CN117513691B - Synchronous installation method for marble skirting line and aluminum plate - Google Patents

Synchronous installation method for marble skirting line and aluminum plate Download PDF

Info

Publication number
CN117513691B
CN117513691B CN202410004225.8A CN202410004225A CN117513691B CN 117513691 B CN117513691 B CN 117513691B CN 202410004225 A CN202410004225 A CN 202410004225A CN 117513691 B CN117513691 B CN 117513691B
Authority
CN
China
Prior art keywords
marble
skirting line
skirting
clamping
aluminum plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202410004225.8A
Other languages
Chinese (zh)
Other versions
CN117513691A (en
Inventor
刘诗迪
邢文涛
郭云鹏
邹兆董
杨晓凯
姜厚任
孙翌超
胡亮
孙源文
乔明彦
田嘉琳
韩超
刘逸枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway No 9 Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway No 9 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway No 9 Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway No 9 Group Co Ltd
Priority to CN202410004225.8A priority Critical patent/CN117513691B/en
Publication of CN117513691A publication Critical patent/CN117513691A/en
Application granted granted Critical
Publication of CN117513691B publication Critical patent/CN117513691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F19/0459Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the fixing method
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F19/0459Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the fixing method
    • E04F19/0477Plinths fixed by means of adhesive
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
    • E04F21/1855Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one of elongated elements, e.g. sidings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F2019/0404Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the material
    • E04F2019/0418Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings characterised by the material of stone or stone like material, e.g. ceramics, concrete; of glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to the field of interior decoration, and in particular relates to a method for synchronously mounting marble skirting lines and aluminum plates, which comprises the following steps: firstly, hanging an aluminum plate on a keel, and reserving a gap below the aluminum plate; step two, the first marble skirting line is plugged into the reserved gap by using two fixing clamps and fixed; thirdly, coating marble structural adhesive on the end of the first marble skirting line; clamping a second marble skirting line by using two fixing clamps, and plugging into the reserved gap and aligning; adjusting the positions of the two fixing clamps to the edge of the second marble skirting line; removing the positioning skirting line after the marble structure is gelled and fixed, and loosening and removing the fixing clip; and then, circularly constructing according to the first step, the third step and the fourth step until the whole sub-construction task is completed; according to the invention, the skirting line and the aluminum plate are synchronously installed, so that the skirting line installation quality can be ensured, the construction period can be saved, the construction efficiency can be accelerated, and the labor cost can be reduced.

Description

Synchronous installation method for marble skirting line and aluminum plate
Technical Field
The invention belongs to the technical field of interior decoration, and particularly relates to a method for synchronously mounting marble skirting lines and aluminum plates.
Background
In the decoration construction of subways, the most common decoration structure is a dry-hanging aluminum plate, and the wall surface is decorated and protected by skirting lines at the bottommost of the dry-hanging aluminum plate. One common collocation of right angles is to construct by adopting a design scheme of marble skirting lines and profile steel joist hanging aluminum plates. The traditional skirting line installation construction sequence is as follows: floor cleaning, plastering and leveling, marble skirting line manufacturing, marble skirting line installation, marble skirting line backrest masonry, aluminum plate installation, cleaning and acceptance inspection. However, the manufacturing time of the marble skirting line is long, the marble skirting line and the surface of the aluminum plate are in the same horizontal plane, the next procedure of aluminum plate installation can be carried out by installing the marble skirting line, and the period is long.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a method for synchronously mounting marble skirting lines and aluminum plates, which can synchronously mount the skirting lines and the aluminum plates, save the construction period and accelerate the construction efficiency.
In order to achieve the above object, the present invention provides the following technical solutions:
a method for synchronously installing marble skirting line and aluminum plate comprises the following steps:
firstly, hanging an aluminum plate on a keel, and reserving a reserved gap for installing marble skirting lines below the aluminum plate;
step two, clamping a first marble skirting line by using two fixing clamps, and plugging the first marble skirting line into a reserved gap by holding the fixing clamps; fixing the first marble skirting line and removing the two fixing clips;
thirdly, coating marble structural adhesive on the end of the first marble skirting line; clamping a second marble skirting line by using two fixing clamps to be plugged into the reserved gap; positioning skirting lines are arranged at the tail end of the second marble skirting line side by side, and the positioning skirting lines and the second marble skirting line are aligned with the first marble skirting line; adjusting the positions of the two fixing clamps to the edge of the second marble skirting line, so that one fixing clamp simultaneously clamps the first marble skirting line and the second marble skirting line, and the other fixing clamp simultaneously clamps the second marble skirting line and the positioning skirting line;
removing the positioning skirting line after the marble structure is gelled and fixed, and loosening and removing the fixing clip;
and by analogy, circularly constructing according to the first step, the third step and the fourth step until the whole sub-construction task is completed.
Further, before the marble skirting line is installed, cement mortar leveling is performed on the marble skirting line.
Further, the vertical section shape of the positioning skirting line is the same as that of the marble skirting line.
Further, the end area of the marble skirting line is not less than 23cm 2
Further, the fixing clamp comprises a first clamping plate, a second clamping plate, a connecting plate, a clamping rod, a top plate and a fastening piece, wherein the first clamping plate and the second clamping plate are oppositely arranged, the connecting plate is fixedly connected between the first clamping plate and the second clamping plate, the clamping rod is connected to the lower part of the second clamping plate in a penetrating mode, the top plate is fixed at the inner end of the clamping rod, and the fastening piece is fixed on the second clamping plate; the clamping bar is movable relative to the thickness direction of the second clamping plate and is locked in position by the fastener such that the distance between the top plate and the first clamping plate is adjustable.
Further, the fastener is a threaded hole column fixedly arranged on the second clamping plate, and the clamping rod threads penetrate through the threaded hole column.
Further, a gasket is arranged on the end face, facing the first clamping plate, of the top plate.
Further, the outer end of the clamping rod is fixed with a hand block.
The beneficial effects of the invention are as follows:
the invention changes the long-term installation mode of the skirting line of the subway station, so that the skirting line and the aluminum plate are synchronously installed, thereby not only ensuring the installation quality of the skirting line, but also saving the construction period, accelerating the construction efficiency and reducing the labor cost; and marble skirting line is fixed by adopting marble structural adhesive, so that the material consumption of a skirting line backrest is effectively reduced, and the material cost is reduced.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention. Wherein:
fig. 1 is a schematic view illustrating a process of plugging a marble skirting line into a reserved gap according to an embodiment of the present invention.
Fig. 2 is a schematic view illustrating a positioning skirting line according to an embodiment of the present invention.
FIG. 3 is a schematic view of a process for removing a fixing clip according to an embodiment of the present invention.
Fig. 4 is a schematic structural view of a fixing clip according to an embodiment of the present invention.
In the figure, 1-fixation clamp, 11-first splint, 12-connecting plate, 13-second splint, 14-fastener, 15-clamp bar, 16-hand piece, 17-roof, 18-gasket, 19-handle, 4-location skirting line, 5-aluminum plate, 6-wall.
Detailed Description
The following description of the technical solutions in the embodiments of the present invention will be clear and complete, and it is obvious that the described embodiments are only some embodiments of the present invention, but not all embodiments. All other embodiments, which are derived by a person skilled in the art based on the embodiments of the invention, fall within the scope of protection of the invention.
In the description of the present invention, the terms "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", etc. refer to the orientation or positional relationship based on that shown in the drawings, merely for convenience of description of the present invention and do not require that the present invention must be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention. The terms "coupled" and "connected" as used herein are to be construed broadly and may be, for example, fixedly coupled or detachably coupled; either directly or indirectly through intermediate components, the specific meaning of the terms being understood by those of ordinary skill in the art as the case may be.
The invention will be described in detail below with reference to the drawings in connection with embodiments. It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other.
A method for synchronously installing marble skirting line and aluminum plate comprises the following steps:
firstly, hanging an aluminum plate 5 on a keel, and reserving a reserved gap for installing marble skirting lines below the aluminum plate 5; as shown in fig. 1, a keel (not shown) is mounted on the wall surface 6, and an aluminum plate 5 is hung on the keel; the height of the reserved gap is generally 100mm or 10mm higher than the height of the marble skirting line;
step two, clamping a first marble skirting line by using two fixing clamps 1, and plugging the first marble skirting line into a reserved gap by holding the fixing clamps 1; fixing the first marble skirting line and removing the two fixing clips 1;
thirdly, coating marble structural adhesive on the end of the first marble skirting line; clamping a second marble skirting line by using two fixing clamps 1 to be plugged into the reserved gap; positioning skirting lines 4 are arranged at the tail ends of the second marble skirting lines side by side, and the positioning skirting lines 4 and the second marble skirting lines are aligned with the first marble skirting lines; adjusting the positions of the two fixing clamps 1 to the edge of the second marble skirting line, so that one fixing clamp 1 simultaneously clamps the first marble skirting line and the second marble skirting line, and the other fixing clamp 1 simultaneously clamps the second marble skirting line and the positioning skirting line 4; as shown in fig. 2, one fixing clip 1 is clamped at the joint of the marble skirting line which is already installed and the marble skirting line which is being installed, and the other fixing clip 1 is clamped at the joint of the marble skirting line which is being installed and the positioning skirting line 4;
if a skirting line installer plugs the finished skirting line into a gap below the aluminum plate 5 by hand, the marble skirting line cannot be finely adjusted by hand because the reserved gap is narrow, so that the skirting line cannot be installed smoothly, the backrest cannot be constructed, and the marble skirting line cannot be fixed; the invention adopts the fixing clamp 1 to assist in construction, the thickness of a connecting sheet at the top of the fixing clamp 1 is thinner, the connecting sheet can freely slide between the lower edge of the aluminum plate 5 and the upper edge of the marble skirting line, and after the marble skirting line is clamped by the fixing clamp 1, a worker can hold the fixing clamp 1 to finely adjust the position of the marble skirting line;
removing the positioning skirting line 4 after the marble structure is gelled and fixed, and loosening and removing the buckle of the fixing clamp 1; the thickness of the marble structural adhesive coating adopted by the invention is about 5mm-8mm, solidification is generally carried out for 1-2 hours, and about 24 hours are needed for complete solidification according to the proportion of climate and curing agent, for example, the Guangzhou Jinkang brand structural adhesive on the market can be adopted; in fig. 3 one of the clips 1 has been removed from the marble skirting line, the other clip 1 is slipping;
and by analogy, circularly constructing according to the first step, the third step and the fourth step until the whole sub-construction task is completed.
Further, before the marble skirting line is installed, cement mortar leveling is carried out on the marble skirting line; the marble skirting line is fixed with the cement mortar at the bottom by virtue of the marble structural adhesive, and is not required to be fixed in a mode of pasting back plain cement or grouting back as a conventional stone skirting line, so that the material is saved to a certain extent.
Further, the vertical section shape of the positioning skirting line 4 is the same as that of the marble skirting line, and the length of the positioning skirting line 4 is not less than 10cm; the positioning skirting line 4 can adopt a part cut out by marble skirting line as the positioning skirting line 4, or can directly take a piece of marble skirting line as the positioning skirting line 4, and in the embodiment, the length of the marble skirting line is 80cm.
Further, the end area of the marble skirting line is not less than 23cm 2 The two marble skirting lines are convenient to bond firmly.
Further, as shown in fig. 4, the fixing clip 1 includes a first clamping plate 11 and a second clamping plate 13 which are disposed opposite to each other, a connecting plate 12 fixedly connected between the first clamping plate 11 and the second clamping plate 13, a clamping rod 15 penetrating through the lower portion of the second clamping plate 13, a top plate 17 fixed at the inner end of the clamping rod 15, and a fastening member 14 fixed on the second clamping plate 13; the clamping rod 15 can move relative to the thickness direction of the second clamping plate 13 and is locked by the fastener 14, so that the distance between the top plate 17 and the first clamping plate 11 is adjustable, and the clamping or release of the marble skirting line is realized by adjusting the distance between the top plate 17 and the first clamping plate 11 through the clamping rod 15; the thickness of the connecting plate 12 is 2mm-5mm, which is smaller than the distance between the lower edge of the aluminum plate 5 and the upper edge of the marble skirting line after installation; preferably, a gasket 18 is disposed on an end surface of the top plate 17 facing the first clamping plate 11, and the gasket 18 has elasticity or micro elasticity, for example, a gasket 18 made of silica gel, rubber or polyurethane; the outer end of the clamping rod 15 is fixed with a hand block 16, and the hand block 16 radially protrudes out of the clamping rod 15, so that a worker can conveniently knob the hand block 16 to adjust the position of the clamping rod 15.
In one embodiment, as shown in fig. 4, the fastener 14 is a threaded hole column fixedly provided on the second clamping plate 13, through which the clamping rod 15 is threaded; when in use, the position of the top plate 17 is adjusted and locked by the forward rotation or reverse rotation of the clamping rod 15; a handle 19 may be additionally provided on the second clamping plate 13, or the clamping bar 15 may be directly used as the handle 19, so that a worker can hold the marble skirting line while clamping and transferring the marble skirting line.
The installation of the aluminum plate 5 in the original scheme must be after the marble skirting backrest is built and completely solidified, because the distance between the aluminum plate 5 and the marble skirting is very small, the aluminum plate 5 is very easy to touch the marble skirting of which the bonding material is not completely solidified when being installed, and the marble skirting is misplaced or skewed, so the original scheme must be to install the marble skirting first and then install the aluminum plate 5; assuming that the respective installation periods are 15 days, the total period of time for installing the marble skirting line (the bonding material to be completely solidified) and the aluminum plate 5 in the original scheme is 30 days according to the sequential construction mode, if the time for completely solidifying the cement mortar is 2-3 days, the installation of the aluminum plate 5 can be started after the marble skirting line is partially installed and solidified, and the shortest total period of time required is the total solidification time for building the marble backrest and the installation time of the aluminum plate 5, namely 17-18 days.
The mode of installing marble skirting line after the aluminum plate 5 is installed earlier in this application, can wait for its natural cure after marble skirting line is installed the reservation gap can, can not receive the influence of aluminum plate 5 installation. The original scheme is basically equivalent to the material investment and mechanical cost of the optimization scheme, and the optimization scheme mainly solves the problem that skirting lines and the aluminum plate 5 cannot be synchronously constructed and the construction efficiency of personnel is reduced. Compared with the original method of firstly installing the skirting line and then installing the aluminum plate 5, the synchronous installation method has the advantages that the structural adhesive is adopted to replace the original skirting line backrest construction, the construction efficiency of personnel is improved by 20%, a subway station is taken as an example, the skirting line and the aluminum plate 5 are synchronously constructed, the original construction periods are 15 days, the solidification time of marble structural adhesive is not considered, the total construction period is determined by the installation period of the aluminum plate 5, and the total construction period is 15 days, so that the total construction period is reduced. Meanwhile, the efficiency of the installation of the marble skirting line is improved, and the construction period can be shortened by 3 days; arranging 1 person of a technician and 1 person of a construction team and 2 persons of an installer according to each team of construction; 1 table and 2 fixing clamps of a transport wheelbarrow are used; the total of 8 stations are constructed simultaneously, and the project installer is 20 persons in each station according to the peak period; the local is responsible for the project installer for 200 yuan/day; the construction period of the marble skirting line is shortened by 3 days, so that the personnel cost is saved in total: (20×20% ×200+20×200×3) ×8=102400 elements.
In the aspect of social benefit, the marble skirting line installation effect and quality can be effectively guaranteed, meanwhile, the marble skirting line and the aluminum plate are synchronously installed, the construction progress is effectively accelerated, the construction efficiency of installers is improved, and the construction cost is reduced. Meanwhile, the requirements of owners on quality are also met, and the social benefits of enterprises are improved.
In the aspect of environmental benefit, the marble structural adhesive is adopted for auxiliary installation, so that the material consumption of the skirting line backrest is effectively reduced, and meanwhile, the marble skirting line and the aluminum plate 5 are synchronously constructed, so that the waste of human resources is reduced, the integral improvement of engineering image is facilitated, and good environmental benefit is obtained for enterprises.
It is to be understood that the above description is exemplary only and that the embodiments of the present application are not limited thereto. The foregoing description of the preferred embodiments of the invention is not intended to limit the invention to the particular embodiments disclosed, but on the contrary, the intention is to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the appended claims.

Claims (7)

1. A method for synchronously installing marble skirting lines and aluminum plates is characterized in that: the method comprises the following steps:
firstly, hanging an aluminum plate (5) on a keel, and reserving a reserved gap for installing marble skirting lines below the aluminum plate (5);
step two, clamping a first marble skirting line by using two fixing clamps (1), and plugging the first marble skirting line into a reserved gap by holding the fixing clamps (1); fixing the first marble skirting line and removing the two fixing clips (1);
thirdly, coating marble structural adhesive on the end of the first marble skirting line; clamping a second marble skirting line by using two fixing clamps (1) to be plugged into the reserved gap; positioning skirting lines (4) are arranged at the tail ends of the second marble skirting lines side by side, and the positioning skirting lines (4) and the second marble skirting lines are aligned with the first marble skirting lines; adjusting the positions of the two fixing clamps (1) to the edge of the second marble skirting line, so that one fixing clamp (1) simultaneously clamps the first marble skirting line and the second marble skirting line, and the other fixing clamp (1) simultaneously clamps the second marble skirting line and the positioning skirting line (4);
removing the positioning skirting line (4) after the marble structure is gelled and fixed, and loosening and removing the buckle of the fixing clamp (1);
and then, circularly constructing according to the first step, the third step and the fourth step until the whole sub-construction task is completed;
the fixing clamp (1) comprises a first clamping plate (11) and a second clamping plate (13) which are oppositely arranged, a connecting plate (12) fixedly connected between the first clamping plate (11) and the second clamping plate (13), a clamping rod (15) penetrating through the lower part of the second clamping plate (13), a top plate (17) fixed at the inner end of the clamping rod (15) and a fastening piece (14) fixed on the second clamping plate (13); the clamping bar (15) is movable relative to the thickness direction of the second clamping plate (13) and is locked in position by the fastener (14) such that the distance between the top plate (17) and the first clamping plate (11) is adjustable.
2. The method for synchronously installing marble skirting line and aluminum plate according to claim 1, wherein: before the marble skirting line is installed, cement mortar leveling is carried out on the marble skirting line.
3. The method for synchronously installing marble skirting line and aluminum plate according to claim 1, wherein: the vertical section shape of the positioning skirting line (4) is the same as that of the marble skirting line.
4. The method for synchronously installing marble skirting line and aluminum plate according to claim 1, wherein: the end area of the marble skirting line is not less than 23cm 2
5. The method for synchronously installing marble skirting line and aluminum plate according to claim 1, wherein: the fastener (14) is a threaded hole column fixedly arranged on the second clamping plate (13), and the clamping rod (15) penetrates through the threaded hole column in a threaded mode.
6. The method for synchronously installing marble skirting line and aluminum plate according to claim 1, wherein: a gasket (18) is arranged on the end face of the top plate (17) facing the first clamping plate (11).
7. The method for synchronously installing marble skirting line and aluminum plate according to claim 1, wherein: the outer end of the clamping rod (15) is fixed with a hand block (16).
CN202410004225.8A 2024-01-03 2024-01-03 Synchronous installation method for marble skirting line and aluminum plate Active CN117513691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410004225.8A CN117513691B (en) 2024-01-03 2024-01-03 Synchronous installation method for marble skirting line and aluminum plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410004225.8A CN117513691B (en) 2024-01-03 2024-01-03 Synchronous installation method for marble skirting line and aluminum plate

Publications (2)

Publication Number Publication Date
CN117513691A CN117513691A (en) 2024-02-06
CN117513691B true CN117513691B (en) 2024-03-15

Family

ID=89749708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410004225.8A Active CN117513691B (en) 2024-01-03 2024-01-03 Synchronous installation method for marble skirting line and aluminum plate

Country Status (1)

Country Link
CN (1) CN117513691B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100592466B1 (en) * 2004-04-16 2006-06-23 파스템건설 주식회사 Doubled-wall structure completed by prefabbing panels
CN103615098A (en) * 2013-10-21 2014-03-05 倪国梁 Skirting board assembly provided with split type skirting boards
CN207245105U (en) * 2017-09-12 2018-04-17 北京金碧合力建筑设计工程有限公司 One kind illumination skirting
CN208137198U (en) * 2018-03-20 2018-11-23 中建一局集团装饰工程有限公司 The light steel keel partition of LED light strip and skirting is set
CN215106971U (en) * 2021-07-08 2021-12-10 苏州美瑞德建筑装饰有限公司 Stone material column bottom movable design receipts limit structure convenient to maintain

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100592466B1 (en) * 2004-04-16 2006-06-23 파스템건설 주식회사 Doubled-wall structure completed by prefabbing panels
CN103615098A (en) * 2013-10-21 2014-03-05 倪国梁 Skirting board assembly provided with split type skirting boards
CN207245105U (en) * 2017-09-12 2018-04-17 北京金碧合力建筑设计工程有限公司 One kind illumination skirting
CN208137198U (en) * 2018-03-20 2018-11-23 中建一局集团装饰工程有限公司 The light steel keel partition of LED light strip and skirting is set
CN215106971U (en) * 2021-07-08 2021-12-10 苏州美瑞德建筑装饰有限公司 Stone material column bottom movable design receipts limit structure convenient to maintain

Also Published As

Publication number Publication date
CN117513691A (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN107178170B (en) Integrated ceiling with integral toilet keel and veneer and construction method
TWI352149B (en)
CN108086627A (en) A kind of combined wall board Fast Installation structure and its installation method
CN117513691B (en) Synchronous installation method for marble skirting line and aluminum plate
CN102561691A (en) Method for eliminating cracking of joint between fair-faced concrete shear wall and masonry
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN112443109A (en) Mounting structure of detachable wall panel and using method
CN201908369U (en) External heat insulation structure for polystyrene board external walls
CN111962792A (en) Wall surface hanging system and mounting method
KR20090055805A (en) Insulated stone panel method
CN216196242U (en) Buckle keel for fixing wallboard
CN214498208U (en) Can dismantle mounting structure of shingle nail
CN212249002U (en) Glass attachment device for building decoration
CN214498158U (en) Wall body reentrant corner ceramic tile mounting structure
CN111395587B (en) Integrated detachable assembly type wall and installation method thereof
CN210288947U (en) Wall surface installation system for assembled ceramic tile concrete composite board
CN202899532U (en) Connecting component for low carbon plate adhesive clamping combination
CN112523459A (en) Indoor floor decoration method
CN213710017U (en) Convex GFRC link plate curb plate positioning control device
CN201129020Y (en) Construction bracket for building board
CN111962791A (en) Wall surface hanging type external corner system
CN207092439U (en) A kind of joggle wallboard quick assembling coupling
CN217000614U (en) Assembled wall brick mounting structure
CN202810083U (en) Embedding groove water-proof connecting mechanism of plastic external wall panel
CN212715740U (en) Light heat-insulating decorative board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant