CN1189630C - Apparatus and structure for connecting head of steel pipe pile and concrete footing - Google Patents

Apparatus and structure for connecting head of steel pipe pile and concrete footing Download PDF

Info

Publication number
CN1189630C
CN1189630C CNB018021263A CN01802126A CN1189630C CN 1189630 C CN1189630 C CN 1189630C CN B018021263 A CNB018021263 A CN B018021263A CN 01802126 A CN01802126 A CN 01802126A CN 1189630 C CN1189630 C CN 1189630C
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
conjunction
component effect
vertical component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB018021263A
Other languages
Chinese (zh)
Other versions
CN1418277A (en
Inventor
吴成男
金泰圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SMARTEC ENGINEERING Co Ltd
Original Assignee
SMARTEC ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020000041671A external-priority patent/KR100324104B1/en
Application filed by SMARTEC ENGINEERING Co Ltd filed Critical SMARTEC ENGINEERING Co Ltd
Publication of CN1418277A publication Critical patent/CN1418277A/en
Application granted granted Critical
Publication of CN1189630C publication Critical patent/CN1189630C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/16Foundations formed of separate piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

The invention relates to an apparatus and structure for connecting the head of the steel pile and the concrete footing. The system comprises a cylinder type vertical part having a number of bolts holes at the top side thereof and being inserted into the head of a steel piles, a flange part provided on the top of the vertical part so that the vertical part is suspended on the top of the steel pile, and a bottom plate integrally provided with the lower end of the vertical part for closing the cross section of the steel pile.

Description

Be used in conjunction with the head of steel pipe pile and the conjunction and the integrated structure of concrete foundation
Technical field
The present invention relates to be used for conjunction and integrated structure in conjunction with the head of the concrete foundation of building or building structure and steel pipe pile, specifically relate to be easily mounted on the head of steel pipe pile, make concrete foundation and steel pipe pile form the conjunction and the integrated structure of strong bonded.
Background technology
As the head of steel pipe pile and the integrated structure of concrete foundation, adopt two kinds of methods of following A, B usually.
The A method is that the head of steel pipe pile is imbedded in the concrete foundation with the length greater than the diameter of steel pipe pile, forms the structure of the external force (pressure or pulling force) of the head of supporting to act on steel pipe pile in the part of imbedding steel pipe pile.
The B method is the head of steel pipe pile to be imbedded the degree of about 10cm in the concrete foundation, connects the head and the concrete foundation of steel pipe pile with stiffener, and support affacts the method for external force of the head of steel pipe pile from concrete foundation.
In the structure of A method, owing to imbed the interference of the steel pipe pile in the concrete foundation, cut off the main reinforcement of the bottom surface that is configured in concrete foundation, the configuration of reinforcing bar has the shortcoming that increases amount of reinforcement than B method complexity.Therefore, use the B method usually.
As the example of described B method, as shown in Figure 6, following structure is arranged, promptly after cross stiffener 6 welding were inserted in the inside of steel pipe pile 1, welded on the top that circular cover plate 5 is placed on steel pipe pile 1, again at the side of steel pipe pile 1 welding stiffener 3.But, in these existing structures,, be difficult to utilize the weight of cross stiffener 6 to be provided with because the effect of cover plate 5 is limited, expense is also higher.Especially must weld stiffener in the side of steel pipe pile 1, weld job also needs a lot of manpowers and expense.
For solving such problem, developed Korean Patent No. 229166.But this scheme remains the top that the parts that combine with cross stiffener and cover plate is arranged on steel pipe pile, does not still address the above problem.
After this, as shown in Figure 7, developed in the inside of steel pipe pile and imbedded concrete structure.Steel pipe pile 1 internal side wall prevents to misplace the band plate 101 and protuberance 102 of usefulness respectively with the welding manner setting after, the lower panel 103 of sealing steel pipe pile 1 is arranged on the protuberance 102.Stiffener 3 is arranged on the top of lower panel 103, fluid concrete.
But, in this prior art, must be with welding manner at the inwall setting of steel pipe pile 1 prevent from the to misplace band plate 101 and the protuberance 102 of usefulness, because the inside of steel pipe pile 1 is narrow, installation exercise is very chaotic, the possibility that produces problems of welded quality is big.
For solving these prior art problems, the present inventor has developed structure as shown in Figure 8, speciallys permit 2000-12472 number application as Korea S.In this structure, the columnar conjunction 200 that is provided with protuberance 202 in bottom integral body inserted the inside of steel pipe pile 1 fully after, utilize bolt 201 conjunction 200 and the synthetic integral body of the lateral junction of steel pipe pile 1.On the top, side of above-mentioned conjunction 200, the vertical stiffener 3 that the inside of imbedding concrete foundation 2 is installed.Section for sealing steel pipe pile 1 is provided with lower board unit 203 on above-mentioned protuberance 202.When forming concrete foundation, the inside of the steel pipe pile 1 that forms on the top of lower board unit 203 also can fill concrete.
In these prior aries, the axial force (pressure and pulling force) that acts on the head of steel pipe pile must be by the proof stress support with the bolt that combines steel pipe pile and conjunction of the surface of steel pipe pile and the adhesive power between the concrete.But the surface state of steel pipe pile when above-mentioned adhesive power is constructed also promptly is subjected to the influence of foreign matter degree such as subsidiary soil or water on the surface of steel pipe pile, considers these situations, must guarantee sufficient safety during design.
For example, be in 140 tons of the standard elastic ultimate stresses of 508mm steel pipe pile for the 9mm diameter at general thickness, allow that 129 tons behind the adhesive power must must be provided with about 28 bolts by the bolt bearing in conjunction with steel pipe pile and conjunction for this reason owing to remove 11 tons.For many like this bolts are set expense is significantly increased, economy descends.
In addition, for guaranteeing the adhesive power of concrete and steel pipe pile, the position of conjunction must be positioned at apart from the top of steel pipe pile greater than the below of the distance of the diameter of steel pipe pile, and the result makes the position of bolt also lower than ground, has the very problem of difficulty of bolt hole joint bolt that is provided with.
Usually, in steel pipe pile, must be by supporting that from the axial force of concrete foundation the pulling force and the pressure ratio of steel pipe pile are very little.The present inventor is conceived to the characteristic of such steel pipe pile, has developed the structure that the inside of steel pipe pile head is filled with concrete, and the conjunction of the axial force that steel pipe pile must be supported can be effectively supported in exploitation simultaneously.
Summary of the invention
Therefore, the objective of the invention is the bolt by making fastening steel pipe pile and conjunction or the pulling force of proof stress role-taking on steel pipe pile of weld part, the major part of the pressure of the big relatively load of conduct is born by the protuberance of conjunction or the proof stress of horizontal part, thereby the head of the steel pipe pile that can significantly reduce fastening bolt quantity and improve manufacturability and economy and the conjunction and the integrated structure of concrete foundation are provided.
Other purpose of the present invention is the flexural rigidity by the head that increases steel pipe pile, when can bearing bigger moment of deflection, the bearing pressure that minimizing takes place on the concrete foundation on the top of steel pipe pile, thus the head of the steel pipe pile that can bear bigger pressure and the conjunction and the integrated structure of concrete foundation are provided.
In addition, after inserting the head of steel pipe pile at the conjunction of produce in factory, fill concrete to be guaranteeing the adhesive strength between concrete and the conjunction, thereby the head of the steel pipe pile that can bring into play excellent properties and the conjunction and the integrated structure of concrete foundation are provided.
The conjunction of the steel pipe pile that has following feature for achieving the above object, the invention provides.This conjunction comprises: the cylindrical shape vertical component effect, the side is provided with a plurality of bolts hole that are used to make steel pipe pile and bolt combination with predetermined distance at an upper portion thereof, be provided with and concrete is the projection that is offset of preventing of mechanical engagement effect in that inside face is outstanding, had corresponding to the external diameter of steel pipe pile internal diameter and insert the head of described steel pipe pile; Protuberance when inserting the head of described steel pipe pile at conjunction, hangs on the described steel pipe pile described conjunction, and the pressure that acts on the described conjunction is passed to described steel pipe pile, and is outstanding to the outside from the epimere portion of described vertical component effect; Base plate seals the section of described steel pipe pile, is wholely set the bottom at described vertical component effect, is formed with fixedly a plurality of reinforcement installation hole of stiffener.
In described conjunction, be formed with medium pore in the central authorities of described base plate, can on described medium pore, constitute the cover plate of the described medium pore of sealing.In this case, can reduce the use amount of the steel that form base plate.
The invention provides the conjunction of steel pipe pile with following feature.The conjunction of described steel pipe pile comprises body, a plurality of vertical reinforcing bars and base plate, described body comprises vertical component effect and horizontal part, described vertical component effect is columnar, has external diameter corresponding to the internal diameter of steel pipe pile, insert the head of described steel pipe pile, described horizontal part has the shape of the circular rings of Rack on the top of described vertical component effect, for inserting described steel pipe pile at conjunction when inner, described conjunction is hung on the described steel pipe pile, formation to the outstanding protuberance in outside, is formed with the fixing hole of vertical reinforcing bar from the top of described vertical component effect with predetermined distance along circumference; Described a plurality of vertical reinforcing bar, an end insert the fixing hole that is fixed on the vertical reinforcing bar that forms on the described horizontal part of described body and prolong vertically downward; Described base plate is connected the other end of described vertical reinforcing bar, seals the section of described steel pipe pile.
In described conjunction, form a plurality of bolts hole in the side of described vertical component effect, when vertical component effect inserts the head of described steel pipe pile, can constitute described body and combine, weld together by upper end perhaps that also conjunction body and steel pipe pile to be combined into as a whole the bottom of the protuberance of described horizontal part and steel pipe pile with the bolt of steel pipe pile.Between described horizontal part and vertical component effect, can be provided for supporting a plurality of vertical muscle of described horizontal part and vertical component effect.
In described conjunction, also can be a plurality of stiffener fixing holes of the end that stiffener insert to be installed along the circumference of described horizontal part with the predetermined distance setting, the end of this stiffener is imbedded and is anchored in the concrete foundation, also can play the projection and the band plate that prevents to be offset of mechanical engagement effect at the inwall setting of described vertical component effect and the concrete in the inside filling.
The invention provides steel pipe pile conjunction with following feature.The conjunction of this steel pipe pile comprises body, a plurality of vertical reinforcing bar and base plate.Described body comprises vertical component effect, horizontal part and protuberance, described vertical component effect be columnar, have corresponding to the external diameter of the internal diameter of steel pipe pile and insert the head of described steel pipe pile, described horizontal part has the shape of the circular rings of Rack in the hypomere portion of described vertical component effect, with the predetermined distance setting, described protuberance is to hang over the epimere portion of described steel pipe pile and outstanding to the outside from the epimere portion of described vertical component effect to the fixing hole of vertical reinforcing bar along circumference; Described a plurality of vertical reinforcing bar, an end insert the fixing hole that is fixed on the vertical reinforcing bar that forms on the described horizontal part of described body and prolong vertically downward; Described base plate is connected the other end of described vertical reinforcing bar, seals the section of described steel pipe pile.
The body of described conjunction also can combine with steel pipe pile with bolt, perhaps also can be by the bottom of the protuberance of described horizontal part and the epimere portion of steel pipe pile are welded together, and it is as a whole that body and steel pipe pile are combined into.Also can between described horizontal part and vertical component effect, be provided for a plurality of vertical muscle of support level portion and vertical component effect.In addition, in described horizontal part, also can be along the circumference of described horizontal part, form the fixing hole of a plurality of stiffeners with predetermined distance, this fixing hole is installed and is imbedded the end that is anchored at the stiffener in the concrete foundation.
Description of drawings
Fig. 1 a is the exploded perspective view of an embodiment of conjunction of the present invention;
Fig. 1 b is the state that combines the conjunction of Fig. 1 a, is the stereogram that diagram can be seen the section of being cut open by the A-A line of Fig. 1 a;
Fig. 1 c is the conjunction of Fig. 1 a and the sectional drawing of concrete foundation bonding state;
Fig. 2 a is the exploded perspective view of another embodiment of conjunction of the present invention;
Fig. 2 b is the state that combines the conjunction of Fig. 2 a, is the exploded perspective view that diagram can be seen the section of being cut open by the A-A line of Fig. 2 a;
Fig. 2 c is the conjunction of Fig. 2 a and the sectional drawing of concrete foundation bonding state;
Fig. 2 d is the bonding state in the variation of the conjunction of Fig. 2 a, is the stereogram that diagram can be seen section;
Fig. 3 a is the exploded perspective view of another embodiment of conjunction of the present invention;
Fig. 3 b is the bonding state that combines the conjunction of Fig. 3 a, is the stereogram that diagram can be seen the section of being cut open by the A-A line of Fig. 3 a;
Fig. 3 c is the conjunction of Fig. 3 a and the sectional drawing of concrete foundation bonding state;
Fig. 3 d is the bonding state of variation of the conjunction of Fig. 3 a, is the stereogram that diagram can be seen section;
Fig. 3 e is the conjunction of Fig. 3 d and the sectional drawing of concrete foundation bonding state;
Fig. 4 a is the bonding state of another embodiment of distortion of the conjunction of Fig. 3 a, and diagram can be seen the stereogram of section;
Fig. 4 b is the conjunction of Fig. 4 a and the sectional drawing of concrete foundation bonding state;
Fig. 5 a is the bonding state of another embodiment of distortion of the conjunction of Fig. 3 a, and diagram can be seen the stereogram of section;
Fig. 5 b is the conjunction of Fig. 5 a and the sectional drawing of concrete foundation bonding state;
Fig. 6 is the stereogram of existing conjunction;
Fig. 7 and Fig. 8 are the sectional drawings of the integrated structure of various available coagulation earth foundations of expression and steel pipe pile.
The specific embodiment
Below the standard implementation example that present invention will be described in detail with reference to the accompanying.At first, the embodiment that represents to Fig. 1 c of key diagram 1a.Fig. 1 a is the exploded perspective view of an embodiment of conjunction of the present invention; Fig. 1 b is the combined state of the conjunction of Fig. 1 a, is the stereogram that can see the section of being cut open by the A-A line of Fig. 1 a; Fig. 1 c is the conjunction of Fig. 1 a and the sectional drawing of concrete foundation bonding state.
Conjunction 10 of the present invention comprises columnar vertical component effect 12, protuberance 14 and base plate 15.Wherein: the vertical component effect 12 of garden tubular has the external diameter of the internal diameter of corresponding steel pipe pile 1, inserts the head of steel pipe pile 1; When protuberance 14 inserts the head of steel pipe pile 1 at conjunction 10, hang on the steel pipe pile 1 for making conjunction 10, outstanding from the epimere portion of described vertical component effect 12 to the outside of radial direction, form one with described vertical component effect 12; The section of base plate 15 sealing steel pipe piles 1, integrally formed in the bottom of described vertical component effect 12.Described protuberance 14 also has and can pass to the function of described steel pipe pile 1 acting on pressure on the conjunction 10.
Shown in Fig. 1 a and Fig. 1 b,, form a plurality of bolts hole 16 with predetermined distance in the upper side of described vertical component effect 12.On described bolt hole 16, when described vertical component effect 12 inserts the head of described steel pipe pile 1, by making bolt 17 run through the corresponding bolt hole of the also side formation of fastening steel pipe pile 1 and the bolt hole 16 of described vertical component effect 12, make steel pipe pile 1 and conjunction 10 be combined into as a whole.The pulling force that affacts on the conjunction 10 from concrete foundation passes to steel pipe pile 1 by described bolt 17.
On existing conjunction shown in Figure 8, because must be by bearing nearly all pressure in conjunction with the bolt of conjunction and steel pipe pile, therefore need a plurality of bolts, and in the present invention, bolt 17 in conjunction with conjunction 10 and steel pipe pile 1 is mainly born pulling force, therefore can reduce the quantity of essential bolt 17.
Prevent the band plate 18 that is offset in the side of described vertical component effect 12 towards outstanding being provided with of internal direction.Since described prevent that the band plate 18 that is offset is filled into the space that is formed by vertical component effect 12 and base plate 15 at concrete after, form the mechanical engagement effect with concrete, so pass to steel pipe pile 1 from the axial force (pressure or pulling force) of concrete foundation transmission.In addition, because the described band plate 18 that is offset that prevents forms in the inside of vertical component effect 12, its expansion is subjected to the constraint of vertical component effect 12, so the concrete bearing strength of filling in the space that is formed by vertical component effect 12 and base plate 15 is big especially.Its result acts on the conjunction 10 pressure of quite a few and is born by the band plate 18 that prevents to be offset, and the pressure that passes to base plate 15 is diminished.Therefore, base plate 15 thickness can be done very thinly, and the length of vertical component effect 12 also can shorten.Reduce the quantity of the steel that are used for conjunction 10 like this, brought the effect that reduces the weight of conjunction 10, therefore, improved the manufacturability and the economy of conjunction 10.
On base plate 15, be formed with the fixing hole 19 of stiffener with the interval of regulation along its circumference.Insert an end of vertical stiffener 3 at described stiffener fixing hole 19.The other end of stiffener 3 is imbedded (with reference to Fig. 1 c) in the concrete foundation 2.After the combination of the fixing hole 19 usefulness bolts of an end of stiffener 3 and described stiffener, can further utilize the shearing resistance that is produced by the bolt combination, thereby can reduce the anchorage length of the described stiffener 3 that is anchored at concrete foundation.
For reducing the weight of conjunction 10, also can do the thickness of the central portion of described base plate 15 differently with the thickness in the outside.In the embodiment shown in the figures, the central authorities' formation medium pore 8 at described base plate 15 on described medium pore 8, covers the thin cover plate 9 of iron plate or plank etc., begins to form the structure of sealing medium pore 8.
In addition, be support base 15 securely, a plurality of vertical reinforcing ribs 7 also can be set between base plate 15 and vertical component effect 12.
Below, illustrate the embodiment of the invention that the front has illustrated conjunction structure and method to set up be set.
Shown in Fig. 1 c, behind the top of the vertical component effect 12 insertion steel pipe piles 1 of conjunction 10, utilize the top and the vertical component effect 12 of bolt 17 fastening steel pipe piles 1.The end of stiffener 3 being put into the fixing hole 19 of the stiffener of base plate 15 fixes.The threaded portion is set respectively on the fixing hole 19 of described stiffener and described stiffener 3 and screws tight mutually under the situation of combination, can further utilize screw thread in conjunction with the shearing resistance that is produced.Thereby, after stiffener 3 is combined in base plate 15, can and tighten up vertical component effect 12 insertion steel pipe piles 1.
On steel pipe pile 1, arrange the reinforcing bar 4 of concrete foundation 2, fill concrete and maintenance in the inside of described vertical component effect 12 and concrete foundation 2.
On existing conjunction shown in Figure 8, because at foreign matters such as subsidiary soil of the inwall of steel pipe pile or water, adhesive strength between concrete and the steel pipe pile is descended, and in the present invention, because conjunction is at produce in factory and install, so do not worry when placing of concrete, reducing adhesive strength between concrete and the conjunction.
Following key diagram 2a is to an alternative embodiment of the invention shown in Fig. 2 c.
Fig. 2 a is the exploded perspective view of the conjunction 20 of an alternative embodiment of the invention.Fig. 2 b is the state that combines the conjunction of Fig. 2 a, is the stereogram that can illustrate the described conjunction 20 of the section of being cut open by the A-A line of Fig. 2 a.Fig. 2 c is the sectional drawing of above-mentioned conjunction 20 and concrete foundation bonding state.
Conjunction 20 comprises body 21, vertical reinforcing bar 30 and base plate 25, wherein body 21 is formed with vertical component effect 22 and horizontal part 23, this vertical component effect 22 is columnar, external diameter with internal diameter of corresponding steel pipe pile 1, can insert the head of steel pipe pile 1, this horizontal part 23 forms the shape of the circular rings of Rack on the top of described vertical component effect 22, have the protuberance of giving prominence to the outside for the epimere portion that hangs over described steel pipe pile 1 24; Described vertical reinforcing bar 30 1 ends are fixed on the horizontal part 23 of described body 21, prolong vertically downward; Described base plate 25 is fixed on the other end of described vertical reinforcing bar 30, the section of sealing steel pipe pile 1.
On described horizontal part 23, inserting also, the fixing hole 31 of the vertical reinforcing bar of an end of fixed vertical reinforcing bar 30 forms with the interval of stipulating.Vertical component effect 22 retreats above the thickness of steel pipe pile 1 and is vertical configuration from the end of horizontal part 23 to inside, the edge of horizontal part 23 form protuberance 24 to the outstanding part in the outside of vertical component effect 22.Described protuberance 24 hangs over the upper end of steel pipe pile 1 to conjunction 20, and the pressure that acts on the conjunction 20 is passed to steel pipe pile 1.
On horizontal part 23, also can have the stiffener fixing hole 29 of the stiffener 3 of fixedly imbedding and be anchored in concrete foundation inside.On described stiffener 3 and stiffener fixing hole 29, also all form the threaded portion respectively, make stiffener 3 and the 29 screw thread combinations of stiffener fixing hole.In case stiffener 3 and the 29 screw thread combinations of stiffener fixing hole can improve adhesion, the anchorage length of the stiffener 3 of the inside that is anchored at steel pipe pile 1 can be reduced, thereby expense can be reduced, improve manufacturability.
In the side of described vertical component effect 22, form a plurality of bolts hole 26 with the interval of stipulating.When described vertical component effect 22 inserted steel pipe pile 1, bolt 27 was applied in the bolt hole of the side correspondence of steel pipe pile 1, and inserting bolt hole 26 is combined as a whole steel pipe pile 1 and conjunction 20.Make the pulling force that acts on the conjunction 20 pass to steel pipe pile 1 by described bolt 27.
Be horizontal part 23 and the vertical component effect 22 of supporting vertical combination, a plurality of vertical muscle 37 can be set between horizontal part 23 and vertical component effect 22.8~12 of the quantity of described muscle 37 are suitable, but also not necessarily are limited to these numbers.
Different to the embodiment shown in Fig. 1 c with Fig. 1 a, in the present embodiment, described base plate 25 separates with vertical component effect 22.Like this, in the present embodiment, because base plate 25 separates with vertical component effect 22, on base plate 25 during fill concrete, can bear axial force (pressure or pulling force) by the adhesive power between the surface of the side of concrete and steel pipe pile 1, its result can reduce the use amount of steel, improves economy and manufacturability.
The circular slab of the diameter that described base plate 25 usefulness are littler than the internal diameter of steel pipe pile 1 makes.Described base plate 25 is connected the enclose inside of steel pipe pile 1 with described horizontal part 23 by vertical reinforcing bar 30.Seal by base plate 25, no-leak during the inner space fill concrete of the steel pipe pile 1 that forms on the top of base plate 25 for making concrete, also can have seal member (not diagram) at the outer peripheral face of described base plate 25.In case be provided with seal member, just can prevent that underground water from flowing into from the bottom of steel pipe pile 1.
One end of described vertical reinforcing bar 30 is inserted and secured in the vertical reinforcing bar fixing hole 31 of horizontal part 23.Also be formed with the fixing hole 32 of vertical reinforcing bar at base plate 25, the other end of vertical reinforcing bar 30 is inserted and secured in the fixing hole 32 of the vertical reinforcing bar that described base plate 25 forms.As the method that the end of vertical reinforcing bar 30 is fixed on described base plate 25 and/or horizontal part, also can be after vertical reinforcing bar 30 inserts fixing hole 31,32 each, in its end nut being installed fixes, perhaps also can form the threaded portion in the end of vertical reinforcing bar 30, also form corresponding therewith threaded portion at fixing hole 31,32, adopt and fix with screw thread mutually.The quantity of described vertical reinforcing bar 30 determines by structural calculation, preferably 8~12, counts but also not necessarily be limited to these.
Below, illustrate the present embodiment that the front has illustrated conjunction 20 structure and method to set up be set.
Conjunction 20 is formed by body 21, vertical reinforcing bar 30 and base plate 25 assemblings, and wherein body 21 is made by vertical component effect 22 and horizontal part 23.Promptly be that an end of vertical reinforcing bar 30 is fixed on the fixing hole 32 of vertical reinforcing bar of base plate 25, the vertical other end of reinforcing bar 30 is combined with the fixing hole 31 of the vertical reinforcing bar of horizontal part 23.But the assembling sequence of vertical reinforcing bar 30 is not limited only to this.
Then, with the top that the conjunction 20 that assembles inserts steel pipe pile 1, the protuberance 24 of horizontal part 23 is hung over the top of described steel pipe pile 1., also fastening the bolt hole that forms in the upper side of steel pipe pile 1 by inserting bolt 27 with after the spiral shell verify 26 of vertical component effect 22 is aimed at, conjunction 20 is combined with steel pipe pile 1.
Then, the stiffener 3 of imbedding concrete foundation is installed on the conjunction 20.Shown in Fig. 2 b and Fig. 2 c, on the horizontal part 23 of body 21, form the fixing hole 29 of stiffener, stiffener 3 is fixed and is vertically set on the fixing hole 29 of described stiffener.
Be provided with after the stiffener 3, arrange concrete foundation on the top of this steel pipe pile 1 with reinforcing bar 4, fill concrete and maintenance in by the inside of described base plate 25 sealings and the steel pipe pile 1 that forms and concrete foundation.
Fig. 2 d represents the variation of the above-mentioned embodiment that has illustrated, and Fig. 2 d is a state of having assembled conjunction 20, is the stereogram of diagram end face.
Shown in Fig. 2 d, as replacing with bolt in conjunction with the side of vertical component effect 22 and the mode of steel pipe pile 1, also can form chamfering 33, the top of chamfering 33 with steel pipe pile 1 is welded to each other, conjunction 20 and steel pipe pile 1 are combined into one at the protuberance 24 of horizontal part 23.Occasion in conjunction 20 and 27 combinations of steel pipe pile 1 usefulness bolt, must also beat bolt hole in the side of steel pipe pile 1 at the scene according to the bolt hole 26 of conjunction 20, in the occasion of using welding manner in conjunction with conjunction 20 and steel pipe pile 1, need not beat such bolt hole again, improve manufacturability.In addition, owing to do not exist, therefore can make full use of the proof stress of steel pipe pile 1 because of play the cross section loss that bolt hole 26 takes place on conjunction 20 and steel pipe pile 1.
In addition, can stiffener 3 not combined with horizontal part 23 yet, and stiffener 3 is inserted in the hole that the central authorities of horizontal part 23 form, according to the rules vertical the setting and placing of concrete in interval on base plate 25.
Below illustrate at Fig. 3 a to another embodiment of the present invention shown in Fig. 3 c.
Fig. 3 a is the exploded perspective view of the conjunction 40 of another embodiment of the present invention; At Fig. 3 b, be bonding state at the conjunction of Fig. 3 a, the stereogram of the described conjunction 40 of the section that expression is cut open by the A-A line of Fig. 3 a; Fig. 3 c represents the sectional drawing of conjunction 40 and concrete foundation 2 bonding states; Fig. 3 d is that expression conjunction 40 usefulness welding manners combine with steel pipe pile 1, the end of stiffener 3 less than with state that horizontal part combines under be placed on the stereogram of the embodiment on the base plate.Fig. 3 e is the sectional drawing of the shape of embodiment shown in the presentation graphs 3d and concrete foundation 2 combinations.
To the embodiment shown in Fig. 3 e, is the variation of Fig. 2 a to the embodiment shown in Fig. 2 d at Fig. 3 a, and described horizontal part forms in the bottom of vertical component effect.
Specifically, conjunction 40 comprises: body 41, vertical reinforcing bar 50 and base plate 45.Wherein body 41 comprises vertical component effect 42, horizontal part 43 and protuberance 44, vertical component effect 42 is columnar, external diameter with internal diameter of corresponding steel pipe pile 1, insert in the steel pipe pile 1, shape with the circular rings of Rack forms horizontal part 43 in the bottom of described vertical component effect 42, and protuberance 44 is provided with in that the top of described vertical component effect 42 is outstanding for the top that hangs over described steel pipe pile 1; Vertical reinforcing bar 50 1 ends are fixed on the horizontal part 43 of described body 41 and prolong vertically downward; Base plate 45 is fixed on the other end of described vertical reinforcing bar 50, seals the section of described steel pipe pile 1.
In the embodiment shown in Fig. 2 e, horizontal part 23 forms at the topmost of described vertical component effect 22 at Fig. 2 a, because horizontal part 23 is more outstanding to the outside expansion than the external diameter of vertical component effect 22, its outstanding part forms protuberance 24.In contrast to this, in the embodiment shown in Fig. 3 e, horizontal part 43 forms in the lower end of vertical component effect 42 at Fig. 3 a, and protuberance 44 is arranged on the upper end of vertical component effect 42 separately.
Like this, in the present embodiment, because horizontal part 43 forms in the bottom of vertical component effect 42, for the horizontal part 43 of supporting described vertical combination and a plurality of vertical tendon 57 of vertical component effect 42 form (in the embodiment shown in Fig. 2 e, muscle 57 is located at the bottom of horizontal part at Fig. 2 a) on the top of horizontal part 43.About other explanation of present embodiment, since identical with Fig. 2 a to the content of the embodiment shown in Fig. 2 e, in this omission.
In the present embodiment,, and lean on concrete to strengthen, so more can strengthen the coupling part between stiffener and the conjunction owing to stiffener is connected with conjunction in the inside of steel pipe pile.
In addition, in the occasion of Fig. 3 a to the embodiment shown in Fig. 3 c, stiffener 3 is combined with horizontal part 23, stiffener 3 is inserted in the hole of horizontal part 43 central authorities formation, after in accordance with regulations interval on the base plate 45 vertically is provided with, placing of concrete (with reference to figure 3d to Fig. 3 e).
Is Fig. 3 a another different variation to the embodiment shown in Fig. 3 c at Fig. 4 a to Fig. 4 b.Fig. 4 a is installed in the sectional stereogram that expression under the state of steel pipe pile 1 head can be seen section at conjunction 40; Fig. 4 b is the sectional drawing of described conjunction 40 of expression and concrete foundation 2 bonding states.
At Fig. 4 a in the embodiment shown in Fig. 4 b, as replacing with bolt in conjunction with the side of vertical component effect 42 and the mode of steel pipe pile 1, can form chamfering 33 at the protuberance 44 of described horizontal part 43, by the top of this chamfering 33 with steel pipe pile 1 is welded to each other together, conjunction 40 and steel pipe pile 1 are combined into one.
Fig. 5 a and Fig. 5 b be at Fig. 3 a in the embodiment shown in Fig. 3 c, the shape of the conjunction that the band plate 59 that appends protuberance 58 at vertical component effect 22 inwalls and prevent to be offset is formed, the figure that represents at separately sectional stereogram and sectional drawing.Described protuberance 58 and the band plate 59 that prevents to be offset, prevent that the inner concrete of filling of vertical component effect from shrinking and the separating of vertical component effect because of drying, by means of bearing tensile load and the compression load that passes out from concrete, thereby reduce the load that acts on the base plate with concrete mechanical engagement effect.The band plate 59 that such protuberance 58 and preventing is offset also can be configured among the embodiment that the front illustrated.
About other the explanation of the represented embodiment of Fig. 4 a, Fig. 4 b, Fig. 5 a and Fig. 5 b,, no longer explain over and over again because the content of the relevant embodiment that illustrated with the front is identical.The occasion of the whole embodiment of the present invention that illustrated in front, the mode that also can be used in winding of band-type reinforcing bar on the vertical reinforcing bar is strengthened.
According to the present invention who in above various embodiment, illustrates, the pulling force that is delivered to steel pipe pile from concrete foundation is to be born by bolt or weld part in conjunction with steel pipe pile and conjunction, the major part of the pressure of big relatively load is born by the protuberance of conjunction and/or the proof stress of horizontal part.Thereby, compare with existing conjunction, can significantly reduce quantity in conjunction with the bolt of steel pipe pile and conjunction, thus, can improve manufacturability and economy.
In addition, owing to utilize conjunction of the present invention, can make reinforced concrete structure to the head of steel pipe pile, so can bear moment of deflection and the pressure that is added in the steel pipe pile head better.
In addition, because after the conjunction insertion steel pipe pile inside of produce in factory, fill concrete between conjunction and steel pipe pile can improve the adhesive strength between concrete and the conjunction, can reduce the degree of depth of the vertical component effect of the conjunction that inserts steel pipe pile inside.Thereby, steel that can corresponding minimizing conjunction and the manufacturing cost of saving conjunction.

Claims (16)

1, a kind of conjunction of steel pipe pile, it is characterized in that, this conjunction comprises: the cylindrical shape vertical component effect, the side is provided with a plurality of bolts hole that are used to make steel pipe pile and bolt combination with predetermined distance at an upper portion thereof, be provided with and concrete is the projection that is offset of preventing of mechanical engagement effect in that inside face is outstanding, had corresponding to the external diameter of steel pipe pile internal diameter and insert the head of described steel pipe pile; Protuberance when inserting the head of described steel pipe pile at conjunction, hangs on the described steel pipe pile described conjunction, and the pressure that acts on the described conjunction is passed to described steel pipe pile, and is outstanding to the outside from the epimere portion of described vertical component effect; Base plate seals the section of described steel pipe pile, is wholely set the bottom at described vertical component effect, is formed with fixedly a plurality of reinforcement installation hole of stiffener.
2, the conjunction of steel pipe pile as claimed in claim 1 is characterized in that, is formed with medium pore in the central authorities of described base plate, covers cover plate to seal described medium pore on described medium pore.
3, a kind of head of the steel pipe pile that uses conjunction and the integrated structure of concrete foundation, it is characterized in that, described conjunction comprises: the cylindrical shape vertical component effect, the side is formed with a plurality of bolts hole with predetermined distance at an upper portion thereof, be provided with and concrete is the projection that is offset of preventing of mechanical engagement effect in that inside face is outstanding, had corresponding to the external diameter of steel pipe pile internal diameter and insert the head of described steel pipe pile; Protuberance hangs on the described steel pipe pile for making described conjunction, and the pressure that acts on the described conjunction is passed to described steel pipe pile, and is outstanding to the outside from the epimere portion of described vertical component effect; Base plate seals the section of described steel pipe pile, is wholely set the bottom at described vertical component effect, is formed with a plurality of reinforcement installation hole,
Described conjunction is installed in the head of described steel pipe pile and adopts the bolt combination, the stiffener that one end is fixed on the reinforcement installation hole of described base plate prolongs and imbeds to the external vertical of described conjunction and is installed in the concrete foundation, the concrete that constitutes described concrete foundation is filled in the space that is formed by described base plate and vertical component effect, the head of described steel pipe pile and concrete foundation are incorporated into as a whole
4, a kind of conjunction of steel pipe pile, it is characterized in that, comprise body, a plurality of vertical reinforcing bars and base plate, described body comprises vertical component effect and horizontal part, described vertical component effect is columnar, has external diameter corresponding to the internal diameter of steel pipe pile, insert the head of described steel pipe pile, described horizontal part has the shape of the circular rings of Rack on the top of described vertical component effect, for inserting described steel pipe pile at conjunction when inner, described conjunction is hung on the described steel pipe pile, form the protuberance of giving prominence to the outside from the top of described vertical component effect, be formed with the fixing hole of vertical reinforcing bar along circumference with predetermined distance;
Described a plurality of vertical reinforcing bar, an end insert the fixing hole that is fixed on the vertical reinforcing bar that forms on the described horizontal part of described body and prolong vertically downward;
Described base plate is connected the other end of described vertical reinforcing bar, seals the section of described steel pipe pile.
5, the conjunction of steel pipe pile as claimed in claim 4, it is characterized in that, be formed with a plurality of bolts hole of inserting bolt in the side of described vertical component effect, when described vertical component effect inserts the head of described steel pipe pile, described body is combined with described steel pipe pile bolt, between described horizontal part and vertical component effect, be provided with a plurality of vertical muscle that is used to support described horizontal part and vertical component effect.
6, the conjunction of steel pipe pile as claimed in claim 4 is characterized in that, makes described body and described steel pipe pile be combined into as a whole by the epimere portion of the bottom of the protuberance of described horizontal part and described steel pipe pile is welded together;
Between described horizontal part and vertical component effect, be provided with a plurality of vertical muscle that is used to support described horizontal part and vertical component effect.
7, as the conjunction of claim 5 or 6 described steel pipe piles, it is characterized in that, insert a plurality of stiffener fixing holes that the end of imbedding and be anchored at the stiffener in the concrete foundation is installed, along the circumference of described horizontal part, with the predetermined distance setting.
8, as the conjunction of claim 5 or 6 described steel pipe piles, it is characterized in that, at the inwall of described vertical component effect, the outstanding projection and the band plate that prevents to be offset that plays the mechanical engagement effect with the concrete of portion's filling within it that be provided with.
9, a kind of conjunction of steel pipe pile, it is characterized in that, comprise body, a plurality of vertical reinforcing bar and base plate, described body comprises vertical component effect, horizontal part and protuberance, described vertical component effect is columnar, has external diameter corresponding to the internal diameter of steel pipe pile, insert the head of described steel pipe pile, described horizontal part forms the shape of the circular rings of Rack in the hypomere portion of described vertical component effect, the fixing hole of vertical reinforcing bar along circumference with the predetermined distance setting, described protuberance is the epimere portion that hangs over described steel pipe pile, and is outstanding to the outside from the top of described vertical component effect;
One end of described a plurality of vertical reinforcing bars inserts in the fixing hole that is fixed on the described vertical reinforcing bar that forms on the described horizontal part of described body and vertically downward and prolongs;
Described base plate is connected the other end of described vertical reinforcing bar and seals the section of described steel pipe pile.
10, the conjunction of steel pipe pile as claimed in claim 9 is characterized in that, is formed with a plurality of bolts hole of inserting bolt in the side of described vertical component effect, and when described vertical component effect inserted the head of described steel pipe pile, described body combined with bolt with described steel pipe pile,
Between described horizontal part and vertical component effect, be provided with a plurality of vertical muscle that is used to support described horizontal part and vertical component effect.
11, the conjunction of steel pipe pile as claimed in claim 9 is characterized in that, makes described body and described steel pipe pile be combined into as a whole by the epimere portion of the bottom of the protuberance of described horizontal part and described steel pipe pile is welded together;
Between described horizontal part and vertical component effect, be provided with a plurality of vertical muscle that is used to support described horizontal part and vertical component effect.
12, as the conjunction of claim 10 or 11 described steel pipe piles, it is characterized in that, insert a plurality of stiffener fixing holes that the end of imbedding and be anchored at the stiffener in the concrete foundation is installed, along the circumference of described horizontal part, with the predetermined distance setting.
13, a kind of head of the steel pipe pile that uses conjunction and the integrated structure of concrete foundation, it is characterized in that, described conjunction comprises body, a plurality of vertical reinforcing bars and base plate, described body comprises vertical component effect and horizontal part, described vertical component effect is columnar, has external diameter corresponding to the internal diameter of steel pipe pile, insert the head of described steel pipe pile, described horizontal part forms the shape of the circular rings of Rack on the top of described vertical component effect, for inserting described steel pipe pile at conjunction when inner, described conjunction is hung on the described steel pipe pile, be formed with from the top of described vertical component effect to the outstanding protuberance in outside, the fixing hole of vertical reinforcing bar along circumference with the predetermined distance setting;
Described a plurality of vertical reinforcing bar, an end is inserted and is fixed in the fixing hole of the vertical reinforcing bar that forms on the described horizontal part of described body, and prolongs vertically downward;
Described base plate is connected the other end of described vertical reinforcing bar, seals the section of described steel pipe pile,
Described conjunction be installed in described steel pipe pile head and with described steel pipe pile be combined into as a whole,
Be inserted in the hole that described horizontal part central authorities form, on described base plate, prolong and imbed to the external vertical of described conjunction and be installed in the concrete foundation with the stiffener of predetermined distance setting,
The concrete that constitutes described concrete foundation is filled in the space that is formed by described base plate and vertical component effect, and the head of described steel pipe pile and described concrete foundation are incorporated into as a whole.
14, the integrated structure of the head of the steel pipe pile of use conjunction as claimed in claim 13 and concrete foundation is characterized in that, form with predetermined distance along circumference at the fixing hole of the described horizontal part stiffener of described body,
Described stiffener one end is fixed in the fixing hole of described stiffener of described horizontal part, and its other end prolongs and imbeds to the external vertical of described conjunction and is installed in the concrete foundation.
15, a kind of head of the steel pipe pile that uses conjunction and the integrated structure of concrete foundation, it is characterized in that, described conjunction comprises body, a plurality of vertical reinforcing bars and base plate, described body comprises vertical component effect, horizontal part and protuberance, described vertical component effect is columnar, has external diameter corresponding to the internal diameter of steel pipe pile, insert the head of described steel pipe pile, described horizontal part forms the shape of the circular rings of Rack in the hypomere portion of described vertical component effect, the fixing hole of vertical reinforcing bar along circumference with the predetermined distance setting, described protuberance is the epimere portion that hangs over described steel pipe pile, and is outstanding to the outside from the epimere portion of described vertical component effect;
One end of described a plurality of vertical reinforcing bars inserts in the fixing hole that is fixed on the described vertical reinforcing bar that forms on the described horizontal part of described body and vertically downward and prolongs;
Described base plate is connected the other end of described vertical reinforcing bar and seals the section of described steel pipe pile,
The head that described conjunction is installed in described steel pipe pile is combined into as a whole,
Be inserted in hole that described horizontal part central authorities form, on described base plate, prolong and imbed to the external vertical of described conjunction and be installed in the concrete foundation with the stiffener of predetermined distance setting,
The concrete that constitutes described concrete foundation is filled in the space that is formed by described base plate and described vertical component effect, and the head of described steel pipe pile and concrete foundation are incorporated into as a whole.
16, the integrated structure of the head of the steel pipe pile of use conjunction as claimed in claim 15 and concrete foundation is characterized in that, form with predetermined distance along circumference at the fixing hole of the described horizontal part stiffener of described body,
Described stiffener one end is fixed in the fixing hole of described stiffener of described horizontal part, and its other end prolongs and imbeds to the external vertical of described conjunction and is installed in the concrete foundation.
CNB018021263A 2000-07-20 2001-07-18 Apparatus and structure for connecting head of steel pipe pile and concrete footing Expired - Fee Related CN1189630C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020000041671A KR100324104B1 (en) 2000-07-20 Apparatus and Structure for connecting head of steel pile and concrete footing
KR2000/41671 2000-07-20

Publications (2)

Publication Number Publication Date
CN1418277A CN1418277A (en) 2003-05-14
CN1189630C true CN1189630C (en) 2005-02-16

Family

ID=19678995

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB018021263A Expired - Fee Related CN1189630C (en) 2000-07-20 2001-07-18 Apparatus and structure for connecting head of steel pipe pile and concrete footing

Country Status (4)

Country Link
JP (1) JP3649717B2 (en)
CN (1) CN1189630C (en)
AU (1) AU2001271119A1 (en)
WO (1) WO2002007499A2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5133650B2 (en) * 2007-10-22 2013-01-30 株式会社竹中工務店 Joint structure of column and steel pipe pile
AU2013222045A1 (en) * 2012-07-11 2014-01-30 Patented Foundations Pty Ltd Building slab system
KR101443598B1 (en) 2014-04-07 2014-09-23 한국건설기술연구원 Constructing Method of Temporary Retaining Wall in Underwater Ground by Suction Pressure
JP6412754B2 (en) * 2014-09-19 2018-10-24 株式会社竹中工務店 Pile-column connection structure
CN106703020A (en) * 2016-12-30 2017-05-24 重庆中材参天建材有限公司 Recyclable standard steel protective barrel for super-long underwater pile foundation
CN106836197A (en) * 2017-04-10 2017-06-13 中国水利水电第七工程局成都水电建设工程有限公司 The isolating and protecting device and its construction method of a kind of prevention pile foundation steel bar cage deflection
CN108442368A (en) * 2018-05-18 2018-08-24 广西盛虎金属制品有限公司 A kind of connector for steel-pipe pile
CN110438982A (en) * 2019-08-12 2019-11-12 中国建筑第二工程局有限公司 A kind of pile end board and tubular pole connection method
CN111719546B (en) * 2020-06-04 2021-09-07 江苏文博建筑设计有限公司 Tubular pile structure with high stability
CN115012438A (en) * 2021-12-14 2022-09-06 广州城建职业学院 Diameter-adjustable connecting structure for connecting pile top of concrete precast tubular pile with bearing platform and preparation method of diameter-adjustable connecting structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5594316A (en) * 1979-01-11 1980-07-17 Key Pharma Diffusion matrix for medicine release
JPH068435U (en) * 1992-07-06 1994-02-04 大成建設株式会社 Pile head reinforcement structure
US5961253A (en) * 1994-12-05 1999-10-05 Okawa; Shogen Pile head dresser, pile head dressing method, and, placement of cast-in-place concrete piles
JPH09302680A (en) * 1996-05-17 1997-11-25 Shimizu Corp Pile foundation structure
JP3258592B2 (en) * 1997-03-31 2002-02-18 川崎製鉄株式会社 Jig for rotary press fitting of steel pipe pile
KR100262977B1 (en) * 1998-12-17 2000-08-01 정숭렬 A plate for steel pile plile
KR100348394B1 (en) * 1999-05-14 2002-08-10 정기승 Steel reinforcing connect structure for pile

Also Published As

Publication number Publication date
JP3649717B2 (en) 2005-05-18
KR20010007734A (en) 2001-02-05
WO2002007499A3 (en) 2002-06-20
JP2004504521A (en) 2004-02-12
CN1418277A (en) 2003-05-14
WO2002007499A2 (en) 2002-01-31
AU2001271119A1 (en) 2002-02-05

Similar Documents

Publication Publication Date Title
CN1189630C (en) Apparatus and structure for connecting head of steel pipe pile and concrete footing
US11274412B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
CN1673473A (en) Method of reinforcing opening of steel frame girder
CN210766856U (en) Prefabricated spliced center cylinder and tower cylinder foundation with same
KR20050000710A (en) A connection device to connect concrete piles
JP3359818B2 (en) Synthetic resin manhole
CN110396919A (en) A kind of assembling type steel structure-concrete composite bridge and its construction method
CN112813973A (en) Bearing plate device for bag
CN109595126B (en) Wind generating set foundation anchor bolt assembly and construction method for connecting tower barrel thereof
KR20180007292A (en) Connecting device for PHC pile
JPH02232416A (en) Foundation pile structure
CN208633272U (en) A kind of Prefabricated concrete-filled steel tube ring beam connection structure
CN218195952U (en) Tubular pile mould
CN109811764A (en) Bored pile construction recoverable steel pile casting and construction method
JP6703466B2 (en) Jig for preventing leakage of filler and method for manufacturing composite pile using the jig
KR101551269B1 (en) The large diameter composition piles to be clamp socket wing beam combination with small diameter pipe
CN111321821B (en) Adopt prefabricated shear force wall steel bar connection structure tied in a bundle of full assembled level seam
JP2021076002A (en) Base structure, steel segment used for base structure, and construction method of base structure
CN220434311U (en) Secondary grouting-free exposed rigid joint column foot
KR20030009835A (en) Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
CN1064720A (en) The preparation method of hollow concrete pile and producing device
JPS58127836A (en) Construction of foundation structure for structure using foundation pile
CN220555813U (en) A connection structure for prefabricating tubular pile
CN213573000U (en) Pier body template for construction of main pier of super-large bridge
CN211036968U (en) Quick anchor stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050216