CN118313561A - Intelligent engineering cost management system based on big data - Google Patents

Intelligent engineering cost management system based on big data Download PDF

Info

Publication number
CN118313561A
CN118313561A CN202410577589.5A CN202410577589A CN118313561A CN 118313561 A CN118313561 A CN 118313561A CN 202410577589 A CN202410577589 A CN 202410577589A CN 118313561 A CN118313561 A CN 118313561A
Authority
CN
China
Prior art keywords
project
month
module
net
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410577589.5A
Other languages
Chinese (zh)
Inventor
徐柏林
贺洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Tianhong Ruida Group Co ltd
Original Assignee
Hunan Tianhong Ruida Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Tianhong Ruida Group Co ltd filed Critical Hunan Tianhong Ruida Group Co ltd
Priority to CN202410577589.5A priority Critical patent/CN118313561A/en
Publication of CN118313561A publication Critical patent/CN118313561A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the field of engineering cost management systems, in particular to an intelligent engineering cost management system based on big data; according to the method, based on the fact that part of projects are affected by uncontrollable factors such as environment and the like in the process of proceeding, frequent flow of workers can be caused, so that the situation that project delay is caused by a prediction period being larger than a preset period and the situation that related comprehensive wage cost is inaccurate is caused, the project cost of the whole project is inaccurate, the relation between the time spent by workers and the time spent by the enterprise and the enterprise projects is counted by using historical data, and the prediction period of the enterprise projects and the calculation of the comprehensive wage cost in the whole project process are realized, so that the calculation of the whole project cost of the whole project is more accurate; the method solves the problem that the current engineering cost management system lacks the estimation of the fund loss caused by the job departure and job entry of workers due to engineering environment, thereby causing inaccurate estimation of the overall engineering cost.

Description

Intelligent engineering cost management system based on big data
Technical Field
The invention relates to the field of engineering cost management systems, in particular to an intelligent engineering cost management system based on big data.
Background
In the engineering construction process, the proficiency and the production efficiency of workers with different working ages in the working process are different to a certain extent, so that the stability of the working state of the workers in the engineering construction process is very important, but the working pressure of the workers is large due to the fact that some engineering is limited by factors such as environment and the like which are difficult to control, so that partial workers are out of duty in the engineering construction process, particularly in the outdoor engineering projects such as road construction and house construction and the like, the labor intensity is large, the working environment is relatively bad, the stability of the workers is poor, the worker flows frequently and finally the engineering delay is caused, or the situation that workers need to add shift and add points in order to ensure the engineering completion is caused, more funds are caused, but the current engineering cost management system lacks estimation of the partial funds, so that the overall engineering cost estimation is inaccurate, and the engineering cost is possibly lost.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides an intelligent engineering cost management system based on big data, which solves the problem that the current engineering cost management system lacks in estimating the fund loss caused by the job departure and job entry of workers due to engineering environment, thereby causing inaccurate estimation of the overall engineering cost.
In order to achieve the above purpose, the present invention provides the following technical solutions:
an intelligent engineering cost management system based on big data, comprising:
the historical data module is used for storing the personnel flow data of enterprise historical off-staff and on-staff personnel, and acquiring the wage conditions of the off-staff and on-staff personnel through big data so as to establish basic data comprising the personnel flow data and the wage conditions;
The personnel management module is used for periodically predicting the total net departure number in the project residual time, the staff wage structure and the estimated period of the project according to the basic data in the historical data module;
The project cost evaluation module is used for predicting the comprehensive wage cost when the project is completed and outputting a result according to the wage structure of the incumbent personnel and the estimated period of the project at any time output by the personnel management module.
Preferably, the personnel management module includes:
The project period acquisition module is used for acquiring months contained in a project scheduled period of an enterprise, marking the months as project months, predicting and counting wage distribution conditions of total net-job-departure personnel in the productivity statistics module through a big data model, and counting wage structure conditions of the job-job personnel;
The month influence module is used for predicting the net departure number of each item month influenced by month factors in the item remaining time according to the basic data;
The pressure influence module is used for predicting the number of net departure persons, influenced by the project pressure, of the months of each project in the project residual time according to the basic data and the project pressure of the project period prediction module;
the productivity statistics module is used for counting total net off-staff numbers according to the net off-staff numbers of the months of each project output in the month influence module and the pressure influence module, and predicting productivity of staff at any time in enterprise engineering according to the total net off-staff numbers, initial staff numbers and project pressure;
The project period estimating module is used for calculating the estimated period of each project month of the enterprise project in the project residual time according to the total net departure number of the productivity counting module, and calculating the project pressure of each project month in the project residual time according to the estimated period and the initial preset period of the enterprise.
Preferably, the month influence module includes:
The first net off-staff number module is used for acquiring off-staff numbers in the month which is the same as the month of the project and is carried out without the project and the on-staff number of the month from the basic data, and calculating the net off-staff number influenced by the month in the remaining time of the project according to the off-staff number and the on-staff number; the calculation formula of the net departure personnel number influenced by months is as follows:
In the above-mentioned method, the step of, Indicating the net off-office number of the month affected by the month of the ith project in the project remaining time calculated by the first net off-office number module,Indicating the number of outliers in the j-th month which is the same as the month of the i-th project and which is performed without the project, the total number of months in the basic data which is the same as the month of the i-th project and which is performed without the project is k 1,Representing the number of persons entered in the j month which is the same as the month of the i project and which is performed without the project;
The second net departure personnel number module is used for acquiring two project months closest to the project month and respectively located before and after the project month through the project period acquisition module when the month which is the same as the project month and is carried out without the project exists in the basic data, marking the project months as adjacent months, calculating net departure personnel numbers of the adjacent months in the project residual time and influenced by the months through the first net departure personnel number module, and calculating the net departure personnel numbers of the project months; the second net departure personnel number module calculates the calculation formula of the net departure personnel number of the project month in the project residual time as follows:
In the above-mentioned method, the step of, Indicating the net off-office number of the month affected by the month of the ith item in the item remaining time calculated by the second net off-office number module, i1 and i2 being the number of months of two adjacent months of item month i,AndThe first net away number of people module calculates the net away number of people whose adjacent months marked as i1 and i2 are affected by the month, respectively.
Preferably, the pressure influence module includes:
The pressure corresponding module is used for acquiring project pressure data corresponding to each project month in the project residual time from the project period prediction module, and acquiring the number of off-duty people in the month which is the same as the project pressure value and the number of on-duty people in the month from the basic data;
And the third net off-staff number module is used for calculating the net off-staff number of each project month in the project residual time influenced by the project pressure according to the off-staff number and the on-staff number data acquired by the pressure corresponding module.
Preferably, the productivity statistics module includes:
The total net off-staff number module is used for calculating the total net off-staff number of each month in the project residual time according to the net off-staff number influenced by the month and output by the month influence module and the net off-staff number influenced by the project pressure and output by the pressure influence module; the calculation formula of the total net departure number is as follows:
In the above formula, N i represents the total net departure number of the month of the ith project, Indicating the net number of departures from the project for the ith project month affected by the project pressure,The net job number of the month affected by the month of the ith project output by the month affecting module;
the productivity calculation module is used for calculating the productivity of each project month in the project residual time according to the total net departure personnel number, the initial personnel number and the project pressure; the calculation formula of the productivity of each project month in the project remaining time is as follows:
In the above formula, PD i represents productivity of the ith item month in the item remaining time, N 0 represents an initial number of items, N i represents a total net departure number of the ith item month, w represents a total number of item months, σ i represents a productivity conversion coefficient of the ith item month, and the productivity conversion coefficient is preset according to item pressure of the corresponding month.
Preferably, the productivity conversion coefficient is calculated by the following formula:
In the above formula, σ i represents the productivity calculation coefficient of the ith project month in the project residual time, p i represents the project pressure output by the project period prediction module, τ is a positive number greater than 1, a is a base number, p 1 is a pressure demarcation coefficient, and 1.3 is generally taken.
Preferably, the project period estimation module includes:
The project period module is used for calculating and completing the estimated period of the project of the rest part of the enterprise according to the productivity of the ith project month in the project rest time output by the productivity statistics module; the estimated period for completing the rest of the enterprise satisfies the following relationship:
In the above formula, PDZ represents the total task amount to be completed for the enterprise project, PD i represents the productivity of the ith project month in the project remaining time, T i represents the duration of the ith project month in the project remaining time, and T 1 project months are total in the project remaining time;
The project pressure calculation module is used for calculating project pressures of the months of each project in the project residual time according to the estimated period and the initial preset period of completing the projects of the residual part of the enterprise, which are output by the project period module.
Preferably, the construction cost evaluation module includes:
The first wage cost module is used for calculating a first wage expenditure quantity of normal working time in any project month according to the incumbent staff wage structure output by the staff management module; the first payroll number is calculated as:
In the above formula, WA i (1) represents the first payroll number of month of the ith project, For the y-th payroll to be paid in the month of the i-th project, there are z payrolls in total,The number of people in month of the ith project who need to pay the y-th wage;
The second wage cost module is used for calculating second wage expenditure quantity of the on-duty personnel overtime when the project estimated period is larger than the project scheduled period, and a calculation formula of the second wage expenditure quantity is as follows:
in the above equation, WA i (2) represents the second payroll number, T 1 represents the estimated period for completing the rest of the project of the enterprise, T 0 represents the initial predetermined period, T 2 represents the project time that the project of the enterprise has been conducted, For the y-th payroll to be paid in the month of the i-th project, there are z payrolls in total,For the number of people in month of the ith project who need to pay the y-th payroll, WA 0 is the second payroll expenditure that has been paid;
The comprehensive cost module is used for calculating comprehensive wage cost according to the output results calculated by the first wage cost module and the second wage cost module; the calculation formula of the comprehensive wage cost is as follows:
in the above formula, WA represents the comprehensive wage cost, WA i (1) and WA i (2) represent the first wage cost and the second wage cost, respectively, and b represents the total number of project months.
Preferably, the calculation formula of the number of net departure persons of each project month in the project remaining time, which is influenced by project pressure, is:
In the above-mentioned method, the step of, Indicating the net number of departures from the project pressure for the i-th project month in the project's remaining time,AndRespectively representing the number of outliers and the number of entries in the r month which is the same as the month of the ith project, the same project pressure and the presence project, the total number of months which is the same as the month of the ith project, the presence project and the project pressure p in the basic data is k 2,The month of the r-th project output by the month influence module is the net job number influenced by the month.
Preferably, the calculation formula of the project pressure of each project month in the project remaining time is:
In the above formula, p represents the project pressure of any project month, T 1 represents the estimated period of completing the rest of the projects of the enterprise, T 0 represents the initial predetermined period, T 3 represents the estimated period, and T 2 represents the project time of the project of the enterprise.
Compared with the prior art, the invention provides an intelligent engineering cost management system based on big data, which has the following beneficial effects:
1. The invention makes the project cost of the whole project inaccurate based on the situation that part of projects possibly cause frequent flow of workers in the process of proceeding, thereby causing project delay caused by the fact that the estimated period is larger than the preset period, and the situation that the related comprehensive wage cost is inaccurate, and utilizes the historical data to count the relationship between the past-year worker job-in and job-out situation of the enterprise and the enterprise projects, thereby realizing the estimation of the estimated period and the comprehensive wage cost of the enterprise projects in the whole project process, so that the overall cost investment of the whole project is more accurate.
2. According to the method, the prediction of the job entering and leaving conditions in the process of carrying out the enterprise project is constructed, the prediction period and the productivity change of the enterprise project are further calculated according to the total net leaving number of workers, and the prediction period, the initial preset period and the productivity change are fed back to the total net leaving number of workers according to the prediction period, the initial preset period and the productivity change, so that an integral interaction model is constructed, a comprehensive wage cost module related to wages of workers in the relative accurate prediction project cost is realized, and the prediction precision of the enterprise on the integral project cost in the project is improved in an auxiliary mode.
3. According to the method, the total net off-staff number of the enterprise is estimated through the weather and the pressure which have large factors of influence on staff entering and off-staff and are difficult to control manually, and the data of the relevant months of the net off-staff number influenced only by the months and the net off-staff number influenced only by the pressure are called from the historical data, so that the estimation of the total net off-staff number of each project month is realized, and the method is more accurate.
4. According to the invention, under the condition that the employee leaves and enters the employee, the large data statistics is used for counting the change of the wage structure of each project month and the change of the normal work-on time and the overtime time, and the normal work-on wage and overtime wage amounts are calculated through the first wage expenditure module and the second wage expenditure module respectively, so that the estimation of the overall comprehensive wage cost is realized, and the estimation is relatively more accurate.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this specification, illustrate embodiments of the application and together with the description serve to explain the application and do not constitute a limitation on the application. In the drawings:
FIG. 1 is a block diagram of a project cost management system of the present invention;
FIG. 2 is a block diagram of a month influencing module of the present invention;
FIG. 3 is a block diagram of a pressure influencing module according to the present invention;
FIG. 4 is a block diagram of a productivity statistics module of the present invention;
FIG. 5 is a block diagram illustrating a project period estimation module according to the present invention;
FIG. 6 is a schematic diagram of the integrated payroll cost impact of the present invention.
In the figure: 1. a history data module; 2. a personnel management module; 21. a project period acquisition module; 22. a month influencing module; 221. a first net departure personnel number module; 222. a second net departure personnel number module; 23. a pressure influencing module; 231. a pressure correspondence module; 232. a third net departure personnel number module; 24. a productivity statistics module; 241. a total net departure personnel number module; 242. a productivity calculation module; 25. project period prediction module; 251. a project period module; 252. a project pressure calculation module; 3. a project cost evaluation module; 31. a first payroll cost module; 32. a second payroll cost module; 33. and (5) a comprehensive cost module.
Detailed Description
In order that the above-recited objects, features and advantages of the present application will become more readily apparent, a more particular description of the application will be rendered by reference to the appended drawings and appended detailed description. Therefore, the realization process of how to apply the technical means to solve the technical problems and achieve the technical effects can be fully understood and implemented.
Those of ordinary skill in the art will appreciate that all or a portion of the steps in a method of implementing the following embodiments may be implemented by a program to instruct related hardware, and thus, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
In order to improve the accuracy of project cost estimation and reduce the risk of project stagnation caused by fund shortage in the later construction process, the invention provides an intelligent project cost management system based on big data, which further improves the existing project cost management system and adds the estimation of cost loss caused by employee departure caused by project environment, as shown in fig. 1-6, and the system comprises:
the historical data module 1 is used for storing the personnel flow data of the enterprise historical off-staff and on-staff personnel, and acquiring the wage conditions of the off-staff and on-staff personnel through big data so as to establish basic data containing the personnel flow data and the wage conditions, so that the personnel flow conditions of the enterprise project in the process can be predicted conveniently through the basic data; a personnel management module 2 for periodically predicting the total net departure personnel number, the incumbent personnel wage structure and the estimated period of the project in the project residual time according to the basic data in the history data module 1; the project cost evaluation module 3 is used for predicting comprehensive wage cost when the project is completed according to the project prediction period of the project and the on-job personnel wage structure at any time output by the personnel management module 2, as shown in fig. 6, the personnel management module 2 calculates total net departure number, project pressure and project prediction period data in the project prediction process, the project cost evaluation module 3 further calculates the prediction data, and finally obtains the predicted comprehensive wage cost by comparing with the project preset period, thereby being capable of assisting the project cost system to further accurately estimate the whole project cost in the whole project implementation process.
When the personnel management module 2 predicts the employee's job entering and leaving conditions, the external environment will affect the employee's job entering and leaving conditions, so that the rule needs to be summarized first, and then the total net job leaving number, the job in progress staff wage structure and project prediction period are predicted more accurately, so that the personnel management module 2 includes: the project period acquisition module 21 is used for acquiring months contained in a project scheduled period of an enterprise and marked as project months, and predicting and counting wage distribution conditions of total net-away staff in the productivity statistics module 24 through a big data model, and counting wage structure conditions of staff; a month influence module 22 for predicting, based on the basic data, the number of net departure persons for which the month of each item is influenced by the month factor, where the item remaining time refers to a time when a part of the item is not yet performed as compared with the current time, for example, a time when an enterprise item needs to be from 3 months to 9 months, and if the current time is the last day of 5 months, the item remaining time refers to a time after the beginning of 1 day of 6 months, typically a time of 6 months to 9 months; the pressure influence module 23 is used for predicting the number of net job departure people, which are influenced by project pressure, of each project month in the project residual time according to the basic data and the project pressure of the project period prediction module 25, and the working pressure can influence the job departure probability of enterprise workers in the working process of the workers; a productivity statistics module 24 for counting total net departure persons according to the net departure persons of each month output in the month influence module 22 and the pressure influence module 23, and predicting productivity of the incumbent person at any time in the enterprise engineering according to the total net departure persons, the initial persons and the project pressure, wherein the productivity represents workload of the incumbent person in a certain period of time, such as workload of one day, one week or one month, at any time; the project period estimating module 25 is configured to calculate the estimated period of each project month of the project in the project remaining time according to the total net job departure number of the productivity statistical module 24, and calculate the project pressure of each project month in the project remaining time according to the estimated period and the initial predetermined period of the enterprise, where the estimated period is longer than the predetermined period, the larger the project pressure is indicated, and at this time, in order to ensure that the project is completed in the predetermined period, the manager needs to increase the labor intensity by overtime or other modes, i.e. the larger the project pressure is, and the easier the job departure probability of the worker is.
The weather varies from month to month in a year, for example, the outdoor temperature is high in summer, and outdoor projects are easy to raise the off-duty probability of personnel of the projects, so in order to accurately evaluate the influence of months on the personnel flow condition, the month influence module 22 includes:
The first net off-job number module 221 is configured to obtain, from the base data, the off-job number in the month that is the same as the month of the project and is performed without the project, and the on-job number of the month, and calculate the net off-job number affected by the month in the remaining time of the project according to the off-job number and the on-job number; the calculation formula of the net departure personnel number influenced by months is as follows:
In the above-mentioned method, the step of, Indicating the net off-job number of the month affected by the i-th item month in the item remaining time calculated by the first net off-job number module 221,Indicating the number of outliers in the j-th month which is the same as the month of the i-th project and which is performed without the project, the total number of months in the basic data which is the same as the month of the i-th project and which is performed without the project is k 1,Representing the number of persons entered in the j month which is the same as the month of the i project and which is performed without the project;
a second net departure number module 222, where the second net departure number module 222 is configured to, when there is no month that is the same as a month of a project and no project is performed in the basic data, acquire, through the project period acquisition module 21, two project months that are closest to the month of the project and are located before and after the month, and mark as adjacent months, and calculate, through the first net departure number module 221, a net departure number of the adjacent months in a remaining time of the project, which is affected by the month, and calculate a net departure number of the month of the project; the second net departure number module 222 calculates the net departure number of the project month in the project remaining time as:
In the above-mentioned method, the step of, Indicating the net away number of months affected by month for the ith item in the item remaining time calculated by the second net away number module 222, i1 and i2 are the number of months of two adjacent months for item month i,AndThe first net away people count module 221 calculates the net away people count for the month affected by the adjacent months labeled i1 and i2, respectively.
In evaluating the influence of the project pressure and the staff flow condition of different project months in the project through the basic data, it is necessary to select month data equal to the project pressure of different project months from the basic data, so as to estimate the net departure staff number according to the data, and the pressure influence module 23 includes: a pressure correspondence module 231 for acquiring project pressure data corresponding to each project month in the project remaining time from the project period estimation module 25, and acquiring the number of outliers in the month which is the same as the project pressure value and the number of staff entering in the month from the basic data; a third net job leaving number module 232 for calculating net job leaving numbers of the months of the item affected by the item pressure in the remaining time of the item according to the job leaving number and job entering number data acquired by the pressure correspondence module 231; the calculation formula of the number of net departure persons of each project month influenced by project pressure in the project residual time is as follows:
In the above-mentioned method, the step of, Indicating the net number of departures from the project pressure for the i-th project month in the project's remaining time,AndRespectively representing the number of outliers and the number of entries in the r month which is the same as the month of the ith project, the same project pressure and the presence project, the total number of months which is the same as the month of the ith project, the presence project and the project pressure p in the basic data is k 2,The month of the r-th project output for month influence module 22 is the net number of departures influenced by the month.
Since the number of incumbents for different project months is different, when a project is performed, there is a difference in the amount of the project that can be completed in a fixed period of time, that is, there is a difference in productivity, in order to accurately calculate the productivity of each project month in the remaining time of the project by the productivity statistics module 24, the module includes: a total net off-staff number module 241 for calculating the total net off-staff number of each item month in the item remaining time according to the net off-staff number influenced by the month outputted by the month influencing module 22 and the net off-staff number influenced by the item pressure outputted by the pressure influencing module 23; the calculation formula of the total net departure number is as follows:
In the above formula, N i represents the total net departure number of the month of the ith project, Indicating the net number of departures from the project for the ith project month affected by the project pressure,The net job number for the month affected by the month for the ith project month output by the month impact module 22;
a productivity calculation module 242 for calculating productivity of each project month in the project remaining time based on the total net job number, the initial number and the project pressure; the calculation formula of the productivity of each project month in the project remaining time is as follows:
In the above formula, PD i represents the productivity of the ith project month in the project remaining time, N 0 represents the initial number of people of the project, N i represents the total net departure number of the ith project month, w represents the total number of the project months, sigma i represents the productivity conversion coefficient of the ith project month, the productivity conversion coefficient is preset according to the project pressure of the corresponding month, when the project pressure is less than or equal to 1 according to long-term observation, the project progress is not delayed, the workers do not have working pressure, and work normally, the normal average productivity is basically achieved, and when the project pressure is less than 1.3, namely, when the project pressure of the workers is increased between 0 and 1.3, the average productivity is continuously improved; however, after exceeding 1.3, the average productivity does not rise and fall, because the working strength of constructors exceeds the tolerance line of workers at the moment to generate side effects until the constructors leave the work, the productivity conversion coefficient is further set based on the rule, and the calculation formula of the productivity conversion coefficient is as follows:
In the above expression, σ i represents the productivity calculation coefficient of the ith project month in the project remaining time, p i represents the project pressure output by the project period estimation module 25, τ is a positive number greater than 1, a is a base number, and p 1 is a pressure division coefficient, which is generally 1.3.
When productivity in a project month is reduced due to the fact that workers leave the project, the estimated period of construction is prolonged, and finally the project is delayed, a manager usually adopts a overtime strategy, but the overtime can improve productivity in a short time, the construction period is shortened, the labor productivity of workers is reduced if the project month is long, the productivity is reduced, the construction period is prolonged, and in order to accurately calculate the estimated period, the project period estimating module 25 comprises: a project period module 251 for calculating the estimated period of the project of the remainder of the enterprise according to the productivity of the i-th project month in the project remainder time outputted by the productivity statistics module 24; the estimated period for completing the rest of the enterprise satisfies the following relationship:
In the above formula, PDZ represents the total task amount to be completed for the enterprise project, PD i represents the productivity of the ith project month in the project remaining time, T i represents the duration of the ith project month in the project remaining time, and T 1 project months are total in the project remaining time;
The project pressure calculation module 252 is used for calculating the project pressure of each project month in the project residual time according to the estimated period of completing the project of the residual part of the enterprise and the initial preset period, which are output by the project period module 251; the calculation formula of the project pressure of each project month in the project residual time is as follows:
In the above formula, p represents the project pressure of any project month, T 1 represents the estimated period of completing the rest of the projects of the enterprise, T 0 represents the initial predetermined period, T 3 represents the estimated period, and T 2 represents the project time of the project of the enterprise.
The job positions and wages of the job entered and the job exited are different, so in order to accurately calculate the comprehensive wage cost, it is necessary to calculate the time of overtime and normal work on the basis of the estimated period, and accurately calculate the comprehensive wage cost on the basis of the wage structure of the job, and the engineering cost evaluation module 3 includes:
A first payroll cost module 31, wherein the first payroll cost module 31 is used for calculating a first payroll expenditure amount of normal working time in any project month according to the staff payroll structure output by the staff management module 2; the first payroll number is calculated as:
In the above formula, WA i (1) represents the first payroll number of month of the ith project, For the y-th payroll to be paid in the month of the i-th project, there are z payrolls in total,The number of people in month of the ith project who need to pay the y-th wage;
the second payroll cost module 32 is configured to calculate a second payroll expenditure amount of the on-duty person overtime when the project estimated period is greater than the project predetermined period, where a calculation formula of the second payroll expenditure amount is:
in the above equation, WA i (2) represents the second payroll number, T 1 represents the estimated period for completing the rest of the project of the enterprise, T 0 represents the initial predetermined period, T 2 represents the project time that the project of the enterprise has been conducted, The average time to overtime is required for each month,For the y-th payroll to be paid in the month of the i-th project, there are z payrolls in total,For the number of people in the month of the ith project who need to pay the y-th payroll, WA 0 is the second payroll paid,Total overtime payroll for each project month in the business project remaining time at the time of calculation;
A comprehensive cost module 33, wherein the comprehensive cost module 33 is used for calculating a comprehensive wage cost according to the output results calculated by the first wage cost module 31 and the second wage cost module 32; the calculation formula of the comprehensive wage cost is as follows:
in the above formula, WA represents the comprehensive wage cost, WA i (1) and WA i (2) represent the first wage cost and the second wage cost, respectively, and b represents the total number of project months.
The foregoing embodiments have been presented in a detail description of the invention, and are presented herein with a particular application to the understanding of the principles and embodiments of the invention, the foregoing embodiments being merely intended to facilitate an understanding of the method of the invention and its core concepts; meanwhile, as those skilled in the art will have variations in the specific embodiments and application scope in accordance with the ideas of the present invention, the present description should not be construed as limiting the present invention in view of the above.

Claims (10)

1. An intelligent engineering cost management system based on big data, comprising:
the historical data module (1) is used for storing the personnel flow data of enterprise historical off-staff and on-staff personnel, and acquiring the wage conditions of the off-staff and on-staff personnel through big data so as to establish basic data comprising the personnel flow data and the wage conditions;
the personnel management module (2) is used for periodically predicting the total net departure personnel number, the incumbent personnel wage structure and the estimated period of the project in the project residual time according to the basic data in the historical data module (1);
the project cost assessment module (3), the project cost assessment module (3) is used for predicting the comprehensive wage cost when the project is completed and outputting the result according to the pre-estimated period of the wage structure and the project of the incumbent personnel at any time output by the personnel management module (2).
2. The management system according to claim 1, wherein the personnel management module (2) comprises:
The project period acquisition module (21) is used for acquiring months contained in a project scheduled period of an enterprise, marking the months as project months, predicting and counting wage distribution conditions of total net-free staff in the productivity statistics module (24) through a big data model, and counting wage structure conditions of staff;
The month influence module (22) is used for predicting the net departure number of each item month influenced by month factors in the item remaining time according to the basic data;
a pressure influence module (23), wherein the pressure influence module (23) is used for predicting the number of net departure persons, the month of each item of which is influenced by the item pressure, in the item residual time according to the basic data and the item pressure of the item period prediction module (25);
The productivity statistics module (24) is used for counting total net off-staff numbers according to the net off-staff numbers of each project month output in the month influence module (22) and the pressure influence module (23) and predicting productivity of staff at any time in enterprise engineering according to the total net off-staff numbers, initial staff numbers and project pressure;
the project period estimating module (25), wherein the project period estimating module (25) is used for calculating the estimated period of the project of the enterprise in each project month in the project residual time according to the total net departure number of the productivity counting module (24), and calculating the project pressure of each project month in the project residual time according to the estimated period and the initial preset period of the enterprise.
3. The management system according to claim 2, wherein the month influencing module (22) comprises:
The first net off-staff number module (221), wherein the first net off-staff number module (221) is used for acquiring the off-staff number in the month which is the same as the month of the project and is carried out without the project and the on-staff number of the month from the basic data, and calculating the net off-staff number influenced by the month in the project residual time according to the off-staff number and the on-staff number; the calculation formula of the net departure personnel number influenced by months is as follows:
In the above-mentioned method, the step of, Indicating the net off-job number of the month affected by the ith project month in the project remaining time calculated by the first net off-job number module (221),Indicating the number of outliers in the j-th month which is the same as the month of the i-th project and which is performed without the project, the total number of months in the basic data which is the same as the month of the i-th project and which is performed without the project is k 1,Representing the number of persons entered in the j month which is the same as the month of the i project and which is performed without the project;
The second net departure number module (222) is used for acquiring two project months closest to the project month and respectively located before and after the project month through the project period acquisition module (21) when the month which is the same as the project month and is carried out without the project exists in the basic data, marking the two project months as adjacent months, calculating net departure number influenced by the month in the adjacent months in the project remaining time through the first net departure number module (221), and calculating the net departure number of the project month; the second net departure number module (222) calculates the net departure number of the project month in the project remaining time as follows:
In the above-mentioned method, the step of, Indicating the net away number of months affected by the month for the ith item in the item remaining time calculated by the second net away number module (222), i1 and i2 being the number of months of two adjacent months for item month i,AndThe first net away number of people module (221) calculates the net away number of people with the month influence for the adjacent months marked as i1 and i 2.
4. The management system according to claim 2, wherein the pressure influencing module (23) comprises:
The pressure corresponding module (231) is used for acquiring project pressure data corresponding to each project month in the project residual time from the project period estimating module (25), and acquiring the number of outliers of the month which is the same as the project pressure value and the number of entries of the month from the basic data;
And the third net off-staff number module (232), wherein the third net off-staff number module (232) is used for calculating the net off-staff number of each project month in the project residual time influenced by the project pressure according to the off-staff number and the on-staff number data acquired by the pressure corresponding module (231).
5. The management system according to claim 2, wherein the productivity statistics module (24) comprises:
A total net departure personnel number module (241), wherein the total net departure personnel number module (241) is used for calculating the total net departure personnel number of each item month in the item residual time according to the net departure personnel number influenced by the month and output by the month influence module (22) and the net departure personnel number influenced by the item pressure and output by the pressure influence module (23); the calculation formula of the total net departure number is as follows:
In the above formula, N i represents the total net departure number of the month of the ith project, Indicating the net number of departures from the project for the ith project month affected by the project pressure,The net job number of month affected month for the ith project month output by the month impact module (22);
A productivity calculation module (242), wherein the productivity calculation module (242) is used for calculating the productivity of each project month in the project residual time according to the total net departure number, the initial number and the project pressure; the calculation formula of the productivity of each project month in the project remaining time is as follows:
In the above formula, PD i represents productivity of the ith item month in the item remaining time, N 0 represents an initial number of items, N i represents a total net departure number of the ith item month, w represents a total number of item months, σ i represents a productivity conversion coefficient of the ith item month, and the productivity conversion coefficient is preset according to item pressure of the corresponding month.
6. The management system of claim 5, wherein the productivity conversion factor is calculated by the formula:
In the above formula, σ i represents the productivity calculation coefficient of the ith project month in the project remaining time, p i represents the project pressure output by the project period estimation module (25), τ is a positive number greater than 1, a is a base number, p 1 is a pressure demarcation coefficient, and 1.3 is generally taken.
7. The management system according to claim 2, wherein the project period estimation module (25) comprises:
The project period module (251), the project period module (251) is used for calculating and finishing the estimated period of the project of the rest part of the enterprise according to the productivity of the ith project month in the project rest time output by the productivity statistics module (24); the estimated period for completing the rest of the enterprise satisfies the following relationship:
In the above formula, PDZ represents the total task amount to be completed for the enterprise project, PD i represents the productivity of the ith project month in the project remaining time, T i represents the duration of the ith project month in the project remaining time, and T 1 project months are total in the project remaining time;
The project pressure calculation module (252) is used for calculating the project pressure of each project month in the project residual time according to the estimated period for completing the project of the residual part of the enterprise and the initial preset period output by the project period module (251).
8. The management system according to claim 1, wherein the construction cost assessment module (3) comprises:
A first payroll cost module (31), wherein the first payroll cost module (31) is used for calculating a first payroll expenditure quantity of normal working time in any project month according to the incumbent staff payroll structure output by the staff management module (2); the first payroll number is calculated as:
In the above formula, WA i (1) represents the first payroll number of month of the ith project, For the y-th payroll to be paid in the month of the i-th project, there are z payrolls in total,The number of people in month of the ith project who need to pay the y-th wage;
the second payroll cost module (32), the second payroll cost module (32) is used for calculating the second payroll expenditure quantity of the overtime staff when the project estimated period is larger than the project scheduled period, and the calculation formula of the second payroll expenditure quantity is as follows:
in the above equation, WA i (2) represents the second payroll number, T 1 represents the estimated period for completing the rest of the project of the enterprise, T 0 represents the initial predetermined period, T 2 represents the project time that the project of the enterprise has been conducted, For the y-th payroll to be paid in the month of the i-th project, there are z payrolls in total,For the number of people in month of the ith project who need to pay the y-th payroll, WA 0 is the second payroll expenditure that has been paid;
a comprehensive cost module (33), the comprehensive cost module (33) being configured to calculate a comprehensive payroll cost from output results calculated by the first payroll cost module (31) and the second payroll cost module (32); the calculation formula of the comprehensive wage cost is as follows:
in the above formula, WA represents the comprehensive wage cost, WA i (1) and WA i (2) represent the first wage cost and the second wage cost, respectively, and b represents the total number of project months.
9. The system of claim 4, wherein the calculation formula of the net off-job number of each item month in the item remaining time affected by the item pressure is:
In the above-mentioned method, the step of, Indicating the net number of departures from the project pressure for the i-th project month in the project's remaining time,AndRespectively representing the number of outliers and the number of entries in the r month which is the same as the month of the ith project, the same project pressure and the presence project, the total number of months which is the same as the month of the ith project, the presence project and the project pressure p in the basic data is k 2,The month of the r-th project output for the month influence module (22) is influenced by the net number of departures from the month.
10. The management system according to claim 7, wherein the calculation formula of the project pressure of each project month in the project remaining time is:
In the above formula, p represents the project pressure of any project month, T 1 represents the estimated period of completing the rest of the projects of the enterprise, T 0 represents the initial predetermined period, T 3 represents the estimated period, and T 2 represents the project time of the project of the enterprise.
CN202410577589.5A 2024-05-10 2024-05-10 Intelligent engineering cost management system based on big data Pending CN118313561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410577589.5A CN118313561A (en) 2024-05-10 2024-05-10 Intelligent engineering cost management system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410577589.5A CN118313561A (en) 2024-05-10 2024-05-10 Intelligent engineering cost management system based on big data

Publications (1)

Publication Number Publication Date
CN118313561A true CN118313561A (en) 2024-07-09

Family

ID=91720634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410577589.5A Pending CN118313561A (en) 2024-05-10 2024-05-10 Intelligent engineering cost management system based on big data

Country Status (1)

Country Link
CN (1) CN118313561A (en)

Similar Documents

Publication Publication Date Title
Blatter et al. The costs of hiring skilled workers
US6850905B2 (en) Modular service payroll system
CN116384595B (en) Project progress prediction analysis method based on cost linkage
CN113837730B (en) Three-rate-in-one-based multidimensional collaborative management and control system for project of main grid of power grid infrastructure
CN111461628B (en) Dynamic inventory prediction method for equipment leasing
CN109598631B (en) Method and system for generating human resource outsourcing client bill based on social security policy
CN110059945A (en) A kind of statistical analysis system of employee performance, method and medium
CN116683452A (en) Method and system for repairing solar heat lost electric quantity
CN116050866A (en) Combined user missing electric quantity fitting method and system based on typical load curve
CN118313561A (en) Intelligent engineering cost management system based on big data
KR101439257B1 (en) Power consumption monitoring device and method
Reichelstein et al. Cost-and price dynamics of solar PV modules
CN116151696A (en) Method and system for evaluating expected benefits of demand response of power customer
CN114358954A (en) Employee medical insurance fund collection and payment data prediction method, device, medium and equipment
CN114021813A (en) Salary prediction method, device, equipment and storage medium based on business deployment
CN114298847A (en) Prediction method, device, equipment and storage medium for employee medical insurance fund balance
CN112862340A (en) Method and system for accurately calculating project labor cost
CN113095567A (en) Loan yield prediction method, device, equipment and storage medium
CN112381436A (en) Time-by-time electrical load generation method, device, electronic equipment and storage medium
CN113269514A (en) Enterprise health degree measuring method, device and system
CN111754193A (en) Automatic accounting method, system and medium for piece wage in production and processing process
CN116050718A (en) Target demand data calculation method, electronic device and storage medium
US11138532B1 (en) Statistical facility event monitor
CN118134338A (en) Worker recommendation method, system and storage medium
Xiong et al. CapSolve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination