CN1198020C - 联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器 - Google Patents

联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器 Download PDF

Info

Publication number
CN1198020C
CN1198020C CNB011137193A CN01113719A CN1198020C CN 1198020 C CN1198020 C CN 1198020C CN B011137193 A CNB011137193 A CN B011137193A CN 01113719 A CN01113719 A CN 01113719A CN 1198020 C CN1198020 C CN 1198020C
Authority
CN
China
Prior art keywords
tubular pile
pile hole
linked tubular
hole former
guiding device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB011137193A
Other languages
English (en)
Other versions
CN1322881A (zh
Inventor
谢庆道
谢庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xie Qingdao
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB011137193A priority Critical patent/CN1198020C/zh
Publication of CN1322881A publication Critical patent/CN1322881A/zh
Priority to US10/004,793 priority patent/US6749372B2/en
Application granted granted Critical
Publication of CN1198020C publication Critical patent/CN1198020C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Abstract

本发明涉及用于软土地基防渗漏工程的联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器。施工中利用带公、母导接器的二个随着联体筒桩成孔器相继衔接沉至软土层中,再往第一个成孔器中灌注混凝土并上拔,完成第一个筒桩,继续将拔出的成孔器和第二个成孔器衔接下沉后,再上拔灌注第二个成孔器,以此类推构成联体筒桩地下连续墙。该施工方法快速经济,效果好。专用的联体筒桩成孔器结构简单,使用中可同步排土,下沉阻力小,减少土方量。

Description

联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器
背景技术:
本发明涉及一种用于软土地基防渗漏工程的地下连续墙施工方法,同时涉及一种施工专用的联体筒桩成孔器。
地下连续墙在水库堤坝防渗、地下室防渗、港工水闸地基防渗及河道两岸防渗等方面有广泛应用。现在建造地下连续墙是先开挖沟槽,再浇注混凝土成为不透水的连续墙。这种方法在建造过程中土方量很大,混凝土用量也很大,工期长,费用较高。在有地下水等不良地质条件时,沟槽壁难以稳定,施工难度很大。如果采用钢板桩或预制混凝土板桩等构件,则投资成倍增加,防渗效果也不佳。在专利CN1221056A中公开了一种可以快速方便建造用于软土地基中的混凝土筒桩施工方法及专用的成孔器,但是单个的筒桩还无法方便经济的构筑地下连续墙。
发明内容:
本发明的目的是提供一种施工速度快、经济实用,可以取得较理想防渗效果的联体筒桩地下连续墙施工方法,同时提供实施该方法的联体筒桩成孔器。
本发明利用筒桩联体构成地下连续墙,施工方法为:
(A)在所有的联体筒桩成孔器的筒腔(3)底部装有环形并带有切削面的专用配套桩靴(4);
(B)将第一个联体筒桩成孔器竖立置于施工位置并在震动头(7)上施压,使该联体筒桩成孔器沉至设计深度的软土层,被排挤的泥土从该联体筒桩成孔器的出泥口(8)排出;
(C)将第二个联体筒桩成孔器上的公导接器(9)和第一个联体筒桩成孔器上的母导接器(10)衔接定位配合,如步骤(B)同样方法将第二个联体筒桩成孔器沉至设计深度;
(D)从第一个联体筒桩成孔器的进料斗灌注混凝土,边灌注边振动上拔该联体筒桩成孔器,桩靴和筒腔分离,其同灌注的混凝土一起形成第一个筒桩;
(E)将拔出的第一个联体筒桩成孔器装上新桩靴或者采用另一个已准备好的联体筒桩成孔器,如步骤(C)同样方法和第二个联体筒桩成孔器衔接定位,沉至设计深度;
(F)将第二个联体筒桩成孔器如步骤(D)方法拔出,形成第二个筒桩,并和第一个筒桩构成联体;
(G)以此类推重复,直至形成足够多的联体筒桩构成地下连续墙。
为实施该施工方法用的联体筒桩成孔器包括同心设置的内套筒和外套筒,外套筒内壁和内套筒外壁之间的空腔为筒腔,筒腔底部的开口可与桩靴连接配合,内套筒和外套筒的上端均连接在法兰盖上,法兰盖上设有振动头,该振动头上设有和内套筒的内腔连通的出泥口,在外套筒的外壁上设有和筒腔连通的进料斗,在外套筒外壁上还设有轴线方向布置的公导接器和母导接器,公导接器和母导接器相对内套筒中心轴线形成的夹角,即公、母导接器的夹角为不小于60度的角度。
本发明的方法在施工过程中土方量少,混凝土用量也较少,可以快速方便的将现浇混凝土筒桩联体构成地下连续墙,工期短,费用低,并且防渗效果好。
本发明中的联体筒桩成孔器结构简单,设于其上的公母导接器衔接定位方便快速,容易使筒桩联成一体。并且在下沉过程中可以同步排土,下沉阻力小,减少土方量。
附图说明:
下面结合附图和实施例进一步说明本发明。
图1是联体筒桩成孔器的主结构示意图;
图2是图1的A-A剖视图;
图3是公母导接器衔接定位的示意图;
图4是联体筒桩地下连续墙的横截面示意图。
具体实施方式:
本发明的实施方法实质是利用带公母导接器的联体筒桩成孔器将现浇混凝土筒桩联成一体构成地下连续墙,其方法是:
(A)在所有联体筒桩成孔器的筒腔3底部装上环形并带有切削面的配套桩靴4;
(B)将第一个联体筒桩成孔器竖立置于施工位置并在振动头7上施压,使该联体筒桩成孔器沉至设计深度的软土层,被排挤的泥土从该联体筒桩成孔器的出泥口8排出;
(C)将第二个联体筒桩成孔器上的公导接器9和第一个联体筒桩成孔器的母导接器10衔接定位配合,如步骤(B)同样方法将第二个联体筒桩成孔器沉至设计深度;
(D)从第一个联体筒桩成孔器的进料斗5灌注混凝土,边灌注边振动上拔该联体筒桩成孔器,桩靴4和筒腔3分离,其同灌注的混凝土一起形成第一个筒桩;
(E)将拔出的第一个联体筒桩成孔器装上新桩靴4或者采用另一个已准备好的联体筒桩成孔器,如步骤(C)同样方法和第二个联体筒桩成孔器衔接定位,沉至设计深度;
(F)将第二个联体筒桩成孔器如步骤(D)方法拔出,形成第二个筒桩,并和第一个筒桩构成联体;
(G)以此类推重复,直至形成足够多的联体筒桩构成地下连续墙。
在施工中,下沉联体筒桩成孔器时可以采用静压力,但用振动压力下沉更快速,效果较好。在上拔时,静力上拔摩擦过大,振动上拔阻力小,同时可振实混凝土。排挤的泥土从内套筒2的内腔经过排出,这样拔出后无需回填泥土到内腔,减少工作量。如果联体筒桩需要钢筋混凝土结构,可在桩靴4装到筒腔3之前,先在筒腔3中置入钢筋笼或钢筋条,这样钢筋笼和桩靴会一起和灌注的混凝土形成筒桩。
用来实施该施工方法用的联体筒桩成孔器包括同心设置的内套筒2和外套筒1,外套筒1内壁和内套筒2外壁之间的空腔为筒腔3,筒腔3底部的开口可与桩靴4连接配合,内套筒2和外套筒1的上端均连接在法兰盖6上,法兰盖6上设有振动头7,该振动头7上设有和内套筒2的内腔连通的出泥口8,在外套筒1的外壁上设有和筒腔3连通的进料斗5,在外套筒1外壁上设有轴线方向布置的公导接器9和母导接器10,公导接器9和母导接器10相对内套筒2中心轴线形成的夹角,即公、母导接器的夹角为不小于60度的角度。
配套的桩靴4一般采用混凝土预制件,为环形并带切削面。公导接器9和母导接器10的夹角如果小于60度,会出现筒桩重叠。一般根据地下连续墙转角或弧度需要,中心夹角可以为90度、120度等各个角度。对于平行直线的地下连续墙,公导接器9和母导接器10的夹角为180度,即两者分别设于外套筒1的两侧。本实施例中的公导接器9为扁条状的型材,母导接器10为具有相应形状滑行通槽的型材。实际上也可以是其它形状的型材或导接装置,只要使两个联体通桩成孔器可以衔接定位配合,能形成联体筒桩即可。振动头7上的出泥口8可以向侧边开口排土,但朝上进行排土阻力较小。

Claims (5)

1、一种联体筒桩地下连续施工方法,其特征在于:
(A)在所有的联体筒桩成孔器的筒腔(3)底部装有环形并带有切削面的专用配套桩靴(4);
(B)将第一个联体筒桩成孔器竖立置于施工位置并在震动头(7)上施压,使该联体筒桩成孔器沉至设计深度的软土层,被排挤的泥土从该联体筒桩成孔器的出泥口(8)排出;
(C)将第二个联体筒桩成孔器上的公导接器(9)和第一个联体筒桩成孔器上的母导接器(10)衔接定位配合,如步骤(B)同样方法将第二个联体筒桩成孔器沉至设计深度;
(D)从第一个联体筒桩成孔器的进料斗(5)灌注混凝土,边灌注边振动上拔该联体筒桩成孔器,桩靴(4)和筒腔(3)分离,其同灌注的混凝土一起形成第一个筒桩;
(E)将拔出的第一个联体筒桩成孔器装上新桩靴(4)或者采用另一个已准备好的联体筒桩成孔器,如步骤(C)同样方法和第二个联体筒桩成孔器衔接定位,沉至设计深度;
(F)将第二个联体筒桩成孔器如步骤(D)方法拔出,形成第二个筒桩,并和第一个筒桩构成联体;
(G)依此类推重复,直至形成足够多的联体筒桩构成地下连续墙。
2、根据权利要求1所述的联体筒桩地下连续墙施工方法,其特征在于:将桩靴(4)装在筒腔(3)之前,先在筒腔(3)中置入钢筋笼或钢筋条。
3、一种用于实施权利要求1所述的施工方法的联体筒桩成孔器,包括同心设置的内套筒(2)和外套筒(1),外套筒(1)内壁和内套筒(2)外壁之间的空腔为筒腔(3),筒腔(3)底部的开口与桩靴(4)连接配合,内套筒(2)和外套筒(1)的上端均有连接在法兰盖(6)上,法兰盖(6)上设有振动头(7),该振动头(7)上设有内套筒(2)的内腔连通的出泥口(8),在外套筒(1)的外壁上设有和筒腔(3)连通的进料斗(5),其特征为:在外套筒(1)外壁上还设有轴线方向布置的公导接器(9)和母导接器(10),公导接器(9)和母导接器(10)相对套筒(2)中心轴线形成的夹角,即公、母导接器(9、10)的夹角为不小于60度的角度。
4、根据权利3所述的联体筒桩成孔器,其特征为:公、母导接器的中心夹角为180度,即公导接器(9)和母导接器(10)分别设于外套筒(1)外壁的两侧。
5、根据权利3或4所述的联体筒桩成孔器,其特征在于:振动头(7)上设有的出泥口(8)开口朝上。
CNB011137193A 2001-06-20 2001-06-20 联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器 Expired - Fee Related CN1198020C (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CNB011137193A CN1198020C (zh) 2001-06-20 2001-06-20 联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器
US10/004,793 US6749372B2 (en) 2001-06-20 2001-12-07 Underground shell-pile continuous wall job practice and its special drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB011137193A CN1198020C (zh) 2001-06-20 2001-06-20 联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器

Publications (2)

Publication Number Publication Date
CN1322881A CN1322881A (zh) 2001-11-21
CN1198020C true CN1198020C (zh) 2005-04-20

Family

ID=4660427

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB011137193A Expired - Fee Related CN1198020C (zh) 2001-06-20 2001-06-20 联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器

Country Status (2)

Country Link
US (1) US6749372B2 (zh)
CN (1) CN1198020C (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITTO20050682A1 (it) * 2005-09-30 2007-04-01 Soilmec Spa Metodo ed attrezzatura per realizzare un diaframma impermeabile di pali secanti.
CN101560766B (zh) * 2009-05-13 2011-03-02 江苏东大鸿基科技有限公司 格栅状地下连续墙板及其制作方法
CN102677657B (zh) * 2011-03-11 2015-12-09 常雷 联排浇结薄壁混凝土复合桩墙的施工处理方法
CN102268870A (zh) * 2011-04-15 2011-12-07 傅健 带排土管的沉管灌注桩
CN102808406B (zh) * 2011-06-01 2016-09-07 常雷 联排复合桩墙的施工处理方法
CN102296592A (zh) * 2011-06-27 2011-12-28 河海大学 现浇x形钢筋混凝土桩地下连续墙的施工方法
CN103314889B (zh) * 2013-05-15 2014-08-27 李胜南 水域生态养殖牧场的围体结构单元的施工方法、及其围体结构单元和应用
CN103321215B (zh) * 2013-05-15 2015-06-03 李胜南 应用于水域的现浇混凝土筒桩的施工工艺及其专用成孔器
CN105002885B (zh) * 2015-07-23 2016-07-20 青岛静力工程股份有限公司 挤入式地下连续墙变距成墙装置及使用方法
CN109235433B (zh) * 2018-09-30 2020-10-02 台州玖达基础工程有限公司 软土公路基地的快速打桩施工机械
CN112523206A (zh) * 2020-11-17 2021-03-19 胡鹏 一种预制水平承载式高韧性混凝土透水桩及其制备方法

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US910252A (en) * 1907-08-19 1909-01-19 Lewis Wolfley Concrete piling and production thereof.
US1665798A (en) * 1925-04-22 1928-04-10 George B Sipe Method of producing and placing piles in interlocked relation
US3455832A (en) * 1963-09-09 1969-07-15 Monsanto Co Schiff bases
US3779025A (en) * 1971-10-07 1973-12-18 Raymond Int Inc Pile installation
EP0339780B1 (en) * 1988-04-29 1996-08-28 Beckman Instruments, Inc. Capillary detector cartridge for electrophoresis
JPH02156242A (ja) * 1988-12-08 1990-06-15 Mitsubishi Paper Mills Ltd 平版印刷版の製版方法
US5240348A (en) * 1989-08-25 1993-08-31 Louis Breaux Methods of hazardous waste containment
EP0581983B1 (en) * 1992-08-04 1996-10-23 Hewlett-Packard GmbH Apparatus for performing capillary electrophoresis
GB9312767D0 (en) * 1993-06-21 1993-08-04 Univ Waterloo Systems for installing material in the ground
US5503994A (en) * 1993-10-08 1996-04-02 The Board Of Trustees Of The Leland Stanford Junior University System for sample detection with compensation for difference in sensitivity to detection of components moving at different velocities
US5800096A (en) * 1995-04-27 1998-09-01 Barrow; Jeffrey Subsurface barrier wall and method of installation
US5694215A (en) * 1996-03-04 1997-12-02 Carver; David R. Optical array and processing electronics and method therefor for use in spectroscopy
US5830659A (en) * 1996-09-13 1998-11-03 University Of Utah Research Foundation Active microtubule-based separations by kinesins
US6048137A (en) * 1996-10-31 2000-04-11 Beck, Iii; August H. Drilled, cast-in-place shell pile and method of constructing same
US5823276A (en) * 1996-12-24 1998-10-20 Beck, Iii; August H. Diamond-tipped core barrel and method of using same
US6189630B1 (en) * 1998-06-17 2001-02-20 Beck, Iii August H. Downhole hammer-type core barrel

Also Published As

Publication number Publication date
CN1322881A (zh) 2001-11-21
US6749372B2 (en) 2004-06-15
US20020195274A1 (en) 2002-12-26

Similar Documents

Publication Publication Date Title
CN105887806B (zh) 装配式地下连续墙及其施工方法
CN1198020C (zh) 联体筒桩地下连续墙施工方法及其专用联体筒桩成孔器
CN102124163B (zh) 椅式自支撑挡土墙的施工方法
CN108612111B (zh) 一种钢管桩和基坑围护结构及基坑围护结构的施工方法
CN101718099B (zh) 静压地下连续墙自动成墙装置及方法
CN111764404A (zh) 一种部分可回收的咬合桩支护结构及施工方法
CN205776157U (zh) 装配式地下连续墙
CN1341795A (zh) 可变式支盘扩底植入桩及成型方法
CN1200178C (zh) 筒桩和板桩联体施工方法及其专用设备
CN110896644B (zh) 全套管钻孔导引预制桩的注浆固结方法
CN109853534B (zh) 一种劲芯扩底桩施工方法
CN103898918A (zh) 组合支护结构及施工方法
KR100834920B1 (ko) 흙막이 시공 파일용 피막시트 및 이를 이용한 흙막이시공방법
CN212248222U (zh) 一种注浆成型薄壁管桩的施工设备
CN1104280A (zh) 预制灌注复合管桩及其成桩工艺和设备
CN2518904Y (zh) 联体筒桩成孔器
CN1243184A (zh) 高压旋喷扩底桩的施工方法
CN111636419A (zh) 一种注浆成型薄壁管桩的施工设备及施工方法
CN110080243A (zh) 一种临近构筑物情况下的拉森钢板桩打、拔方法
CN217480135U (zh) 一种可射水下沉和同步灌浆拔除的拉森钢板桩装置
CN1563600A (zh) 钢管扩大头桩及其制造方法
CN215482881U (zh) 一种用于玻璃纤维筋地连墙雌槽的接头装置
CN2443998Y (zh) 软地基工程沉管成孔机
CN216108492U (zh) 一种中振法预制管桩防挤土施工装置
CN212506303U (zh) 一种部分可回收的咬合桩支护结构

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT INVENTOR; FROM: XIE QINGDAO; TO: XIE QINGDAO; XIE QINGHUA

TA01 Transfer of patent application right

Effective date of registration: 20021017

Address after: 310012, 9-2-502 village, Wen two street, Hangzhou, Zhejiang

Applicant after: Xie Qingdao

Inventor after: Xie Qingdao

Inventor after: Xie Qinghua

Address before: 310012, 9-2-502 village, Wen two street, Hangzhou, Zhejiang

Applicant before: Xie Qingdao

Inventor before: Xie Qingdao

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050420