CN1176272C - Method for lowering seepage line of body of dam by adopting osyris wightiana guide filtration - Google Patents
Method for lowering seepage line of body of dam by adopting osyris wightiana guide filtration Download PDFInfo
- Publication number
- CN1176272C CN1176272C CNB021477795A CN02147779A CN1176272C CN 1176272 C CN1176272 C CN 1176272C CN B021477795 A CNB021477795 A CN B021477795A CN 02147779 A CN02147779 A CN 02147779A CN 1176272 C CN1176272 C CN 1176272C
- Authority
- CN
- China
- Prior art keywords
- dam
- hole
- sand
- osyris
- dam body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The present invention relates to a method for lowering a seepage line of a dam body by adopting sand needle guide filtration. A hole is dug in a slope surface at a dam foundation foot of the back slope of the dam body needing guide filtration, and the hole direction is parallel or roughly parallel to the horizontal surface. The diameter of the hole is 70 to 90mm, and the depth is 2 to 6 m. The material having easy water penetration is filled or placed in the hole so as to form sand needles. Then, a hole mouth is sealed by mixed sand and stone materials, and thus, the appearance of the dam slope is restored. Subsequently, the water penetrating into the dam body is guided toward the hole mouth and drained out of the dam body. The needle distance is 1 to 1.5m, and the sand needles are arranged in single row or double-row mode. The sand needles are arranged alternately mutually or arranged in a shape of a plum blossom. The method uses the characteristic of the easy water penetration of the sand needles. As a result, the present invention can effectively guide the penetrating water contained in the dam body over the sand needles to the hole mouth and drain the water out of a dam. Besides, the method has any damage for the dam. The present invention has the advantages of low cost, convenient construction and no need of dam body digging. In addition, the present invention has obvious effect of reducing the seepage line and obtains the effect instantly, and thus, the present invention can extremely effectively drain the water and stably concrete the back slope of the dam. Finally, the present invention performs the function of preventing separate dipping, piping and slope removal and stabilizing dams.
Description
Technical field
The present invention relates to dyke building, particularly a kind of Osyris wightiane that adopts in dyke building is led the method that filter reduces dam seepage line.
Background technology
China is the very serious country of flood.Quite growing one period, because indiscriminate felling of trees, overgraze and other are all to the environment damage behavior, cause rivers,lakes and seas periphery ecological environment to be subjected to very big infringement, there is statistics to show, Yangtze river basin flood generation frequency by in the past per 8 years once, shorten to per 5 years gradually, whenever biyearly.China's dyke is of a great variety, is divided into earth embankment (dam), stone-pitched jetty, native stone mixing dike, steel concrete flood protection wall etc. by banking material.Wherein earth embankment accounts for quite heavy ratio in whole dyke building.
At flood season, earth dam near water the face length time bear the high water level water pressure, water content increases in the dam body, phreatic line rises, and goes out the ease point behind the slope and rises, domatic humidity, softening.Add that people and animals trample on or dam body in leave over inhomogeneities (often living through repeatedly heightening and thickening) or the like the factor of structure such as stub, pipeline or interim preloading or dam body, can make dykes and dams occur loosing and soak piping, the generation that can bring out and aggravate to wash away dike slopes when serious.Experiences and practices shows, reduces phreatic line, reduce the ease point be prevent to loose behind the earth dam soak, piping or the effective way of washing away dike slopes, increasing draining, to lead the filter facility be effective.Now common method has following several: the one, and dam body face near water adds clay wall and bedding intercepts water; The 2nd, intercept water every being seeped into basic unit in dam center line curtain grouting; The 3rd, build pressure at the dam body back side and soak platform; The 4th, at the dam body back side vertical drainage is set and leads the filter well; The 5th, lead the filter shallow ridges in the draining of dam adverse grade excavation herringbone.Preceding four kinds of methods the ease point positive effect are arranged reducing dam seepage line, reducing, but engineering quantity is big, expend higher, several also be subjected to construction operation environment, the restrictions of time (whether in flood season) are arranged, and last a kind of method then is an emergency measure in a kind of flood season, and effect is limited.
Summary of the invention
The purpose of this invention is to provide a kind of easy construction, lead the method for the effective and economic reduction dam seepage line of filter, reduce dam adverse grade water content.
The said method of the present invention is: burrow on domatic intending leading filter dam body adverse grade dam foundation pin place, the hole is to parallel or be in substantially parallel relationship to horizontal plane, the diameter in hole is 70~90mm, the degree of depth is 2~6m, fills or insert the material of easy percolating water in the hole, forms Osyris wightiane, then the hole is sealed with the mixed sand building stones, recover the dam slope profile, will infiltrate the water of dam body and guide the hole into, discharge dam body.Needle gage is 1~1.5m, and single file or duplicate rows are arranged, and be alternate each other, perhaps is the plum blossom shape and arranges.
Parallel or be in substantially parallel relationship to horizontal plane on the dam adverse grade, squeeze into a row or many two row's Osyris wightianes to face direction near water, utilize the easy percolating water characteristic of Osyris wightiane, can be effectively with the contained infiltration guiding of the above dam body of Osyris wightiane hole, then discharge by gutter outside the dam, this method has no to damage to dykes and dams, have with low cost, easy construction, need not excavate the advantage of dam body, it is remarkable to reduce the phreatic line effect, gets instant result, discharging consolidation stablize the dam adverse grade very effectively, and finally playing prevents to loose soaks, piping and washing away dike slopes and the firmly effect of dyke.
Description of drawings
Fig. 1 is that the present invention leads filter effect schematic diagram;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is an Osyris wightiane arrangement form schematic diagram;
Fig. 4 is a kind of pneumatic punch hammer structural principle schematic diagram that is used to burrow;
Fig. 5~Fig. 8 is the Osyris wightiane construction flow chart.
Among the figure: 1-former drawdown curve, 2-dam crest, 3-beat drawdown curve behind the Osyris wightiane, 4-adverse grade, A-former go out to escape a little, go out to escape a little behind the B-beat Osyris wightiane, 5-in the line that washes away dike slopes, 6-Osyris wightiane, 7--dam foundation pin, 8-near water is domatic, 9-drill bit, 1-sleeve pipe, 11--wears pick machine drill bar, 12-guide pipe, 13-connector, 14-carriage, 15-guide rail, 16-stretcher, 17-punch hammer, 18-direction finder, 19-air hose, 20 power tables, 21-supporting pipeline, 22-gas storage bag, 23-air compressor, 24-scale, 25-yellow sand inserts, 26-sandstone mixing sealing compound.
Embodiment
Being similar to the pneumatic punch hammer of marine products QC and Hubei Polytichnic College's aerogenesis, moving underground to wear the underground pick machinery of wearing such as pick machine be very much to be suitable for wearing on dykes and dams the said hole of pick the present invention.The dry season dry weather, the dykes and dams soil moisture content is little, when forming the small-bore, is difficult in the hole caving in, and is the best period that adopts the said method construction of the present invention at this moment.Method has two kinds, and the one, with wearing pick mechanical presses punching, when reaching projected depth, withdraw from punch hammer immediately, be about to pvc pipe or steel pipe subsequently and send in the hole, the limit is entered husky limit and is moved back tube edge and tear pipe open then; The 2nd, sleeve pipe punching, pipe and hammer advanced in unison when reaching projected depth, withdraw from punch hammer outside the pipe at once, and then, the limit is entered husky limit and is moved back tube edge and tear pipe open.Should note: A can adopt and push away husky bar (its front end has circular push pedal, bar merogenesis, establishes joint) to push away sand plug tight, yellow sand in the push-tight hole when moving back pipe; B is little because lead the diameter of filter sand pin, and length is short, so it is little to move back the pipe resistance; C is shorter because of Osyris wightiane, thus except that requiring level, get final product with dam body axis approximate vertical, generally needn't be directed, as the needs orientation, available engineering survey method orientation burrows; D is owing to construction plant broad behind the dykes and dams, so can only dig shallow working pit or not dig working pit; E is that constructing operation is convenient, and all kinds of sleeve pipes all can be made 2 meter one joint, establish joint.
But also manual pore-forming under similarity condition.With luoyang spade elder generation several holes of sondage, if smoothly, then behind pore-forming, fill in yellow sand immediately.Requirement is: the yellow sand of cleaning, in case pore-forming is filled in husky and jam-pack immediately, and reasonable cloth hole.
In non-excavation underground construction equipment, pneumatic punch hammer is generally used for pipeline installation in the urban construction with high efficiency, low cost, the simple advantage of job practices.It is made up of an airtight cylinder body and a piston reciprocating in cylinder body, piston is power with compressed air, along with air pressure alternately changing in the chamber, front and back, constantly back and forth impact the impact head that its front end and cylinder body connect together, thereby punch hammer or steel pipe are constantly advanced along the axis of design in soil layer, realize the purpose of non-excavation punching pipe laying.Fig. 5~concrete job step of Osyris wightiane construction technology process shown in Figure 8 is: the first step, and drill bit and sleeve pipe advance (Fig. 5 shows) simultaneously; Second step, arrive at the bottom of the hole after, the motionless drilling rod that withdraws from of sleeve pipe advances middle rough sand (Fig. 6 shows); In the 3rd step, sleeve pipe withdraws from one section, advances husky material (Fig. 7 shows) again; The 4th step repeated for the 3rd step, limit drill drift pipe, and the limit advances yellow sand, and long 400mm is sealed with melon rice, yellow sand macadam-aggregate mix in the hole.
Generally speaking, for the safety of backwater levee slope, the toe place of backwater be provided with horizontal Osyris wightiane lead the filter drainage both can with go out the ease point drop to domatic below, both economical again.Yet, although Osyris wightiane is led the monolithic stability that filter does not influence dam body, but because dam body formative factor complexity, generally speaking following four aspect reasons are arranged, the one, some earth embankment all is just to reach present dyke section from bright after clearly repeatedly increasing training so far, its soil property is inhomogeneous, even ginseng is mixed with thin sand and soil, sandy loam even building that carries in history and structure; The 2nd, in work progress, banket
Blocked up, roll unreally, dry density does not reach design standard, " forces on " during heightening and thickening, and shear strength is not enough, and the too fast or draining of the progress of building a dam of banketing in the water is not good at forming concentrated soft layer; The 3rd, administrative reason, arbitrarily preloading in dykes and dams, the load that washes away dike slopes in artificially having increased, to serious loose soak with piping dike section flood before do not take measures, lead filter drainage imperfection behind the dike, ponding is difficult to efflux; The 4th, natural cause, the high water level duration in flood season is long, and flood level exceeds design standard, and phreatic line continues to rise, and the domatic point that goes out to escape constantly rises behind the dam.Therefore, except determine to be the safety meter diameter, the degree of depth, needle gage and the Osyris wightiane arrangement form of Osyris wightiane according to the said conventional method of the present invention, should control needle penetration, should observe water law and River Embankment management rules according to the safety requirements construction of water conservancy administrator office and design department.And should " GB50286-98, CJJ50-92 " carries out seepage flow and seepage stability and calculates, then do suitable adjustment again according to national standard.
Said to fill one of easy percolating water material in the hole be yellow sand, should clean; Insert one of easy percolating water material and lead the filter flexible pipe for plastics in the hole, this flexible pipe has the commercially available prod, but never is used in the non-excavation hydraulic engineering; Simultaneously, also can in the hole, insert monitoring instrument, in order to situations such as the infiltration of monitoring dam body, stability.
Claims (5)
1. one kind is adopted Osyris wightiane to lead the method that filter reduces dam seepage line, it is characterized in that: burrow on domatic intending to lead filter dam body adverse grade dam foundation pin place, the hole is to being parallel to horizontal plane, the diameter in hole is 70~90mm, the degree of depth is 2~6m, and fills the easily material yellow sand of infiltration in the hole, forms the Osyris wightiane entity, to infiltrate the water of dam body and guide the hole into, discharge dam body.
2. lead the method that filter reduces dam seepage line as the said employing Osyris wightiane of claim 1, it is characterized in that: said Osyris wightiane entity needle gage is 1~1.5m, and single file or duplicate rows are arranged, interlaced with each other the arranging of hole of two row when duplicate rows is arranged.
3. lead the method that filter reduces dam seepage line as claim 1,2 said employing Osyris wightianes, it is characterized in that: cavitation is filled out husky back and with the mixed sand building stones hole is sealed, and recovers the dam slope profile.
4. lead the method that filter reduces dam seepage line as claim 1,2 said employing Osyris wightianes, it is characterized in that: burrow machinery and operating procedure are: the one, with wearing the pick mechanical punching, when reaching projected depth, withdraw from punch hammer immediately, be about to pvc pipe or steel pipe subsequently and send in the hole, the limit is entered husky limit and is moved back tube edge and tear pipe open; The 2nd, sleeve pipe punching, pipe and hammer advanced in unison when reaching projected depth, manages motionlessly, and horse back withdraws from punch hammer outside the pipe, and then, the limit is entered husky limit and is moved back tube edge and tear pipe open.
5. lead the method that filter reduces dam seepage line as claim 1,2 said employing Osyris wightianes, it is characterized in that: also available hand tool digs a hole, and fills in clean yellow sand after the cavitation immediately.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB021477795A CN1176272C (en) | 2002-12-04 | 2002-12-04 | Method for lowering seepage line of body of dam by adopting osyris wightiana guide filtration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB021477795A CN1176272C (en) | 2002-12-04 | 2002-12-04 | Method for lowering seepage line of body of dam by adopting osyris wightiana guide filtration |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1412390A CN1412390A (en) | 2003-04-23 |
CN1176272C true CN1176272C (en) | 2004-11-17 |
Family
ID=4751296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB021477795A Expired - Fee Related CN1176272C (en) | 2002-12-04 | 2002-12-04 | Method for lowering seepage line of body of dam by adopting osyris wightiana guide filtration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1176272C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102486030A (en) * | 2010-12-06 | 2012-06-06 | 黄垤树 | Retaining wall or sloping field deep-layer water diversion structure |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100362173C (en) * | 2004-07-16 | 2008-01-16 | 贵阳铝镁设计研究院 | Drainage assembly of dry process red mud stockyard outer dam |
CN100373012C (en) * | 2004-11-15 | 2008-03-05 | 贵阳铝镁设计研究院 | Dry redmud yard drainage method and apparatus |
CN102776894B (en) * | 2012-08-28 | 2015-03-04 | 中国电建集团中南勘测设计研究院有限公司 | Dam foundation uplift pressure regulation device |
CN110965519B (en) * | 2019-12-03 | 2020-10-16 | 中国科学院地理科学与资源研究所 | Method for solving unsmooth flow of urban mass water body |
-
2002
- 2002-12-04 CN CNB021477795A patent/CN1176272C/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102486030A (en) * | 2010-12-06 | 2012-06-06 | 黄垤树 | Retaining wall or sloping field deep-layer water diversion structure |
Also Published As
Publication number | Publication date |
---|---|
CN1412390A (en) | 2003-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131575B (en) | A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation | |
CN111088788B (en) | Method for communicating aquifers of soil dumping site in strip mine | |
CN106759297A (en) | A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits | |
CN101215835A (en) | Hole drilling mudjack pile construction method | |
CN109056694B (en) | Method for treating dredger fill through combination of shearing pressurization and vacuum preloading | |
CN105649000A (en) | Back pressure backfilling shallow-buried excavation construction method for tunnel undercrossing gully | |
CN109281330A (en) | A kind of osmotic control method | |
CN207727546U (en) | A kind of displacement hull and cured layer combined foundation structure | |
CN215669631U (en) | Deep overburden foundation structure | |
CN1176272C (en) | Method for lowering seepage line of body of dam by adopting osyris wightiana guide filtration | |
CN105112652B (en) | A kind of rare earth ore in-situ leaching disposing mother liquor canal body structure | |
CN106593456A (en) | Method for setting shield tunneling machine free in water-rich sand cobble stratum due to stuck cutter | |
CN106703053A (en) | Construction method for reinforced soil drainage composite revetment structure | |
CN206800431U (en) | A kind of sealing bottom type caisson wall | |
CN104108919A (en) | Environment-friendly water-stop curtain | |
CN106836182A (en) | A kind of compacted technique of vibroflotation water conservancy diversion | |
CN111455976A (en) | Construction method of self-setting mortar impervious wall by grooving method | |
CN206667225U (en) | A kind of novel solid drainage system of reinforcing soft ground | |
CN207794060U (en) | A kind of Ecotype Concrete support pile | |
CN106869107A (en) | The novel solid drainage system and its dewatering construction method of a kind of reinforcing soft ground | |
CN203846479U (en) | Saturated loose sand compacting system | |
CN207405640U (en) | Stake film is combined cofferdam with soil | |
CN111155541A (en) | Environment-friendly sludge yard sludge rapid solidification system and solidification method | |
CN111719575A (en) | Foundation pit anti-settling drainage method | |
CN201268857Y (en) | Soil shovel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |