CN1213211C - Precast building surface member - Google Patents

Precast building surface member Download PDF

Info

Publication number
CN1213211C
CN1213211C CN 03112491 CN03112491A CN1213211C CN 1213211 C CN1213211 C CN 1213211C CN 03112491 CN03112491 CN 03112491 CN 03112491 A CN03112491 A CN 03112491A CN 1213211 C CN1213211 C CN 1213211C
Authority
CN
China
Prior art keywords
order
panel
groove
building
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 03112491
Other languages
Chinese (zh)
Other versions
CN1472409A (en
Inventor
王京光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Guangyu Intellectual Property Research And Consulting Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03112491 priority Critical patent/CN1213211C/en
Publication of CN1472409A publication Critical patent/CN1472409A/en
Application granted granted Critical
Publication of CN1213211C publication Critical patent/CN1213211C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a prefabricated building surface member fixed on the surface of a building, which comprises an outer wall board, a roof board, an inner wall board, a ceiling board and a floor board, wherein pipeline grooves and chases used for installing pipelines are arranged on all the boards, and various accessories of line cards, connection points, sockets, switches, etc. are reserved according to needs. The prefabricated building surface member can be produced according to standards in factories before the construction of a building main body by the prefabricated building surface member of the present invention, the main body building is fixed and installed after completed, and the present invention has the advantages of short construction time and high standardization degree.

Description

The pre-fabricated building surface element
The present invention relates to a kind of pre-fabricated building surface element that is fixed on building surface.
Technical background
Traditional building operations at first is a building main body construction, carry out interior and exterior finishes after the main body completion again and lay various pipelines, along with development of times, the installation conveyance system of building requires also more and more higher, except water, electricity, warm, intelligent installing engineerings such as the broadband in the building, cable television, phone, fire-fighting, gate inhibition, building automatic control, security alarm are also more and more, and the shared ratio of the interior and exterior finishes in building operations later stage and installing engineering is increasing, and the duration is more and more longer.The increase of all kinds of pipelines makes construction become more complicated, and the prick post through walls of simultaneously a large amount of pipelines also causes very big destruction to structure.The finishing of building is the large-engineering in the construction work, and the engineering time is long, difficulty is big, it is high to require.Sometimes the finishing time of building often takies the over half of construction work duration.
Goal of the invention
The purpose of this invention is to provide a kind of pre-fabricated building surface element, with the constructional difficulties that is caused of separating with building structure and water, electricity, installing engineering such as warm of increasing of all kinds of pipelines of thorough solution, and the building structure that the prick post through walls of a large amount of pipelines causes destroys; The batch production that building interior and exterior finishes and big water gaging, electricity, equipment such as warm are installed is produced and is shortened building cycle, solve finishing and water, electricity, the problem that the installing engineering engineering time is long, difficulty is big such as warm, guarantee quality, all kinds of pipeline concealed installations and the easy access simultaneously of finishing and water, electricity, installing engineering such as warm, not only increased but also be convenient to that to use be the main trend of Future Development attractive in appearance.And the fast development that more helps building structure that separates of structure and metope and installing engineering.
Summary of the invention
For achieving the above object, the present invention adopts following technical scheme:
A kind of pre-fabricated building surface element of the present invention comprise in order to the side fascia that is installed in the skin face, in order to the roof panel that is installed in building roofing, in order to the inner wall panel that is installed in the inner wall of building face, in order to be installed on the building ceiling ceiling floor and in order to be installed in the ground panel on the constructure ground; The side fascia inboard has groove, has all around in order to what peg graft with other members that close on to accept part; Have around the roof panel in order to what peg graft and accept part with other members; The upper end of inner wall panel has in order to what peg graft with ceiling floor accepts part, and the lower end has in order to what peg graft with the ground panel accepts part, and both sides have with other inner wall panels are pegged graft accepts part, and the inner wall panel inboard has groove; Have around the ceiling floor in order to what peg graft with other members that close on and accept part, the ceiling floor inboard has groove; Have around the ground panel in order to what peg graft with other members that close on and accept part, panel inboard, ground has groove.
Above-mentioned roof panel, side fascia, inner wall panel, ceiling floor, the groove of panel be provided with lid, cover with lockly, be provided with fixedly card in the groove in order to fixed pipelines, groove is linked to be path by accepting part.
Above-mentioned pre-fabricated building surface element also comprises stair tread, has groove in the stair tread.
Above-mentioned side fascia comprises that in order to the top exterior wall plate that is connected with building roofing it is the part of accepting L shaped, in order to be connected with the roofing socket joint that its upper end has the cross section.
Wall face and ceiling floor, roofing are provided with socket, switch, lamp base, radiator, air conditioning air outlet, lighting proof strip, lightning rod, disconnecting clamp case, doorframe, window frame in region of interest in above-mentioned.
Adopt technical scheme of the present invention; can be according to standard production pre-fabricated building surface element before the building main body construction, in factory; and after main building is finished, be fixed and install; engineering time is short, standardization level is high; and various pipeline passways have been reserved with in each surface element; do not need on the building main body, to punch, protected the agent structure of building for various pipelines are installed.Strengthened aesthetic property, helped accelerating the development of building construction technology, applicable to multi-purpose building.
Description of drawings
Fig. 1 is the side elevational view of one embodiment of the present of invention side fascia;
Fig. 2 is the front elevation view of side fascia;
Fig. 3 is the side stereogram of the side fascia that is connected with roofing;
Fig. 4 is the lateral view of roof panel;
Fig. 5 is the back of the body front elevation view of roof panel;
Fig. 6 is the side elevational view of inner wall panel;
Fig. 7 is the front elevation view of inner wall panel;
Fig. 8 is the side elevational view of the inner wall panel that is connected with door;
Fig. 9 is the front elevation view of the inner wall panel that is connected with door;
Figure 10 is the side elevational view of the inner wall panel that is connected with window;
Figure 11 is the front elevation view of the inner wall panel that is connected with window;
Figure 12 is the side elevational view of ceiling floor;
Figure 13 is the front elevation view of ceiling floor;
Figure 14 is the side elevational view of ground panel;
Figure 15 is the front elevation view of ground panel;
Figure 16 is the lateral view of stair tread;
The specific embodiment
Pre-fabricated building surface element of the present invention comprises wall face, roofing, interior metope, ceiling, ground of building etc.This building surface member is divided into surface portion, composite duct and environment division.Surface portion is steel or wooden or other composite materials, assembles connection by socket joint mode or interlock mode.The surface portion on roofing, ground should have bearing; The surface portion of interior wall face, ceiling should have impact resistance; Surface portions such as interior wall face, ceiling and roofing, ground, stair face all have the device surface layer, and adopt different architectural surfaces as required.The surface portion on the ground in wall face, roofing, washroom, kitchen etc. has the effect of waterproof and insulation.The pre-fabricated building surface element is connected with body of wall, ceiling, ground by the tie point of surface portion.Tie point adopts modes such as nail articulates, expansion bolt connection, and tie point partly is located in chase place or the special-purpose tie point box, can be different shape in the tie point box, is provided with lid and lock, for convenience detach, maintenance.Comprehensive pipeline passway is the chase of pipelines such as various strong and weak electricity pipelines such as electric power, wired, phone, broadband, monitoring and water pipe, heating pipe, air-conditioning duct, airduct, Gas Pipe, gutter, rectangle can be adopted in the cross section, also can adopt semicircle or other shapes, the pipeline fastening devices is set in the groove.For convenient maintenance, switch lock can also be set on chase.The surface duct groove also should have the effect of load-bearing.Environment division comprises the various junction boxes that are arranged on as required on the member, socket, switch, air conditioner heat radiator, air conditioning air outlet, lighting proof strip (pin), equipotential line, disconnecting clamp case, doorframe, window frame etc.
As Fig. 1--Fig. 3, wall face surface portion material adopt the cement-bonded wood chipboard of external surface for floating seal marble decorative boards, and thickness is 20mm.Side fascia is of a size of high 3.0 meters, wide 3.6 meters, to adapt to the real size requirement of building.Pipe-line tank and chase are set on the side fascia, comprise storm sewer groove 2, device illumination chase 3, monitoring circuit chase 4, disconnecting clamp case 5.Pipe-line tank and chase are rectangle hard composite plastic board slot, the size of storm sewer groove 2 is wide * and height is 120mm * 120mm, the size of decorative lighting chase 3 and monitoring chase 4 is wide * and height is 50mm * 25mm, and the size of disconnecting clamp case 5 is wide * and height is 100mm * 250mm.Establish fixation clamp 10 every 1 meter in the storm sewer groove 2, establish fixation clamp 11 every 1 meter in decorative lighting chase 3 and the monitoring circuit chase 4, pipeline and chase are all established wire casing lock 6.Establish tie point 7 every 1 meter in pipeline and the chase, position and fixation clamp stagger, and tie point employing Z85 tapping screw is connected with body of wall.A wall face top and a side are provided with insertion portion 8, and wall face bottom and opposite side are connected for other side fascia insertion portion holds groove 9.
The side fascia figure that is connected with roofing as Fig. 3, except that with roofing hold insertion portion that groove connects 12 different with other side fascia, other all with.
As Fig. 4, Fig. 5, roofing surface portion material adopts the cement-bonded wood chipboard of external surface for floating seal marble decorative boards.The roof panel dimensions length is pressed the width of roofing, the wide 3.6m that presses.Environment division comprise support card 12, lighting proof strip 13, lighting proof strip tie point 14, tie point box 15, be connected with side fascia plate insertion portion hold groove 16, tie point 17.Tie point 17 adopts tapping screw to be connected with roof panel.
As Fig. 6--metope surface portion material adopts cement-bonded wood chipboard in Figure 11, and external surface all scribbles milky coating, and thickness is 15mm.It is wide that inner wall panel is of a size of 2.8m height * 3.12m.The comprehensive pipeline of interior wall and environment division comprise wire casing lock 6, tie point 7, air port 19, light switch 20, forceful electric power wire casing 21, light current wire casing 22, airduct tube seat 23, pipe-line tank 24, forceful electric power socket 25, light current socket 26, and the inner wall surface part is connected with the floor insertion portion holds groove 27, hold insertion portion 28 that groove is connected, hold groove 29, insertion portion 30, doorframe 37, window frame 38 with ceiling floor.The size in air port is 86mm * 86mm.Switch and socket are 86 series.
Adopt cement-bonded wood chipboard as Figure 12, Figure 13 ceiling surface portion material, thickness is 15mm, and the external surface of ceiling all scribbles milky coating.It is wide that ceiling is of a size of 2.8m height * 3.12m.The comprehensive pipeline and the environment division of ceiling comprises wire casing lock 6, tie point 7, air port 19, forceful electric power wire casing 21, light current wire casing 22, airduct tube seat 23, pipe-line tank 24, lamp base 31, vertical groove 32, horizontal insertion portion 33, the vertical insertion portion 36 of chase of holding.
Adopt cement-bonded wood chipboard as Figure 14, Figure 15 floor surface part material, the thickness on ground is 20mm.The comprehensive pipeline and the environment division on ground comprises wire casing lock 6, tie point 7, forceful electric power wire casing 21, light current wire casing 22, airduct tube seat 23, pipe-line tank 24, horizontal insertion portion 33, vertical insertion portion 35, the vertical insertion portion 36 of chase.Forceful electric power wire casing 21, light current wire casing 22, airduct tube seat 23, pipe-line tank 24 are rectangle hard toughness plank chase, and the chase size of forceful electric power circuit, light current circuit is 50mm * 25mm.The chase panel is provided with lock, and the chase size of various pipes and airduct is 120mm * 120mm.Establish fixation clamp 10 every 1 meter in the pipe-line tank, establishes fixation clamp 11 every 1 meter in the chase.Plate adopts plug-in type to connect with being connected of plate, and the plate insertion portion is inserted holding in the groove of another plate.
As Figure 16, stair tread adopts the cement-bonded wood chipboard material, and tie point 7 and chase are set below.

Claims (5)

1, a kind of pre-fabricated building surface element is characterized in that: comprise in order to the side fascia that is installed in the skin face, in order to the roof panel that is installed in building roofing, in order to the inner wall panel that is installed in the inner wall of building face, in order to be installed on the building ceiling ceiling floor and in order to be installed in the ground panel on the constructure ground; The side fascia inboard has groove, has all around in order to what peg graft with other members that close on to accept part; Have around the roof panel in order to what peg graft and accept part with other members; The upper end of inner wall panel has in order to what peg graft with ceiling floor accepts part, and the lower end has in order to what peg graft with the ground panel accepts part, and both sides have with other inner wall panels are pegged graft accepts part, and the inner wall panel inboard has groove; Have around the ceiling floor in order to what peg graft with other members that close on and accept part, the ceiling floor inboard has groove; Have around the ground panel in order to what peg graft with other members that close on and accept part, panel inboard, ground has groove.
2, pre-fabricated building surface element according to claim 1, it is characterized in that: above-mentioned roof panel, side fascia, inner wall panel, ceiling floor, the groove of panel be provided with lid, cover with lockly, be provided with the fixedly card in order to fixed pipelines in the groove, groove is linked to be path by accepting part.
3, pre-fabricated building surface element according to claim 1 and 2 is characterized in that: also comprise stair tread, have groove in the stair tread.
4, pre-fabricated building surface element according to claim 1 and 2 is characterized in that: side fascia comprises that in order to the top exterior wall plate that is connected with building roofing it is the part of accepting L shaped, in order to be connected with the roofing socket joint that its upper end has the cross section.
5, pre-fabricated building surface element according to claim 1 and 2 is characterized in that: interior wall face and ceiling floor, roofing are provided with socket, switch, lamp base, radiator, air conditioning air outlet, lighting proof strip, lightning rod, disconnecting clamp case, doorframe, window frame in region of interest.
CN 03112491 2003-07-11 2003-07-11 Precast building surface member Expired - Lifetime CN1213211C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03112491 CN1213211C (en) 2003-07-11 2003-07-11 Precast building surface member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03112491 CN1213211C (en) 2003-07-11 2003-07-11 Precast building surface member

Publications (2)

Publication Number Publication Date
CN1472409A CN1472409A (en) 2004-02-04
CN1213211C true CN1213211C (en) 2005-08-03

Family

ID=34152458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03112491 Expired - Lifetime CN1213211C (en) 2003-07-11 2003-07-11 Precast building surface member

Country Status (1)

Country Link
CN (1) CN1213211C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541477B (en) * 2013-11-06 2016-01-13 上海市建筑装饰工程集团有限公司 For keel and the mounting method thereof of dry-hang stone curtain wall
CN103526866B (en) * 2013-11-06 2016-03-09 上海市建筑装饰工程集团有限公司 Dry-hang stone curtain wall and mounting method thereof
CN105811335A (en) * 2016-03-22 2016-07-27 蔡明轩 Circuit tube for home decoration
CN106351413A (en) * 2016-10-26 2017-01-25 云南中乾集成房屋有限公司 Wood-plastic wallboard for wood-plastic structure house and installation method thereof
CN112204205A (en) * 2018-05-16 2021-01-08 增城市碧桂园物业发展有限公司 Wallboard system integrated with water pipe and strong electric wire
CN112166225A (en) * 2018-05-16 2021-01-01 增城市碧桂园物业发展有限公司 Wallboard system integrated with water pipe and weak current electric wire
CN109487921A (en) * 2018-12-20 2019-03-19 三筑工科技有限公司 The prefabricated wire structures and building of assembled interior wall

Also Published As

Publication number Publication date
CN1472409A (en) 2004-02-04

Similar Documents

Publication Publication Date Title
CN105649207B (en) A kind of construction method and structure of pin-connected panel standard relocation housing
CN109072612B (en) Pre-assembled wall panel, multi-storey building, method of constructing a utility wall
CN204781329U (en) Pin -connected panel standard turnover room
JP7312253B2 (en) modular building system
CN1213211C (en) Precast building surface member
CN111485694A (en) Assembled wall structure
CN108824648A (en) Space module house
CN110984435B (en) Assembling method of mortise-tenon connected assembled partition wall
US20200248460A1 (en) Modular building construction system and method
CN2634005Y (en) Prefabricated building surface member
CN105649208B (en) A kind of method and structure being combined into big room by standard relocation housing
CN2312981Y (en) Plug-in combination type moveable dewellings
CN117449545B (en) Assembled type track traffic station entrance and exit awning and construction method
CN212773271U (en) Assembled wall structure
EP1636446A1 (en) Ready-to-use containerised house
CN208733977U (en) A kind of decorative wall electricity separation system
CN204826205U (en) Have enough to meet need structure that room made up into big room by standard
CN211143435U (en) Drainage keel for curtain wall, connection supporting assembly and curtain wall system
CN213682630U (en) Prefabricated interior wall structure of integration convenient to electromechanical pipeline house-entry
CN219773367U (en) Assembled wall of integrated slidable equipment area
CN212836457U (en) Mounting structure of decorative wall
CN216616355U (en) Integrated assembly type wall body
CN217232914U (en) Assembled integrated bathroom
CN214786340U (en) Integrated toilet
CN210563560U (en) Movable modular police duty equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WEIFANG GUANGYU INTELLECTUAL PROPERTY RESEARCH CON

Free format text: FORMER OWNER: WANG JINGGUANG

Effective date: 20130411

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 261000 WEIFANG, SHANDONG PROVINCE TO: 261061 WEIFANG, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130411

Address after: 261061 Shandong city in Weifang province Fu hi tech Development Zone in the North East East Road West of Tai Heng building 907B

Patentee after: Weifang Guangyu Intellectual Property Research and Consulting Co.,Ltd.

Address before: 261000 Shandong city in Weifang province people's Hospital Orthopedic Clinic Wang Yanhua street right turn

Patentee before: Wang Jingguang

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20050803