CN118134108A - Urban physical examination questionnaire investigation prompting method and related equipment thereof - Google Patents

Urban physical examination questionnaire investigation prompting method and related equipment thereof Download PDF

Info

Publication number
CN118134108A
CN118134108A CN202410540424.0A CN202410540424A CN118134108A CN 118134108 A CN118134108 A CN 118134108A CN 202410540424 A CN202410540424 A CN 202410540424A CN 118134108 A CN118134108 A CN 118134108A
Authority
CN
China
Prior art keywords
information
questionnaire
target area
city construction
construction field
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202410540424.0A
Other languages
Chinese (zh)
Inventor
何云
谭润南
李贝
吴笛
邵斯嘉
盘宇澄
彭建德
黄雪莲
袁林
何文静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Urban Planning And Design Research Institute Co ltd
Original Assignee
Foshan Urban Planning And Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Urban Planning And Design Research Institute Co ltd filed Critical Foshan Urban Planning And Design Research Institute Co ltd
Priority to CN202410540424.0A priority Critical patent/CN118134108A/en
Publication of CN118134108A publication Critical patent/CN118134108A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application belongs to the technical field of investigation and discloses a method for prompting urban physical examination questionnaire and relevant equipment thereof, wherein after a user initiates urban physical examination questionnaire investigation and completes investigation aiming at one target urban construction field of a target area, a server background determines the relevant urban construction field and the degree of risk of people not full of the relevant urban construction field according to questionnaire investigation information of the questionnaire investigation, and further carries out questionnaire investigation prompt to a main department of the relevant urban construction field of the target area according to the degree of risk of people not full of the relevant urban construction field in time so as to prompt the main department of the relevant urban construction field to timely carry out questionnaire investigation; therefore, relevant authorities can be timely reminded to conduct questionnaire investigation under the conditions that questionnaire investigation is not conducted in some city construction fields and people possibly feel dissatisfied with the corresponding city construction conditions, and accordingly improvement of city construction is facilitated.

Description

Urban physical examination questionnaire investigation prompting method and related equipment thereof
Technical Field
The application relates to the technical field of investigation, in particular to an urban physical examination questionnaire investigation prompting method and relevant equipment thereof.
Background
At present, some urban physical examination questionnaire investigation systems utilize mobile phone APP or small programs to carry out questionnaire investigation on people aiming at the urban construction fields such as child friendly facility construction, old care facility construction, old district transformation, traffic transformation and the like so as to obtain reference data for perfecting urban construction, and compared with offline questionnaire investigation, the urban examination questionnaire investigation system is more convenient and has higher efficiency.
However, such a system for questionnaire examination for urban physical examination generally needs to be actively initiated by an initiator passing through identity verification to collect relevant questionnaire information and collect data for analysis (the initiator is usually the authorities in each urban construction field, because in practical application, people can actively cooperate to fill out questionnaires only when the initiator of questionnaire examination is the authorities in each urban construction field, otherwise, enough questionnaire examination information is difficult to collect), if some urban construction fields are not actively initiated by users for a long time, even if people are not satisfied with the corresponding urban construction conditions, the authorities cannot find out the condition that people are not satisfied with the corresponding urban construction conditions in time, which is unfavorable for the improvement of urban construction.
Disclosure of Invention
The application aims to provide a questionnaire investigation prompting method for urban physical examination and related equipment, which can prompt related authorities to carry out questionnaire investigation in time under the conditions that the questionnaire investigation is not carried out in some urban construction fields and the corresponding urban construction conditions are possibly not satisfied by people, thereby being beneficial to the improvement of urban construction.
In a first aspect, the present application provides a method for prompting an urban physical examination questionnaire investigation, which is applied to a server of an urban physical examination questionnaire investigation system, and includes the steps of:
A1. When the urban physical examination questionnaire investigation of a target urban construction field, which is actively initiated by a user, is completed each time, corresponding questionnaire investigation information is obtained as reference questionnaire investigation information; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information;
A2. determining the city construction field of the target area related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire subject information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field;
A3. Determining the degree of risk of people not full of the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information;
A4. And carrying out questionnaire investigation prompt on a main department of the relevant city construction field of the target area according to the degree of risk that people in the relevant city construction field of the target area are not full.
After a user initiates a city examination questionnaire investigation aiming at a target city construction field of a target area and completes the investigation, determining the relevant city construction field and the risk degree of people not full of the relevant city construction field by a server background according to the questionnaire investigation information of the questionnaire investigation, and further timely carrying out questionnaire investigation prompt to a main department of the relevant city construction field of the target area according to the risk degree of people not full of the relevant city construction field so as to prompt the main department of the relevant city construction field to timely carry out the questionnaire investigation; therefore, relevant authorities can be timely reminded to conduct questionnaire investigation under the conditions that questionnaire investigation is not conducted in some city construction fields and people possibly feel dissatisfied with the corresponding city construction conditions, and accordingly improvement of city construction is facilitated.
Preferably, step A2 comprises:
A201. selecting an alternative city construction field of the target area from other city construction fields except the target city construction field of the target area according to the target area information and the target city construction field information in the reference questionnaire investigation information;
A202. acquiring preset standard questionnaire question information of each alternative city construction field of the target area;
A203. And determining the related city construction field of the target area from the candidate city construction fields of the target area by comparing the questionnaire question information in the reference questionnaire investigation information with the standard questionnaire question information of the candidate city construction fields of the target area.
Optionally, step a201 includes:
and taking all other city construction fields except the target city construction field of the target area as the alternative city construction fields of the target area.
Optionally, step a201 includes:
And selecting the alternative city construction field of the target area from other city construction fields except the target city construction field of the target area according to the correlation level of each city construction field of the target area.
Thereby being beneficial to reducing the number of the alternative city construction fields, reducing the calculated amount in the subsequent determination process of the related city construction fields and improving the processing efficiency.
Preferably, step a203 comprises:
comparing the questionnaire question information in the reference questionnaire investigation information with the standard questionnaire question information of each alternative city construction field of the target area to determine a reference question in the standard questionnaire question information of each alternative city construction field of the target area; the reference questions are questions which are the same as or related to one of the questions in the questionnaire question information in the reference questionnaire investigation information in the standard questionnaire question information in the alternative city construction field;
And determining the related city construction field of the target area from the candidate city construction fields of the target area according to the number or the number proportion of the reference questions in the standard questionnaire question information of the candidate city construction fields of the target area.
Preferably, step A3 comprises:
Extracting feedback information of corresponding questions from questionnaire feedback information in the reference questionnaire investigation information according to the reference questions in the standard questionnaire information of each relevant city construction field of the target area, and taking the feedback information as reference feedback information of the corresponding reference questions;
and determining the degree of risk of people not full of the related city construction fields of the target area according to the reference feedback information.
Preferably, step A4 comprises:
If the audience non-full risk of the related city construction field of the target area exceeds a preset risk threshold, sending prompt information to a main department of the related city construction field of the target area so as to prompt the corresponding main department to initiate a city physical examination questionnaire investigation of the related city construction field.
When the risk of the urban construction field is too high, prompt information is sent to the corresponding authorities, so that the corresponding authorities can timely learn that the urban construction conditions of the people in the corresponding urban construction field are possibly not satisfied, and accordingly urban examination questionnaires are timely researched to learn more accurate research information, and improvement of urban construction is facilitated.
In a second aspect, the present application provides an urban physical examination questionnaire investigation prompting device, which is applied to a server of an urban physical examination questionnaire investigation system, and includes:
The reference information acquisition module is used for acquiring corresponding questionnaire investigation information as reference questionnaire investigation information when the urban physical examination questionnaire investigation of a target urban construction field aiming at a target area, which is actively initiated by a user, is completed each time; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information;
the related field determining module is used for determining the city construction field of the target area, which is related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire title information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field;
The risk determining module is used for determining the degree of risk of people not full of the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information;
And the prompt module is used for carrying out questionnaire investigation prompt on the authorities in the related city construction field of the target area according to the degree of risk that people in the related city construction field of the target area are not full.
In a third aspect, the present application provides an electronic device, including a processor and a memory, where the memory stores a computer program executable by the processor, and when the processor executes the computer program, the steps in the urban physical examination questionnaire investigation prompting method described above are executed.
In a fourth aspect, the present application provides a computer readable storage medium having stored thereon a computer program which when executed by a processor performs the steps in a method of urban physical examination questionnaire investigation prompting as described hereinbefore.
The beneficial effects are that: according to the urban physical examination questionnaire investigation prompting method and the relevant equipment thereof, after a user initiates urban physical examination questionnaire investigation aiming at one target urban construction field of a target area and completes investigation, a server background determines relevant urban construction fields and the risk degree of people not full of the relevant urban construction fields according to questionnaire investigation information of the questionnaire investigation, and questionnaire investigation prompting is carried out on authorities in the relevant urban construction fields of the target area according to the risk degree of people not full of the relevant urban construction fields in time so as to prompt authorities in the relevant urban construction fields to carry out questionnaire investigation in time; therefore, relevant authorities can be timely reminded to conduct questionnaire investigation under the conditions that questionnaire investigation is not conducted in some city construction fields and people possibly feel dissatisfied with the corresponding city construction conditions, and accordingly improvement of city construction is facilitated.
Drawings
Fig. 1 is a flowchart of an urban physical examination questionnaire investigation prompting method provided by an embodiment of the application.
Fig. 2 is a schematic structural diagram of an urban physical examination questionnaire investigation prompting device provided by an embodiment of the application.
Fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the present application.
Fig. 4 is a schematic diagram of an exemplary urban physical examination questionnaire investigation system.
Description of the reference numerals: 1. a reference information acquisition module; 2. a related-area determining module; 3. a risk determination module; 4. a prompting module; 301. a processor; 302. a memory; 303. a communication bus; 100. a server; 200. an initiating terminal; 300. and responding to the terminal.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. The components of the embodiments of the present application generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the application, as presented in the figures, is not intended to limit the scope of the application, as claimed, but is merely representative of selected embodiments of the application. All other embodiments, which can be made by a person skilled in the art without making any inventive effort, are intended to be within the scope of the present application.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures. Meanwhile, in the description of the present application, the terms "first", "second", and the like are used only to distinguish the description, and are not to be construed as indicating or implying relative importance.
Referring to fig. 1, fig. 1 is a schematic diagram of a method for prompting an urban physical examination questionnaire according to some embodiments of the present application, which is applied to a server of an urban physical examination questionnaire investigation system, and includes the steps of:
A1. When the urban physical examination questionnaire investigation of a target urban construction field, which is actively initiated by a user, is completed each time, corresponding questionnaire investigation information is obtained as reference questionnaire investigation information; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information;
A2. Determining the city construction field of the target area related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire subject information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field;
A3. determining the degree of risk of people not full in the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information;
A4. and carrying out questionnaire investigation prompt to the authorities in the relevant city construction field of the target area according to the audience dissatisfaction risk degree in the relevant city construction field of the target area.
After a user initiates a city examination questionnaire investigation aiming at a target city construction field of a target area and completes the investigation, determining the relevant city construction field and the risk degree of people not full of the relevant city construction field by a server background according to the questionnaire investigation information of the questionnaire investigation, and further timely carrying out questionnaire investigation prompt to a main department of the relevant city construction field of the target area according to the risk degree of people not full of the relevant city construction field so as to prompt the main department of the relevant city construction field to timely carry out the questionnaire investigation; therefore, relevant authorities can be timely reminded to conduct questionnaire investigation under the conditions that questionnaire investigation is not conducted in some city construction fields and people possibly feel dissatisfied with the corresponding city construction conditions, and accordingly improvement of city construction is facilitated.
The urban physical examination questionnaire investigation prompting method can be applied to a server 100 of the urban physical examination questionnaire investigation system shown in fig. 4, wherein the urban physical examination questionnaire investigation system comprises the server 100, a plurality of initiating terminals 200 and a plurality of responding terminals 300, and the initiating terminals 200 and the responding terminals 300 are in communication connection with the server 100; the initiating terminal 200 is configured to initiate a city physical examination questionnaire investigation request to the server 100, the server 100 is configured to send questionnaire question information to the responding terminal 300 in response to the city physical examination questionnaire investigation request, the responding terminal 300 is configured to collect feedback information (i.e., questionnaire feedback information, information fed back after the questionnaire is filled in the responding terminal 300 for the masses) for the questionnaire question information, and then feed back the feedback information to the server 100, and the server 100 is configured to record and analyze the feedback information and send an analysis result to the initiating terminal 200.
The initiating terminal 200 is generally a terminal owned by a governing department in each city construction field, and the responding terminal 300 is generally a terminal owned by a public or a public terminal arranged in a public area; but is not limited thereto. Preferably, the server 100 sends the questionnaire information to the response terminal 300 and also sends the identity information of the initiator of the urban physical examination questionnaire investigation to the response terminal 300, so that the audience knows that the initiator is the authority of the urban construction field, thereby improving the enthusiasm for filling out the questionnaire.
Wherein the initiator terminal 200 and the responder terminal 300 may be any user device capable of interacting with the server 100 via any form of wired and/or wireless connection (e.g., wi-Fi, LAN, cellular, coaxial cable, etc.), including but not limited to: smart phones, non-smart phones, tablet computers, laptop personal computers, desktop personal computers, minicomputers, midrange computers, mainframe computers, and the like.
The server 100 may be an independent device or a cluster server, and the server 100 may provide data support for multiple terminals at the same time. Server 100 may include, but is not limited to, a physical server and/or a virtual server.
The user in step A1 refers to the user of the initiator terminal 200, and is generally a main authority in each city construction field, but is not limited thereto.
The target area may be, but is not limited to, a block, an administrative district, or a city domain (the administrative district herein is a component of the city domain, for example, a city is composed of A1 region, A2 region, and A3 region, and then the whole area of the a city is a city domain, and the A1 region, the A2 region, and the A3 region are each an administrative district of the a city) and other administrative areas in different ranges.
Urban construction areas include, but are not limited to, child friendly facility construction, geriatric care facility construction, old district improvement, traffic improvement, and the like. The city construction areas of the different levels of target areas (for example, the different levels of target areas between the neighborhood, administrative district and city domain) may be the same or different; the city construction areas of the same level target areas (for example, the same level target areas for different blocks, the same level target areas for different administrative areas, and the same level target areas for different city areas) are generally the same, but may be different. The target city construction field may be any city construction field of the target area.
In step A1, a user initiates a city examination questionnaire investigation request for a target area to the server 100 through the initiating terminal 200, the server 100 responds to the city examination questionnaire investigation request and sends corresponding questionnaire information to the responding terminal 300 (the questionnaire information includes a plurality of questionnaire topics, which may include system default questionnaires and/or questionnaires which are user-defined or autonomously selected from a question library of the server 100, wherein the system default questionnaires are all questionnaires in the question library), the responding terminal 300 collects feedback information (i.e. questionnaire information) of people for the questionnaire information and feeds the feedback information back to the server 100, and the server 100 records and analyzes the feedback information (specific analysis content and analysis method may be set according to actual needs, and is not limited here) and sends analysis results to the initiating terminal 200 so far.
The target area information is identification information of the target area, and may include at least one of a name, a number and a position. The target city construction field information refers to identification information of the city construction field aimed at by questionnaire investigation, and may be, but not limited to, city construction field number or city construction field name. The questionnaire feedback information comprises feedback information (namely questionnaire filling information) of the people aiming at the questionnaire topic information.
Specifically, step A2 includes:
A201. Selecting an alternative city construction field of the target area from other city construction fields except the target city construction field of the target area according to the target area information and the target city construction field information in the reference questionnaire investigation information;
A202. Acquiring preset standard questionnaire question information of each alternative city construction field of a target area;
A203. And determining the related city construction field of the target area from the candidate city construction fields of the target area by comparing the questionnaire question information in the reference questionnaire investigation information with the standard questionnaire question information of the candidate city construction fields of the target area.
In some possible embodiments, step a201 includes:
and taking all other city construction fields except the target city construction field of the target area as alternative city construction fields of the target area.
By the mode, the alternative city construction field can be obtained more comprehensively, and the condition of missing detection is avoided.
In other possible embodiments, step a201 includes:
And selecting an alternative city construction field of the target area from other city construction fields except the target city construction field of the target area according to the correlation grade of each city construction field of the target area.
Thereby being beneficial to reducing the number of the alternative city construction fields, reducing the calculated amount in the subsequent determination process of the related city construction fields and improving the processing efficiency.
The higher the association level between the two city construction fields is, the greater the correlation of information to be collected in the questionnaire investigation of the two city construction fields is, and the association level between the city construction fields can be preset (set according to the actual correlation of the information to be collected in the questionnaire investigation of the city construction fields).
Other city construction fields with the association level with the target city construction field of the target area above a preset level threshold (which can be set according to actual needs) can be selected as alternative city construction fields of the target area.
In step a202, the preset standard questionnaire question information, that is, the questionnaire questions included in the preset standard questionnaire question information are the questionnaire question information of the default questionnaire questions of the system; the default questionnaire questions of the system in each city construction field can be preset according to actual needs.
In the target area with the same level, standard questionnaire subject information in the same city construction field is generally the same, but can also be different; in the target areas with different levels, standard questionnaire subject information in the same city construction field can be the same or different.
The preset standard questionnaire information of each city construction field is recorded in the standard questionnaire information base in advance, and in step A202, the preset standard questionnaire information of each alternative city construction field of the target area is extracted from the standard questionnaire information base.
Wherein, step a203 includes:
Comparing the questionnaire question information in the reference questionnaire investigation information with the standard questionnaire question information of each alternative city construction field of the target area to determine the reference questions in the standard questionnaire question information of each alternative city construction field of the target area; the reference questions are questions which are the same as or related to one of the questions in the questionnaire question information in the reference questionnaire investigation information in the standard questionnaire question information in the alternative city construction field;
And determining the related city construction field of the target area from the candidate city construction fields of the target area according to the number or the number proportion of the reference questions in the standard questionnaire question information of the candidate city construction fields of the target area.
Specifically, the step of comparing the questionnaire information in the reference questionnaire investigation information with the standard questionnaire information of each candidate city construction field of the target area to determine the reference questionnaire in the standard questionnaire information of each candidate city construction field of the target area includes sequentially executing, for each candidate city construction field of the target area:
Taking each questionnaire question in the standard questionnaire question information of the alternative city construction field of the target area as a question to be judged;
comparing each questionnaire question in the questionnaire question information in the reference questionnaire investigation information with the questions to be judged;
If one question exists in the question information of the reference question investigation information and is the same as the question to be judged, the corresponding question to be judged is determined to be the reference question (further, the question which is the same as the question to be judged in the question information of the reference question investigation information is marked as a first type of associated question of the question to be judged);
If no question in the question information of the reference question is the same as the question to be judged, the degree of correlation between each question in the question information of the reference question and the question to be judged (for example, the degree of correlation calculation is performed based on keywords, the degree of correlation calculation is performed by using an AI model, etc.) is recorded as the first degree of correlation, and if the maximum value of the first degree of correlation is greater than a preset correlation threshold (set according to actual needs), the question corresponding to the maximum value of the first degree of correlation in the question information of the reference question is judged to be correlated with the question to be judged, and the corresponding question to be judged is determined as one reference question (further, the question corresponding to the maximum value of the first degree of correlation in the question information of the reference question is marked as the second type of associated question of the question to be judged).
Specifically, if the number of reference questions in the standard questionnaire information of any one of the candidate city construction fields of the target area exceeds a preset number threshold (set according to actual needs), or if the number of reference questions in the standard questionnaire information of any one of the candidate city construction fields of the target area (i.e., the ratio of the number of reference questions in the total number of questionnaires of the standard questionnaire information) exceeds a preset ratio threshold (set according to actual needs), determining the any one of the candidate city construction fields of the target area as the relevant city construction field of the target area.
In practical application, if the related city construction field of the target area finishes questionnaire investigation in a certain time, the questionnaire investigation is not needed to be performed again in a short time, and the corresponding authorities should not be subjected to questionnaire investigation prompt so as not to influence user experience.
Therefore, in some embodiments, after step a201 and before step a202, a time interval between the time when the candidate city construction field of the target area is subjected to the questionnaire investigation last time and the current time is acquired, and if the time interval is smaller than a preset interval threshold (set according to actual needs), the corresponding candidate city construction field is redetermined as a non-candidate city construction field.
In other embodiments, after step a203, the method further comprises the steps of: and acquiring the time interval between the time of the last questionnaire investigation of each relevant city construction field of the target area and the current moment, and re-determining the corresponding relevant city construction field as the non-relevant city construction field if the time interval is smaller than a preset interval threshold value.
Preferably, step A3 comprises:
A301. extracting feedback information of corresponding questions from questionnaire feedback information in the reference questionnaire investigation information according to reference questions in standard questionnaire question information of each relevant city construction field of the target area, and taking the feedback information as reference feedback information of corresponding reference questions;
A302. and determining the degree of risk of people not full of the relevant city construction field of the target area according to the reference feedback information.
In step a301, the step of extracting feedback information of a corresponding question from the questionnaire feedback information in the reference questionnaire investigation information as reference feedback information of the corresponding reference question specifically includes: and extracting feedback information of associated topics (the first type of associated topics and the second type of associated topics are collectively called as associated topics) of each reference topic from questionnaire feedback information in the reference questionnaire investigation information, and taking the feedback information as reference feedback information of the corresponding reference topic.
The feedback information of the associated questions includes the option selection result or the filling information, the questionnaire questions are mainly selected questions (such as the selected questions about satisfaction), or also includes a small number of filling questions (such as the filling questions of filling advice), so when the associated questions are selected questions, the feedback information includes the option selection result (for example, the options include quite unsatisfied, generally satisfied, quite satisfied, etc.), the option selection result is the selection result of one option selected by the questionnaire writer from the options, but when the associated questions are filling questions, the feedback information includes the filling information (i.e., the filling content information).
Further, step a302 includes:
if the associated topic of the reference topic is the selection topic, extracting an option selection result from the corresponding reference feedback information; if the associated question of the reference question is a filling question, extracting filling information from corresponding reference feedback information;
If the associated topic of the reference topic is a selected topic, determining the satisfaction score of the associated topic of the reference topic according to the corresponding option selection result based on the preset satisfaction score corresponding to each option of the associated topic of the reference topic;
If the associated topic of the reference topic is a filling topic, acquiring a satisfaction score of the associated topic of the reference topic according to corresponding filling information;
and calculating the degree of risk of people not full of the related city construction field of the target area according to the satisfaction score of the related questions of each reference question.
Specifically, a satisfaction score can be preset for each option of each selected question in the question library, and for the selected questions customized by the user, when the user performs selected question customization, the user is required to set a satisfaction score for each option; after responding to the urban physical examination questionnaire investigation request of the user, the server generates corresponding questionnaire question information, and then extracts satisfaction scores corresponding to each option of the selected questions in the questionnaire question information to form a satisfaction score query table; in step a302, when the associated topic of the reference topic is a selected topic, the satisfaction score of the associated topic of the reference topic is obtained from the satisfaction score lookup table according to the corresponding selection result.
For the filling questions, the filling information may be divided into two types, the filling information indicating no opinion or suggestion such as "none", or the like is used as the first type of filling information, the other filling information is used as the second type of filling information, and corresponding satisfaction scores are set for the first type of filling information and the second type of filling information in advance, so that in step a302, the category of the filling information of the associated question of the reference question is judged (if the category is judged according to the keyword, or the information length of the filling information is obtained, if the information length is smaller than the preset length threshold, the corresponding filling information is judged to be the first type of filling information, otherwise, the corresponding filling information is judged to be the second type of filling information, but not limited to this), and then the corresponding satisfaction score is obtained according to the category of the filling information as the satisfaction score of the associated question of the reference question.
For filling in questions, the AI model may also be used to analyze the filling in information to obtain corresponding satisfaction scores.
Wherein, the satisfaction score is a value in the range of [0,1], the average value of the satisfaction scores of the associated questions of each reference question can be calculated first, and then the people not full risk degree of the relevant city construction field of the target area can be calculated by using the following formula:
Wherein, For the people in the k-th related city construction field of the target area, the risk degree is not full of,/>Average value of satisfaction scores of ith first class associated questions in kth related city construction field of target area,/>, for target areaThe total number of first class associated topics in the k-th associated city construction field of the target area,/>, andAverage value of satisfaction scores of jth second class associated questions in kth associated city construction field of target area,/>, for target areaFor the first relevance corresponding to the j-th second class associated topic of the k-th associated city construction field of the target area,/>The total number of the second type of associated topics in the k-th associated city construction field of the target area. Thus, the risk of people dissatisfaction is inversely related to the satisfaction score of each associated question, and/>Values in the range of [0,1 ].
In some embodiments, step A4 comprises:
If the risk degree of the people in the relevant city construction field of the target area is less than a preset risk degree threshold (set according to actual needs), a prompt message is sent to a main department in the relevant city construction field of the target area so as to prompt the corresponding main department to initiate a city examination questionnaire investigation in the relevant city construction field.
When the risk of the urban construction field is too high, prompt information is sent to the corresponding authorities, so that the corresponding authorities can timely learn that the urban construction situation of the urban construction field is possibly not satisfied by the people, and accordingly urban physical examination questionnaires are timely researched to acquire more accurate research information, urban construction can be guided according to questionnaire research results, and improvement of urban construction is facilitated.
In some embodiments, step A4 is followed by the further step of:
A5. When receiving the reply information which is sent back by the main authorities of the relevant city construction field of the target area in response to the prompt information and indicates that the city physical examination questionnaire investigation needs to be initiated, corresponding questionnaire information is generated, and the questionnaire investigation is conducted based on the questionnaire information (specifically, the questionnaire information is sent to a plurality of response terminals 300, feedback information which is sent back by each response terminal 300 and is aimed at the questionnaire information is received, and after recording and analyzing the feedback information, an analysis result is sent to the initiating terminal 200, preferably, identity information of the main authorities of the relevant city construction field of the target area is also sent to the corresponding response terminals 300 while the questionnaire information is sent to the plurality of response terminals 300).
When corresponding questionnaire information is generated, according to the urban construction field of the main department sending the reply information, obtaining corresponding preset standard questionnaire information and an average value of satisfaction scores of associated topics corresponding to each reference topic in the standard questionnaire information, taking the reference topic with the average value of the satisfaction scores of the corresponding associated topics smaller than a preset satisfaction score threshold (set according to actual needs) as an important topic, sorting the important topics in ascending order according to the average value of the satisfaction scores of the associated topics corresponding to the important topics, and then adjusting the important topics in the standard questionnaire information to the front of other topics according to sorting results.
For example, the standard questionnaire item information of a relevant city construction field of the target area includes items T1-T30, where items T3, T6, T10, T21 and T26 are reference items, satisfaction scores of associated items corresponding to items T3, T6, T10, T21 and T26 are respectively 0.1, 0.3, 0.6, 0.2 and 0.8, and a preset satisfaction score threshold is 0.7, and then the important items are items T3, T6, T10 and T21, and ascending order of the important items is as follows: from front to back, the title T3, the title T21, the title T6 and the title T10 are sequentially arranged; thus, based on the original question ordering of the standard questionnaire question information, the question T3 is adjusted to be a first question, the question T21 is adjusted to be a second question, the question T6 is adjusted to be a third question, and the question T10 is adjusted to be a fourth question.
In fact, when the questionnaire is filled out, the more front questions are sometimes filled in seriously (especially when the number of questions is more, the more rear questions are easy to fill out seriously), and the more real (namely, more realistic opinion of the people) feedback information aiming at the important questions is facilitated to be obtained by placing the important questions with lower satisfaction scores in front, so that the dissatisfaction condition of the people is more truly known, and city construction is better guided.
According to the urban physical examination questionnaire investigation prompting method, when urban physical examination questionnaire investigation of a target urban construction field, which is actively initiated by a user, is completed each time, corresponding questionnaire investigation information is obtained as reference questionnaire investigation information; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information; determining the city construction field of the target area related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire subject information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field; determining the degree of risk of people not full in the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information; according to the audience dissatisfaction risk of the related city construction field of the target area, carrying out questionnaire investigation prompt on a main department of the related city construction field of the target area; therefore, relevant authorities can be timely reminded to conduct questionnaire investigation under the conditions that questionnaire investigation is not conducted in some city construction fields and people possibly feel dissatisfied with the corresponding city construction conditions, and the improvement of city construction is facilitated.
Referring to fig. 2, the application provides a prompt device for urban physical examination questionnaires, which is applied to a server of an urban physical examination questionnaire investigation system, and comprises:
The reference information acquisition module 1 is used for acquiring corresponding questionnaire investigation information as reference questionnaire investigation information when the urban physical examination questionnaire investigation of a target urban construction field of a target area, which is actively initiated by a user, is completed each time; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire subject information and questionnaire feedback information (refer to the step A1 in the foregoing specifically);
The related-area determining module 2 is configured to determine, according to the target area information, the target city construction area information, and the questionnaire subject information in the reference questionnaire investigation information, a city construction area of the target area related to the completed city examination questionnaire investigation, and record the city construction area as a related city construction area (refer to the step A2 above specifically);
The risk determining module 3 is configured to determine a degree of risk of people not full in the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information (refer to the step A3 above specifically);
the prompt module 4 is configured to perform questionnaire investigation and prompt to a authorities in the relevant city construction field of the target area according to the audience dissatisfaction risk degree in the relevant city construction field of the target area (refer to the step A4).
In some embodiments, the urban physical examination questionnaire investigation prompting device further comprises:
The questionnaire investigation response module is used for generating corresponding questionnaire question information when receiving reply information which is sent back by the authorities in the relevant city construction field of the target area in response to the prompt information and indicates that the city physical examination questionnaire investigation needs to be initiated, and carrying out questionnaire investigation based on the questionnaire question information (refer to the step A5).
Referring to fig. 3, fig. 3 is a schematic structural diagram of an electronic device according to an embodiment of the present application, where the electronic device includes: processor 301 and memory 302, the processor 301 and the memory 302 being interconnected and in communication with each other by a communication bus 303 and/or other form of connection mechanism (not shown), the memory 302 storing a computer program executable by the processor 301, the processor 301 executing the computer program when the electronic device is running to perform the urban physical examination questionnaire investigation prompting method in any of the alternative implementations of the above embodiments to implement the following functions: when the urban physical examination questionnaire investigation of a target urban construction field, which is actively initiated by a user, is completed each time, corresponding questionnaire investigation information is obtained as reference questionnaire investigation information; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information; determining the city construction field of the target area related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire subject information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field; determining the degree of risk of people not full in the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information; and carrying out questionnaire investigation prompt to the authorities in the relevant city construction field of the target area according to the audience dissatisfaction risk degree in the relevant city construction field of the target area.
The embodiment of the application provides a computer readable storage medium, on which a computer program is stored, which when executed by a processor, performs the urban physical examination questionnaire investigation prompting method in any optional implementation manner of the above embodiment, so as to realize the following functions: when the urban physical examination questionnaire investigation of a target urban construction field, which is actively initiated by a user, is completed each time, corresponding questionnaire investigation information is obtained as reference questionnaire investigation information; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information; determining the city construction field of the target area related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire subject information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field; determining the degree of risk of people not full in the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information; and carrying out questionnaire investigation prompt to the authorities in the relevant city construction field of the target area according to the audience dissatisfaction risk degree in the relevant city construction field of the target area. The computer readable storage medium may be implemented by any type or combination of volatile or non-volatile Memory devices, such as static random access Memory (Static Random Access Memory, SRAM for short), electrically erasable Programmable Read-Only Memory (ELECTRICALLY ERASABLE PROGRAMMABLE READ-Only Memory, EEPROM for short), erasable Programmable Read-Only Memory (Erasable Programmable Read Only Memory, EPROM for short), programmable Read-Only Memory (PROM for short), read-Only Memory (ROM for short), magnetic Memory, flash Memory, magnetic disk, or optical disk.
In the embodiments provided in the present application, it should be understood that the disclosed apparatus and method may be implemented in other manners. The above-described apparatus embodiments are merely illustrative, for example, the division of the units is merely a logical function division, and there may be other manners of division in actual implementation, and for example, multiple units or components may be combined or integrated into another system, or some features may be omitted, or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed with each other may be through some communication interface, device or unit indirect coupling or communication connection, which may be in electrical, mechanical or other form.
Further, the units described as separate components may or may not be physically separate, and components shown as units may or may not be physical units, may be located in one place, or may be distributed over a plurality of network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
Furthermore, functional modules in various embodiments of the present application may be integrated together to form a single portion, or each module may exist alone, or two or more modules may be integrated to form a single portion.
In this document, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.
The above description is only an example of the present application and is not intended to limit the scope of the present application, and various modifications and variations will be apparent to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the protection scope of the present application.

Claims (10)

1. The urban physical examination questionnaire investigation prompting method is applied to a server of an urban physical examination questionnaire investigation system and is characterized by comprising the following steps:
A1. When the urban physical examination questionnaire investigation of a target urban construction field, which is actively initiated by a user, is completed each time, corresponding questionnaire investigation information is obtained as reference questionnaire investigation information; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information;
A2. determining the city construction field of the target area related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire subject information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field;
A3. Determining the degree of risk of people not full of the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information;
A4. And carrying out questionnaire investigation prompt on a main department of the relevant city construction field of the target area according to the degree of risk that people in the relevant city construction field of the target area are not full.
2. The urban physical examination questionnaire investigation prompting method according to claim 1, wherein the step A2 comprises:
A201. selecting an alternative city construction field of the target area from other city construction fields except the target city construction field of the target area according to the target area information and the target city construction field information in the reference questionnaire investigation information;
A202. acquiring preset standard questionnaire question information of each alternative city construction field of the target area;
A203. And determining the related city construction field of the target area from the candidate city construction fields of the target area by comparing the questionnaire question information in the reference questionnaire investigation information with the standard questionnaire question information of the candidate city construction fields of the target area.
3. The urban physical examination questionnaire investigation prompting method according to claim 2, wherein step a201 comprises:
and taking all other city construction fields except the target city construction field of the target area as the alternative city construction fields of the target area.
4. The urban physical examination questionnaire investigation prompting method according to claim 2, wherein step a201 comprises:
And selecting the alternative city construction field of the target area from other city construction fields except the target city construction field of the target area according to the correlation level of each city construction field of the target area.
5. The urban physical examination questionnaire investigation prompting method according to claim 2, wherein step a203 comprises:
comparing the questionnaire question information in the reference questionnaire investigation information with the standard questionnaire question information of each alternative city construction field of the target area to determine a reference question in the standard questionnaire question information of each alternative city construction field of the target area; the reference questions are questions which are the same as or related to one of the questions in the questionnaire question information in the reference questionnaire investigation information in the standard questionnaire question information in the alternative city construction field;
And determining the related city construction field of the target area from the candidate city construction fields of the target area according to the number or the number proportion of the reference questions in the standard questionnaire question information of the candidate city construction fields of the target area.
6. The urban physical examination questionnaire investigation prompting method according to claim 5, wherein the step A3 comprises:
Extracting feedback information of corresponding questions from questionnaire feedback information in the reference questionnaire investigation information according to the reference questions in the standard questionnaire information of each relevant city construction field of the target area, and taking the feedback information as reference feedback information of the corresponding reference questions;
and determining the degree of risk of people not full of the related city construction fields of the target area according to the reference feedback information.
7. The urban physical examination questionnaire investigation prompting method according to claim 1, wherein the step A4 comprises:
If the audience non-full risk of the related city construction field of the target area exceeds a preset risk threshold, sending prompt information to a main department of the related city construction field of the target area so as to prompt the corresponding main department to initiate a city physical examination questionnaire investigation of the related city construction field.
8. The utility model provides a city physical examination questionnaire investigation suggestion device, is applied to city physical examination questionnaire investigation system's server, its characterized in that includes:
The reference information acquisition module is used for acquiring corresponding questionnaire investigation information as reference questionnaire investigation information when the urban physical examination questionnaire investigation of a target urban construction field aiming at a target area, which is actively initiated by a user, is completed each time; the questionnaire investigation information comprises target area information, target city construction area information, questionnaire question information and questionnaire feedback information;
the related field determining module is used for determining the city construction field of the target area, which is related to the completed city examination questionnaire according to the target area information, the target city construction field information and the questionnaire title information in the reference questionnaire investigation information, and marking the city construction field as the related city construction field;
The risk determining module is used for determining the degree of risk of people not full of the related city construction field of the target area according to the target area information and the questionnaire feedback information in the reference questionnaire investigation information;
And the prompt module is used for carrying out questionnaire investigation prompt on the authorities in the related city construction field of the target area according to the degree of risk that people in the related city construction field of the target area are not full.
9. An electronic device comprising a processor and a memory, the memory storing a computer program executable by the processor, when executing the computer program, running the steps in the urban physical examination questionnaire investigation prompting method according to any of claims 1-7.
10. A computer readable storage medium having stored thereon a computer program, which when executed by a processor performs the steps of the urban physical examination questionnaire investigation prompting method according to any of claims 1-7.
CN202410540424.0A 2024-04-30 2024-04-30 Urban physical examination questionnaire investigation prompting method and related equipment thereof Pending CN118134108A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410540424.0A CN118134108A (en) 2024-04-30 2024-04-30 Urban physical examination questionnaire investigation prompting method and related equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410540424.0A CN118134108A (en) 2024-04-30 2024-04-30 Urban physical examination questionnaire investigation prompting method and related equipment thereof

Publications (1)

Publication Number Publication Date
CN118134108A true CN118134108A (en) 2024-06-04

Family

ID=91236198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410540424.0A Pending CN118134108A (en) 2024-04-30 2024-04-30 Urban physical examination questionnaire investigation prompting method and related equipment thereof

Country Status (1)

Country Link
CN (1) CN118134108A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015064666A (en) * 2013-09-24 2015-04-09 株式会社富士通マーケティング Questionnaire analysis system and program thereof
CN109284981A (en) * 2018-09-25 2019-01-29 中建八局第二建设有限公司 A kind of employee satisfaction survey questionnaire information system and method
KR102382211B1 (en) * 2020-10-26 2022-04-01 재단법인 차세대융합기술연구원 Citizen satisfaction prediction system and operation method for smart city construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015064666A (en) * 2013-09-24 2015-04-09 株式会社富士通マーケティング Questionnaire analysis system and program thereof
CN109284981A (en) * 2018-09-25 2019-01-29 中建八局第二建设有限公司 A kind of employee satisfaction survey questionnaire information system and method
KR102382211B1 (en) * 2020-10-26 2022-04-01 재단법인 차세대융합기술연구원 Citizen satisfaction prediction system and operation method for smart city construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谢欣露;郑艳;: "城市居民气候灾害风险及适应性认知分析――基于上海社会调查问卷", 城市与环境研究, no. 01, 31 December 2014 (2014-12-31), pages 80 - 91 *

Similar Documents

Publication Publication Date Title
RU2408066C2 (en) Method and device for delivering network information
CN107330459B (en) Data processing method and device and electronic equipment
CN108269128B (en) Advertisement putting method, device, equipment and storage medium
KR20180122926A (en) Method for providing learning service and apparatus thereof
CN105447147B (en) A kind of data processing method and device
CN111353921A (en) Examination management method and system and electronic equipment
CN109450771A (en) Add method, apparatus, computer equipment and the storage medium of good friend
CN107528867B (en) Information pushing method and system
CN104702629A (en) Method and device for collecting resource access information
CN111523035A (en) Recommendation method, device, server and medium for APP browsing content
CN116308497A (en) Data processing method and device
CN112839063A (en) Message pushing method, message display method, storage medium and computer equipment
CN109711656B (en) Multisystem association early warning method, device, equipment and computer readable storage medium
CN106294406A (en) A kind of method and apparatus accessing data for processing application
CN113378044A (en) Question matching method and platform
CN113407696A (en) Collection table processing method, device, equipment and storage medium
CN118134108A (en) Urban physical examination questionnaire investigation prompting method and related equipment thereof
CN111198960A (en) Method and device for determining user portrait data, electronic equipment and storage medium
CN107734534A (en) A kind of network load appraisal procedure and device
KR102472393B1 (en) Hybrid online education information provision system, and method thereof
CN111107439B (en) Content distribution method, content distribution device, server and storage medium
CN113918548A (en) Questionnaire survey method and device based on private domain flow and storage medium
CN107784080B (en) Method, device, system and storage medium for automatically establishing user knowledge framework
CN111767464A (en) Course platform content recommendation method, device, equipment and storage medium
CN111309608A (en) Test case selection method and device, electronic equipment and readable storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination