CN118166328B - A reactive gas control system and debugging method for reactive magnetron sputtering - Google Patents

A reactive gas control system and debugging method for reactive magnetron sputtering

Info

Publication number
CN118166328B
CN118166328B CN202410321357.3A CN202410321357A CN118166328B CN 118166328 B CN118166328 B CN 118166328B CN 202410321357 A CN202410321357 A CN 202410321357A CN 118166328 B CN118166328 B CN 118166328B
Authority
CN
China
Prior art keywords
gas
control system
valve
reactive
magnetron sputtering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202410321357.3A
Other languages
Chinese (zh)
Other versions
CN118166328A (en
Inventor
许磊
宋永辉
刘超
姜颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Shangji Semiconductor Technology Co ltd
Original Assignee
Wuxi Shangji Semiconductor Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Shangji Semiconductor Technology Co ltd filed Critical Wuxi Shangji Semiconductor Technology Co ltd
Priority to CN202410321357.3A priority Critical patent/CN118166328B/en
Publication of CN118166328A publication Critical patent/CN118166328A/en
Application granted granted Critical
Publication of CN118166328B publication Critical patent/CN118166328B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • C—CHEMISTRY; METALLURGY
    • C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/0021—Reactive sputtering or evaporation
    • C23C14/0036—Reactive sputtering
    • C23C14/0042—Controlling partial pressure or flow rate of reactive or inert gases with feedback of measurements
    • C—CHEMISTRY; METALLURGY
    • C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/34—Sputtering
    • C23C14/35—Sputtering by application of a magnetic field, e.g. magnetron sputtering
    • C—CHEMISTRY; METALLURGY
    • C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/54—Controlling or regulating the coating process
    • C23C14/542—Controlling the film thickness or evaporation rate
    • C23C14/545—Controlling the film thickness or evaporation rate using measurement on deposited material

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Physical Vapour Deposition (AREA)

Abstract

本发明公开了一种用于反应磁控溅射的反应气体控制系统及调试方法,属于半导体制造技术领域。用于反应磁控溅射的反应气体控制系统,包括多管路气体流量控制系统和反应气体分流器;多管路气体流量控制系统包括管路和n级阀门,反应气体分流器包括2n‑1根通入磁控溅射腔体的气体管路,n级阀门逐级分流气体至气体管路,向磁控溅射腔体内通入气体。本发明采用n级阀门,通过均匀分布的多路气体分流器将气体送入腔体内,结合调试方法中反应后对薄膜多点电阻值的测量和计算,独立控制各阀门送出气体的流量,能够有效改善和保证薄膜成分均匀性。

This invention discloses a reactive gas control system and debugging method for reactive magnetron sputtering, belonging to the field of semiconductor manufacturing technology. The reactive gas control system for reactive magnetron sputtering includes a multi-pipe gas flow control system and a reactive gas distributor. The multi-pipe gas flow control system includes pipelines and n-stage valves. The reactive gas distributor includes 2n -1 gas pipelines leading into the magnetron sputtering cavity. The n-stage valves sequentially distribute gas to the gas pipelines, introducing gas into the magnetron sputtering cavity. This invention uses n-stage valves and a uniformly distributed multi-pipe gas distributor to deliver gas into the cavity. Combined with the measurement and calculation of the multi-point resistance value of the thin film after reaction in the debugging method, the flow rate of the gas delivered by each valve is independently controlled, which can effectively improve and ensure the uniformity of the thin film composition.

Description

Reactive gas control system for reactive magnetron sputtering and debugging method
Technical Field
The invention belongs to the technical field of semiconductor manufacturing, and particularly relates to a reactive gas control system and a debugging method for reactive magnetron sputtering.
Background
Reactive magnetron sputtering is an improved magnetron sputtering technique, which introduces reactive gases based on conventional magnetron sputtering. The components and properties of the film can be changed by adding the reaction gas in the sputtering process, so that the film can be accurately regulated.
The process of reactive magnetron sputtering is similar to that of traditional magnetron sputtering, but is different in the gas injection link. Inert gas (such as argon) is used in the traditional magnetron sputtering to maintain a stable sputtering process, and gas containing reactive components is added in the reactive magnetron sputtering, so that chemical reaction occurs in the sputtering process.
By adding the reaction gas, the following functions can be achieved:
And preparing the alloy film, namely adding gas containing alloy components to react the target material with the reaction gas, so as to form the alloy film on the substrate.
The compound thin film is prepared by adding a gas containing a compound component, chemically reacting a target material with a reaction gas, and forming the compound thin film on a substrate.
And preparing an oxide film, namely adding oxygen-containing gas to enable metal elements in the target material to react with oxygen to form the metal oxide film.
The reaction magnetron sputtering can realize the precise control of the components and the structure of the film, expands the application range of film preparation, and has important application value in the fields of material science, electronic devices, optical films and the like.
The reaction gas can react with sputtered metal atoms or ions on the surface of the target material to form a compound film. Common reactant gases include nitrogen, oxygen, argon, methane, and the like. Different reactant gases introduce different chemical elements, thereby affecting the chemical composition and structure of the film.
The concentration and flow rate of the reactant gases are important in controlling the composition of the film. Increasing the flow of the reactant gas increases the rate of the chemical reaction and increases the amount of compound in the deposited film. However, excessive reactant gas flow rates may result in excessive chemical reactions that produce undesirable film properties.
The effect of reactant gas distribution on film uniformity is very important. Uniform film deposition ensures that the film has a consistent thickness and composition across the substrate surface, thereby ensuring consistent film performance and function.
Uneven distribution of the reaction gas may cause the following problems:
1. thickness non-uniformity-if the reactant gas distribution is non-uniform, the gas concentration in some regions is higher, while the gas concentration in other regions is lower, which results in a difference in film deposition rate in different regions, and eventually a film with non-uniform thickness is formed.
2. Non-uniformity of composition-non-uniform distribution of reactant gases can also result in non-uniformity of film composition. In the partial region, the reactant gas concentration is higher, resulting in more chemical reactions occurring, forming different deposit compositions. This will result in differences in film composition in different regions.
3. Structural non-uniformity-non-uniformity in the distribution of the reactant gases can also affect the structure of the film. For example, in oxidation reactions, non-uniformity in oxygen concentration can lead to non-uniform formation of oxide phases, thereby affecting the crystal structure and performance of the thin film.
In order to ensure uniformity of the thin film, it is necessary to design a proper gas injection system, and by properly designing a gas supply system, it is ensured that the reaction gas is uniformly injected onto the target. There is no system architecture in the prior art that can meet the above needs.
Disclosure of Invention
In order to solve the problems, the invention discloses a reaction gas control system and a debugging method for reactive magnetron sputtering, which adopt pipelines which can control flow and are uniformly distributed to introduce gas into a magnetron sputtering cavity, so that the uniformity of a film can be improved.
In order to achieve the above purpose, the technical scheme of the invention is as follows:
the debugging method of the reaction gas control system for the reaction magnetron sputtering comprises the following steps:
step 1, setting the initial value of the gas flow of each valve in a multi-pipeline gas flow control system;
Step 2, introducing gas into the magnetron sputtering cavity through a multi-pipeline gas flow control system and a reaction gas flow divider, wherein the multi-pipeline gas flow control system comprises pipelines and n-stage valves, n is a natural number and n is larger than or equal to 4, the reaction gas flow divider comprises 2 n-1 gas pipelines which are introduced into the magnetron sputtering cavity, and the n-stage valves divide the gas into the gas pipelines step by step;
Step 3, taking a plurality of measuring points on the surface of the film after the reaction is finished, and testing to obtain the resistance values of the measuring points;
Step 4, calculating variances of the resistance values of the measuring points obtained in the step 3, and dividing the variances by the average value of the resistance values of the measuring points to obtain a numerical value for representing the uniformity of the film;
Step 5, judging whether the value obtained in the step 4 is larger than a threshold value, if so, indicating that the flow of part of the gas pipeline needs to be regulated, and entering the step 6;
and 6, obtaining measuring points which deviate from the average value of the resistance values of all the measuring points by a certain range, performing compensation adjustment on the oxygen flow flowing at the measuring points, adjusting the gas flow in the corresponding gas pipe at the measuring points, and repeatedly executing the steps 2-5.
Further, the measuring points are uniformly distributed on the surface of the film.
A reactive gas control system for reactive magnetron sputtering, comprising a multi-pipeline gas flow control system and a reactive gas splitter;
The multi-pipeline gas flow control system comprises a pipeline and n-level valves, wherein each n-level valve comprises a1 st-level valve, two 2 nd-level valves and four 3 rd-level valves, wherein the 1 st-level valve is used for introducing gas into the multi-pipeline gas flow control system, and each two valves in the current-level valve are respectively connected with one previous-level valve through the pipeline from the 2 nd-level valve and used for shunting the gas introduced from the previous-level valve;
The reaction gas flow divider comprises 2 n-1 gas pipelines which are respectively connected with 2 n-1 nth-stage valves, and the gas pipelines are led into the magnetron sputtering cavity.
Further, the air outlets of the 2 n-1 air pipelines are uniformly distributed.
Further, the reaction gas flow divider further comprises a fixing ring, wherein the fixing ring is arranged in the magnetron sputtering cavity, and 2 n-1 gas pipelines are arranged on the fixing ring.
Further, solenoid valves are respectively arranged in front of the 1-stage valve and behind the n-stage valve.
Further, the n-stage valve adopts a manual valve or a mass flowmeter.
Further, when the n-stage valve adopts mass flow meter, the mass flow meter is controlled by the PLC.
The beneficial effects of the invention are as follows:
The reaction gas control system for the reaction magnetron sputtering adopts the multi-stage valves, the gas is fed into the cavity through the uniformly distributed multi-path gas flow divider, and the flow rate of the gas fed out by each valve is independently controlled by combining the measurement and calculation of the multipoint resistance value of the film after the reaction in the debugging method, so that the uniformity of the components of the film can be effectively improved and ensured. By adopting the system and the method provided by the invention, the gas can be directly and dispersedly introduced into the magnetron sputtering cavity from the reaction gas control system, the cavity opening operation is not needed, the operation steps are reduced, and the debugging time of the process is shortened.
Drawings
Fig. 1 is a schematic diagram of a multi-pipeline gas flow control system in a reactive gas control system for reactive magnetron sputtering.
FIG. 2 is a schematic diagram of a magnetron sputtering chamber.
Fig. 3 is a top view of a reactant gas splitter in a reactant gas control system for reactive magnetron sputtering.
Fig. 4 is a cross-sectional view of a reactant gas splitter in a reactant gas control system for reactive magnetron sputtering.
FIG. 5 is a schematic illustration of the measurement points of the surface of the film.
Reference numerals illustrate:
1, 2-3, 4-7, 3, 8-15, 4, 101, 102, 103, 104, 105, 106, 107, 108, and 108, the wafer stage, 102, the target, 103, the magnet, 104, the reaction gas diverter, 105, the fixed ring, 106, the gas pipeline, 107, the Vcr joint.
Detailed Description
The technical scheme provided by the present invention will be described in detail with reference to the following specific examples, and it should be understood that the following specific examples are only for illustrating the present invention and are not intended to limit the scope of the present invention.
The invention designs a reaction gas control system for reaction magnetron sputtering, which comprises a multi-pipeline gas flow control system and a reaction gas diverter.
The overall structure of the multi-pipeline gas flow control system is shown in fig. 1, and the multi-pipeline gas flow control system comprises pipelines and 4-stage valves. Wherein the stage 1 valve comprises valve 1. The gas flow control range is 0-500sccm. The 2 nd stage valve comprises a valve 2 and a valve 3. The gas flow control range of each level 2 valve is 0-250sccm. The 3 rd level valve comprises a valve 4, a valve 5, a valve 6 and a valve 7. The gas flow control range of each grade 3 valve is 0-100sccm. The 4 th level valve comprises a valve 8, a valve 9, a valve 10, a valve 11, a valve 12, a valve 13, a valve 14 and a valve 15. The gas flow control range of each level 4 valve is 0-50sccm.
The valve 1 is connected with the valve 2 and the valve 3 respectively through pipelines, so as to control the gas flow through the valve 2 and the valve 3. The valve 2 is connected with the valve 4 and the valve 5 respectively through pipelines so as to control the gas flow passing through the valve 4 and the valve 5, and the valve 3 is connected with the valve 6 and the valve 7 respectively through pipelines so as to control the gas flow passing through the valve 6 and the valve 7. Similarly, valve 4 is connected to valve 8 and valve 9 via pipes to control the flow of gas through valves 8 and 9, valve 5 is connected to valve 10 and valve 11 via pipes to control the flow of gas through valves 10 and 11, valve 6 is connected to valve 12 and valve 13 via pipes to control the flow of gas through valves 12 and 13, and valve 7 is connected to valve 14 and valve 15 via pipes to control the flow of gas through valves 14 and 15. All the valves can be manual valves regulated by visual scales or mass flow meters with PLC control systems regulated by system set values.
The front of the level 1 valve (the front of the gas inflow direction and the rear of the gas outflow direction) and the rear of the level 4 valve are respectively connected with electromagnetic valves, and the electromagnetic valves can control the overall gas on-off of the multi-pipeline gas flow control system after being started. According to different application scenes, the electromagnetic valve can be connected to the front of the 1-stage valve or arranged behind the 4-stage valve independently, so that the control requirement is met.
The gas is introduced from the valve 1, so that the valve 1 is controlled to control the total amount of the reaction gas introduced into the magnetron sputtering cavity. The total amount of intake air is fixed. When the total amount of air intake is fixed, single flow control of 2-way 2-level gas pipelines (pipelines where 2-level valves are located), 4-way 3-level gas pipelines (pipelines where 3-level valves are located) and 8-way 4-level gas pipelines (pipelines where 3-level valves are located) can be respectively realized by adjusting the flow of each valve.
The multi-pipeline gas flow control system is arranged outside the magnetron sputtering cavity, and the reaction gas flow divider is arranged in the magnetron sputtering cavity. The magnetron sputtering cavity structure is shown in fig. 2, a wafer carrier 101, a target 102 and a magnet 103 are arranged in the cavity. The reaction gas splitter 104 is installed inside the magnetron sputtering chamber, and its top view structure is shown in fig. 3, and includes an annular fixing ring 105 adapted to the shape of the chamber, and eight uniformly distributed gas pipes 106 connected to the annular fixing ring. One end of each of the eight gas pipelines is fixed on the annular fixed ring, and the other end of each of the eight gas pipelines extends into the magnetron sputtering cavity. The interface of each gas pipeline fixed on the annular fixing ring is respectively connected with a4 th-stage valve in the multi-pipeline gas flow control system through pipelines. The joint of the root parts of the eight air pipes fixed on the annular fixing ring can be connected with the 4 th-stage valve through an air pipeline after being provided with a 1/4 inch Vcr joint 107 in a sealing way. Eight gas pipelines can be connected in disorder, but are connected in sequence after fixing the starting point based on equipment debugging convenience. A cross-sectional view of the reactant gas splitter 104 is shown in fig. 4. The size of the gas pipeline is designed according to the sizes of the cavity and the wafer, and the gas distribution in the cavity is uniform by combining the debugging method.
The reaction gas flows through the multi-pipeline gas flow control system, then enters the reaction gas flow divider and finally enters the cavity. After active diffusion, uniform distribution is formed in the cavity.
In order to make the components of the magnetron sputtering oxide film uniform and in an ideal range, the reactive gas flow rate of different inlets in different directions needs to be compensated and adjusted in the cavity debugging stage, namely, different flow rates are selected at different positions in the 4-stage valve so as to control the components of the oxide film.
It should be noted that the 4-stage valve is only an example, and those skilled in the art can adjust the number of stages of the valve as required, preferably greater than or equal to 4 stages. For example, a 5-stage valve can be adopted, namely, after 8 4-stage gas pipelines, the pipeline is divided into 16 pipelines, and each pipeline is provided with one valve, and 16 valves are connected in total, so that the 5-stage valve is formed. Increasing the number of stages increases the number of gas lines that ultimately flow into the chamber, thereby increasing control accuracy, but with the consequent increase in cost. Those of ordinary skill in the art will select the appropriate number of stages of piping and valves as desired.
The specific debugging method of the reaction gas control system for the reaction magnetron sputtering comprises the following steps:
Step 1, setting the initial value of each valve gas flow in the multi-pipeline gas flow control system, wherein the initial flow of each valve in a specific embodiment is shown in the following table 1, in this example, the target material is Ti, and the introduced reaction gas is O 2. It should be noted that the initial flow is uniformly distributed in this example, but this should not be taken as a limitation of the present invention, and one of ordinary skill in the art can adjust the initial flow value of each valve according to the need.
Target material Ti
Valve number/mass flowmeter number Reactant gas flow/O 2
1 50sccm
2 25sccm
3 25sccm
4 10sccm
5 10sccm
6 10sccm
7 10sccm
8 5sccm
9 5sccm
10 5sccm
11 5sccm
12 5sccm
13 5sccm
14 5sccm
15 5sccm
TABLE 1
As can be seen from the above table, the sum of the gas flows of the 2 nd stage is larger than the sum of the gas flows of the 3 rd stage, so that the pressure of the front stage is ensured to be larger than the pressure of the rear stage, and the backflow is avoided.
And 2, introducing gas into the magnetron sputtering cavity through a multi-pipeline gas flow control system and a reaction gas flow divider.
And step 3, taking a plurality of measuring points on the surface of the film after the reaction is finished, and testing the resistance values of the measuring points. As shown in fig. 5, in this example, 9 points (the number of the points is adjusted according to the need) are taken on the surface of the TiO 2 film obtained on the surface of the wafer 108 in a more dispersed manner, and the measured resistance values of the points at each point are shown in table 2:
Point location Resistance KΩ
1 150
2 142
3 148
4 149
5 144
6 155
7 153
8 171
9 165
TABLE 2
The number and the positions of the measurement points in fig. 5 are only taken as examples, and the number and the specific positions of the measurement points can be adjusted according to the needs during actual debugging, so that the measurement points are preferably uniformly distributed.
And 4, calculating the variance of the resistance values of the measuring points obtained in the step 3, and dividing the variance by the average value of the resistance values of the measuring points to obtain the TiO 2 film with the uniformity of 6.23%. The lower the number, the better the film uniformity.
And 5, judging whether the result obtained in the step 4 is greater than a threshold value, if so, indicating that the flow of part of the gas pipeline needs to be regulated, in the example, presetting the threshold value to be 3% (which can be regulated according to the requirement), and obviously, if the uniformity of the TiO 2 film is 6.23% greater than the threshold value, regulating the flow, and entering the step 6. If the flow rate of each gas pipeline is not greater than the threshold value, the flow rate of each gas pipeline is moderate, and the debugging is finished.
And 6, obtaining measuring points which deviate from the average value of the resistance values of all measuring points by a certain range, wherein the average value of the resistance is 153KΩ in the example, the resistance of the point ⑧、⑨ is larger and is 171KΩ and 165KΩ respectively, and the resistance exceeds the average value by more than 10KΩ, which means that the proportion of the film oxygen element at the corresponding position of the point ⑧、⑨ is larger, and the oxygen flow flowing through the position needs to be compensated and regulated, namely the oxygen flow in the corresponding gas pipeline at the position is reduced. In this example, since the number of the points with the resistance higher than the average value is greater than the number of the points with the resistance lower than the average value, the high-resistance points with larger deviation are selected as the adjustment points, and the oxygen flow at the adjustment points is reduced. If the number of the points with the resistance lower than the average value is more than that of the points with the resistance higher than the average value, the low-resistance point with larger deviation is selected as the adjusting point, and the oxygen flow in the corresponding gas pipeline at the position close to the adjusting point is increased. Through the adjusting mode, the number of pipelines needing to be adjusted in flow can be reduced, and operation steps and cost are saved. The corresponding gas pipelines at the adjusting point positions are obtained by respectively calculating the distances between the outlets of the gas pipelines and the point ⑧、⑨, and the gas pipelines with the flow needing to be adjusted are obtained when the distances are smaller than the adjusting threshold range. The valve numbers of stage 4 connected to each gas line are shown in fig. 5, wherein the gas line outlets corresponding to valves 8, 9, 10, 15 are closer to point ⑧、⑨, and their flow rates are adjusted as shown in table 3 below:
Target material Ti
Valve number/mass flowmeter number Reactant gas flow rate/O2
1 50sccm
2 25sccm
3 25sccm
4 10sccm
5 10sccm
6 10sccm
7 10sccm
8 4.5sccm
9 4.5sccm
10 5.2sccm
11 5sccm
12 5sccm
13 5sccm
14 5sccm
15 5.2sccm
TABLE 3 Table 3
Step 2 to step 5 are performed again, and the 9 points in fig. 5 are still measured, and the resistance is shown in the following table 4:
Point location Resistance KΩ
1 147
2 144
3 149
4 148
5 145
6 154
7 153
8 153
9 154
TABLE 4 Table 4
The uniformity of the TiO 2 film obtained by the calculation in the step 4 is obviously improved, the uniformity is reduced from 6.23% to 2.63%, the uniformity is lower than a threshold value, and the debugging is finished.
It should be noted that the foregoing merely illustrates the technical idea of the present invention and is not intended to limit the scope of the present invention, and that a person skilled in the art may make several improvements and modifications without departing from the principles of the present invention, which fall within the scope of the claims of the present invention.

Claims (8)

1. The debugging method of the reaction gas control system for the reaction magnetron sputtering is characterized by comprising the following steps of:
step 1, setting the initial value of the gas flow of each valve in a multi-pipeline gas flow control system;
Step 2, introducing gas into the magnetron sputtering cavity through a multi-pipeline gas flow control system and a reaction gas flow divider, wherein the multi-pipeline gas flow control system comprises pipelines and n-level valves, n is a natural number and n is equal to or greater than 4, the reaction gas flow divider comprises 2 n-1 gas pipelines which are introduced into the magnetron sputtering cavity, the n-level valves divide the gas into the gas pipelines step by step, the 2 n-1 gas pipelines are horizontally and evenly distributed along the circumferential direction on the horizontal plane of the cavity, gas outlets of the gas pipelines are all directed at the circle centers to form a plurality of groups of mutually opposite gas outlets, each 2 n-1 pipelines of each stage are respectively provided with independently controlled valves, and the sum of the 2 nd gas flow is larger than the sum of the 3 rd gas flow;
Step 3, taking a plurality of measuring points on the surface of the film after the reaction is finished, and testing to obtain the resistance values of the measuring points;
Step 4, calculating variances of the resistance values of the measuring points obtained in the step 3, and dividing the variances by the average value of the resistance values of the measuring points to obtain a numerical value for representing the uniformity of the film;
Step 5, judging whether the value obtained in the step 4 is larger than a threshold value, if so, indicating that the flow of part of the gas pipeline needs to be regulated, and entering the step 6;
and 6, obtaining measuring points which deviate from the average value of the resistance values of all the measuring points by a certain range, performing compensation adjustment on the oxygen flow flowing at the measuring points, adjusting the gas flow in the corresponding gas pipe at the measuring points, and repeatedly executing the steps 2-5.
2. The method for debugging a reactive gas control system for reactive magnetron sputtering according to claim 1, wherein the measurement points are uniformly distributed on the surface of the thin film, and in the step 6, when the number of points with resistance higher than the average value is greater than the number of points with resistance lower than the average value, high resistance points with larger deviation are selected as adjustment points, the gas flow at the adjustment points is reduced, and when the number of points with resistance lower than the average value is greater than the number of points with resistance higher than the average value, low resistance points with larger deviation are selected as adjustment points, and the gas flow in the corresponding gas pipeline at the vicinity of the adjustment points is increased.
3. A reactive gas control system for reactive magnetron sputtering, characterized by comprising a multi-pipeline gas flow control system and a reactive gas splitter;
The multi-pipeline gas flow control system comprises a pipeline and n-level valves, wherein each n-level valve comprises a1 st-level valve, two 2 nd-level valves and four 3 rd-level valves, wherein the 1 st-level valve is used for introducing gas into the multi-pipeline gas flow control system, and each two valves in the current-level valve are respectively connected with one previous-level valve through the pipeline from the 2 nd-level valve and used for shunting the gas introduced from the previous-level valve;
The reaction gas flow divider comprises 2 n-1 gas pipelines which are respectively connected with 2 n-1 n-th-stage valves, the gas pipelines are led into the magnetron sputtering cavity, the 2 n-1 gas pipelines are horizontally discharged and uniformly distributed along the circumferential direction on the horizontal plane of the cavity, gas outlets of the gas pipelines are all directed towards and close to the circle center to form a plurality of groups of mutually opposite gas outlets, the distance between the two opposite gas pipeline outlets is smaller than half of the diameter of the cavity, 2 n-1 pipelines of each stage are respectively provided with an independently controlled valve, and the sum of the 2-stage gas flow is larger than the sum of the 3-stage gas flow.
4. A reactive gas control system for reactive magnetron sputtering as claimed in claim 3, wherein the gas outlets of the 2 n-1 gas lines are uniformly distributed.
5. A reactive gas control system for reactive magnetron sputtering as recited in claim 3, wherein the reactive gas splitter further comprises a retainer ring mounted within the magnetron sputtering chamber, and 2 n-1 gas lines are mounted on the retainer ring.
6. A reactive gas control system for reactive magnetron sputtering according to claim 3, wherein solenoid valves are provided before the 1-stage valve and/or after the n-stage valve, respectively.
7. A reactive gas control system for reactive magnetron sputtering according to claim 3, wherein the n-stage valve employs a manual valve or a mass flow meter.
8. The reactive gas control system for reactive magnetron sputtering of claim 7, wherein the mass flowmeter is controlled by the PLC when the n-stage valve is mass flow clocked.
CN202410321357.3A 2024-03-20 2024-03-20 A reactive gas control system and debugging method for reactive magnetron sputtering Active CN118166328B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410321357.3A CN118166328B (en) 2024-03-20 2024-03-20 A reactive gas control system and debugging method for reactive magnetron sputtering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410321357.3A CN118166328B (en) 2024-03-20 2024-03-20 A reactive gas control system and debugging method for reactive magnetron sputtering

Publications (2)

Publication Number Publication Date
CN118166328A CN118166328A (en) 2024-06-11
CN118166328B true CN118166328B (en) 2026-08-18

Family

ID=91346702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410321357.3A Active CN118166328B (en) 2024-03-20 2024-03-20 A reactive gas control system and debugging method for reactive magnetron sputtering

Country Status (1)

Country Link
CN (1) CN118166328B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121344547A (en) * 2025-10-24 2026-01-16 无锡尚积半导体科技股份有限公司 VOx Thin Film Steady-State Growth Inlet Device Based on Fast-Response Gas Control

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866292A (en) * 2012-12-13 2014-06-18 丽佳达普株式会社 Atomic layer deposition device
CN114150287A (en) * 2021-12-10 2022-03-08 深圳新声半导体有限公司 Thin film deposition method and apparatus
CN115354308A (en) * 2022-08-10 2022-11-18 安徽光智科技有限公司 Deposition equipment and thin film resistor uniformity debugging method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008090763A1 (en) * 2007-01-22 2008-07-31 Panasonic Corporation Semiconductor device manufacturing method and semiconductor manufacturing apparatus
JP5291907B2 (en) * 2007-08-31 2013-09-18 株式会社アルバック Sputtering equipment
CN112899616A (en) * 2019-12-03 2021-06-04 上海新微技术研发中心有限公司 Thin film deposition method
CN114381692A (en) * 2020-10-16 2022-04-22 上海新微技术研发中心有限公司 Physical vapor deposition apparatus
CN115679272A (en) * 2021-07-26 2023-02-03 北京北方华创微电子装备有限公司 Method for preparing metal film by physical vapor deposition
WO2023122900A1 (en) * 2021-12-27 2023-07-06 华为技术有限公司 Magnetron sputtering device and control method therefor
CN116162911B (en) * 2023-02-24 2024-06-11 安徽光智科技有限公司 A method for adjusting the uniformity of thin films prepared by magnetron sputtering
CN116949409A (en) * 2023-09-06 2023-10-27 安徽光智科技有限公司 Magnetron sputtering equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866292A (en) * 2012-12-13 2014-06-18 丽佳达普株式会社 Atomic layer deposition device
CN114150287A (en) * 2021-12-10 2022-03-08 深圳新声半导体有限公司 Thin film deposition method and apparatus
CN115354308A (en) * 2022-08-10 2022-11-18 安徽光智科技有限公司 Deposition equipment and thin film resistor uniformity debugging method

Also Published As

Publication number Publication date
CN118166328A (en) 2024-06-11

Similar Documents

Publication Publication Date Title
TWI897852B (en) Multi-port gas injection system and reactor system including same
CN107177832B (en) Gas distribution device for improved film uniformity in epitaxial systems
TW587139B (en) Gas distribution system and method for the plasma gas in the chamber
US6766260B2 (en) Mass flow ratio system and method
US6418954B1 (en) System and method for dividing flow
TW200807209A (en) Variable flow rate ratio type fluid supply device
JPS5867856A (en) Gas flow control system for low temperature oxide membrane chemical evaporation apparatus
JP2003504866A (en) Method and apparatus for delivering uniform gas to a substrate during CVD and PECVD processes
CN118166328A (en) A reactive gas control system and debugging method for reactive magnetron sputtering
CN110923644B (en) Physical vapor deposition apparatus for reactive sputtering
US10409295B2 (en) Methods and apparatus for enhanced flow detection repeatability of thermal-based mass flow controllers (MFCS)
US20070292612A1 (en) Metal-organic vaporizing and feeding apparatus, metal-organic chemical vapor deposition apparatus, metal-organic chemical vapor deposition method, gas flow rate regulator, semiconductor manufacturing apparatus, and semiconductor manufacturing method
CN114369813A (en) Diffusion furnace
CN103882409B (en) The adjustable gas path device of source conveying ratio of mixture
CN114672788A (en) Semiconductor deposition apparatus
CN111524778A (en) Gas transport pipeline, method for controlling gas transport and semiconductor equipment
CN110400768A (en) Reaction chamber
CN120683478A (en) Air intake structure, air supply system and processing method for semiconductor process
TWI732373B (en) Gas flow control device and control method and semiconductor equipment using the device
CN119663236A (en) Substrate processing device and pipeline matching method thereof
CN110299300A (en) The scaling method of the mass flowmenter of board-like PECVD device
KR20120091564A (en) Apparatus for supplying gas and method for controlling the same
CN114381692A (en) Physical vapor deposition apparatus
CN223318903U (en) Gas transmission system and semiconductor processing equipment
CN206418190U (en) A kind of PVD equipment inlet duct

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: Factory Building, No. 35-312, Changjiang Nan Road, Xinwu District, Wuxi City, Jiangsu Province 214142

Applicant after: Wuxi Shangji Semiconductor Technology Co.,Ltd.

Address before: 214000 plant, No. 35-312, Changjiang South Road, Xinwu District, Wuxi City, Jiangsu Province

Applicant before: Wuxi Shangji Semiconductor Technology Co.,Ltd.

Country or region before: China

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant