CN117760499A - 中小流域数据驱动洪水全过程实时精准预报系统及方法 - Google Patents
中小流域数据驱动洪水全过程实时精准预报系统及方法 Download PDFInfo
- Publication number
- CN117760499A CN117760499A CN202410002061.5A CN202410002061A CN117760499A CN 117760499 A CN117760499 A CN 117760499A CN 202410002061 A CN202410002061 A CN 202410002061A CN 117760499 A CN117760499 A CN 117760499A
- Authority
- CN
- China
- Prior art keywords
- optical fiber
- flood
- real
- time accurate
- small
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 49
- 230000008569 process Effects 0.000 title claims abstract description 42
- 239000013307 optical fiber Substances 0.000 claims abstract description 160
- 238000003860 storage Methods 0.000 claims abstract description 24
- 238000002955 isolation Methods 0.000 claims abstract description 7
- 239000013078 crystal Substances 0.000 claims description 52
- 239000000835 fiber Substances 0.000 claims description 24
- 238000013500 data storage Methods 0.000 claims description 23
- 238000012360 testing method Methods 0.000 claims description 6
- 230000004927 fusion Effects 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 230000014759 maintenance of location Effects 0.000 abstract description 2
- 239000004038 photonic crystal Substances 0.000 description 8
- 230000003287 optical effect Effects 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 239000000306 component Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000004146 energy storage Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000006424 Flood reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000005541 medical transmission Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202410002061.5A CN117760499B (zh) | 2024-01-02 | 2024-01-02 | 中小流域洪水全过程实时精准预报系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202410002061.5A CN117760499B (zh) | 2024-01-02 | 2024-01-02 | 中小流域洪水全过程实时精准预报系统及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN117760499A true CN117760499A (zh) | 2024-03-26 |
CN117760499B CN117760499B (zh) | 2024-06-11 |
Family
ID=90316512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202410002061.5A Active CN117760499B (zh) | 2024-01-02 | 2024-01-02 | 中小流域洪水全过程实时精准预报系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117760499B (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004163219A (ja) * | 2002-11-12 | 2004-06-10 | Hitachi Cable Ltd | 光ファイバ河床洗掘・流速センサ及び河床洗掘・流速計測システム |
JP2004191303A (ja) * | 2002-12-13 | 2004-07-08 | Hitachi Cable Ltd | 光ファイバ流速センサ |
CN202904818U (zh) * | 2012-09-28 | 2013-04-24 | 中国石油天然气股份有限公司 | 一种油气管道山洪灾害监测系统 |
CN103700223A (zh) * | 2012-09-28 | 2014-04-02 | 中国石油天然气股份有限公司 | 一种油气管道山洪灾害监测系统 |
US20180266947A1 (en) * | 2015-10-02 | 2018-09-20 | Smart Fibres Limited | Monitoring Probe |
US20180274360A1 (en) * | 2015-12-16 | 2018-09-27 | Halliburton Energy Services, Inc. | Real-time bottom-hole flow measurements for hydraulic fracturing with a doppler sensor in bridge plug using das communication |
CN113091827A (zh) * | 2021-04-29 | 2021-07-09 | 中铁第四勘察设计院集团有限公司 | 一种城市轨道交通地下综合体智能化水灾自动监测系统 |
CN115950486A (zh) * | 2023-02-16 | 2023-04-11 | 大连理工大学 | 一种基于分布式光纤的堤坝变形和渗流一体化监测装置及方法 |
CN117307841A (zh) * | 2023-09-19 | 2023-12-29 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种具备参数监测功能的感知结构一体化法兰 |
-
2024
- 2024-01-02 CN CN202410002061.5A patent/CN117760499B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004163219A (ja) * | 2002-11-12 | 2004-06-10 | Hitachi Cable Ltd | 光ファイバ河床洗掘・流速センサ及び河床洗掘・流速計測システム |
JP2004191303A (ja) * | 2002-12-13 | 2004-07-08 | Hitachi Cable Ltd | 光ファイバ流速センサ |
CN202904818U (zh) * | 2012-09-28 | 2013-04-24 | 中国石油天然气股份有限公司 | 一种油气管道山洪灾害监测系统 |
CN103700223A (zh) * | 2012-09-28 | 2014-04-02 | 中国石油天然气股份有限公司 | 一种油气管道山洪灾害监测系统 |
US20180266947A1 (en) * | 2015-10-02 | 2018-09-20 | Smart Fibres Limited | Monitoring Probe |
US20180274360A1 (en) * | 2015-12-16 | 2018-09-27 | Halliburton Energy Services, Inc. | Real-time bottom-hole flow measurements for hydraulic fracturing with a doppler sensor in bridge plug using das communication |
CN113091827A (zh) * | 2021-04-29 | 2021-07-09 | 中铁第四勘察设计院集团有限公司 | 一种城市轨道交通地下综合体智能化水灾自动监测系统 |
CN115950486A (zh) * | 2023-02-16 | 2023-04-11 | 大连理工大学 | 一种基于分布式光纤的堤坝变形和渗流一体化监测装置及方法 |
CN117307841A (zh) * | 2023-09-19 | 2023-12-29 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种具备参数监测功能的感知结构一体化法兰 |
Also Published As
Publication number | Publication date |
---|---|
CN117760499B (zh) | 2024-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107460898B (zh) | 一种沉入式桥梁桩基冲刷实时监测系统及其监测方法 | |
CN110210059B (zh) | 一种基于岩溶水动态的岩溶地面塌陷预测预报方法 | |
CN207244680U (zh) | 一种沉入式桥梁桩基冲刷实时监测系统 | |
CN102721604A (zh) | 深埋隧道围岩稳定性物理仿真模拟试验装置及其方法 | |
CN105806311A (zh) | 一种光纤坡坝位移沉降监测系统 | |
CN112016145A (zh) | 一种bim技术在隧道施工过程中应用的方法 | |
CN117760499B (zh) | 中小流域洪水全过程实时精准预报系统及方法 | |
CN113624153B (zh) | 一种大型岩质边坡表面变形监测方法 | |
CN112195927B (zh) | 采用基坑变形监测的深基坑桩锚支护施工方法 | |
CN106441101A (zh) | 一种工程监测用高精度结构位移测量方法 | |
CN112348312A (zh) | 一种施工震动对周边环境影响评估及预警系统 | |
CN110629595A (zh) | 一种新型光纤智能植筋装置 | |
CN109520471A (zh) | 光纤单孔分层沉降监测装置及其监测方法 | |
CN112112168A (zh) | 深基坑桩锚支护体系及其施工方法 | |
Wu et al. | Life cycle monitoring of offshore steel pipe piles via UWFBG Wireless sensor network | |
CN108360490B (zh) | 路面交通荷载对临近基坑围护结构影响的现场测试方法 | |
CN113932694B (zh) | 一种涵洞安全自动化监测系统 | |
CN213121145U (zh) | 一种用于海洋平台单点滑环安全运维的原型监测装置 | |
CN205317245U (zh) | 一种长距离输水隧洞安全混合监测系统 | |
CN114737991A (zh) | 一种用于水下沉管隧道最终接头结构的安全监测方法 | |
CN209181770U (zh) | 光纤单孔分层沉降监测装置 | |
CN117538956B (zh) | 多源融合降水信息及实时感知信息驱动洪水预报系统及方法 | |
CN220167007U (zh) | 一种高水位地区路基边坡稳定性监测预警装置 | |
Wu et al. | Application and comparative analysis of Intelligent Monitoring Technology for Grouted Pile Construction based on abaqus | |
CN218669460U (zh) | 一种城市地铁施工降水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Jin Junliang Inventor after: Guan Tiesheng Inventor after: Liu Yanli Inventor after: Yang Meng Inventor after: Yin Xin Inventor after: Zhang Haibin Inventor after: Xu Qin Inventor after: Ma Yufei Inventor before: Guan Tiesheng Inventor before: Yang Meng Inventor before: Liu Yanli Inventor before: Jin Junliang Inventor before: Yin Xin Inventor before: Zhang Haibin Inventor before: Xu Qin Inventor before: Ma Yufei |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |