CN1203239C - Method and equipment for installing floor slabs of building - Google Patents

Method and equipment for installing floor slabs of building Download PDF

Info

Publication number
CN1203239C
CN1203239C CN 01129796 CN01129796A CN1203239C CN 1203239 C CN1203239 C CN 1203239C CN 01129796 CN01129796 CN 01129796 CN 01129796 A CN01129796 A CN 01129796A CN 1203239 C CN1203239 C CN 1203239C
Authority
CN
China
Prior art keywords
floor
slab form
fixed code
building
floor slabs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01129796
Other languages
Chinese (zh)
Other versions
CN1342824A (en
Inventor
李渊河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01129796 priority Critical patent/CN1203239C/en
Publication of CN1342824A publication Critical patent/CN1342824A/en
Application granted granted Critical
Publication of CN1203239C publication Critical patent/CN1203239C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention discloses a method for installing floor slabs of buildings and equipment thereof, which mainly solves the problems existing in the prior art that the workload is large and the construction period is long when supporting racks and the templates of floor slabs are installed and disassembled, the strength of the floor slabs is influenced badly after floor slab structures are shaped because the floor slabs bear large pressure in the construction process, etc. With the adoption of the installation method of the buildings of the present invention, installation equipment is utilized to draw the templates of the floor slabs to move downwards from the top ends of the buildings to complete the installation of the floor slabs of each floor. The installation equipment comprises a drawing rope, a drawing device and a fixed yard fixed on the load-bearing structure of the building. Thus, the templates of the floor slabs are drawn to move among floors. The method for installing the floor slabs of the buildings and the equipment thereof have the advantages of small workload, short construction period, and good force-bearing situation of the floor slabs in the installation process.

Description

The mounting method of building floor and erection equipment thereof
Technical field
The present invention relates to house building method, the particularly mounting method of multistory building floor, and be used for the erection equipment of this mounting method.
Background technology
The floor of building is vertically cut apart the space of whole building, to satisfy the use needs of user to building space, existing building floor adopts concrete structure mostly, its mounting method is at load-carrying construction such as the concrete frame of finishing every layer, or after finishing the construction of load-carrying construction of whole building, floor successively upwards is installed, after the concrete of lower floor's floor is finished perfusion, need wait for a period of time, make concrete reach certain degree of solidifying, in the time of bearing certain intensity, on this floor plate, bracing frame is installed, with bracing frame in the installation site of last layer floor fixing slab form, draw reinforcing bar from load-carrying construction again, floor bar is installed, concrete perfusion on slab form when concrete degree of solidifying acquires a certain degree, re-uses said method the upper strata floor is installed then.This floor mounting method, be suitable for the installation of various building floors, but in installation process, because concrete setting needs a period of time, before floorslab concrete solidifies fully, bracing frame and slab form can not be removed, like this, in building the floor process, just have bracing frame and slab form are housed between the multilayer floor, mainly bring the problem of two aspects, the one, need install and remove bracing frame and slab form, workload is big, duration is longer, and the 2nd, multilayer floor and bracing frame, the weight of slab form is delivered to the floor of lower floor by bracing frame, before floorslab concrete does not solidify fully, promptly bear big pressure, the intensity after the floor slab structure moulding is caused harmful effect.
Summary of the invention
The object of the present invention is to provide a kind of mounting method and erection equipment thereof of building floor, workload is less, and the duration is shorter, and the force-bearing situation of floorslab concrete in process of setting is better.
The mounting method of building floor of the present invention, erection equipment is installed on the load-carrying construction with screw rod, by erection equipment slab form is drawn to the floor installation site, lock erection equipment then, fixedly slab form is installed reinforcing bar on position suitable on the slab form, concrete perfusion, when floorslab concrete reaches necessarily degree of solidifying, use erection equipment that slab form is drawn to down first floor plate installation site downwards, repeat abovementioned steps installation lower floor floor again;
The erection equipment of building floor of the present invention contains bracing frame, and the bracing frame top is connected with slab form, and the bracing frame bottom is connected with draw-gear by drag cable, and draw-gear is connected with fixed code on can being fixed on the building load-carrying construction.
Because the mounting method and the erection equipment thereof of building floor of the present invention, be to use erection equipment traction slab form to move, only needing to take out screw rod reorientates fixed code, can finish the installation of each floor floor, workload greatly reduces, also shortened the duration, in addition, the weight of each floor board concrete, slab form is delivered on the load-carrying construction that sufficient intensity bears by erection equipment respectively, reduced each floor plate stressed in building course, guaranteed that the force-bearing situation of floorslab concrete in process of setting is better.
Description of drawings
Below in conjunction with drawings and Examples the present invention is described in further detail:
Fig. 1 is a scheme of installation of the present invention;
Fig. 2 is the concrete spouting of the present invention schematic diagram that finishes;
Fig. 3 is the another embodiment of the present invention scheme of installation;
Fig. 4 is the lateral view of Fig. 3;
Fig. 5 is the A-A sectional view of Fig. 1;
The mounting method of building floor of the present invention, as Fig. 1, erection equipment 1 usefulness screw rod 15 is installed on the load-carrying construction 2, by erection equipment 1 slab form 3 is drawn to floor 5 installation sites, stablize erection equipment 1 then, fixedly slab form 3, reinforcing bar 4 is installed on position suitable on the slab form 3, concrete perfusion, when floorslab concrete reaches necessarily degree of solidifying, use erection equipment 1 that slab form 3 is drawn to down first floor plate installation site downwards,, repeat abovementioned steps again lower floor's floor is installed as Fig. 2; On load-carrying construction 2 exterior walls 6 of described installation floor location, have groove 7, on interior wall 16, have hole 8, as Fig. 5, reinforcing bar 4 is passed hole 8, and stretch in the groove 7 by building standard, behind such method perfusion floorslab concrete, can obtain comparatively desirable structural strength, the edge of described groove 7 is arc preferably, and described hole 8 is infundibulate preferably, with when pouring into floorslab concrete, concrete and load-carrying construction have better adhesion effect; Rubber pad 9 is housed around slab form, concrete permeates between the gap of slab form 3 and load-carrying construction 2 when preventing concrete perfusion, influence the moulding of floor, the section of described rubber pad 9 is a triangle, with 2 frictions of load-carrying construction, the angle upper fin that while rubber pad 9 contacts with load-carrying construction 2 rises, after floor installs when moving downward to reduce slab form 3, the bottom of floor 5 and load-carrying construction 2 junctions is to being recessed on the installation of more convenient ceiling;
The erection equipment of building floor of the present invention, contain bracing frame 10, bracing frame 10 tops are connected with slab form 3, and bracing frame 10 bottoms are connected with draw-gear 12 by drag cable 11, and draw-gear 12 is connected with fixed code 13 on can being fixed on building load-carrying construction 2; Adjustment screw 14 is housed on the top of fixed code 13, adjusts the top of screw 14 extended fixed code 13.
The mounting method of building floor of the present invention, as Fig. 3,4, slab form 3 places on the fixed code 13, and by the adjustment screw 14 jack-up slab forms 3 on the fixed code 13, make 13 of slab form 3 and fixed code that certain interval be arranged, as 3 to 10 millimeters, then by regulate adjusting the level that screw 14 is regulated slab form 3, after concrete perfusion has necessarily degree of solidifying, unclamp and adjust screw 14, slab form 3 is thrown off with floor 5 under the action of gravity of its deadweight and bracing frame 10, drop on the fixed code 13, in following first floor plate installation site, load onto fixed code 13 then, draw-gear 12 is taken off from a last fixed code 13, be contained on the new fixing fixed code 13 tension drag cable 11, the weight that new fixed code 13 of installing is born described erection equipment 1, at this moment just can take off original fixed code 13, and can install by abovementioned steps lower floor's floor 5, fixing floor is more easy to operate by this way, floor is easy to separate with slab form, good manufacturability.
Certainly, described draw-gear 12 also can be a pulley, also can be micro-machine, or other alternate device.
The mounting method of the building floor of the present invention and main installation that is suitable for the multistory building floor is installed is installed the mounting means of floor again after the load-carrying construction building that is specially adapted to multistory building finishes.

Claims (6)

1, the mounting method of building floor, it is characterized in that: erection equipment (1) is installed on the load-carrying construction (2) with screw rod (15), by erection equipment (1) slab form (3) is drawn to floor (5) installation site, stablize erection equipment (1) then, fixing slab form (3), on the upward suitable position of slab form (3), reinforcing bar (4) is installed, concrete perfusion, when floorslab concrete reaches necessarily degree of solidifying, use erection equipment (1) that slab form (3) is drawn to down first floor plate (5) installation site downwards, repeat abovementioned steps again lower floor's floor is installed.
2, for realizing the erection equipment of the described building floor mounting method of claim 1, contain bracing frame (10), it is characterized in that: its bracing frame (10) top is connected with slab form (3), bracing frame (10) bottom is connected with draw-gear (12) by drag cable (11), and draw-gear (12) is connected with fixed code (13) on can being fixed on building load-carrying construction (2).
3, the mounting method of building floor according to claim 1, it is characterized in that: when floor bar (4) is installed, on load-carrying construction (2) exterior wall of described installation floor (5) position, have groove (7), on interior wall (16), have hole (8), reinforcing bar (4) is passed hole (8), and stretch in the groove (7) by building standard, rubber pad (9) is housed around slab form (3).
4, the mounting method of building floor according to claim 3 is characterized in that: the edge of described groove (7) is an arc, and described hole (8) are infundibulates, and the section of described rubber pad (9) is a triangle.
5, erection equipment according to claim 2 is characterized in that: be equipped with on the top of fixed code (13) and adjust screw (14), adjust the top of the extended fixed code of screw (14) (13).
6, according to claim 1,3, the mounting method of 4 described building floors, it is characterized in that: slab form (3) places on the fixed code (13), and by adjustment screw (14) the jack-up slab form (3) on the fixed code (13), make between slab form (3) and fixed code (14) certain interval is arranged, then by regulating the level that screw (14) is regulated slab form (3) of adjusting, after concrete perfusion has necessarily degree of solidifying, unclamp and adjust screw (14), slab form (3) is thrown off with floor (5) under the action of gravity of its deadweight and bracing frame (10), drop on the fixed code (13), then in following first floor plate (5) installation site, load onto fixed code (13), draw-gear (12) is taken off from a last fixed code (13), be contained on the new fixing fixed code (13), tension drag cable (11), new fixed code (13) of installing is born the weight of described erection equipment (1), at this moment just can take off original fixed code (13), and can install by abovementioned steps lower floor's floor (5).
CN 01129796 2001-10-22 2001-10-22 Method and equipment for installing floor slabs of building Expired - Fee Related CN1203239C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01129796 CN1203239C (en) 2001-10-22 2001-10-22 Method and equipment for installing floor slabs of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01129796 CN1203239C (en) 2001-10-22 2001-10-22 Method and equipment for installing floor slabs of building

Publications (2)

Publication Number Publication Date
CN1342824A CN1342824A (en) 2002-04-03
CN1203239C true CN1203239C (en) 2005-05-25

Family

ID=4669453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01129796 Expired - Fee Related CN1203239C (en) 2001-10-22 2001-10-22 Method and equipment for installing floor slabs of building

Country Status (1)

Country Link
CN (1) CN1203239C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2281364C2 (en) * 2002-02-01 2006-08-10 Юаньхэ ЛИ Method and device for building floor panel erection
CN103276837A (en) * 2013-06-22 2013-09-04 张海冰 Method for on-site wall pouring without form removal

Also Published As

Publication number Publication date
CN1342824A (en) 2002-04-03

Similar Documents

Publication Publication Date Title
CN1028556C (en) Building construction system
KR100968068B1 (en) Multi-Horizontal Structure Member Forming Method
CN1114738C (en) In-situ cast hollow reinforced concrete slab pre-provided with hollow hard thin-wall members and its construction method
SG185173A1 (en) A prefabricated element of a multi-storey building and a semi-prefabricating construction method thereof
WO2018057791A1 (en) Structure and method of making the same
CN101319559A (en) Multifunctional variable integral hoisting template system
CN1203239C (en) Method and equipment for installing floor slabs of building
CN208122461U (en) The construction equipment of towering structure
CN209369331U (en) A kind of plate device of floor
CN2079205U (en) Formwork lifting frame
CN115075613B (en) Assembled building supporting system and construction method thereof
CN215562019U (en) Novel road and bridge crack consolidate device
CN213171304U (en) Prestressing force jack removes erection equipment
CN201381634Y (en) Variable formwork system of jacking steel platform with low level, three supporting points and long stroke
CN211923574U (en) Construction device for constructing top floor of building
CN110158987B (en) Brick wall reinforcing structure for roof parking system
WO2003064781A1 (en) An erection unit for a building floor slab and the erection method thereof
CN2459394Y (en) Construction frame for building
CN202544394U (en) Early-dismounting template system
CN2653044Y (en) Formwork lifting device for building wall
CN221119247U (en) Plate thickness control device capable of fixing aluminum die diagonal bracing
RU2008105317A (en) BALCONY DESIGN AND METHOD FOR ITS MANUFACTURE
CN215167005U (en) Sound insulation mortar and sound insulation floor structure
CN111305550A (en) Aluminum-wood mixed template structure and construction method thereof
CN205857489U (en) Bamboo in-core puts module and cast-in-situ concrete hollow building roof precast construction

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050525

Termination date: 20121022