CN117495210B - 公路混凝土施工质量管理系统 - Google Patents

公路混凝土施工质量管理系统 Download PDF

Info

Publication number
CN117495210B
CN117495210B CN202410001600.3A CN202410001600A CN117495210B CN 117495210 B CN117495210 B CN 117495210B CN 202410001600 A CN202410001600 A CN 202410001600A CN 117495210 B CN117495210 B CN 117495210B
Authority
CN
China
Prior art keywords
module
data
analysis
construction
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202410001600.3A
Other languages
English (en)
Other versions
CN117495210A (zh
Inventor
冯翠娟
刘海儒
吴建强
任秋儒
王文凯
唐鹏
陈朋州
李雪峰
王贵平
张于会
司海建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Yetong Construction Engineering Co ltd
Original Assignee
Hengshui Yetong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Yetong Construction Engineering Co ltd filed Critical Hengshui Yetong Construction Engineering Co ltd
Priority to CN202410001600.3A priority Critical patent/CN117495210B/zh
Publication of CN117495210A publication Critical patent/CN117495210A/zh
Application granted granted Critical
Publication of CN117495210B publication Critical patent/CN117495210B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Software Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Primary Health Care (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • General Health & Medical Sciences (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及质量管理技术领域,具体为公路混凝土施工质量管理系统,系统包括数据采集模块、质量动态分析模块、风险评估与控制模块、施工流程优化模块、预应力自动调节模块、缺陷智能检测模块、抗震性能优化模块、持续质量改进模块。本发明中,动态系统模型和时间序列分析应用数据变化趋势分析,风险决策树与故障模式影响分析结合,识别风险点和评估潜在影响,图神经网络和遗传算法优化施工流程和资源分配,提高效率,自适应控制技术和机器学习算法用于结构安全监测和效能验证,深度学习技术应用缺陷检测,提高识别和定位准确度,结构动力分析和多目标优化技术增强混凝土抗震性能,持续改进和质量管理循环原则的采纳确保施工监控和质量提升。

Description

公路混凝土施工质量管理系统
技术领域
本发明涉及质量管理技术领域,尤其涉及公路混凝土施工质量管理系统。
背景技术
公路混凝土施工质量管理系统属于质量管理技术领域,特别是在建筑和土木工程行业中。这个技术领域侧重于保证建筑材料的质量、施工过程的符合性,以及最终结构的安全和耐用性。涵盖了从材料选择、配比设计到施工方法、现场管理和最后的质量评估与控制的全过程。该领域运用现代科技和管理原则,确保公路建设符合预定的质量标准,以及相关的法律和行业规范。
公路混凝土施工质量管理系统是指一套专门用于监控、控制和保证公路施工过程中混凝土质量的技术和管理措施。该系统的目的是确保混凝土的每个环节都达到既定的质量标准,从而保证公路的整体质量、安全性和耐久性。通过实施这样的系统,旨在减少或消除施工缺陷,提高工程效率,延长公路使用寿命,并确保公共安全。此外,系统还旨在提供文档记录和反馈,以供未来的质量改进和责任追溯。
传统系统缺乏系统化和动态的质量评估手段,难以准确预测风险和评估施工质量。在施工流程优化、预应力调节和缺陷检测方面,传统方法缺少智能化和自动化的支持,导致施工效率低下,人工成本高昂。此外,传统系统在抗震性能的优化方面考虑不足,不能充分适应复杂的施工环境和自然条件,影响工程的长期稳定性和安全性。总体而言,传统系统在数据处理、风险管理、流程优化和质量控制等方面存在局限,难以满足现代施工的高效和智能化需求。
发明内容
本发明的目的是解决现有技术中存在的缺点,而提出的公路混凝土施工质量管理系统。
为了实现上述目的,本发明采用了如下技术方案:公路混凝土施工质量管理系统包括数据采集模块、质量动态分析模块、风险评估与控制模块、施工流程优化模块、预应力自动调节模块、缺陷智能检测模块、抗震性能优化模块、持续质量改进模块;
所述数据采集模块基于施工现场环境,采用环境监测传感器网络和数据采集方法,实时捕获包括温度、湿度、振动的关键参数,通过数据预处理和同步技术进行信号清洗和整合,形成结构化施工环境数据,生成实时施工数据;
所述质量动态分析模块基于实时施工数据,采用动态系统模型和时间序列分析,分析数据变化趋势,通过模式识别和未来时间段趋势预测,对施工质量进行多维评估,生成质量状态评估;
所述风险评估与控制模块基于质量状态评估,采用风险决策树和故障模式影响分析,识别关键风险点,评估其潜在影响和发生概率,制定风险控制策略;
所述施工流程优化模块基于风险控制策略,采用图神经网络和遗传算法,分析施工流程中的依赖关系和潜在瓶颈,优化施工活动排序和资源分配,生成优化后的施工计划;
所述预应力自动调节模块基于优化后的施工计划,采用自适应控制技术和机器学习算法,监测预应力系统的响应,根据实时数据调整预应力参数,验证结构安全和效能,生成调节后的预应力参数;
所述缺陷智能检测模块基于调节后的预应力参数,采用深度学习技术,分析施工图像和传感器数据,识别和定位潜在缺陷,估算规模和影响,生成缺陷检测结果;
所述抗震性能优化模块基于缺陷检测结果,采用结构动力分析和多目标优化技术,评估混凝土结构在差异化震动下的响应,并设计优化方案提升抗震性能,生成抗震优化参数;
所述持续质量改进模块基于实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果、抗震优化参数,采用持续改进和质量管理循环原则,对施工过程进行持续监控和评估,制定质量改进措施和方案。
作为本发明的进一步方案,所述实时施工数据包括环境温度、湿度指标、振动频率、材料固化速度和施工阶段进度,所述质量状态评估包括趋势变化图、风险等级指标和关键质量控制点,所述风险控制策略包括风险等级分类、预防措施和应急响应流程,所述优化后的施工计划包括活动排序列表、资源分配表和预计时间表,所述调节后的预应力参数包括应力大小调整值、分布调整区域和调整时间间隔,所述缺陷检测结果包括缺陷类型识别、位置定位和大小估计,所述抗震优化参数包括结构改进方案、性能提升措施和实施优先级,所述质量改进措施和方案包括改进目标设定、具体执行步骤和效果评估方法。
作为本发明的进一步方案,所述数据采集模块包括环境监测子模块、材料检测子模块、施工监测子模块;
所述环境监测子模块基于施工现场环境,采用环境监测传感器网络实时捕获包括温度、湿度、振动的关键参数,数据通过傅里叶变换进行信号频域分析,卡尔曼滤波用于信号去噪,数据插值和时间戳对齐实现数据同步,生成结构化环境监测数据;
所述材料检测子模块基于结构化环境监测数据,红外光谱分析提取材料的分子振动信息,X射线荧光分析定量评估元素组成,质谱分析和原子吸收光谱法保障材料化学稳定性,生成材料质量报告;
所述施工监测子模块基于材料质量报告和结构化环境监测数据,卷积神经网络用于图像分类和特征提取,边缘检测算法识别施工区域,频谱分析和时频分析监测振动数据,进行施工过程的实时监控,生成实时施工数据。
作为本发明的进一步方案,所述质量动态分析模块包括数据融合子模块、质量预测子模块、状态评估子模块;
所述数据融合子模块基于实时施工数据,加权平均法融合多来源数据的可靠性,采用数据正规化标准化不同数据尺度,聚类分析识别数据模式和异常,生成综合质量信息;
所述质量预测子模块基于综合质量信息,自回归移动平均模型分析历史数据趋势,长短期记忆网络预测未来质量变化,季节性调整考虑时间因素影响,生成质量趋势预测;
所述状态评估子模块基于质量趋势预测,特征提取识别关键质量指标,分类器训练基于历史数据建立评估模型,主成分分析简化数据维度,逻辑回归进行质量等级评估,生成质量状态评估。
作为本发明的进一步方案,所述风险评估与控制模块包括风险识别子模块、问题分析子模块、控制策略子模块;
所述风险识别子模块基于质量状态评估数据,执行风险决策树分析,系统自动遍历多施工场景,识别风险点,故障模式与影响分析通过历史数据和专家知识库定量评估风险的严重性、发生概率和检测难度,生成风险点分析报告;
所述问题分析子模块基于风险点分析报告,应用因果关系图揭示风险发生的根本原因,概率统计方法计算风险发生的频率和影响程度,解析多风险点的后果,生成风险根源和后果分析;
所述控制策略子模块基于风险根源和后果分析,开展风险缓解策略设计,包括风险转移和风险分散,制定应急响应计划,包括资源调配和紧急措施预案,生成风险控制策略。
作为本发明的进一步方案,所述施工流程优化模块包括流程分析子模块、资源调度子模块、计划优化子模块;
所述流程分析子模块基于风险控制策略,利用图神经网络分析施工流程,自动识别流程中的关键依赖节点和潜在瓶颈,图注意力网络关注高风险节点,生成流程依赖和瓶颈分析;
所述资源调度子模块基于流程依赖和瓶颈分析,运用线性规划和网络流优化模型,制定资源分配策略,参照资源限制和优先级,动态调整资源分配以解决瓶颈问题,生成资源分配优化方案;
所述计划优化子模块基于资源分配优化方案,应用遗传算法对施工活动进行排序,种群初始化基于当前施工计划,通过交叉变异和适应度评估迭代搜索最优施工活动排序和资源配置方案,生成优化后的施工计划。
作为本发明的进一步方案,所述预应力自动调节模块包括实时监测子模块、调节算法子模块、参数设置子模块;
所述实时监测子模块基于优化后的施工计划,通过应力和振动传感器收集预应力实时数据,采用傅里叶变换对信号进行频域分析,自适应滤波算法去除噪声,生成实时响应数据;
所述调节算法子模块基于实时响应数据,运用支持向量机分析预应力调整需求,决策树算法辅助预测预应力参数调整方向和幅度,结合实时负载和应力数据,制定预应力调整策略,生成预应力调整方案;
所述参数设置子模块基于预应力调整方案,采用闭环控制自动调整预应力参数,运用PID控制器和自适应控制策略进行调节,模拟测试验证调整效果,保障结构安全,生成调节后的预应力参数。
作为本发明的进一步方案,所述缺陷智能检测模块包括图像识别子模块、数据分析子模块、缺陷预测子模块;
所述图像识别子模块基于调节后的预应力参数,应用卷积神经网络分析施工图像,识别缺陷特征,图像分割算法定位缺陷区域,生成缺陷图像分析结果;
所述数据分析子模块基于缺陷图像分析结果,结合传感器数据,运用多源数据融合技术和相关性分析,归类缺陷性质和规模,生成缺陷特性分析;
所述缺陷预测子模块基于缺陷特性分析,采用随机森林和线性回归模型,估算缺陷的潜在影响和发展趋势,生成缺陷检测结果。
作为本发明的进一步方案,所述抗震性能优化模块包括性能评估子模块、设计调整子模块、优化算法子模块;
所述性能评估子模块基于缺陷检测结果,运用有限元方法模拟混凝土结构,在差异化震动条件下分析其响应,模态分析提供结构的固有频率和振型数据,时程分析用于模拟结构在实际地震波作用下的动态响应,生成结构响应评估;
所述设计调整子模块基于结构响应评估,利用灵敏度分析确定结构薄弱点,应用结构加固和材料升级策略,对设计进行调整,提高抗震能力,生成设计调整方案;
所述优化算法子模块基于设计调整方案,应用粒子群优化和遗传算法,对设计参数进行优化,检索成本与性能之间的平衡点,生成抗震优化参数。
作为本发明的进一步方案,所述持续质量改进模块包括反馈整合子模块、改进策略子模块、实时监控子模块;
所述反馈整合子模块基于实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果、抗震优化参数,采用数据融合技术,包括多源数据集成和实时数据处理,通过模式识别分析施工过程中的关键质量指标,同时应用机器学习的异常检测和风险预测,对潜在风险进行识别和分类,生成综合质量风险评估;
所述改进策略子模块基于综合质量风险评估,采用决策分析方法,进行成本效益分析和风险评价,对风险因素进行量化分析,结合优化调度策略,包括资源优化分配和进度调整,制定质量改进与风险控制方案;
所述实时监控子模块基于质量改进与风险控制方案,采用实时监控技术,包括传感器网络监控和数据实时分析,对施工过程进行监控,同时应用质量调节技术,进行预应力参数调整和抗震参数优化,实时调节施工质量,生成施工质量持续监控报告。
与现有技术相比,本发明的优点和积极效果在于:
本发明中,通过动态系统模型和时间序列分析的应用,有效分析了数据变化趋势,提升了质量评估的准确性和前瞻性。风险决策树和故障模式影响分析的结合,增强了风险点的精确识别和潜在影响的评估。图神经网络和遗传算法的应用,优化了施工流程和资源分配,提高了施工效率。自适应控制技术和机器学习算法在预应力系统中的使用,实现了更精确的结构安全监测和效能验证。深度学习技术在缺陷检测中的应用,提高了潜在缺陷的识别和定位准确度。结构动力分析和多目标优化技术,增强了混凝土结构的抗震性能。持续改进和质量管理循环原则的采纳,确保了施工过程的全面监控和持续质量提升。
附图说明
图1为本发明的系统流程图;
图2为本发明的系统框架示意图;
图3为本发明的数据采集模块流程图;
图4为本发明的质量动态分析模块流程图;
图5为本发明的风险评估与控制模块流程图;
图6为本发明的施工流程优化模块流程图;
图7为本发明的预应力自动调节模块流程图;
图8为本发明的缺陷智能检测模块流程图;
图9为本发明的抗震性能优化模块流程图;
图10为本发明的持续质量改进模块流程图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
在本发明的描述中,需要理解的是,术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。
实施例一
请参阅图1至图2,公路混凝土施工质量管理系统包括数据采集模块、质量动态分析模块、风险评估与控制模块、施工流程优化模块、预应力自动调节模块、缺陷智能检测模块、抗震性能优化模块、持续质量改进模块;
数据采集模块基于施工现场环境,采用环境监测传感器网络和数据采集方法,实时捕获包括温度、湿度、振动的关键参数,通过数据预处理和同步技术进行信号清洗和整合,形成结构化施工环境数据,生成实时施工数据;
质量动态分析模块基于实时施工数据,采用动态系统模型和时间序列分析,分析数据变化趋势,通过模式识别和未来时间段趋势预测,对施工质量进行多维评估,生成质量状态评估;
风险评估与控制模块基于质量状态评估,采用风险决策树和故障模式影响分析,识别关键风险点,评估其潜在影响和发生概率,制定风险控制策略;
施工流程优化模块基于风险控制策略,采用图神经网络和遗传算法,分析施工流程中的依赖关系和潜在瓶颈,优化施工活动排序和资源分配,生成优化后的施工计划;
预应力自动调节模块基于优化后的施工计划,采用自适应控制技术和机器学习算法,监测预应力系统的响应,根据实时数据调整预应力参数,验证结构安全和效能,生成调节后的预应力参数;
缺陷智能检测模块基于调节后的预应力参数,采用深度学习技术,分析施工图像和传感器数据,识别和定位潜在缺陷,估算规模和影响,生成缺陷检测结果;
抗震性能优化模块基于缺陷检测结果,采用结构动力分析和多目标优化技术,评估混凝土结构在差异化震动下的响应,并设计优化方案提升抗震性能,生成抗震优化参数;
持续质量改进模块基于实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果、抗震优化参数,采用持续改进和质量管理循环原则,对施工过程进行持续监控和评估,制定质量改进措施和方案。
实时施工数据包括环境温度、湿度指标、振动频率、材料固化速度和施工阶段进度,质量状态评估包括趋势变化图、风险等级指标和关键质量控制点,风险控制策略包括风险等级分类、预防措施和应急响应流程,优化后的施工计划包括活动排序列表、资源分配表和预计时间表,调节后的预应力参数包括应力大小调整值、分布调整区域和调整时间间隔,缺陷检测结果包括缺陷类型识别、位置定位和大小估计,抗震优化参数包括结构改进方案、性能提升措施和实施优先级,质量改进措施和方案包括改进目标设定、具体执行步骤和效果评估方法。
通过实时监控和数据分析确保施工在最佳条件下进行,及时发现并调整问题,从而减少环境因素引起的质量问题。系统中的风险评估与控制模块能够有效识别和评估潜在风险,制定控制策略,降低事故发生概率,确保施工安全。此外,流程和资源的优化减少了不必要的延误和资源浪费,节约成本并缩短工期。系统还注重结构的安全与性能,通过预应力自动调节和抗震性能优化,提升结构的稳固性和适应性。智能化的缺陷检测能准确识别潜在问题,及时修复,提高结构可靠性。持续质量改进模块通过学习和改进循环,不断提升施工方法和流程,保障未来项目的高质量完成。
请参阅图3,数据采集模块包括环境监测子模块、材料检测子模块、施工监测子模块;
环境监测子模块基于施工现场环境,采用环境监测传感器网络实时捕获包括温度、湿度、振动的关键参数,数据通过傅里叶变换进行信号频域分析,卡尔曼滤波用于信号去噪,数据插值和时间戳对齐实现数据同步,生成结构化环境监测数据;
材料检测子模块基于结构化环境监测数据,红外光谱分析提取材料的分子振动信息,X射线荧光分析定量评估元素组成,质谱分析和原子吸收光谱法保障材料化学稳定性,生成材料质量报告;
施工监测子模块基于材料质量报告和结构化环境监测数据,卷积神经网络用于图像分类和特征提取,边缘检测算法识别施工区域,频谱分析和时频分析监测振动数据,进行施工过程的实时监控,生成实时施工数据。
在环境监测子模块中,通过环境监测传感器网络实时捕获关键参数,如温度、湿度和振动。数据采集格式通常为时间序列数据,每个传感器输出的是一系列与时间戳关联的数值。对这些数据进行傅里叶变换,可将时间域的信号转换到频域,便于分析信号的频率成分。接下来,卡尔曼滤波算法被应用于信号去噪,消除环境噪声或设备误差引入的干扰。数据插值和时间戳对齐是为了实现不同传感器之间数据的同步,确保所有数据都是在相同时间框架下进行比较和分析的。这些处理步骤生成结构化的环境监测数据,对施工现场环境的准确评估至关重要,帮助监控和维持适宜的施工环境。
在材料检测子模块中,基于结构化环境监测数据,红外光谱分析用于提取材料的分子振动信息,此过程侧重于材料的化学特性分析。数据格式通常为光谱图,显示不同波长下材料吸收光的强度。X射线荧光分析进一步对元素组成进行定量评估,结果呈现为元素的存在量和种类。质谱分析和原子吸收光谱法被用于确保材料的化学稳定性,通过检测样品中的元素和化合物,评估材料的纯度和稳定性。这些分析结果汇总成材料质量报告,为施工过程提供了材料的详细化学和物理特性信息,确保施工材料符合质量标准。
在施工监测子模块中,基于材料质量报告和结构化环境监测数据,采用卷积神经网络进行图像分类和特征提取。这涉及的数据格式为图像数据,包括施工现场的照片或视频帧。卷积神经网络通过学习识别图像中的模式和结构,对施工区域进行有效监控。边缘检测算法用于识别施工区域的轮廓,强化监控精度。频谱分析和时频分析则用于监测振动数据,帮助评估施工过程中的机械设备运行和结构稳定性。这些技术的应用产生实时施工数据,实现施工过程的持续监控和评估,确保施工安全和效率。
请参阅图4,质量动态分析模块包括数据融合子模块、质量预测子模块、状态评估子模块;
数据融合子模块基于实时施工数据,加权平均法融合多来源数据的可靠性,采用数据正规化标准化不同数据尺度,聚类分析识别数据模式和异常,生成综合质量信息;
质量预测子模块基于综合质量信息,自回归移动平均模型分析历史数据趋势,长短期记忆网络预测未来质量变化,季节性调整考虑时间因素影响,生成质量趋势预测;
状态评估子模块基于质量趋势预测,特征提取识别关键质量指标,分类器训练基于历史数据建立评估模型,主成分分析简化数据维度,逻辑回归进行质量等级评估,生成质量状态评估。
在数据融合子模块中,通过加权平均法处理实时施工数据,实现多来源数据的可靠性融合,步骤中,不同来源的数据首先经过正规化和标准化处理,以消除不同数据尺度带来的影响,确保数据在统一的比例尺度下进行比较和分析。采用聚类分析来识别数据中的模式和异常,这个过程侧重于发现数据中的固有结构和潜在的异常点。这些操作共同生成了综合质量信息,为后续的质量评估和预测提供了一个全面和准确的数据基础。
在质量预测子模块中,基于综合质量信息,自回归移动平均模型被用于分析历史数据的趋势。这个模型能够捕捉时间序列数据中的模式和趋势,为未来的质量变化提供预测基础。长短期记忆网络(LSTM)用于预测未来的质量变化,其优势在于能够处理和记忆长期的数据依赖关系。季节性调整被考虑进模型中,以应对时间因素对质量的影响。这些步骤的结合生成了质量趋势预测,为施工质量的前瞻性管理和决策提供了科学依据。
在状态评估子模块中,基于质量趋势预测,进行特征提取以识别关键质量指标。接着,通过分类器训练,基于历史数据建立了质量评估模型。这个步骤利用了主成分分析,以简化数据维度,减少计算复杂性,保持数据的关键信息。逻辑回归被应用于进行质量等级的评估,此系列操作生成了质量状态评估,为施工过程中质量控制提供了量化的评估工具,有助于及时发现和纠正质量问题,保障施工质量和效率。
请参阅图5,风险评估与控制模块包括风险识别子模块、问题分析子模块、控制策略子模块;
风险识别子模块基于质量状态评估数据,执行风险决策树分析,系统自动遍历多施工场景,识别风险点,故障模式与影响分析通过历史数据和专家知识库定量评估风险的严重性、发生概率和检测难度,生成风险点分析报告;
问题分析子模块基于风险点分析报告,应用因果关系图揭示风险发生的根本原因,概率统计方法计算风险发生的频率和影响程度,解析多风险点的后果,生成风险根源和后果分析;
控制策略子模块基于风险根源和后果分析,开展风险缓解策略设计,包括风险转移和风险分散,制定应急响应计划,包括资源调配和紧急措施预案,生成风险控制策略。
在风险识别子模块中,通过执行风险决策树分析,基于质量状态评估数据,系统自动遍历多个施工场景以识别潜在的风险点。数据格式通常为结构化的质量评估报告,包括各种质量指标和相关参数。风险决策树分析侧重于系统地探索和识别潜在风险,并将这些风险点映射到不同的施工场景。故障模式与影响分析(FMEA)结合历史数据和专家知识库,对每个风险点的严重性、发生概率和检测难度进行定量评估,此过程生成了风险点分析报告,为后续的问题分析和控制策略制定提供了详细的风险信息。
在问题分析子模块中,基于风险点分析报告,应用因果关系图来揭示风险发生的根本原因。这涉及的数据格式包括风险点的详细描述和相关因素。因果关系图侧重于映射和理解风险点之间的相互作用和影响机制。概率统计方法被用于计算风险发生的频率和影响程度,帮助量化风险的严重性。通过解析多个风险点的后果,生成了风险根源和后果分析报告,为制定有效的风险控制策略提供了关键的洞见。
在控制策略子模块中,基于风险根源和后果分析,进行风险缓解策略的设计,包括风险转移和风险分散措施的制定,此过程中,数据格式为风险分析的结果和相关风险管理计划。策略设计重点在于识别和实施有效的风险管理措施,以减轻或避免潜在的风险影响。制定应急响应计划,包括资源调配和紧急措施预案,以确保在风险事件发生时能迅速有效地应对。这些操作共同生成了风险控制策略,为施工项目的风险管理提供了全面和实用的指导,有效降低了项目执行过程中的风险,保障了施工的顺利进行。
请参阅图6,施工流程优化模块包括流程分析子模块、资源调度子模块、计划优化子模块;
流程分析子模块基于风险控制策略,利用图神经网络分析施工流程,自动识别流程中的关键依赖节点和潜在瓶颈,图注意力网络关注高风险节点,生成流程依赖和瓶颈分析;
资源调度子模块基于流程依赖和瓶颈分析,运用线性规划和网络流优化模型,制定资源分配策略,参照资源限制和优先级,动态调整资源分配以解决瓶颈问题,生成资源分配优化方案;
计划优化子模块基于资源分配优化方案,应用遗传算法对施工活动进行排序,种群初始化基于当前施工计划,通过交叉变异和适应度评估迭代搜索最优施工活动排序和资源配置方案,生成优化后的施工计划。
流程分析子模块中,采用图神经网络和图注意力网络。
图神经网络分析施工流程
示例代码(Python):
import dglimport torchimport torch.nn as nnimport torch.nn.functionalas F
class GraphConvolutionNetwork(nn.Module):
def __init__(self):
super(GraphConvolutionNetwork, self).__init__()
self.layer1 = dgl.nn.GraphConv(20, 5) # 假设20个特征输入,5个输出特征
self.layer2 = dgl.nn.GraphConv(5, 1) # 输出单个特征表示风险评分
def forward(self, g, features):
x = F.relu(self.layer1(g, features))
x = self.layer2(g, x)
return x
# 示例用法# 假设 g 是DGL图对象,features 是节点特征
model = GraphConvolutionNetwork()
risk_scores = model(g, features)
资源调度子模块中,进行线性规划和网络流优化。
线性规划和网络流优化
示例代码(Python):
from scipy.optimize import linprog
def resource_allocation_optimization(A, b, c):
res = linprog(c, A_ub=A, b_ub=b, bounds=(0, None))
return res.x
# 示例用法
A = [...] # 约束矩阵
b = [...] # 约束条件
c = [...] # 成本系数
optimized_allocation = resource_allocation_optimization(A, b, c)
计划优化子模块中,采用遗传算法。
遗传算法优化施工计划
示例代码(Python):
from deap import base, creator, tools, algorithmsimport random
def genetic_algorithm_schedule_optimization(data, ngen=50, pop_size=100):
creator.create("FitnessMax", base.Fitness, weights=(1.0,))
creator.create("Individual", list, fitness=creator.FitnessMax)
toolbox = base.Toolbox()
toolbox.register("attr_int", random.randint, 0, len(data))
toolbox.register("individual", tools.initRepeat,creator.Individual, toolbox.attr_int, n=len(data))
toolbox.register("population", tools.initRepeat, list,toolbox.individual)
# 定义适应度函数
def evalSchedule(individual):
return (evaluate_schedule(data, individual),)
toolbox.register("evaluate", evalSchedule)
toolbox.register("mate", tools.cxOrdered)
toolbox.register("mutate", tools.mutShuffleIndexes, indpb=0.05)
toolbox.register("select", tools.selTournament, tournsize=3)
pop = toolbox.population(n=pop_size)
algorithms.eaSimple(pop, toolbox, cxpb=0.7, mutpb=0.2, ngen=ngen,verbose=False)
best_schedule = tools.selBest(pop, 1)[0]
return best_schedule
# 示例用法# 假设 data 是施工活动数据,evaluate_schedule 是评估计划好坏的函数
best_schedule = genetic_algorithm_schedule_optimization(data)
请参阅图7,预应力自动调节模块包括实时监测子模块、调节算法子模块、参数设置子模块;
实时监测子模块基于优化后的施工计划,通过应力和振动传感器收集预应力实时数据,采用傅里叶变换对信号进行频域分析,自适应滤波算法去除噪声,生成实时响应数据;
调节算法子模块基于实时响应数据,运用支持向量机分析预应力调整需求,决策树算法辅助预测预应力参数调整方向和幅度,结合实时负载和应力数据,制定预应力调整策略,生成预应力调整方案;
参数设置子模块基于预应力调整方案,采用闭环控制自动调整预应力参数,运用PID控制器和自适应控制策略进行调节,模拟测试验证调整效果,保障结构安全,生成调节后的预应力参数。
在实时监测子模块中,系统基于优化后的施工计划,通过应力和振动传感器收集预应力实时数据。这些数据的格式通常为时间序列数据,记录了应力和振动的强度随时间的变化。采用傅里叶变换,系统对信号进行频域分析,将时间序列数据转换为频率组件,以便于识别和分析不同频率下的信号特征。接着,利用自适应滤波算法,系统从收集的数据中去除噪声,提高数据的准确性和可靠性。通过这些步骤,生成的实时响应数据呈现为去噪后的时间序列数据,更准确地反映结构的当前状态。这个过程有效地提高了数据的质量,为后续的预应力调节提供了准确的基础数据。
在调节算法子模块中,系统首先基于实时响应数据运用支持向量机(SVM)分析预应力调整需求。SVM是一种监督学习方法,用于识别数据中的模式和规律,此处用于分析预应力数据,判断是否需要进行调整。决策树算法被用于辅助预测预应力参数的调整方向和幅度。决策树通过一系列规则选择过程,对数据进行分类或回归分析,帮助确定最合适的调整策略。结合实时负载和应力数据,系统制定了预应力调整策略,并生成预应力调整方案。这个方案是一系列详细的操作指令,指导如何调整预应力以达到最佳效果。这个过程不仅提高了预应力调整的精准度,而且增加了结构安全性。
在参数设置子模块中,系统基于预应力调整方案采用闭环控制自动调整预应力参数。闭环控制是一种控制系统设计,可以自动调整系统的输出,以保证输出达到预定目标。系统进一步运用PID控制器和自适应控制策略进行调节。PID控制器是一种常用的反馈控制器,根据差错值(即期望值与实际值之间的差异)调整控制输入,优化系统性能。自适应控制策略则能根据实时数据动态调整控制参数,以适应环境变化。经过模拟测试验证调整效果,系统生成调节后的预应力参数。这些参数是经过优化调整的数值,确保结构在各种负载下的稳定性和安全性。这个过程显著提高了预应力系统的自适应能力和可靠性,确保了结构的长期稳定和安全。
请参阅图8,缺陷智能检测模块包括图像识别子模块、数据分析子模块、缺陷预测子模块;
图像识别子模块基于调节后的预应力参数,应用卷积神经网络分析施工图像,识别缺陷特征,图像分割算法定位缺陷区域,生成缺陷图像分析结果;
数据分析子模块基于缺陷图像分析结果,结合传感器数据,运用多源数据融合技术和相关性分析,归类缺陷性质和规模,生成缺陷特性分析;
缺陷预测子模块基于缺陷特性分析,采用随机森林和线性回归模型,估算缺陷的潜在影响和发展趋势,生成缺陷检测结果。
在图像识别子模块中,系统基于调节后的预应力参数应用卷积神经网络(CNN)来分析施工图像。使用的数据格式是高分辨率的图像数据,这些图像捕捉了施工现场的详细视觉信息。卷积神经网络通过其多层结构有效识别图像中的缺陷特征,如裂缝或结构异常。随后,图像分割算法被用于精确地定位这些缺陷区域,此过程通过对图像的每一部分进行分析,识别出与正常结构相比的异常部分。生成的缺陷图像分析结果是详细的视觉报告,其中标出了缺陷的具体位置和特征,此过程显著提升了缺陷识别的准确性和效率,为进一步的分析提供了关键信息。
在数据分析子模块中,系统基于缺陷图像分析结果,结合来自传感器的数据,运用多源数据融合技术和相关性分析。多源数据融合技术整合了来自不同来源的数据,如图像数据和传感器读数,提供了更全面的缺陷视图。相关性分析则探索不同数据之间的关联,如缺陷图像特征与传感器读数之间的关系。通过这些方法,系统能归类缺陷的性质和规模,生成缺陷特性分析报告。这个报告详细描述了每个缺陷的类型、严重程度和影响范围,此过程不仅加深了对缺陷特性的理解,而且为后续的预测和修复工作提供了重要依据。
在缺陷预测子模块中,系统基于缺陷特性分析采用随机森林和线性回归模型来估算缺陷的潜在影响和发展趋势。随机森林是一种基于多个决策树的集成学习方法,有效于处理大量数据集并提供准确的分类结果。线性回归模型则用于估计缺陷特性与其潜在影响之间的关系。结合这两种模型,系统能够预测缺陷的未来发展,如扩展速率和影响的范围。生成的缺陷检测结果是一份包含详细预测和建议的报告,指导维修团队在何处以及如何进行干预。这个过程极大地提高了维护工作的前瞻性和针对性,有助于预防潜在的结构问题,保障施工安全。
请参阅图9,抗震性能优化模块包括性能评估子模块、设计调整子模块、优化算法子模块;
性能评估子模块基于缺陷检测结果,运用有限元方法模拟混凝土结构,在差异化震动条件下分析其响应,模态分析提供结构的固有频率和振型数据,时程分析用于模拟结构在实际地震波作用下的动态响应,生成结构响应评估;
设计调整子模块基于结构响应评估,利用灵敏度分析确定结构薄弱点,应用结构加固和材料升级策略,对设计进行调整,提高抗震能力,生成设计调整方案;
优化算法子模块基于设计调整方案,应用粒子群优化和遗传算法,对设计参数进行优化,检索成本与性能之间的平衡点,生成抗震优化参数。
在性能评估子模块中,系统基于缺陷检测结果运用有限元方法模拟混凝土结构。数据格式以结构的几何模型和材料属性为基础,创建数值模拟环境。在差异化震动条件下,系统分析结构的响应,考察其在不同地震波影响下的表现。模态分析提供结构的固有频率和振型数据,这些数据反映了结构在不同振动条件下的固有特性。时程分析则用于模拟结构在实际地震波作用下的动态响应,生成的结构响应评估报告描述了结构在地震影响下的性能表现,此过程通过精确模拟,有效评估了结构在地震中的表现,为进一步的设计调整提供了科学依据。
在设计调整子模块中,系统基于结构响应评估利用灵敏度分析确定结构薄弱点。灵敏度分析是一种数学方法,用于识别设计参数变化对结构性能的影响。通过识别那些对震动反应最敏感的区域,可以精准定位结构的潜在薄弱点。随后,系统应用结构加固和材料升级策略对设计进行调整,以提高结构的抗震能力。这些调整包括增加支撑、改变材料属性或调整结构布局。生成的设计调整方案是一套建筑改进措施,旨在增强结构的抗震性能,此过程增强了结构的安全性,确保其能在地震中保持更好的稳定性。
在优化算法子模块中,系统基于设计调整方案应用粒子群优化和遗传算法对设计参数进行优化。粒子群优化是一种基于群体智能的优化算法,模拟鸟群猎食行为来寻找最优解。遗传算法则模拟自然选择和遗传机制来优化问题解决方案。系统通过这些算法检索成本与性能之间的最佳平衡点。生成的抗震优化参数是一组经过优化的设计参数,兼顾了结构性能和建设成本。这个过程不仅提高了设计的经济效率,确保了结构的抗震性能,达到了安全与成本效益的最佳平衡。
请参阅图10,持续质量改进模块包括反馈整合子模块、改进策略子模块、实时监控子模块;
反馈整合子模块基于实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果、抗震优化参数,采用数据融合技术,包括多源数据集成和实时数据处理,通过模式识别分析施工过程中的关键质量指标,同时应用机器学习的异常检测和风险预测,对潜在风险进行识别和分类,生成综合质量风险评估;
改进策略子模块基于综合质量风险评估,采用决策分析方法,进行成本效益分析和风险评价,对风险因素进行量化分析,结合优化调度策略,包括资源优化分配和进度调整,制定质量改进与风险控制方案;
实时监控子模块基于质量改进与风险控制方案,采用实时监控技术,包括传感器网络监控和数据实时分析,对施工过程进行监控,同时应用质量调节技术,进行预应力参数调整和抗震参数优化,实时调节施工质量,生成施工质量持续监控报告。
在反馈整合子模块中,系统基于一系列输入数据进行操作,这些数据包括实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果和抗震优化参数。采用的数据融合技术包括多源数据集成和实时数据处理,使得来自不同来源的数据可以被综合考虑。在处理过程中,模式识别分析被应用于识别施工过程中的关键质量指标,机器学习的异常检测和风险预测技术被用于识别和分类潜在风险,此综合方法产生的是一个全面的质量风险评估报告,详细地阐述了施工过程中的各种潜在问题和风险。这个过程提高了风险管理的效率和效果,使得潜在问题可以在成为严重问题之前得到识别和处理。
在改进策略子模块中,系统基于综合质量风险评估采用决策分析方法,此过程涉及成本效益分析和风险评价,对风险因素进行量化分析。通过这种方法,可以精确地识别和评估各种风险因素对项目成本和进度的潜在影响。系统结合优化调度策略,包括资源优化分配和进度调整,制定出质量改进与风险控制方案。这个方案提供了一套操作指南,用于有效管理和缓解项目中的风险。这个过程不仅提升了风险管理的精准性,还有助于确保项目按时按质完成。
在实时监控子模块中,系统基于质量改进与风险控制方案采用实时监控技术。这包括传感器网络监控和数据实时分析,允许对施工过程进行全面和持续的监控。同时,系统应用质量调节技术进行预应力参数调整和抗震参数优化,以实时调节施工质量。这种监控和调节的结合产生了施工质量持续监控报告,这是一个动态更新的文件,记录了施工质量的实时状态和任何必要的调整措施。这个过程使施工管理变得更加灵活和适应性强,确保项目始终符合预定的质量标准。
以上,仅是本发明的较佳实施例而已,并非对本发明作其他形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其他领域,但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。

Claims (6)

1.公路混凝土施工质量管理系统,其特征在于:所述系统包括数据采集模块、质量动态分析模块、风险评估与控制模块、施工流程优化模块、预应力自动调节模块、缺陷智能检测模块、抗震性能优化模块、持续质量改进模块;
所述数据采集模块基于施工现场环境,采用环境监测传感器网络和数据采集方法,实时捕获包括温度、湿度、振动的关键参数,通过数据预处理和同步技术进行信号清洗和整合,形成结构化施工环境数据,生成实时施工数据;
所述质量动态分析模块基于实时施工数据,采用动态系统模型和时间序列分析,分析数据变化趋势,通过模式识别和未来时间段趋势预测,对施工质量进行多维评估,生成质量状态评估;
所述风险评估与控制模块基于质量状态评估,采用风险决策树和故障模式影响分析,识别关键风险点,评估其潜在影响和发生概率,制定风险控制策略;
所述施工流程优化模块基于风险控制策略,采用图神经网络和遗传算法,分析施工流程中的依赖关系和潜在瓶颈,优化施工活动排序和资源分配,生成优化后的施工计划;
所述预应力自动调节模块基于优化后的施工计划,采用自适应控制技术和机器学习算法,监测预应力系统的响应,根据实时数据调整预应力参数,验证结构安全和效能,生成调节后的预应力参数;
所述缺陷智能检测模块基于调节后的预应力参数,采用深度学习技术,分析施工图像和传感器数据,识别和定位潜在缺陷,估算规模和影响,生成缺陷检测结果;
所述抗震性能优化模块基于缺陷检测结果,采用结构动力分析和多目标优化技术,评估混凝土结构在差异化震动下的响应,并设计优化方案提升抗震性能,生成抗震优化参数;
所述持续质量改进模块基于实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果、抗震优化参数,采用持续改进和质量管理循环原则,对施工过程进行持续监控和评估,制定质量改进措施和方案;
所述施工流程优化模块包括流程分析子模块、资源调度子模块、计划优化子模块;
所述流程分析子模块基于风险控制策略,利用图神经网络分析施工流程,自动识别流程中的关键依赖节点和潜在瓶颈,图注意力网络关注高风险节点,生成流程依赖和瓶颈分析;
所述资源调度子模块基于流程依赖和瓶颈分析,运用线性规划和网络流优化模型,制定资源分配策略,参照资源限制和优先级,动态调整资源分配以解决瓶颈问题,生成资源分配优化方案;
所述计划优化子模块基于资源分配优化方案,应用遗传算法对施工活动进行排序,种群初始化基于当前施工计划,通过交叉变异和适应度评估迭代搜索最优施工活动排序和资源配置方案,生成优化后的施工计划;
所述预应力自动调节模块包括实时监测子模块、调节算法子模块、参数设置子模块;
所述实时监测子模块基于优化后的施工计划,通过应力和振动传感器收集预应力实时数据,采用傅里叶变换对信号进行频域分析,自适应滤波算法去除噪声,生成实时响应数据;
所述调节算法子模块基于实时响应数据,运用支持向量机分析预应力调整需求,决策树算法辅助预测预应力参数调整方向和幅度,结合实时负载和应力数据,制定预应力调整策略,生成预应力调整方案;
所述参数设置子模块基于预应力调整方案,采用闭环控制自动调整预应力参数,运用PID控制器和自适应控制策略进行调节,模拟测试验证调整效果,保障结构安全,生成调节后的预应力参数;
所述抗震性能优化模块包括性能评估子模块、设计调整子模块、优化算法子模块;
所述性能评估子模块基于缺陷检测结果,运用有限元方法模拟混凝土结构,在差异化震动条件下分析其响应,模态分析提供结构的固有频率和振型数据,时程分析用于模拟结构在实际地震波作用下的动态响应,生成结构响应评估;
所述设计调整子模块基于结构响应评估,利用灵敏度分析确定结构薄弱点,应用结构加固和材料升级策略,对设计进行调整,提高抗震能力,生成设计调整方案;
所述优化算法子模块基于设计调整方案,应用粒子群优化和遗传算法,对设计参数进行优化,检索成本与性能之间的平衡点,生成抗震优化参数;
所述持续质量改进模块包括反馈整合子模块、改进策略子模块、实时监控子模块;
所述反馈整合子模块基于实时施工数据、质量状态评估、风险控制策略、优化后的施工计划、调节后的预应力参数、缺陷检测结果、抗震优化参数,采用数据融合技术,包括多源数据集成和实时数据处理,通过模式识别分析施工过程中的关键质量指标,同时应用机器学习的异常检测和风险预测,对潜在风险进行识别和分类,生成综合质量风险评估;
所述改进策略子模块基于综合质量风险评估,采用决策分析方法,进行成本效益分析和风险评价,对风险因素进行量化分析,结合优化调度策略,包括资源优化分配和进度调整,制定质量改进与风险控制方案;
所述实时监控子模块基于质量改进与风险控制方案,采用实时监控技术,包括传感器网络监控和数据实时分析,对施工过程进行监控,同时应用质量调节技术,进行预应力参数调整和抗震参数优化,实时调节施工质量,生成施工质量持续监控报告。
2.根据权利要求1所述的公路混凝土施工质量管理系统,其特征在于:所述实时施工数据包括环境温度、湿度指标、振动频率、材料固化速度和施工阶段进度,所述质量状态评估包括趋势变化图、风险等级指标和关键质量控制点,所述风险控制策略包括风险等级分类、预防措施和应急响应流程,所述优化后的施工计划包括活动排序列表、资源分配表和预计时间表,所述调节后的预应力参数包括应力大小调整值、分布调整区域和调整时间间隔,所述缺陷检测结果包括缺陷类型识别、位置定位和大小估计,所述抗震优化参数包括结构改进方案、性能提升措施和实施优先级,所述质量改进措施和方案包括改进目标设定、具体执行步骤和效果评估方法。
3.根据权利要求1所述的公路混凝土施工质量管理系统,其特征在于:所述数据采集模块包括环境监测子模块、材料检测子模块、施工监测子模块;
所述环境监测子模块基于施工现场环境,采用环境监测传感器网络实时捕获包括温度、湿度、振动的关键参数,数据通过傅里叶变换进行信号频域分析,卡尔曼滤波用于信号去噪,数据插值和时间戳对齐实现数据同步,生成结构化环境监测数据;
所述材料检测子模块基于结构化环境监测数据,红外光谱分析提取材料的分子振动信息,X射线荧光分析定量评估元素组成,质谱分析和原子吸收光谱法保障材料化学稳定性,生成材料质量报告;
所述施工监测子模块基于材料质量报告和结构化环境监测数据,卷积神经网络用于图像分类和特征提取,边缘检测算法识别施工区域,频谱分析和时频分析监测振动数据,进行施工过程的实时监控,生成实时施工数据。
4.根据权利要求1所述的公路混凝土施工质量管理系统,其特征在于:所述质量动态分析模块包括数据融合子模块、质量预测子模块、状态评估子模块;
所述数据融合子模块基于实时施工数据,加权平均法融合多来源数据的可靠性,采用数据正规化标准化不同数据尺度,聚类分析识别数据模式和异常,生成综合质量信息;
所述质量预测子模块基于综合质量信息,自回归移动平均模型分析历史数据趋势,长短期记忆网络预测未来质量变化,季节性调整考虑时间因素影响,生成质量趋势预测;
所述状态评估子模块基于质量趋势预测,特征提取识别关键质量指标,分类器训练基于历史数据建立评估模型,主成分分析简化数据维度,逻辑回归进行质量等级评估,生成质量状态评估。
5.根据权利要求1所述的公路混凝土施工质量管理系统,其特征在于:所述风险评估与控制模块包括风险识别子模块、问题分析子模块、控制策略子模块;
所述风险识别子模块基于质量状态评估数据,执行风险决策树分析,系统自动遍历多施工场景,识别风险点,故障模式与影响分析通过历史数据和专家知识库定量评估风险的严重性、发生概率和检测难度,生成风险点分析报告;
所述问题分析子模块基于风险点分析报告,应用因果关系图揭示风险发生的根本原因,概率统计方法计算风险发生的频率和影响程度,解析多风险点的后果,生成风险根源和后果分析;
所述控制策略子模块基于风险根源和后果分析,开展风险缓解策略设计,包括风险转移和风险分散,制定应急响应计划,包括资源调配和紧急措施预案,生成风险控制策略。
6.根据权利要求1所述的公路混凝土施工质量管理系统,其特征在于:所述缺陷智能检测模块包括图像识别子模块、数据分析子模块、缺陷预测子模块;
所述图像识别子模块基于调节后的预应力参数,应用卷积神经网络分析施工图像,识别缺陷特征,图像分割算法定位缺陷区域,生成缺陷图像分析结果;
所述数据分析子模块基于缺陷图像分析结果,结合传感器数据,运用多源数据融合技术和相关性分析,归类缺陷性质和规模,生成缺陷特性分析;
所述缺陷预测子模块基于缺陷特性分析,采用随机森林和线性回归模型,估算缺陷的潜在影响和发展趋势,生成缺陷检测结果。
CN202410001600.3A 2024-01-02 2024-01-02 公路混凝土施工质量管理系统 Active CN117495210B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202410001600.3A CN117495210B (zh) 2024-01-02 2024-01-02 公路混凝土施工质量管理系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202410001600.3A CN117495210B (zh) 2024-01-02 2024-01-02 公路混凝土施工质量管理系统

Publications (2)

Publication Number Publication Date
CN117495210A CN117495210A (zh) 2024-02-02
CN117495210B true CN117495210B (zh) 2024-03-12

Family

ID=89685457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202410001600.3A Active CN117495210B (zh) 2024-01-02 2024-01-02 公路混凝土施工质量管理系统

Country Status (1)

Country Link
CN (1) CN117495210B (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117689278B (zh) * 2024-02-04 2024-08-20 新疆盛诚工程建设有限责任公司 施工质量智能管理系统及方法
CN117713385B (zh) * 2024-02-05 2024-05-03 威海双城电气有限公司 一种基于量子计算和人工智能结合的电力检测系统及方法
CN117789422A (zh) * 2024-02-26 2024-03-29 江西依爱弘泰消防安全技术有限公司 一种可燃气体报警控制系统及方法
CN117910810B (zh) * 2024-03-15 2024-05-17 华仁建设集团有限公司 基于深度学习的施工环境风险分析方法及系统
CN118133672A (zh) * 2024-03-18 2024-06-04 北京市生态地质研究所 基于数据分析的基坑支护性能评估方法及系统
CN117935956B (zh) * 2024-03-19 2024-06-21 浙江伊诺环保集团股份有限公司 一种生活污水生物基碳脱氮处理系统
CN117909855B (zh) * 2024-03-20 2024-05-10 南京鼎研电力科技有限公司 基于电力模型的数据监测与辅助治理方法
CN117930786B (zh) * 2024-03-21 2024-06-11 山东星科智能科技股份有限公司 钢铁生产过程智能化数字孪生仿真系统
CN117932232B (zh) * 2024-03-21 2024-05-28 南京信息工程大学 基于状态识别rime-delm多变量时间序列预测的风速预测系统
CN117944173B (zh) * 2024-03-27 2024-07-26 江西省公路工程有限责任公司 一种用于智能集成预制梁厂的全工序生产方法与系统
CN117993790B (zh) * 2024-04-07 2024-06-14 中国测试技术研究院声学研究所 基于神经网络的指挥室声环境质量权重计量优化分析方法
CN118036832B (zh) * 2024-04-12 2024-07-16 大连新天勤轨道交通有限公司 铁路建设工程质量安全管理系统及方法
CN118052666B (zh) * 2024-04-15 2024-06-14 中铁北京工程局集团(天津)工程有限公司 一种基于物联网的公路施工环境监控方法
CN118071157B (zh) * 2024-04-19 2024-07-19 江西伟灿工程技术咨询有限责任公司 确定化工园区安全风险防护距离的方法及系统
CN118376767B (zh) * 2024-04-30 2024-10-11 泰兴市锦程混凝土有限公司 一种混凝土质量测量分析系统及方法
CN118134062B (zh) * 2024-05-08 2024-06-28 裕耀东展(南通)智能装备有限公司 数控机床铸件质量追踪系统
CN118469312B (zh) * 2024-07-15 2024-09-24 大连启辰建筑工程有限公司 一种土木建筑造价数据分析系统

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114037311A (zh) * 2021-11-17 2022-02-11 北京中百信信息技术股份有限公司 一种信息系统工程监理项目风险评估方法
WO2022099596A1 (zh) * 2020-11-13 2022-05-19 浙江大学 一种面向工业个性化定制生产的自适应学习智能调度统一计算框架及系统
CN116596483A (zh) * 2023-07-14 2023-08-15 中路高科交通检测检验认证有限公司 一种基于三维数字技术的桥梁施工组织方法
CN116993286A (zh) * 2023-07-24 2023-11-03 北京泰策科技有限公司 基于测试进度反推项目进度的测试管理系统及方法
CN117011295A (zh) * 2023-10-07 2023-11-07 西南科技大学 基于深度可分离卷积神经网络的uhpc预制件质量检测方法
CN117172414A (zh) * 2023-09-08 2023-12-05 绍兴拓华工程设计咨询有限公司 一种基于bim技术的建筑幕墙施工管理系统
CN117236894A (zh) * 2023-10-07 2023-12-15 浙江大学 基于bim的工程监测管理方法及系统
CN117273440A (zh) * 2023-09-01 2023-12-22 西华大学 基于深度学习的工程施工物联网监测管理系统及方法
CN117273430A (zh) * 2023-05-31 2023-12-22 三峡生态环境投资有限公司 一种公路施工过程中的风险评估方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022099596A1 (zh) * 2020-11-13 2022-05-19 浙江大学 一种面向工业个性化定制生产的自适应学习智能调度统一计算框架及系统
CN114037311A (zh) * 2021-11-17 2022-02-11 北京中百信信息技术股份有限公司 一种信息系统工程监理项目风险评估方法
CN117273430A (zh) * 2023-05-31 2023-12-22 三峡生态环境投资有限公司 一种公路施工过程中的风险评估方法
CN116596483A (zh) * 2023-07-14 2023-08-15 中路高科交通检测检验认证有限公司 一种基于三维数字技术的桥梁施工组织方法
CN116993286A (zh) * 2023-07-24 2023-11-03 北京泰策科技有限公司 基于测试进度反推项目进度的测试管理系统及方法
CN117273440A (zh) * 2023-09-01 2023-12-22 西华大学 基于深度学习的工程施工物联网监测管理系统及方法
CN117172414A (zh) * 2023-09-08 2023-12-05 绍兴拓华工程设计咨询有限公司 一种基于bim技术的建筑幕墙施工管理系统
CN117011295A (zh) * 2023-10-07 2023-11-07 西南科技大学 基于深度可分离卷积神经网络的uhpc预制件质量检测方法
CN117236894A (zh) * 2023-10-07 2023-12-15 浙江大学 基于bim的工程监测管理方法及系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
公路桥梁施工技术的质量控制分析;易婧;施工技术;20230515;全文 *

Also Published As

Publication number Publication date
CN117495210A (zh) 2024-02-02

Similar Documents

Publication Publication Date Title
CN117495210B (zh) 公路混凝土施工质量管理系统
CN117494292B (zh) 一种基于bim和ai大模型的工程进度管理方法及系统
US7536364B2 (en) Method and system for performing model-based multi-objective asset optimization and decision-making
CN113597618B (zh) 推理计算装置、模型训练装置、推理计算系统
CN117789422A (zh) 一种可燃气体报警控制系统及方法
CN110571792A (zh) 一种电网调控系统运行状态的分析评估方法及系统
CN117875724B (zh) 一种基于云计算的采购风险管控方法及系统
CN117609100B (zh) 一种自动化代码合并及部署方法
CN117669895A (zh) 公路工程环境影响评估系统
CN118011990B (zh) 基于人工智能的工业数据品质监控与提升系统
CN117787711A (zh) 一种基于大数据的拱桥施工单端管理系统
CN118096131B (zh) 一种基于电力场景模型的运维巡检方法
CN115618269A (zh) 基于工业传感器生产的大数据分析方法及系统
Gramegna et al. Smart factory competitiveness based on real time monitoring and quality predictive model applied to multi-stages production lines
Heymann et al. Guideline for deployment of machine learning models for predictive quality in production
CN113688506B (zh) 基于微站等多维数据的潜在大气污染源识别方法
CN117391464A (zh) 一种基于rbf神经网络的工程项目进度预测方法及系统
Palma et al. Predicting Mining Industry Accidents with a Multitask Learning Approach
CN113807704A (zh) 一种城市轨道交通数据的智能算法平台构建方法
Pilliang et al. Risk Management in Software Development Projects: A Systematic Literature Review
Vicêncio et al. An intelligent predictive maintenance approach based on end-of-line test logfiles in the automotive industry
CN118229091B (zh) 基于数据分析的抗震成品支架安全测试管理系统
Bafandegan Emroozi et al. Dynamic modeling of human error in industrial maintenance through structural analysis and system dynamics
Sharma et al. Predictive and Prescriptive Analytics for IoT: Unlocking Insights
Catti¹ et al. Data Analytics and AI for Quality Assurance in Manufacturing: Challenges

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant