CN1205921A - Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes - Google Patents

Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes Download PDF

Info

Publication number
CN1205921A
CN1205921A CN 97115117 CN97115117A CN1205921A CN 1205921 A CN1205921 A CN 1205921A CN 97115117 CN97115117 CN 97115117 CN 97115117 A CN97115117 A CN 97115117A CN 1205921 A CN1205921 A CN 1205921A
Authority
CN
China
Prior art keywords
length
ingot
extruder
decipherer
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 97115117
Other languages
Chinese (zh)
Inventor
叶世中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97115117 priority Critical patent/CN1205921A/en
Publication of CN1205921A publication Critical patent/CN1205921A/en
Pending legal-status Critical Current

Links

Images

Abstract

The present invention is an improvement of application No.96109044.8 and is mainly used to extrude precise aluminium shape product.The extruder has one counter, one interpreter at the position parallel to moving cross wall to sense the length of aluminium ingot, one interpreter at one end of dragger to sense the length of the product.When the dragger interpreter senses the set length, the dragger stops and the extruder stops extrusion; and when the counter counts the set number, the length of residue ingot is judged. The present invention has short job period, less residue ingot and waste and high precise extrusion efficiency.

Description

Reduce the aluminium ingot hot shears method and apparatus of hot extrude section bar production loss
The present invention relates to a kind of processing method and device of aluminium section bar
The hot extrude aluminium section bar is widely used in building, automobile, aerospace industry in modern society ... in modern product, yet under the ever-increasing situation of aluminium alloy range of application, be applied to making more accurate, exquisite product more widely, and because of it uses the moulding nib less, the volume of each finished product is few far beyond common architectural shape.
As shown in Figure 6, be prior art extruder structure configuration schematic diagram.Wherein extruder 1 ' crosstie wall 11 ' front end be provided with depression bar 13 ', cake of press 14 ', be marked with B person among this figure for squeezing the stub ingot that type ends, to avoid if reluctantly aluminium ingot is all extruded, then cake of press 14 ' certainly will smash mould 15 '.Again crosstie wall 11 ' above be provided with the limit switch 12 of manual adjustment position ', when 12 ' time of crosstie wall 11 ' contact limit switch, crosstie wall 11 ' stop, meaning be depression bar 13 ', cake of press 14 ' stop, and output control hauling machine 3 ' stop action.
When being used to implement the accurate material extruding of moulding in the general section bar mode of extruding commonly used, because the volume of accurate extrudate finished product is much smaller than the volume of general extrudate, (at present general extrudate volume greater than the about 2-10 of accurate extrudate doubly), as make be written into ingot-containing tube 15 ' aluminium ingot when only precision of moulding is squeezed the type finished product, must be written into the stub ingot B that still needs residual vast scale after very short aluminium ingot raw material and the each moulding, the waste ratio of stub ingot B is high temporarily.
Again because ingot-containing tube 15 ' volume all can place the short ingot of the some accurate extrudate finished products of moulding, and if ingot-containing tube 15 during each extruding ' interiorly only be written into a short ingot extrusion modling, promptly cause ingot-containing tube 15 ' can't give full play to its benefit, and must make ingot-containing tube 15 ' mobile opening constantly again after forming each extruding, be written into another short ingot again, make the backlash of this extruder increase and reduce it and push efficient.
As shown in Figure 7, for reducing the stub ingot loss and increasing extruding efficient, at present preferable mode be when the accurate section bar of extruding must through artificial primary Calculation (calculate ingot-containing tube 15 ' the plastic some precisions of volume squeeze type finished product 17 '), again ingot-containing tube 15 ' in be written into the aluminium ingot of corresponding primary Calculation suitable length, but this aluminium ingot when cutting, set its length one-shot forming set accurate squeeze a type finished product 17 ', be provided with some adjustable again near switch 18 ' and 19 ' [be provided with two among the figure near switch in crosstie wall 11 ' shift position, should near switch 18 ' and 19 ' with extruder 1 ' shutdown switch be connected], nationality is artificial before the moulding adjusts near switch 18 ' and 19 ' position, when extrusion modling makes the depression bar 13 ' extruding of advancing, crosstie wall 11 ' contact first near 18 ' time of switch, can make extruder 1 ' stop, again order skid off buck on the platform cut off the finished product 17 extruded for the first time ', the platform that skids off by hauling machine 3 ' connection pulls it again.
Restart extruder 1 ' action, make that depression bar 13 ' extruding moves on, when second of crosstie wall 11 ' touch near 19 ' time of switch, can make extruder 1 ' stop, push for the second time finished product 17 ' pull out by skidding off platform again, restart extruder 1 ' action depression bar 13 ' advance extruding and crosstie wall 11 ' contact limit switch 12 ' time extruder 1 ' stop, and pull out the 3rd push finished product 17 '.The cake of press 14 of depression bar 13 ' front end ' and mould 16 ' leave stub ingot B, the mold damage 16 to prevent cake of press 14 ' directly impact '.
Above-mentioned fashion of extrusion can make the some extruding finished products 17 of aluminium ingot moulding in regular turn that once are written into ' and only residual stub ingot B, can significantly reduce the waste of stub ingot B, and minimizing (per three moulding strokes of backlash during because of extruding, reduce the secondary backlash time, that is reduce the generation of two sections stub ingots), this just can increase substantially extruding efficient.But also there is following shortcoming in this fashion of extrusion when actual job:
Because accurate extruding finished product 17 ' the volume exquisiteness, its volume is much smaller than the volume that is written into aluminium ingot, making a bit of aluminium ingot of extruding is plastic considerable extruding finished product.
If the platform length that skids off of hauling machine 3 ' be connected with is 20000MM, when finished product length is made as 1500MM, skid off platform and can hold 12 sections extruding finished products at every turn, its total finished product length is 18000MM, and the sawdust that at every turn cuts loss is 5MM, and then 12 sections sawdust are 60MM, thereby desirable extruding finished product 17 ' length should be 18060MM, and allowable error is 200MM during present actual operations for forming, thus extruding finished product 17 ' length should be 18060MM-18260MM.
When establish aluminium ingot with the extruding finished product 17 ' length ratio be 1: 100, can make when then aluminium ingot length is for 180.6MM the extruding finished product 17 ' length be 18060MM, when operating personnel adjust before extrusion modling when making extruding finished product 17 ' length be 18300MM near switch, also must adjust again near switch and make extruding finished product 17 ' length shorten 40MM at least and reach in the allowed band of 18260MM.
Thereby must adjust 0.4MM again near switch at least, " length is in the allowable error scope just to make crowded type finished product 17.
Yet since near switch be arranged on extruder 1 ' on a kind of mechanical type slide and adjust switch, so real difficult small distance of accurately adjusting to 0.4MM of manual operation, in fact will move slightly near switch, the distance that moves near switch is caused greater than 0.4MM adjust back extruding finished product 17 ' error in length bigger.
So adjusting at present near switch is to cause accurate main difficult point of squeezing the type operation.When adjustment makes crowded type finished product 17 ' length slightly exceed the allowable error scope near switch, for avoiding adjusting the increase that may cause error near switch again, generally promptly no longer adjust, just the slightly long extruding finished product 17 of extrusion modling ' after cut again and exceed part, thereby cause the increase of waste material.
Embodiment shown in Figure 7 is when adjusting first near 18 ' time of switch, and second near switch 19 ' also must correspondingly adjust, and this just more increases the degree of difficulty of adjusting, and makes to adjust operation and expend many operations for forming man-hour, thereby has reduced extruding efficient significantly.
2. the difficulty of accurately adjusting, make its extruding finished product 17 after the extrusion modling ' length FE be slightly larger than preseting length FD, make after the moulding DE section to be cut and to cause waste.
3. import ingot-containing tube 15 ' aluminium ingot length by artificial calculating, the oversize loss of stub ingot B takes place in regular meeting.
The objective of the invention is to the Programmable Logic Controller (PLC) that extruder is provided with counter or has tally function, also available have a line number function conventional arrangement, limit switch and hauling machine position at extruder are provided with the linear position decipherer respectively, counter is set and meter is recorded the radical that an aluminium ingot is extruded finished product, every extruding once be automatic pause cut and derive continue automatically after time of finished product extruding until counter reach stop squeezing after setting number and judge stub ingot length again feedback signal adjust aluminium ingot hot shears length, to reduce the defective material of aluminium ingot and finished product most effectively.
Production equipment of the present invention includes heating furnace, hot shears, extruder and hauling machine, the raw material aluminium ingot heats through heating furnace, hot shears is sheared the back and is imported the extruder ingot-containing tube, by crosstie wall, depression bar and the extruding of cake of press interlock, and by mould, limber wall is derived finished product to hauling machine, be provided with the linear position decipherer of sensing aluminium ingot length at the parallel position of crosstie wall moving direction, the linear position decipherer is provided with optoelectronic switch, be provided with the linear position decipherer that sensing squeezes type finished product length at hauling machine one end, one end of linear position decipherer is provided with shutdown switch, hot shears is provided with aluminium ingot length location and interpretation device, it is characterized in that:
Extruder also is provided with according to primary Calculation with the default counter that once pushes some finished products, once pushes the radical and the aluminium ingot of length to ingot-containing tube importing respective length of finished product according to primary Calculation.
The position of linear position decipherer according to the length setting hauling machine of extruding finished product.
The shutdown switch of hauling machine is sensed when squeezing type finished product end points hauling machine is stopped, and feedback stop signal to extruder makes extruder stop extruding, but extruding finished product length nationality by the linear position decipherer shutdown switch sensing of hauling machine the preseting length that levels off to.
Extruder promptly suspends after receiving stop signal, and the finished product quantity of having pushed by the aluminium ingot of this importing of rolling counters forward, when counter does not reach the setting radical, make extruder continue to repeat next extruding finished product of a program moulding, when reaching the seasonal extruder of setting value, rolling counters forward stops extruding, and by the linear position decipherer interpretation stub ingot length of extruder.
The counter of extruder can use Programmable Logic Controller or other device with tally function with tally function.
When the extruder moulding imports last extruding finished product of aluminium ingot at every turn, the linear position decipherer interpretation stub ingot length of extruder is to revise the error of primary Calculation, when the crosstie wall sense terminals is positioned at the long position of linear position decipherer, represent that promptly stub ingot is long, promptly be converted into length and the feedback that aluminium ingot should shorten and shorten the aluminium ingot length location and interpretation device of control signal to hot shears by the sense position of linear position decipherer, make aluminium ingot shorten respective length to reduce the stub ingot loss, when the allowed band position of sense terminals position at the linear position decipherer, promptly feed back constant signal to hot shears and make it to keep sheared length by the linear position decipherer, when the curtailment position of sense terminals position at the linear position decipherer, represent last finished product curtailment, promptly being converted into aluminium ingot by the linear position decipherer increases the aluminium ingot length location and interpretation device of length feedback signal to hot shears, and finished product is too short to be caused waste material and cause damage to avoid to make hot shears shear longer aluminium ingot next time.
The hot shears that the present invention uses also can use other to shear the device of aluminium ingot.
The present invention compared with the prior art, its advantage is:
1. stop by the photoelectricity shutdown switch induction of hauling machine linear position decipherer when reaching preseting length when squeezing the moulding of type finished product, make and to reduce the prior art mode and must adjust difficulty, and can reduce the idle cost that causes near switch because of time-consuming adjustment significantly by operating personnel near switch;
2. squeeze of the photoelectricity shutdown switch induction control of type finished product length by the linear position decipherer, make its actual finished product length can level off to preseting length, and can reduce the prior art mode significantly and cause the long finished product scrap piece loss that must cut significantly of extruding finished product because of being difficult to accurately adjust near the position of the switch;
3. the length of stub ingot B can be judged by the linear position decipherer of extruder, makes the aluminium ingot length that is written into ingot-containing tube next time can level off to reasonable length, and the error that can revise primary Calculation automatically is to reduce the loss of stub ingot B;
4. extrusion process is all carried out automatically, must the special messenger not fix the work of management extruder, can reduce human cost significantly, makes crowded type efficient higher.
Description of drawings:
Fig. 1 is an extruder action schematic block diagram of the present invention
Fig. 2 is an extruder moulding action schematic diagram of the present invention
Fig. 3 is action and the feedback process schematic diagram of extruder interpretation aluminium ingot length of the present invention when oversize
Fig. 4 is action and the feedback process schematic diagram of extruder interpretation aluminium ingot length of the present invention when suitable
Fig. 5 is extruder interpretation aluminium ingot length of the present invention action and a feedback process schematic diagram too in short-term
Fig. 6 is extruder moulding action schematic diagram commonly used
Fig. 7 squeezes type action schematic diagram for extruder moulding commonly used is accurate
Figure number
1-extruder 11-crosstie wall 12-sense terminals 13-depression bar 14-cake of press 15-ingot-containing tube 16-mould 17-limber wall 18-finished product 19-counter 2-linear position decipherer
3-hauling machine 4-linear position decipherer 7-aluminium ingot length location and decipherer
1 '-extruder 11 '-crosstie wall 12 '-limit switch 13 '-depression bar 14 '-cake of press 15 '-ingot-containing tube 16 '-mould 17 '-finished product 18 '-proximity switch 19 '-proximity switch 3 '-hauling machine
Accompanying drawing is described in conjunction with the embodiments
Consult Fig. 1 and 2, the present invention moves the equality position at the crosstie wall 11 of extruder 1 linear position decipherer 2 sensing aluminium ingot length is set, and at hauling machine 3 one ends linear position decipherer 4 sensing finished products 18 length is set.Linear position decipherer 2 and 4 PQ, WT are allowed band, be provided with photoelectricity safety switch C at linear position decipherer 2, end at linear position decipherer 4 is provided with shutdown switch R, and this shutdown switch R can be squeezed the end points of type finished product 18 and be stopped extruding by the photoelectricity sensing.Aluminium ingot imports ingot-containing tube 15 and the stub ingot B after residual crowded type finishes during by crosstie wall 11, depression bar 13, the extruding of cake of press 14 interlocks, and derives finished products 18 to hauling machine 3 by mould 16, limber wall 17.The present invention's extruder 1 is provided with counter 19, and counter 19 can cooperatively interact also available conventional arrangement with tally function by the input signal of the Programmable Logic Controller (PLC) of stop signal R and tool tally function.Counter 19 is according to the setting value of initial count value with default counter 19, and makes each moulding one accurate type finished product 18 hour counters 19 that squeeze promptly increase by a number, even extruder 1 stops the extruding action when counter 19 reaches setting value.
The operating state of the accurate section bar of extruder 1 moulding of the present invention is shown in Fig. 1-2, at first through primary Calculation, calculate the aluminium ingot length that is written into ingot-containing tube 15 by the finished product number, aluminium ingot length can be corresponding the several times (being generally 2-4) of the accurate extruding of moulding finished product 18, generally be slightly larger than the cumulative volume of finished product 18 according to the aluminium ingot length conversion volume that calculates, fall short of and scrap to prevent last finished product 18.
The counter 19 of extruder 1 is set finished product 18 numerical value of primary Calculation, and shown in Figure 2 is that to be written into aluminium ingot be 3 finished products 18 of moulding at every turn, so counter 19 promptly is set at 3 in the enforcement state of Fig. 2.
According to linear position decipherer 4 positions on the extruding finished product 18 length setting hauling machines 3, and make extruder 1 extruding move, and extruding finished product 18 exports to hauling machine 3, even hauling machine 3 stops during the induction of the photosignal of its end points and shutdown switch R, and feedback stop signal to extruder 1 stops extruder 1, make these finished product 18 length can level off to preseting length, this finished product 18 is promptly cut by the buck that skids off on the platform, and derives by skidding off platform.
The above-mentioned stop signal of extruder 1 reception promptly temporarily halts and pushes a setting-up time, an extruding finished product 18 exports to and skids off platform and export to a side transport platform by skidding off platform on this setting-up time correspondence, can be so that skid off platform in the time that unloaded situation is squeezed type finished product 18 with ccontaining next moulding, counter 19 countings are written into the quantity that aluminium ingot has pushed some finished products 18 with calculating.
When counter 19 numerical value do not reach setting value, the depression bar 13 of extruder 1 next finished product 18 of repetition said procedure extrusion modling that moves on, molded intact last finished product 18 of this aluminium ingot as can be known when counter 19 counting reaches setting value, even extruder 1 stops extruding, and the linear position decipherer on the extruder 12 carries out the interpretation of stub ingot B.
Consult Fig. 3-5, when molded last finished product 18 of the aluminium ingot that is written into each time, promptly by the length of linear position decipherer 2 interpretation stub ingot B to revise the error of primary Calculation, as shown in Figure 2, when the finished product front end has arrived the shutdown switch R of linear position decipherer 4, and sense terminals 12 is positioned at the NP position of linear position decipherer 2, represent that promptly stub ingot B is long, and by the sense position conversion aluminium ingot shortening value of linear position decipherer 2, and FEEDBACK CONTROL signal-shortening signal is to the aluminium ingot length location and interpretation device of hot shears, make the corresponding relative distance of this shortening value that moves of aluminium ingot length location and interpretation device, and making hot shears next time shear the shorter aluminium ingot length of correspondence, it is long and lose that stub ingot still takes place when avoiding the next time extruding.
Shown in Figure 4, when the finished product front end has arrived the shutdown switch R of linear position decipherer 4, and sense terminals 12 is positioned at the PQ position of linear position decipherer 2, represent that promptly this Bao ingot B is in allowed band, and by linear position decipherer 2 feedback one constant signal to hot shears, make aluminium ingot length location and interpretation device keep original position, and make hot shears keep its sheared length.
Shown in Figure 5, when crosstie wall 11 arrives the safe shutdown switch C of linear position decipherers 2, and hauling machine 3 is positioned at the SW position of linear position decipherer 4, the curtailment of promptly representing last finished product 18, and by linear position decipherer 4 conversion aluminium ingot increasing values, and feedback signal is to the aluminium ingot length location and interpretation device of hot shears, make aluminium ingot length be positioned the interpretation device and move increasing value relative distance, and make and shear hot shears next time long aluminium ingot, too short and form waste material to avoid finished product 18.
Also available traditional shearing aluminium ingot of the present invention and extrusion process also utilize technology of the present invention, to reach the loss of saving backlash and reducing stub ingot, squeeze type efficient to improve.

Claims (4)

1. aluminium ingot hot shears method and apparatus that reduces the production loss of hot extrude section bar, production equipment includes heating furnace, hot shears, extruder and hauling machine, the raw material aluminium ingot heats through heating furnace, hot shears is sheared the back and is imported the extruder ingot-containing tube, by crosstie wall, depression bar and the extruding of cake of press interlock, and by mould, limber wall is derived finished product to hauling machine, be provided with the linear position decipherer of sensing aluminium ingot length at the parallel position of crosstie wall moving direction, the linear position decipherer is provided with optoelectronic switch, be provided with the linear position decipherer that sensing squeezes type finished product length at hauling machine one end, one end of linear position decipherer is provided with shutdown switch, hot shears is provided with aluminium ingot length location and interpretation device, it is characterized in that:
1. extruder (1) also is provided with according to primary Calculation with the default counter (19) that once pushes some finished products, once pushes the radical and the aluminium ingot of length to ingot-containing tube (15) importing respective length of finished product (18) according to primary Calculation;
2. according to the position of linear position decipherer (4) of the length setting hauling machine (3) of extruding finished product (18);
3. the shutdown switch (R) of hauling machine (3) is sensed when squeezing type finished product (18) end points hauling machine (3) is stopped, and the feedback stop signal to extruder (1) make extruder (1) stop the extruding, the extruding finished product (18) but the length nationality by linear position decipherer (4) shutdown switch (R) sensing of hauling machine (3) preseting length that levels off to;
4. extruder (1) promptly suspends after receiving stop signal, and count finished product (18) quantity that the aluminium ingot of this importing has pushed by counter (19), when counter (19) does not reach the setting radical, make extruder (1) continue to repeat next extruding finished product (18) of a program moulding, when reaching the seasonal extruder of setting value (1), counter (19) counting stops extruding, and by linear position decipherer (2) interpretation stub ingot (B) length of extruder (1).
2, the aluminium ingot hot shears method and apparatus of minimizing hot extrude section bar according to claim 1 production loss is characterized in that the counter (19) of extruder (1) can use Programmable Logic Controller or other conventional arrangement with tally function with tally function.
3, the aluminium ingot hot shears method and apparatus of minimizing hot extrude section bar according to claim 1 production loss, when it is characterized in that extruder (1) moulding imports last extruding finished product (18) of aluminium ingot at every turn, linear position decipherer (2) interpretation stub ingot (B) length of extruder (1) is to revise the error of primary Calculation, when crosstie wall (11) sense terminals is positioned at the long position of linear position decipherer (2), represent that promptly stub ingot (B) is long, promptly being converted into length that aluminium ingot should shorten and feedback by the sense position of linear position decipherer (2) shortens control signal to the aluminium ingot length location of hot shears and adjusts automatically with the interpretation device, make aluminium ingot shorten respective length to reduce stub ingot (B) loss, when the allowed band position of sense terminals position at linear position decipherer (2), promptly make it to keep sheared length by linear position decipherer (2) feedback constant signal to hot shears, when the curtailment position of sense terminals position at linear position decipherer (2), represent last finished product (18) curtailment, promptly being converted into aluminium ingot by linear position decipherer (2) increases length feedback signal to the aluminium ingot length location of hot shears and adjusts automatically with the interpretation device, and finished product (18) is too short to be caused waste material and cause damage to avoid to make hot shears shear longer aluminium ingot next time.
4, the aluminium ingot hot shears method and apparatus of minimizing hot extrude section bar according to claim 3 production loss is characterized in that hot shears also can use other to shear the device of aluminium ingot.
CN 97115117 1997-07-23 1997-07-23 Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes Pending CN1205921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97115117 CN1205921A (en) 1997-07-23 1997-07-23 Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97115117 CN1205921A (en) 1997-07-23 1997-07-23 Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes

Publications (1)

Publication Number Publication Date
CN1205921A true CN1205921A (en) 1999-01-27

Family

ID=5173136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97115117 Pending CN1205921A (en) 1997-07-23 1997-07-23 Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes

Country Status (1)

Country Link
CN (1) CN1205921A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101918156B (en) * 2008-01-04 2013-08-21 G·詹姆斯澳大利亚股份有限公司 Method of welding heated log segments in an aluminum extrusion process
CN104874852A (en) * 2015-06-18 2015-09-02 傅昌明 Aluminum bar length measurement hot-shear device having double-shearing function and application thereof
CN106938283A (en) * 2017-04-25 2017-07-11 佛山市业精机械制造有限公司 A kind of aluminium section bar machine-shaping system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101918156B (en) * 2008-01-04 2013-08-21 G·詹姆斯澳大利亚股份有限公司 Method of welding heated log segments in an aluminum extrusion process
CN104874852A (en) * 2015-06-18 2015-09-02 傅昌明 Aluminum bar length measurement hot-shear device having double-shearing function and application thereof
CN106938283A (en) * 2017-04-25 2017-07-11 佛山市业精机械制造有限公司 A kind of aluminium section bar machine-shaping system and method

Similar Documents

Publication Publication Date Title
CN205187398U (en) Automatic powder forming machine
CN207914674U (en) Bar shears material head material tail automatic sorting system
CN104874852B (en) Aluminum bar length measurement hot-shear device having double-shearing function and application thereof
CN1205921A (en) Aluminum ignot hot-shearing method and equipment with low loss of hot-extruded shapes
CN108582713B (en) Wallboard automatic production line
CN205905369U (en) A feeding equipment for rubber component
CN205870709U (en) Plastics detonator collection device
CN109226317B (en) Automatic speed and pressure regulating device of extruder and control method
CN2373202Y (en) Aluminum ingot hot hearing machine
CN201036888Y (en) Automatic hydraulic tile-making machine
CN219503628U (en) Automobile safety seat stamping die convenient to unloading
CN1172710A (en) Aluminium ingot hot shear device and method for reducing hot textrusion section material production loss
CN219786052U (en) Forming die is used in processing of solar energy aluminium frame
CN220428466U (en) Automatic discharging device for extruder barrel
CN217620863U (en) Polyethylene composite pipeline cutting device
CN212821822U (en) Extruder for producing high-strength precise aluminum alloy section
CN218800747U (en) Aluminum alloy square tube clipper
CN216857823U (en) Leaf spring crowded angle flattening processing frock
CN216067958U (en) Adjusting mechanism of forming device for manufacturing water permeable bricks
CN218926050U (en) Pile foundation cage ear muscle rapid prototyping device
CN211467209U (en) Novel injection molding machine mould mold insert extrusion structure
CN217121375U (en) S-shaped water cutting bending device
CN217097942U (en) Servo traction sawing machine
CN214704413U (en) Automatic production control system for composite keel
CN219560950U (en) Extrusion die for producing wide-edge thin-wall section bar for aviation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1032917

Country of ref document: HK