CN1191963A - Locking mouth-masonning method for rotary kiln lining by using combined locking brick - Google Patents
Locking mouth-masonning method for rotary kiln lining by using combined locking brick Download PDFInfo
- Publication number
- CN1191963A CN1191963A CN97119977A CN97119977A CN1191963A CN 1191963 A CN1191963 A CN 1191963A CN 97119977 A CN97119977 A CN 97119977A CN 97119977 A CN97119977 A CN 97119977A CN 1191963 A CN1191963 A CN 1191963A
- Authority
- CN
- China
- Prior art keywords
- brick
- fore shaft
- bed
- little area
- rotary kiln
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Muffle Furnaces And Rotary Kilns (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The said masonning method includes mouth-locking masonning for inner lining of rotary kiln with combined mouth-locking brick and several kinds of combined mouth-locking bricks, which are designed based on the sizes of wedged brick and can mason locking mouth tight. The present invention can shorten greatly the repair time, reduce cost and labor strength and raise masonry quality.
Description
The present invention relates to building by laying bricks or stones of inner liner of rotary kiln, particularly a kind of combined type fore shaft brick that utilizes carries out the method that inner liner of rotary kiln is built fore shaft by laying bricks or stones.
Rotary kiln is the common equipment of cement plant or alumina producer.Rotary kiln itself is a steel structure, but one deck refractory brick liner is arranged on inwall.The method that inside lining building is commonly used is to build by laying bricks or stones with eyelid retractor, builds by laying bricks or stones from minimum point, when laying bricks above half cycle 2~3 row, eyelid retractor is installed, and build by laying bricks or stones on rotary kiln limit in limit then, finishes until last fore shaft.It is to stay 3~4 last row to carry out fore shaft when kiln lining is built by laying bricks or stones that present inner liner of rotary kiln is built the fore shaft technology by laying bricks or stones, adopt existing arch brick during fore shaft, press the actual brick size of using of fore shaft, machining or manual processing are carried out in the scene, but, adopt said method to carry out fore shaft and exist many shortcomings with not enough: adopt by hand arch brick is carried out on-the-spot method for processing, labor strength is big, the difficult quality guarantee of processing brick; Adopt machining process, though labor strength decreases, increased the production cost of processing brick, the brick after the processing is cooled simultaneously influences its serviceability after the water-soaked; Consumed a large amount of effective times because of processing brick at the scene, efficiency is reduced; Particularly add and a whole refractory brick will be cut man-hour, cut away part and all scrap, cause the serious waste of material.
The purpose of this invention is to provide a kind of combined type fore shaft brick that utilizes and carry out the method that inner liner of rotary kiln is built fore shaft by laying bricks or stones.
Of the present inventionly utilize combined type fore shaft brick to carry out inner liner of rotary kiln to build the method for fore shaft by laying bricks or stones and be: if used little area of bed of building the general arch brick thickness of liner by laying bricks or stones is not less than 72mm, when inner liner of rotary kiln is built to the fore shaft place, reserve the brick mouth between 2~3 row bricks, build fore shaft by laying bricks or stones with the combination of combined type fore shaft brick, then need following several combined type fore shaft brick, its method for designing is as follows:
The 1st kind: little area of bed (being designated as X1) is 2/3 of general arch brick, and big area of bed is then decided according to little area of bed and inner liner of rotary kiln arch brick design rule, and length is identical with general arch brick with height.
The 2nd kind: little area of bed (X2) is that the 1st kind of little area of bed of fore shaft brick (X1) adds 4mm; The major part size design is decided according to X2 and design rule, and length is identical with general arch brick with height.
The 3rd kind: little area of bed (X3) is that the 2nd kind of little area of bed of fore shaft brick (X2) adds 4mm; The major part size design is decided according to X3 and design rule, and length is identical with general arch brick with height.
The 4th kind: little area of bed (X4) is that the 3rd kind of little area of bed of fore shaft brick (X3) adds 4mm; The major part size design is decided according to X4 and design rule, and length is identical with general arch brick with height.
The rest may be inferred, extraordinarily goes up four demultiplications that 1.5mm is not less than the 1st kind of little area of bed of fore shaft brick when removing 2mm when three of the little area of bed of fore shaft brick that obtains, and then designed several fore shaft bricks can satisfy the fore shaft demand.
Of the present inventionly utilize combined type fore shaft brick to carry out inner liner of rotary kiln to build the method for fore shaft by laying bricks or stones and can also be: if the little area of bed of used general arch brick of building liner by laying bricks or stones is less than 72mm, when inner liner of rotary kiln is built to the fore shaft place, reserve the brick mouth between 3~4 row bricks, build fore shaft by laying bricks or stones with the combination of combined type fore shaft brick, then need following several combined type fore shaft brick, its method for designing is as follows:
The 1st kind: little area of bed (being designated as a1) adds 4mm for the little area of bed of general arch brick; Big area of bed can be decided according to little area of bed and arch brick design rule, and length is identical with general arch brick with height.
The 2nd kind: little area of bed (a2) adds 4mm for a1; Big area of bed is decided according to design rule, and length is identical with general arch brick with height.
The rest may be inferred, extraordinarily goes up 4 demultiplications that 1.5mm is not less than the little area of bed of general arch brick thickness when removing 2mm when three of the little area of bed of fore shaft brick that obtains, and then She Ji several fore shaft bricks can satisfy the fore shaft demand.
Of the present inventionly utilize combined type fore shaft brick to carry out inner liner of rotary kiln to build the method for fore shaft by laying bricks or stones and can shorten maintenance duration significantly, reduce the cost of overhaul, because of every kiln of large-scale rotary kiln whenever stopped 1 hour, the loss that will bring surplus in the of 60,000 yuan to enterprise, and when inner liner of rotary kiln overhauls, adopt this method, each maintenance can save the duration more than 4 hours, and can improve the quality that inner liner of rotary kiln is built fore shaft place masonry by laying bricks or stones, also can reduce labor strength, economic benefit and obvious social benefit significantly simultaneously.
Adopt the combined type fore shaft brick fore shaft of the present invention and the construction effect of processing brick fore shaft to contrast as following table.
Index | Processing brick fore shaft | Combined type fore shaft brick fore shaft |
Fore shaft speed | 2m/ hour | 15m/ hour |
Processing charges | 200 yuan/t | ????0 |
The refractory brick waste | 1 meter of 50kg/ fore shaft | ????0 |
Fore shaft place brickwork joint qualification rate | ????80% | ????100% |
Further describe the present invention below in conjunction with drawings and Examples.
Accompanying drawing 1 is the arch brick schematic diagram.
Embodiment 1:
As single-revolution kiln (Φ 4.5m * when 100m) inside lining is to the fore shaft place, the little area of bed of used general arch brick thickness is not less than 72mm, the fore shaft place reserves the size of brick mouth between 2~3 row bricks, be 3m+4 δ) during W>2m+3 δ, as shown in Figure 2, W is the young area of bed of brick in the formula, general arch brick shape as shown in Figure 1, every size is as follows:
M is 91.5mm, and n is 103mm, and H is 250mm, and L is 164mm, and the kiln liner is II class lining body, longitudinal seam δ=2mm.
Height H=the 250mm of then required combined type fore shaft brick, length L=164mm, gauge is total following several: the 1st kind of (being designated as A): X1=2/3 * 91.5=61mm
The 2nd kind of (being designated as B): X2=61+4=65mm
The 3rd kind of (being designated as C): X3=65+4=69mm
The 4th kind of (being designated as D): X4=69+4=73mm
The 5th kind of (being designated as E): X5=73+4=77mm
The 6th kind of (being designated as F): X6=77+4=81mm
And this moment, 3 * 81 (X6)+1.5=244.5>4 * 61 (X1)~2=242 promptly have 6 kinds of bricks just can satisfy the needs of this masonry of Rotary Kiln fore shaft.
Wherein said R is a cylinder of rotary kiln cross section internal diameter.
During construction,, produce the simulation of fore shaft brick and build table (table 1) by laying bricks or stones, can finish the fore shaft operation by the combination in the table according to the size range of scene reservation brick mouth.
Table 1 fore shaft stock mould intends building by laying bricks or stones table
Brick mouth size (microcephaly) | Configuration fore shaft brick | Brickwork joint (vertically) | Brick mouth size (microcephaly) | Configuration fore shaft brick | Brickwork joint (vertically) |
??190~193mm | ????3A | ??4δ | 237~241mm | ????3E | ????4δ |
??193~197mm | ??2A+1B | ??4δ | 241~245mm | ??2E+1F | ????4δ |
??197~201mm | ??2A+1C | ??4δ | 245~249mm | ??2F+1E | ????4δ |
??201~205mm | ??2A+1D | ??4δ | 249~253mm | ????3F | ????4δ |
??205~209mm | ??2A+1E | ??4δ | 253~256mm | ????4A | ????5δ |
??209~213mm | ??2A+1F | ??4δ | 256~260mm | ??3A+1B | ????5δ |
??213~217mm | ??2B+1E | ??4δ | 260~264mm | ??3A+1C | ????5δ |
??217~221mm | ??2B+1F | ??4δ | 264~268mm | ??3A+1D | ????5δ |
??221~225mm | ??2C+1E | ??4δ | 268~272mm | ??3A+1E | ????5δ |
??225~229mm | ??2C+1F | ??4δ | 272~276mm | ??3A+1F | ????5δ |
??229~233mm | ??2D+1E | ??4δ | 276~280mm | ??3B+1D | ????5δ |
??233~237mm | ??2D+1F | ??4δ | 280~282mm | ??3B+1E | ????5δ |
δ ∈ (1.5,2.5) wherein.
Should illustrate, during inner liner of rotary kiln is built by laying bricks or stones, build, during the fore shaft brick fore shaft on utilization, introduced, generally require the hoop straight joint, because brick mouth size alters a great deal along the rotary kiln axial direction no matter require the fissure of displacement to build still ring by laying bricks or stones.
Embodiment 2
Certain Φ of factory 4.0m * reserve the size of brick mouth when the 100m inner liner of rotary kiln is built fore shaft by laying bricks or stones between 3~4 row bricks, build general arch brick thickness microcephaly size m<72mm that liner is used by laying bricks or stones, i.e. 4m+5 δ>W>3m+4 δ, as shown in Figure 2, W is the young area of bed of brick in the formula, the shape of general arch brick as shown in Figure 1, every size is as follows: m=66.5mm, n=76.5mm, H=250mm, L=164mm, kiln liner are II class masonry, longitudinal seam δ=2mm.
Height H=the 250mm of then required combined type fore shaft brick, length L=164mm, gauge is total following several: the 1st kind of (being designated as A): X1=m+4=70.5mm
The 2nd kind of (being designated as B): x2=x1+4=74.5mm
The 3rd kind of (being designated as C): x3=x2+4=78.5mm
The 4th kind of (being designated as D): x4=x3+4=82.5mm
The 5th kind of (being designated as E): x5=x4+4=86.5mm
The 6th kind of (being designated as F): x6=x5+4=90.5mm
At this moment, 3 * 90.5+1.5=273>4 * 66.5-2=266 promptly has 6 kinds of bricks just can satisfy the needs of masonry of Rotary Kiln fore shaft.
During construction,, make the simulation of fore shaft brick and build table (table 2) by laying bricks or stones, can finish the fore shaft operation by the combination in the table according to the size range of reserving the brick mouth.
Table 2 fore shaft stock mould intends building by laying bricks or stones table
Brick mouth size (microcephaly) mm | Configuration fore shaft brick | Brickwork joint (vertically) | Brick mouth size (microcephaly) mm | Configuration fore shaft brick | Brickwork joint (vertically) |
??207.5~209.5 | ??3P | ??4δ | 241.5~245.5 | ??3C | ??4δ |
??209.5~213.5 | ?2P+1A | ??4δ | 245.5~249.5 | ?2C+1D | ??4δ |
??213.5~217.5 | ?1P+2A | ??4δ | 249.5~253.5 | ?1C+2D | ??4δ |
??217.5~221.5 | ??3A | ??4δ | 253.5~257.5 | ??3D | ??4δ |
??221.5~225.5 | ?2A+B | ??4δ | 257.5~261.5 | ?2D+1E | ??4δ |
??225.5~229.5 | ?1A+2B | ??4δ | 261.5~265.5 | ?1D+2E | ??4δ |
??229.5~233.5 | ??3B | ??4δ | 265.5~269.5 | ??3E | ??4δ |
??233.5~237.5 | ?2B+1C | ??4δ | 269.5~273.5 | ?2E+1F | ??4δ |
??237.5~241.5 | ?2C+1B | ??4δ | 273.5~276 | ??4P | ??5δ |
Used general arch brick when wherein P represents inside lining building, δ ∈ (1.5,2.5).
Should illustrate, during inner liner of rotary kiln is built by laying bricks or stones, build, during the fore shaft brick fore shaft on utilization, introduced, generally require the hoop straight joint, because brick mouth size alters a great deal along the rotary kiln direction of principal axis no matter require the fissure of displacement to build still ring by laying bricks or stones.
Claims (2)
1, a kind of combined type fore shaft brick that utilizes carries out the method that inner liner of rotary kiln is built fore shaft by laying bricks or stones, it is characterized in that: if used little area of bed of building the general arch brick thickness of liner by laying bricks or stones is not less than 72mm, when inner liner of rotary kiln is built to the fore shaft place, reserve the brick mouth between 2~3 row bricks, build fore shaft by laying bricks or stones with the combination of combined type fore shaft brick, then need following several combined type fore shaft brick, its method for designing is as follows:
The 1st kind: little area of bed (being designated as X1) is 2/3 of general arch brick, and big area of bed (being designated as Y1) is then decided according to little area of bed and inner liner of rotary kiln arch brick design rule, and length is identical with general arch brick with height;
The 2nd kind: little area of bed (X2) is that the 1st kind of little area of bed of fore shaft brick (X1) adds 4mm; The major part size design is decided according to X2 and design rule, and length is identical with general arch brick with height;
The 3rd kind: little area of bed (X3) is that the 2nd kind of little area of bed of fore shaft brick (X2) adds 4mm; The major part size design is decided according to X3 and design rule, and length is identical with general arch brick with height;
The 4th kind: little area of bed (X4) is that the 3rd kind of little area of bed of fore shaft brick (X3) adds 4mm; The major part size design is decided according to X4 and design rule, and length is identical with general arch brick with height;
The rest may be inferred, extraordinarily goes up four demultiplications that 1.5mm is not less than the 1st kind of little area of bed of fore shaft brick when removing 2mm when three of the little area of bed of fore shaft brick that obtains, and then designed several fore shaft bricks can satisfy the fore shaft demand.
2, a kind of combined type fore shaft brick that utilizes carries out the method that inner liner of rotary kiln is built fore shaft by laying bricks or stones, it is characterized in that: if the little area of bed of used general arch brick of building liner by laying bricks or stones is less than 72mm, when inner liner of rotary kiln is built to the fore shaft place, reserve the brick mouth between 3~4 row bricks, build fore shaft by laying bricks or stones with the combination of combined type fore shaft brick, then need following several combined type fore shaft brick, its method for designing is as follows:
The 1st kind: little area of bed (being designated as a1) adds 4mm for the little area of bed of general arch brick; Big area of bed can be decided according to little area of bed and arch brick design rule, and length is identical with general arch brick with height;
The 2nd kind: little area of bed (a2) adds 4mm for a1; Big area of bed is decided according to design rule, and length is identical with general arch brick with height;
The rest may be inferred, extraordinarily goes up 4 demultiplications that 1.5mm is not less than the little area of bed of general arch brick thickness when removing 2mm when three of the little area of bed of fore shaft brick that obtains, and then She Ji several fore shaft bricks can satisfy the fore shaft demand.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 97119977 CN1117960C (en) | 1997-10-29 | 1997-10-29 | Locking mouth-masonning method for rotary kiln lining by using combined locking brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 97119977 CN1117960C (en) | 1997-10-29 | 1997-10-29 | Locking mouth-masonning method for rotary kiln lining by using combined locking brick |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1191963A true CN1191963A (en) | 1998-09-02 |
CN1117960C CN1117960C (en) | 2003-08-13 |
Family
ID=5175707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 97119977 Expired - Lifetime CN1117960C (en) | 1997-10-29 | 1997-10-29 | Locking mouth-masonning method for rotary kiln lining by using combined locking brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1117960C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101251335B (en) * | 2008-04-01 | 2010-06-09 | 武汉钢铁(集团)公司 | Method for placing converter liner with helix mode |
CN106323004A (en) * | 2016-08-24 | 2017-01-11 | 新密市万力实业发展有限公司 | Construction method for laying refractory bricks of rotary kiln through bricklaying supporting device |
CN106643130A (en) * | 2016-12-29 | 2017-05-10 | 安徽芜湖海螺建筑安装工程有限责任公司 | Calculating method of number of masonry sealing bricks of firebricks of rotary kiln |
CN107385132A (en) * | 2017-08-14 | 2017-11-24 | 上海二十冶建设有限公司 | Hot-blast stove big-wall closes tweel block and exempts to process construction method |
CN108059470A (en) * | 2017-12-18 | 2018-05-22 | 安徽芜湖海螺建筑安装工程有限责任公司 | A kind of profile arrangement of new dry process rotary kiln refractory brick |
CN110411222A (en) * | 2019-07-08 | 2019-11-05 | 张晓伟 | A kind of rotary kiln refractory brick |
-
1997
- 1997-10-29 CN CN 97119977 patent/CN1117960C/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101251335B (en) * | 2008-04-01 | 2010-06-09 | 武汉钢铁(集团)公司 | Method for placing converter liner with helix mode |
CN106323004A (en) * | 2016-08-24 | 2017-01-11 | 新密市万力实业发展有限公司 | Construction method for laying refractory bricks of rotary kiln through bricklaying supporting device |
CN106643130A (en) * | 2016-12-29 | 2017-05-10 | 安徽芜湖海螺建筑安装工程有限责任公司 | Calculating method of number of masonry sealing bricks of firebricks of rotary kiln |
CN107385132A (en) * | 2017-08-14 | 2017-11-24 | 上海二十冶建设有限公司 | Hot-blast stove big-wall closes tweel block and exempts to process construction method |
CN108059470A (en) * | 2017-12-18 | 2018-05-22 | 安徽芜湖海螺建筑安装工程有限责任公司 | A kind of profile arrangement of new dry process rotary kiln refractory brick |
CN110411222A (en) * | 2019-07-08 | 2019-11-05 | 张晓伟 | A kind of rotary kiln refractory brick |
Also Published As
Publication number | Publication date |
---|---|
CN1117960C (en) | 2003-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101508144B (en) | Concrete casting production technique with energy-saving environmental-protection function | |
CN101260644B (en) | Method of manufacture for simply supported girder box | |
CN1191963A (en) | Locking mouth-masonning method for rotary kiln lining by using combined locking brick | |
CN111975974A (en) | Double-circulation production line and production process of prefabricated components of fabricated building | |
CN115026944A (en) | Method for pre-stressed construction of highway municipal prestressed concrete precast box girder | |
CN111283860A (en) | Assembly line production construction method for assembly type hollow bent cap of high-speed railway | |
CN108425507B (en) | Method for reinforcing concrete column by adopting UHPC | |
CN110468723B (en) | Installation and construction method for wrapping steel plate outside main pier of swivel bridge | |
CN105149180B (en) | A kind of aluminum dipping form plate surface treatment method | |
CN114482265B (en) | GIIH assembled steel structure residential building high-efficiency integrated manufacturing system | |
CN212562647U (en) | Can have enough to meet need modularization secondary structure wall body and build system construction model | |
CN112832546B (en) | Transformation method of existing structure replacement concrete system | |
CN107265036A (en) | A kind of reinforcing bar cage body is reached the standard grade system and method | |
CN114197857A (en) | Colorful fair-faced concrete construction process system | |
CN210195036U (en) | Groove type composite beam | |
CN104530577A (en) | Rubber sleeve for blocking precast box beam for high-speed rail and application method of rubber sleeve | |
CN214195658U (en) | Shear-resistant reinforcing structure suitable for main workshop of hydroelectric engineering | |
CN2092560U (en) | Pre-stressed concrete tubular pile | |
Sherov et al. | Enhancing the efficiency of rebar use in reinforced concrete products’ manufacturing | |
CN108775192A (en) | A kind of prestressed concrete tower rod structure and its construction method | |
CN109578008B (en) | Opposite logistics method for tunnel inverted arch double trestle | |
CN212478634U (en) | High-ductility concrete reinforced adobe wall | |
CN210887775U (en) | Precast prestressed concrete beam without upper prestress in use stage | |
CN219011483U (en) | Prestressed assembled concrete beam | |
Tatenami et al. | An analysis of deep-drawing process combined with bending |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20030813 |