold-rolling practice.What present embodiment adopted is pulling method, and soon the base pipe is placed on and carries out the multiple tracks stretching on the cold drawn car.In drawing process, still semifinished tube should be carried out annealing in process, annealing temperature is 450 ℃.Afterwards, stretch again.Until the pipe that it is pulled into trimmed size.Then, align, and detect, reject substandard products with eddy current flaw detec or Other Instruments with straightening machine.
As adopting cold-rolling practice, effective single roller of base or multi-roll mill after then will annealing are rolled.In the operation of rolling, also need semi-finished product to be carried out annealing in process with cabinet-type electric furnace or raceway stove.Annealing temperature wherein is 450 ℃.Afterwards, be rolled again, until the production tube of making required specification.
(8) clean.With kerosene (or other washing agent) production tube is cleaned, remove its inside and outside aluminium bits and residue.
(9) heat treatment.Split is inserted at the two ends of production tube successively walk in the formula annealing furnace, annealing in process is carried out at its two ends, make its two ends and centre be soft, hard state respectively.Furnace temperature wherein is 520 ℃, and the walking speed of production tube is 100cm/ minute.

Claims (3)

1. the production method of an Al-alloy pipe is characterized in that may further comprise the steps:
(1) melting
Earlier aluminium ingot is placed smelting furnace to make its fusing, when stirring, take dregs off; Then, add manganese, iron, titanium valve, wait for and evenly stirring after 20~30 minutes; When evenly stirring, add refine agent and titanium boron line again, and static 10~20 minutes; At last, under 650~750 ℃ temperature, be cast into aluminium bar;
Wherein, the weight portion proportioning of aluminium ingot, manganese powder, iron powder, titanium valve, refine agent and the agent of titanium boron is: 95~105 parts of aluminium ingots, 0.8~1.6 part of manganese powder, 0.3~1.2 part of iron powder, titanium valve .0.04~0.06 part, 0.01~0.025 part of refine agent, 0.02~0.08 part of titanium boron agent;
(2) homogenization is handled
Aluminium bar is placed 550~650 ℃ oven, be incubated 360~900 minutes;
(3) boring
Aluminium bar after the homogenization is holed, make it become hollow aluminium bar;
(4) railway carriage
Car goes the oxide layer on hollow aluminium bar surface;
(5) extruding
The hollow aluminium bar of car deoxidation layer inserted in the oven it is heated, meanwhile extrusion press mould tube is heated, when the temperature of hollow aluminium bar in the oven and extrusion press mould tube is respectively 350~450 ℃ and 300~480 ℃, hollow aluminium bar sent in the extrusion press push, make it form the base pipe;
(6) annealing
It is in 300~650 ℃ the oven that the base pipe is inserted temperature, keeps 20~720 minutes, carries out annealing in process;
(7) production tube processing
Adopt the metal extension method, the base pipe of annealed processing is drawn into production tube;
(8) clean
Production tube is cleaned, remove its inside and outside aluminium bits and residue;
(9) heat treatment
Under 400~650 ℃ furnace temperature,, make its two ends and centre be soft, hard state respectively with annealing furnace to annealing through the production tube two ends of cleaning.
2. method according to claim 1 is characterized in that described metal extension method is a pulling method.
3. method according to claim 1 is characterized in that described metal extension method is a cold-rolling practice.
CN 99113442 1999-01-27 1999-01-27 Method of producing aluminium alloy tube Expired - Lifetime CN1098987C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99113442 CN1098987C (en) 1999-01-27 1999-01-27 Method of producing aluminium alloy tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99113442 CN1098987C (en) 1999-01-27 1999-01-27 Method of producing aluminium alloy tube

Publications (2)

Publication Number Publication Date
CN1229892A true CN1229892A (en) 1999-09-29
CN1098987C CN1098987C (en) 2003-01-15

Family

ID=5276632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99113442 Expired - Lifetime CN1098987C (en) 1999-01-27 1999-01-27 Method of producing aluminium alloy tube

Country Status (1)

Country Link
CN (1) CN1098987C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100391687C (en) * 2005-08-01 2008-06-04 沈阳华铁异型材有限公司 Production technology of grease cooler air chamber and its product
CN101712116B (en) * 2008-10-06 2011-08-24 程拥军 Process for manufacturing high-strength large-scale aluminum alloy plate
CN102166712A (en) * 2010-12-31 2011-08-31 东莞市东兴铝材制造有限公司 Hot extrusion production process for aluminum tube with polished surface
CN102489540A (en) * 2011-11-21 2012-06-13 浙江中盛铝业有限公司 Method for manufacturing antirust aluminum alloy round tubes and flat tubes for automobile radiator and air conditioner condenser
CN102744304A (en) * 2012-07-26 2012-10-24 襄阳市广谦达进出口有限公司 Processing method of cavity cold-bending large-caliber thin-wall aluminum bent pipe
CN103982711A (en) * 2014-05-26 2014-08-13 江苏亚太轻合金科技股份有限公司 Corrosion-resisting aluminum alloy composite pipe and processing method thereof
CN104324973A (en) * 2014-09-04 2015-02-04 明达铝业科技(太仓)有限公司 Making method of high-strength aluminum section tubes
CN104476128A (en) * 2014-11-21 2015-04-01 西安邦信特种金属材料科技有限公司 Method of manufacturing high-temperature alloy pipe blanks
CN104785573A (en) * 2014-01-20 2015-07-22 河北宏达铝业有限公司 Abnormal-shaped seamless production technology of wire rope aluminium alloy pressed joints
CN108165903A (en) * 2017-12-13 2018-06-15 无锡海特铝业有限公司 A kind of manufacturing process for the overlength aluminium-alloy pipe for being suitable for large-scale wound tube heat exchanger

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100334282C (en) * 2005-05-20 2007-08-29 东北轻合金有限责任公司 Manufacturing method of aluminium alloy integrated disk head
CN102011237A (en) * 2009-09-04 2011-04-13 余定泉 Ultrastrong aluminum alloy heald frame for shuttleless loom and production process thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100391687C (en) * 2005-08-01 2008-06-04 沈阳华铁异型材有限公司 Production technology of grease cooler air chamber and its product
CN101712116B (en) * 2008-10-06 2011-08-24 程拥军 Process for manufacturing high-strength large-scale aluminum alloy plate
CN102166712A (en) * 2010-12-31 2011-08-31 东莞市东兴铝材制造有限公司 Hot extrusion production process for aluminum tube with polished surface
CN102489540A (en) * 2011-11-21 2012-06-13 浙江中盛铝业有限公司 Method for manufacturing antirust aluminum alloy round tubes and flat tubes for automobile radiator and air conditioner condenser
CN102489540B (en) * 2011-11-21 2014-11-26 浙江中盛铝业有限公司 Method for manufacturing antirust aluminum alloy round tubes and flat tubes for automobile radiator and air conditioner condenser
CN102744304A (en) * 2012-07-26 2012-10-24 襄阳市广谦达进出口有限公司 Processing method of cavity cold-bending large-caliber thin-wall aluminum bent pipe
CN102744304B (en) * 2012-07-26 2013-10-02 襄阳市广谦达进出口有限公司 Processing method of cavity cold-bending large-caliber thin-wall aluminum bent pipe
CN104785573A (en) * 2014-01-20 2015-07-22 河北宏达铝业有限公司 Abnormal-shaped seamless production technology of wire rope aluminium alloy pressed joints
CN103982711A (en) * 2014-05-26 2014-08-13 江苏亚太轻合金科技股份有限公司 Corrosion-resisting aluminum alloy composite pipe and processing method thereof
CN104324973A (en) * 2014-09-04 2015-02-04 明达铝业科技(太仓)有限公司 Making method of high-strength aluminum section tubes
CN104476128A (en) * 2014-11-21 2015-04-01 西安邦信特种金属材料科技有限公司 Method of manufacturing high-temperature alloy pipe blanks
CN108165903A (en) * 2017-12-13 2018-06-15 无锡海特铝业有限公司 A kind of manufacturing process for the overlength aluminium-alloy pipe for being suitable for large-scale wound tube heat exchanger

Also Published As

Publication number Publication date
CN1098987C (en) 2003-01-15

Similar Documents

Publication Publication Date Title
CN1098987C (en) Method of producing aluminium alloy tube
CN103962411B (en) A kind of manufacture method of GH3600 alloy fine thin-wall seamless pipe
CN102260840B (en) Short-flow efficient production method for brass tubes
CN101696486B (en) Process for rolling high-intensity titanium alloy pipe
CN110157981B (en) Production method for improving section hardness uniformity of NSM30 plastic die steel
CN101825200A (en) Titanium alloy TC4 hot-rolled tube and production method thereof
CN112845654B (en) Preparation method of large-size titanium and titanium alloy seamless pipe
CN102154599A (en) Short-flow high-efficiency production method for white brass alloy pipes
CN104733133B (en) Copper coated aluminium composite bus arranges preparation technology
CN101091984A (en) Method for manufacturing stainless steel pipe
CN106893936A (en) Using the resonant rod invar cold-heading silk of vacuum melting and electroslag remelting operation
CN104511726A (en) Crankshaft manufacturing method of all-fiber whole die-forged five-cylinder fracturing pump
CN106591658A (en) Preparation method for magnesium alloy profile material for automobile oil tank
CN101704084B (en) Centrifugal cast tube die and manufacturing technique thereof
CN103510001B (en) A kind of double coiled welded tube cold-rolled steel sheet and production method thereof
CN105108377A (en) Nickel alloy welding wire for welding cast iron pipe
CN208038510U (en) A kind of rotatable Equipment for Heating Processing
CN107043891A (en) A kind of production method of resonant rod cold-heading silk
CN105274428A (en) Production method for alloy filament with zero defect on surface
CN102304686B (en) Short-flow efficient production method of pure copper tube
CN1121925C (en) Production process of small steel shape for gas valve
CN105200311A (en) 4J42 alloy wire for discharge tube electrode and production method thereof
CN107297597A (en) A kind of production method of automobile trunk elevating lever
CN101733591B (en) Method for manufacturing bright aluminum alloy welding wire
CN1752472A (en) Method for producing bearing ferrule blanks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU YATAI LIGHT ALLOY SCIENCE CO., LTD.

Free format text: FORMER OWNER: ZHOU FUHAI

Effective date: 20080125

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080125

Address after: 8, Xing Xing Road, New District, Jiangsu, Wuxi

Patentee after: Jiangsu Yatal Aluminum Co., Ltd.

Address before: Jiangsu province Wuxi east Jiang Zhen Zhaohui Road, No. 6

Patentee before: Zhou Fuhai

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20030115