CN117416801A - Electric power overhead line construction device - Google Patents

Electric power overhead line construction device Download PDF

Info

Publication number
CN117416801A
CN117416801A CN202311735264.7A CN202311735264A CN117416801A CN 117416801 A CN117416801 A CN 117416801A CN 202311735264 A CN202311735264 A CN 202311735264A CN 117416801 A CN117416801 A CN 117416801A
Authority
CN
China
Prior art keywords
frame
half slot
line construction
construction device
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311735264.7A
Other languages
Chinese (zh)
Other versions
CN117416801B (en
Inventor
孙冬波
刁龙凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Rock Energy Co ltd
Original Assignee
Shanxi Rock Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Rock Energy Co ltd filed Critical Shanxi Rock Energy Co ltd
Priority to CN202311735264.7A priority Critical patent/CN117416801B/en
Publication of CN117416801A publication Critical patent/CN117416801A/en
Application granted granted Critical
Publication of CN117416801B publication Critical patent/CN117416801B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/32Stands or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/02Arrangements for removing spent cores or receptacles and replacing by supply packages at paying-out stations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G11/00Arrangements of electric cables or lines between relatively-movable parts
    • H02G11/02Arrangements of electric cables or lines between relatively-movable parts using take-up reel or drum
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model provides an electric power overhead line construction device. Relates to the technical field of electric power construction. An electric power overhead line construction apparatus comprising: remove the frame, remove the bottom fixed mounting of frame has two extension boards, two the equal fixed mounting in bottom of extension board has two fu Ma Lun, the top of removing the frame is equipped with bears the strip, it has two U type framves to bear the top fixed mounting of strip, two U type frame's top all is equipped with type frame, two half slot one has all been seted up to U type frame's both sides, two half slot two has all been seted up to type frame's both sides, half slot one's top and half slot two's bottom all are established to the opening, and four half slot one respectively with four half slot two looks adaptations, corresponding two be equipped with same center pin in the half slot one. The electric power wire-drawing construction device provided by the utility model has the advantages of shortening the wire roller replacement time to the greatest extent and improving the wire-drawing efficiency.

Description

Electric power overhead line construction device
Technical Field
The utility model relates to the technical field of power construction, in particular to a power wiring construction device.
Background
In the power construction process, in order to realize normal transportation of power, cables are required to be paved between power towers or power stations, a good transportation path can be provided for the power through the cables, and in a common wire-erecting mode, paying-off work is mostly carried out through a wire winding frame, and then the paid-out cables are paved;
for example, patent document with the authority of CN213011368U proposes an overhead line construction device for electric installation, which comprises a base, the upper surface of the base is fixedly provided with a fixed block, the inner side surface of the fixed block is provided with bearing grooves, bearings are fixedly installed in the bearing grooves, a line winding roller is rotatably installed between the two bearings, the right surface of the left fixed block is provided with a second groove, the outer surface of the line winding roller is fixedly provided with a first gear, the first gear is positioned in the second groove, the left fixed block is provided with an installation groove, the installation groove is rotationally provided with a connecting gear, the connecting gear is in meshed connection with the first gear, the inner side surface of the base is provided with a first groove, the upper surface of the base is provided with a forward and reverse rotation speed reducing motor, the outer surface of an output shaft of the forward and reverse rotation speed reducing motor is fixedly provided with a second gear, the second gear is positioned in the first groove, and the second gear is in meshed connection with the connecting gear.
However, most pay-off frames including the above-mentioned utility model find that when a wire of a wire winding cable is laid, the wire winding roller needs to be disassembled, then another new wire winding roller wound with the wire is replaced to continue the wire winding operation, and the middle disassembling and replacing process needs to wait for a long operation time, so that the normal operation of the wire winding engineering is delayed, and the finishing time is prolonged.
Accordingly, it is necessary to provide an electric power overhead line construction apparatus that solves the above-described technical problems.
Disclosure of Invention
The utility model provides an electric power wire-laying construction device which can shorten wire roller replacement time to the greatest extent and improve wire-laying efficiency.
In order to solve the above technical problems, the present utility model provides an electric power overhead line construction device, comprising: the utility model provides a motor, including the frame, the frame is removed, the bottom fixed mounting who removes the frame has two extension boards, two equal fixed mounting in bottom of extension board has two fuzzers Ma Lun, the top of removing the frame is equipped with the carrier bar, the top fixed mounting who bears the strip has two U type framves, two the top of U type frame all is equipped with type frame, two half slot one has all been seted up to the both sides of U type frame, two half slot two has all been seted up to the both sides of type frame, half slot one's top and half slot two's bottom all are established to the opening, and four half slot one respectively with four half slot two looks adaptation, corresponding two be equipped with same center pin in the half slot one, and two equal fixed cover is equipped with the line roller on the center pin, the top fixed mounting who removes the frame has the bearing board, set up on the bearing bar runs through dodge the mouth, the top fixed mounting of bearing board has the roof, the frame is moved to the roof and is located the frame one and is connected with the pivot, the frame is equipped with one and is fixed with the pivot, the frame is connected with the top of bearing bar one and is fixed to the top.
Preferably, the both sides of bearing plate are all fixed mounting has the diaphragm, two equal slidable mounting has the guide post on the diaphragm, two the bottom of guide post respectively with two type frame fixed connection, two all overlap on the guide post is equipped with spring one, two the top of spring one respectively with two diaphragm fixed connection, two the bottom of spring one respectively with two type frame fixed connection.
Preferably, the wedge blocks are fixedly arranged at the top ends of the two guide posts, the first unidirectional screw rods are rotatably arranged on the top plate, the second unidirectional screw rods are provided with the movable connecting blocks in a threaded manner, the movable connecting blocks are hinged with hinge arms, the bottom parts of the hinge arms are hinged with pushing plates, and the pushing plates are respectively matched with the wedge blocks.
Preferably, the top fixed mounting of roof has two motor two, two motor two's output shaft respectively with two unidirectional screw one's top fixed connection, the bottom fixed mounting of roof has two horizontal poles, two equal slidable mounting has a branch on the horizontal pole, two the bottom of branch respectively with two push pedal fixed connection.
Preferably, the inner walls of the first semicircular groove and the second semicircular groove are respectively embedded with a plurality of balls, the balls are tangent to the outer ring wall of the central shaft, the outer wall of one side of the U-shaped frame is fixedly provided with an electric push rod, the output shaft of the electric push rod is fixedly provided with an arc anti-slip sheet, and the inner walls of the arc anti-slip sheets are respectively abutted to the outer wall of the central shaft.
Preferably, the top fixed mounting of movable frame has the ring body, the ring body is located dodge the mouth in, just the frame is located in the ring body, the annular has been seted up to the bottom of ring body, sliding mounting has two slips in the annular, the bottom fixed mounting of loading strip has two connecting rods, two the connecting rod all runs through the ring body, and two the equal fixed mounting in bottom of connecting rod has the connection piece, two the bottom of slips respectively with two connection piece fixed connection.
Preferably, one of the support plates is fixedly provided with a rectangular frame sleeve, a square column is arranged in the rectangular frame sleeve, the top of the square column extends to the upper side of the rectangular frame sleeve and is in sliding connection with the top of the rectangular frame sleeve, the top of the square column is fixedly provided with a first guide ring, a second unidirectional screw is arranged on the first guide ring in a threaded manner, and a fastening head is fixedly arranged at the bottom end of the second unidirectional screw.
Preferably, a plurality of clamping grooves are formed in the square column, the rectangular frame sleeve is far away from a connecting frame fixedly installed on the outer wall of one side of the movable frame, a linkage rod is rotatably installed on the connecting frame, a clamping plate is fixedly installed on the linkage rod, one side of the clamping plate extends to the uppermost clamping groove, and the clamping plate is matched with the clamping groove.
Preferably, the top fixed mounting of link has the backplate, fixed mounting has the arc pole on the backplate, the slip cap is equipped with the spiral-lock on the arc pole, just one side of spiral-lock with interlock pole fixed connection, the cover is equipped with the spring two on the arc pole, the both ends of spring two respectively with backplate and spiral-lock fixed connection.
Preferably, the square post is kept away from one side fixed mounting of center pin has the boss, the top fixed mounting of boss has guide ring two, guide ring two internal fixation has the wire guide, the top fixed mounting of boss has type frame, type frame is located between guide ring one and the guide ring two, type frame internal rotation is installed bi-directional screw, two sliding plates are installed to the screw on the bi-directional screw, two slot has all been seted up to one side of sliding plate, two all have the inserted block through bolt fixed mounting in the slot, two the one side that the inserted block is close to each other is all fixed mounting piece, two one side that the installed piece is close to each other is all fixed mounting has the foam-rubber cushion, type frame's top fixed mounting has motor three, motor three's output shaft with bi-directional screw's top fixed connection.
Compared with the related art, the electric power overhead line construction device provided by the utility model has the following beneficial effects:
the utility model provides an electric power wire-setting construction device, which is characterized in that two U-shaped frames capable of continuously and alternately setting are arranged, wire rolls wound with cables can be set up in the two U-shaped frames, and the positions of the two U-shaped frames can be alternated through rotation of a rotating shaft after the wires on one wire roll are put down, so that the wire rolls wound with the cables can replace the former wire rolls to continuously perform wire-setting work rapidly, and the other side can take off the empty wire rolls while setting off, replace the wire rolls wound with the cables again, and continue to replace after the wire rolls wound with the cables are put down, so that the alternation time of the two wire rolls is greatly shortened, the wire-setting efficiency is accelerated, and normal wire-setting engineering cannot be delayed.
Drawings
Fig. 1 is one of schematic front views of a first embodiment of an electric power overhead line construction device provided by the utility model;
FIG. 2 is a schematic diagram of a first embodiment of an electrical overhead line construction apparatus according to the present utility model;
fig. 3 is a schematic diagram of a connection structure between a frame and a rotating shaft in a first embodiment of the power line construction device provided by the utility model;
fig. 4 is a schematic diagram showing an assembly structure of a u-shaped frame, a central shaft and a wire roller in a first embodiment of the power line construction device according to the present utility model;
fig. 5 is a schematic front view of the top plate and the cross plate in the first embodiment of the power line construction device according to the present utility model;
fig. 6 is a schematic bottom view of a -type rack in the first embodiment of the power line construction device according to the present utility model;
fig. 7 is a schematic diagram of an opening structure of a ring groove in a first embodiment of the power overhead line construction device provided by the utility model;
fig. 8 is a schematic front view of a second embodiment of the power overhead line construction device provided by the utility model;
fig. 9 is a schematic diagram of a connection structure between a rectangular frame and a square column in a second embodiment of the power overhead line construction device provided by the utility model;
fig. 10 is a schematic structural view of a second unidirectional screw and a fastening head in a second embodiment of the power overhead line construction device provided by the utility model;
fig. 11 is a schematic diagram of a connection structure between a back plate and an arc rod in a second embodiment of the power overhead line construction device provided by the utility model;
fig. 12 is a schematic front view of a third embodiment of the power overhead line construction device provided by the utility model;
fig. 13 is a schematic diagram of a connection structure between a -type frame and a boss in a third embodiment of the power line construction device according to the present utility model;
fig. 14 is a schematic diagram of a connection structure between a bidirectional screw and a -type frame in a third embodiment of the power line construction device according to the present utility model;
fig. 15 is a schematic diagram of a connection structure between an insert and a mounting piece in a third embodiment of the power line construction device according to the present utility model.
Reference numerals in the drawings: 1. a moving rack; 2. a carrier strip; 3. a U-shaped frame; 4. type rack; 5. a semicircular groove I; 6. a semicircular groove II; 7. a central shaft; 8. a wire roller; 9. a top plate; 10. a cross plate; 11. a guide post; 12. a first spring; 13. wedge blocks; 14. a unidirectional screw I; 15. a movable joint block; 16. an articulated arm; 17. a push plate; 18. a bearing plate; 19. a frame; 20. a rotating shaft; 21. an electric push rod; 22. arc antislip sheets; 23. a ring body; 24. a ring groove; 25. a connecting rod; 26. a connecting sheet; 27. a slider; 28. a rectangular frame sleeve; 29. square columns; 30. a first guide ring; 31. a unidirectional screw II; 32. a fastening head; 33. a clamping groove; 34. a connecting frame; 35. a linkage rod; 36. a clamping plate; 37. a back plate; 38. an arc-shaped rod; 39. a rotary vane; 40. a second spring; 41. a second guide ring; 42. a wire nozzle; 43. type rack; 44. a bidirectional screw; 45. a slip plate; 46. a slot; 47. inserting blocks; 48. a mounting piece; 49. a sponge cushion; 50. a boss.
Detailed Description
The utility model will be further described with reference to the drawings and embodiments.
First embodiment
Referring to fig. 1 to 7 in combination, in a first embodiment of the present utility model, an electric power overhead construction apparatus includes: the movable frame 1, two support plates are fixedly arranged at the bottom of the movable frame 1, two Fu Ma Lun are fixedly arranged at the bottom of the two support plates, so that four movable components distributed in a matrix form are formed, the device is convenient to move, a bearing strip 2 is arranged above the movable frame 1, two U-shaped frames 3 are fixedly arranged at the top of the bearing strip 2, -shaped frames 4 are respectively arranged at the top of the two U-shaped frames 3, namely, in an initial state, the U-shaped frames 3 and -shaped frames 4 are only in a contact state, two semicircular grooves I5 are respectively formed at two sides of the two U-shaped frames 3, two semicircular grooves II 6 are respectively formed at two sides of the two -shaped frames 4, the top of the semicircular grooves I5 and the bottom of the semicircular grooves II 6 are respectively provided with openings, namely, each semicircular groove I5 and each semicircular groove II 6 respectively form a complete round hole, namely, two complete round holes can be formed between the U-shaped frames 3 and type frames 4, the same central shaft 7 is arranged in the two corresponding round holes, namely, the two central shafts 7 are shared, in order to ensure that the central shafts 7 can rotate smoothly, a plurality of balls are embedded on the inner walls of the first semicircular groove 5 and the second semicircular groove 6, the balls are tangential with the outer ring wall of the central shaft 7, two central shafts 7 are fixedly sleeved with wire rollers 8 for winding wires, in order to ensure that the wire rollers 8 rotate stably in the U-shaped frames 3, two limiting rings are fixedly sleeved on the wire rollers 8, the two limiting rings are respectively contacted with the inner walls of the two sides of the U-shaped frames 3, so that the central shaft 7 can only rotate stably in the first semicircular groove 5 and the second semicircular groove 6 with the wire rollers 8 without deviation, a bearing plate 18 is fixedly arranged at the top of the movable frame 1, the U-shaped bearing frame is characterized in that an avoidance opening is formed in the U-shaped bearing frame, the bearing bar 2 penetrates through the avoidance opening, the caliber of the avoidance opening is large, the bearing bar 2 is enough to rotate along with the U-shaped bearing frame 3, a top plate 9 is fixedly arranged at the top of the bearing plate 18, a frame 19 positioned in the avoidance opening is fixedly arranged at the top of the moving frame 1, a rotating shaft 20 is rotatably arranged in the frame 19, the top end of the rotating shaft 20 extends to the upper side of the frame 19 and is fixedly connected with the bearing bar 2, a motor I is fixedly arranged in the frame 19, a gear is fixedly sleeved on the output shaft of the motor I and the rotating shaft 20, the gears are meshed, and accordingly the rotating shaft 20 and the bearing bar 2 are driven to rotate through operation of the motor I.
In the above mode, in order to separate the first type frame 4 from the first type frame 4 when the wire changing roller 8 is detached, the transverse plates 10 are fixedly installed on two sides of the bearing plate 18, guide posts 11 are fixedly connected with the first type frame 4 at the bottom of the guide posts 11 respectively, springs I12 are sleeved on the guide posts 11 respectively, the top ends of the springs I12 are fixedly connected with the second transverse plates 10 respectively, the bottom ends of the springs I12 are fixedly connected with the first type frame 4 respectively, the springs I12 are in a stretching state in an initial state, wedge-shaped blocks 13 are fixedly installed on the top ends of the two guide posts 11 respectively, two unidirectional screw rods 14 are rotatably installed on the top plate 9, movable joint blocks 15 are respectively installed on the first 14 in a threaded mode, hinge arms 16 are hinged on the two guide posts 11 respectively, two ejector plate motors 16 are respectively installed on the top plate 17 respectively, two ejector plates 17 are fixedly connected with the top plates 13 respectively, and two top plates 17 are fixedly installed on the top plates 13.
In this mode, in order to under initial condition, center pin 7 can not take place the rotation, at two equal fixed mounting has electric putter 21 on the outer wall of one side of U type frame 3, two equal fixed mounting has arc antiskid sheet 22 on the output shaft of electric putter 21, and two the inner wall of arc antiskid sheet 22 respectively with two the outer wall of center pin 7 is inconsistent, utilizes arc antiskid sheet 22 to provide great power to center pin 7 to make it can not take place natural rotation.
In this way, in order to make the rotation of the carrier bar 2 more stable, the top of the moving frame 1 is fixedly provided with a ring body 23, the ring body 23 passes through the avoiding opening, the frame 19 is located in the ring body 23, the bottom of the ring body 23 is provided with a ring groove 24, two sliders 27 are slidably mounted therein, the bottom of the carrier bar 2 is fixedly provided with two connecting rods 25, the two connecting rods 25 pass through the hollow positions in the ring body 23, the bottom ends of the two connecting rods 25 are fixedly provided with connecting pieces 26, the bottoms of the two sliders 27 are respectively fixedly connected with the two connecting pieces 26, and the sliding of the sliders 27 in the ring groove 24 ensures that the carrier bar 2 can stably slide, so that the gravity center of the carrier bar is stable.
In the present embodiment
In the initial state, cables are wound on the two wire rollers 8, the output shafts of the two electric push rods 21 are in an extending state, and the two springs 12 are in a stretching state;
when the cable is required to be laid in a stringing way, one of the wire rollers 8 faces the laying direction, then the output shaft of the corresponding electric push rod 21 is started to retract, the corresponding arc-shaped antiskid sheet 22 is separated from the corresponding central shaft 7, and then the cable head on the arc-shaped antiskid sheet 22 is pulled out and continuously stirred, so that the cable is continuously paid out and then laid;
after the cables on the wire roller 8 are laid, in order to form butt joint of the cables, two motors II can be started firstly, the output shafts of the motors II drive corresponding unidirectional screws I14 to rotate, so that two movable connecting blocks 15 start to ascend, the movable connecting strips of the articulated arms 16 can descend, the push plates 17 are driven to move horizontally, namely, the push plates 17 at the moment move towards the direction close to each other, the push plates 17 move along with the movement of the push plates 17, the push plates are separated from wedge blocks 13, the tension springs I12 release elasticity and directly bring the two type frames 4 up, the U type frames 3 and type frames 4 are completely separated, the motors I are started immediately, the rotating shafts 20 can be driven to rotate through the engagement between the two gears, the bearing strips 2 and the two U type frames 3 can be driven to rotate, after the two U type frames 3 rotate 180 DEG, the two U type frames 3 at the moment alternate positions are closed, the two U type frames 3 at the moment are firstly moved towards each other, then the opposite directions are started, the corresponding cable guide blocks 13 are wound around the two opposite to the corresponding wedge blocks 13, the two wedge blocks 13 are driven to be continuously contacted with the corresponding wedge blocks 13, the corresponding wedge blocks 13 are correspondingly moved down, the corresponding wedge blocks 13 are correspondingly, the two wedge blocks 13 are correspondingly contacted with the wedge blocks 13 are continuously, and the corresponding wedge blocks 13 are correspondingly moved down, the corresponding wedge blocks 13 are correspondingly, the two wedge blocks 13 are correspondingly pushed down, the corresponding wedge blocks 13 are correspondingly and the two 13 are continuously pushed down, the corresponding wedge blocks are correspondingly, the two 13 are correspondingly down, and the corresponding cable frames are 13 are correspondingly down, and the two 13 are correspondingly down, and can be rotated, after 180 are rotated by 180;
and the other side is used up, the central shaft 7 and the wire roller 8 which are used up are taken down, then the central shaft 7 wound with the cable is put into the two semicircular grooves I5 again, then the corresponding motor II is started, the corresponding loose joint block 15 is lowered, the other type frame 4 is brought down to be in contact with the corresponding U type frame 3, and the wire roller 8 is waited for paying out;
after that, after each wire is fed out from one wire roller 8, the two U-shaped frames 3 are alternately positioned in the same manner as described above, so that an alternate wire feeding work can be formed.
Compared with the related art, the electric power overhead line construction device provided by the utility model has the following beneficial effects:
according to the utility model, through the two U-shaped frames 3 which are arranged at the constantly alternate positions, the wire rollers 8 wound with the wires can be erected in the two U-shaped frames 3, and after the wires on one wire roller 8 are completely paid out, the positions of the two U-shaped frames 3 can be alternated through the rotation of the rotating shaft 20, so that the wire roller 8 wound with the wires can replace the previous wire roller 8 to continuously pay out, and on the other side, the empty wire roller 8 can be taken down while paying out, the wire roller 8 wound with the wires is replaced again, and the wire roller 8 wound with the wires is continuously replaced after the wire roller 8 is paid out, so that the alternate time of the two wire rollers 8 is greatly shortened, the wire-erecting efficiency is accelerated, and the normal wire cable laying engineering is not delayed.
Second embodiment
Based on the power overhead line construction device provided in the first embodiment of the present application, the second embodiment of the present application proposes another power overhead line construction device. The second embodiment is merely a preferred manner of the first embodiment, and implementation of the second embodiment does not affect the implementation of the first embodiment alone.
A second embodiment of the present utility model will be further described with reference to the drawings and embodiments.
Referring to fig. 8-11, the power line construction device further includes a rectangular frame 28, the rectangular frame 28 is fixedly mounted on one of the support plates, a square post 29 is disposed in the rectangular frame 28, the top of the square post extends above the rectangular frame 28 and is slidably connected with the top of the rectangular frame 28, a baffle plate is fixed at the bottom of the square post 29, the baffle plate is larger than a sliding channel between the square post 29 and the rectangular frame 28, so as to prevent the square post 29 from sliding out, a first guide ring 30 is fixedly mounted at the top of the square post 29, a second unidirectional screw 31 is mounted on the first guide ring 30 in a threaded manner, a fastening head 32 is fixedly mounted at the bottom end of the second unidirectional screw 31, and the fastening head 32 is screwed to tightly abut against a cable by rotating the second unidirectional screw 31, so that the cable cannot be thrown on the ground when the cable is cut.
In the above manner, in order to adjust the height of the first guide ring 30 according to the cable laying height, the square column 29 is provided with a plurality of clamping grooves 33, the rectangular frame sleeve 28 is away from the outer wall of one side of the moving frame 1, a connecting frame 34 is fixedly mounted on the outer wall of the rectangular frame sleeve, a linkage rod 35 is rotatably mounted on the connecting frame, a clamping plate 36 is fixedly mounted on the linkage rod 35, one side of the clamping plate 36 extends into the uppermost clamping groove 33, so that the square column 29 is limited at a designated height position, the clamping plate 36 is matched with the clamping groove 33, namely, the clamping plate 36 is tightly attached to the upper and lower inner walls of the clamping groove 33 after being inserted, the square column 29 is not vibrated up and down, a back plate 37 is fixedly mounted on the top of the connecting frame 34, an arc rod 38 is concentric with the linkage rod 35, a rotating plate 39 is fixedly mounted on the linkage rod 38, one side of the rotating plate 39 is fixedly connected with the linkage rod 35, a second spring 40 is fixedly mounted on the clamping plate 38, and the two ends of the clamping plate 40 are tightly connected with the second spring 37, and the two springs 40 are tightly connected with the two elastic clamping plates 33.
In the present embodiment
In the wire erecting process, in order to ensure that the end head of the wire is not thrown on the ground when the wire is cut off, so that the wire is severely worn, the end head of the wire can pass through the first guide ring 30 before being laid, and then the wire is laid;
when a cable is required to be cut after one line is laid, the cutting position can be controlled in the direction that the first guide ring 30 is far away from the U-shaped frame 3, then the second unidirectional screw 31 is rotated, the fastening head 32 starts to descend through the threaded fit between the second unidirectional screw and the first guide ring 30 until the fastening head 32 descends to compress the cable, the rotation is stopped, then the cable can be cut, after the cable is cut, the rest cable wound on the wire roller 8 is not pulled any more through the compression action of the fastening head 32, and the whole cable is not contacted with the ground, so that good protection is formed;
in the subsequent use, if the height of the first guide ring 30 needs to be adjusted according to the actual paved height, the linkage rod 35 is rotated clockwise to bring the clamping plate 36 out of the uppermost clamping groove 33, the second spring 40 is in a compressed state, then the square column 29 is lifted upwards, the first guide ring 30 starts to lift up along with the lifting of the square column 29 until the first guide ring is adjusted to a rough height position, the position relation between the clamping plate 36 and the nearest clamping groove 33 on the square column 29 is observed, the nearest clamping groove 33 is finely adjusted to correspond to the clamping plate 36 in level, then the linkage rod 35 is released, the compressed second spring 40 releases the elastic force to directly bring the clamping plate 36 into the corresponding clamping groove 33, thus the height adjustment work of the first guide ring 30 is completed, and then the overhead line paving work is continued.
Third embodiment
Based on the power overhead line construction apparatus provided in the first and second embodiments of the present application, the third embodiment of the present application proposes another power overhead line construction apparatus. The third embodiment is merely a preferred manner of the first embodiment or the second embodiment, and implementation of the third embodiment does not affect individual implementations of the first embodiment or the second embodiment.
A third embodiment of the present utility model will be further described with reference to the drawings and embodiments.
Referring to fig. 12-15, the electric power overhead line construction device further includes a boss 50, the boss 50 is fixedly installed on one side of the square column 29 away from the central shaft 7, a guide ring two 41 is fixedly installed at the top of the boss 50, a wire guide nozzle 42 is fixedly installed in the guide ring two 41, a type frame 43 is fixedly installed at the top of the boss 50, a type frame 43 is located between the guide ring one 30 and the guide ring two 41, a bidirectional screw 44 is rotatably installed in the type frame 43, two sliding plates 45 are installed on the bidirectional screw 44 in a threaded manner, in order to ensure that the sliding plates 45 can only linearly lift, a limit rod is fixed in the type frame 43, the limit rod penetrates through the two sliding plates 45 and is in sliding connection with the two sliding plates, a slot 46 is formed in one side of the two sliding plates 45, an inserting block 47 is fixedly installed in the two inserting block 47 through bolts, a mounting piece 48 is fixedly installed on one side of the two inserting block 47, two motor mounting pieces are fixedly installed on one side of the two motor mounting pieces, the motor mounting pieces 48 are fixedly installed on one side of the inserting block 47, and the motor mounting pieces are fixedly installed on the top of the three motor mounting pieces , and the top of the motor mounting pieces is fixedly installed on the top of the three motor mounting pieces 43.
In the present embodiment
Because some flocculent floating matters in the air can be attached to the cable in the cable laying process, when the cable roll 8 is used for winding the cable, in order to prevent erosion, mess and other phenomena of the attached matters on the cable, the end part of the cable can pass through between two sponge pads 49 in the initial cable laying process and then pass through a wire nozzle 42 and then be laid, the motor III can be started forward before the winding is completed until the rest cable is required to be wound, and the output shaft drives the bidirectional screw 44 to rotate, so that the two sliding plates 45 move in the direction of approaching each other until the two sponge pads 49 clamp the cable, and the motor III can be closed;
then the central shaft 7 is rotated to wind, in the winding process, the cable can shuttle in the wire nozzle 42, in the shuttle process, the front end edge of the wire nozzle 42 can scrape the visible attachments on the cable, then the cable is wiped by the two sponge pads 49, so that some tiny impurities and some water molecules on the cable are absorbed and removed, and then the cable is wound on the wire roller 8, so that the cable basically cannot be attached with external impurities, and a good protection effect is achieved;
after long-term use, if the sponge cushion 49 is worn seriously and needs to be replaced, the bolts on the insert block 47 and the slot 46 can be taken out, then the insert block 47 is taken down together with the sponge cushion 49, a new insert block 47 and the sponge cushion 49 are replaced, and the insert block is fixed in the slot 46 by the bolts, so that the replacement is convenient and simple.
The foregoing description is only illustrative of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present utility model.

Claims (10)

1. The utility model provides an electric power overhead line construction equipment, includes removes the frame, remove the bottom fixed mounting of frame has two extension boards, two equal fixed mounting in bottom of extension board has two fu Ma Lun, its characterized in that, the top of removing the frame is equipped with the carrier bar, the top fixed mounting of carrier bar has two U type framves, two the top of U type frame all is equipped with type frame, two the both sides of U type frame have all been seted up half slot one, two half slot two have all been seted up to the both sides of type frame, half slot one's top and half slot two's bottom all are established to the opening, and four half slot one respectively with four half slot two looks adaptations, corresponding two be equipped with same center pin in the half slot one, and two equal fixed cover is equipped with the wire roller in the center pin, the top fixed mounting of removing the frame has the bearing board, set up on the bearing board and dodge the mouth, the carrier bar runs through half slot one both sides have half slot one, and half slot two fixed mounting have the pivot to be equipped with in the frame, one side of frame and two fixed mounting have the pivot, one side of rotation axis and two fixed mounting have the pivot.
2. The electric power overhead line construction device according to claim 1, wherein transverse plates are fixedly installed on two sides of the bearing plate, guide posts are slidably installed on the two transverse plates, bottoms of the two guide posts are fixedly connected with the two -type frames respectively, springs I are sleeved on the two guide posts, tops of the springs I are fixedly connected with the two transverse plates respectively, and bottoms of the springs I are fixedly connected with the two -type frames respectively.
3. The electric power overhead line construction device according to claim 2, wherein wedge blocks are fixedly installed at the top ends of the two guide posts, two unidirectional screws I are rotatably installed on the top plate, movable connecting blocks are installed on the unidirectional screws I in a threaded mode, hinge arms are hinged to the movable connecting blocks, pushing plates are hinged to the bottoms of the hinge arms, and the pushing plates are respectively matched with the wedge blocks.
4. The electric power overhead line construction device according to claim 3, wherein the top of the top plate is fixedly provided with two motors II, the output shafts of the motors II are fixedly connected with the top ends of the unidirectional screws I respectively, the bottom of the top plate is fixedly provided with two cross bars, the cross bars are respectively and slidably provided with support bars, and the bottoms of the support bars are respectively and fixedly connected with the push plates.
5. The electric power overhead line construction device according to claim 1, wherein a plurality of balls are embedded on the inner walls of the first semicircular groove and the second semicircular groove, the balls are tangent to the outer ring wall of the central shaft, electric push rods are fixedly installed on the outer walls of one side of the two U-shaped frames, arc-shaped anti-slip sheets are fixedly installed on the output shafts of the two electric push rods, and the inner walls of the two arc-shaped anti-slip sheets respectively collide with the outer walls of the two central shafts.
6. The electric power overhead line construction device according to claim 1, wherein a ring body is fixedly installed at the top of the movable frame, the ring body is located in the avoidance opening, the frame is located in the ring body, a ring groove is formed in the bottom of the ring body, two sliding heads are slidably installed in the ring groove, two connecting rods are fixedly installed at the bottom of the bearing strip, the two connecting rods penetrate through the ring body, connecting pieces are fixedly installed at the bottom ends of the two connecting rods, and the bottoms of the two sliding heads are fixedly connected with the two connecting pieces respectively.
7. The electric power overhead line construction device according to claim 1, wherein one of the support plates is fixedly provided with a rectangular frame sleeve, a square column is arranged in the rectangular frame sleeve, the top of the square column extends to the upper side of the rectangular frame sleeve and is in sliding connection with the top of the rectangular frame sleeve, the top of the square column is fixedly provided with a first guide ring, the first guide ring is provided with a second unidirectional screw through an upper thread, and the bottom end of the second unidirectional screw is fixedly provided with a fastening head.
8. The power line construction device according to claim 7, wherein a plurality of clamping grooves are formed in the square column, a connecting frame is fixedly installed on the outer wall of one side, far away from the moving frame, of the rectangular frame sleeve, a connecting rod is rotatably installed on the connecting frame, a clamping plate is fixedly installed on the connecting rod, one side of the clamping plate extends into the uppermost clamping groove, and the clamping plate is matched with the clamping groove.
9. The power overhead line construction device according to claim 8, wherein a backboard is fixedly installed at the top of the connecting frame, an arc-shaped rod is fixedly installed on the backboard, a rotary blade is sleeved on the arc-shaped rod in a sliding mode, one side of the rotary blade is fixedly connected with the linkage rod, a second spring is sleeved on the arc-shaped rod, and two ends of the second spring are fixedly connected with the backboard and the rotary blade respectively.
10. The electric power overhead line construction device according to claim 7, wherein a boss is fixedly arranged on one side, far away from the central shaft, of the square column, a guide ring II is fixedly arranged on the top of the boss, a wire guide nozzle is fixedly arranged in the guide ring II, a type frame is fixedly arranged on the top of the boss, the type frame is positioned between the guide ring I and the guide ring II, a bidirectional screw is rotatably arranged in the type frame, two sliding plates are arranged on the bidirectional screw in a threaded manner, slots are formed on one side of each sliding plate, inserting blocks are fixedly arranged in the slots through bolts, mounting plates are fixedly arranged on one sides, close to each other, of the two inserting blocks, a sponge pad is fixedly arranged on one side, close to each other, of the two mounting plates, a motor III is fixedly arranged on the top of the type frame, and an output shaft of the motor III is fixedly connected with the top end of the bidirectional screw.
CN202311735264.7A 2023-12-18 2023-12-18 Electric power overhead line construction device Active CN117416801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311735264.7A CN117416801B (en) 2023-12-18 2023-12-18 Electric power overhead line construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311735264.7A CN117416801B (en) 2023-12-18 2023-12-18 Electric power overhead line construction device

Publications (2)

Publication Number Publication Date
CN117416801A true CN117416801A (en) 2024-01-19
CN117416801B CN117416801B (en) 2024-04-26

Family

ID=89532787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311735264.7A Active CN117416801B (en) 2023-12-18 2023-12-18 Electric power overhead line construction device

Country Status (1)

Country Link
CN (1) CN117416801B (en)

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000289926A (en) * 1998-06-10 2000-10-17 Mitsubishi Cable Ind Ltd Drumless method and bundle wire take-up/feeding out device
JP2013090494A (en) * 2011-10-20 2013-05-13 Mikasa Metal Industries Co Ltd Cable supporter
JP2014015314A (en) * 2012-07-11 2014-01-30 Nippon Electric Glass Co Ltd Thread take-up device
KR20150001693U (en) * 2013-10-25 2015-05-06 대우조선해양 주식회사 Stand for cable drum
JP2015113220A (en) * 2013-12-13 2015-06-22 Ykk株式会社 Delivery device of wire for fittings
CN207536910U (en) * 2017-12-05 2018-06-26 通鼎互联信息股份有限公司 Double plate take-up
CN209337876U (en) * 2018-11-26 2019-09-03 无锡巨一同创科技有限公司 Full-automatic vertical turntable admission machine
CN209522409U (en) * 2019-02-18 2019-10-22 东莞市中亚电缆有限公司 Paying out machine is used in a kind of production of cable
CN209835272U (en) * 2019-03-04 2019-12-24 连云港市农业科学院 Pipeline constriction device for agricultural irrigation
US20200161810A1 (en) * 2018-11-19 2020-05-21 The Boeing Company Systems, Methods and Apparatus for Feeding Cable into Cable Processing Equipment
CN211225771U (en) * 2019-10-25 2020-08-11 四川路桥建设集团交通工程有限公司 Cable paying-off support
CN111731928A (en) * 2020-05-28 2020-10-02 国网山东省电力公司平原县供电公司 Electric power worker uses cable scaffold convenient to take cable
CN211920454U (en) * 2020-03-23 2020-11-13 河北盛伟电力工程有限公司 Cable pay-off rack
CN212687173U (en) * 2020-08-10 2021-03-12 大唐山东电力检修运营有限公司 Pay-off device capable of adaptively controlling rotating speed
CN214059507U (en) * 2020-12-30 2021-08-27 湖南华深电气工程有限公司 Quick coiling device of cable
CN215557876U (en) * 2021-06-25 2022-01-18 青海诺克斯电力工程有限公司 Cable unwrapping wire cutting device for power engineering
CN114538185A (en) * 2022-02-18 2022-05-27 湖北西塞山发电有限公司 Cable pay-off device
CN216918095U (en) * 2021-12-12 2022-07-08 山东一文环保科技有限公司 Automatic wire arranging device
CN217322811U (en) * 2021-12-23 2022-08-30 东莞市正伟电线电缆有限公司 Coiling mechanism is used in cable processing with clean function
CN115557322A (en) * 2022-10-14 2023-01-03 贵州电网有限责任公司 Cable rack for bypass operation of power distribution network and operation method
CN116812649A (en) * 2023-02-09 2023-09-29 国网河北省电力有限公司沧州供电分公司 Paying-off device for power transmission line

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000289926A (en) * 1998-06-10 2000-10-17 Mitsubishi Cable Ind Ltd Drumless method and bundle wire take-up/feeding out device
JP2013090494A (en) * 2011-10-20 2013-05-13 Mikasa Metal Industries Co Ltd Cable supporter
JP2014015314A (en) * 2012-07-11 2014-01-30 Nippon Electric Glass Co Ltd Thread take-up device
KR20150001693U (en) * 2013-10-25 2015-05-06 대우조선해양 주식회사 Stand for cable drum
JP2015113220A (en) * 2013-12-13 2015-06-22 Ykk株式会社 Delivery device of wire for fittings
CN207536910U (en) * 2017-12-05 2018-06-26 通鼎互联信息股份有限公司 Double plate take-up
US20200161810A1 (en) * 2018-11-19 2020-05-21 The Boeing Company Systems, Methods and Apparatus for Feeding Cable into Cable Processing Equipment
CN209337876U (en) * 2018-11-26 2019-09-03 无锡巨一同创科技有限公司 Full-automatic vertical turntable admission machine
CN209522409U (en) * 2019-02-18 2019-10-22 东莞市中亚电缆有限公司 Paying out machine is used in a kind of production of cable
CN209835272U (en) * 2019-03-04 2019-12-24 连云港市农业科学院 Pipeline constriction device for agricultural irrigation
CN211225771U (en) * 2019-10-25 2020-08-11 四川路桥建设集团交通工程有限公司 Cable paying-off support
CN211920454U (en) * 2020-03-23 2020-11-13 河北盛伟电力工程有限公司 Cable pay-off rack
CN111731928A (en) * 2020-05-28 2020-10-02 国网山东省电力公司平原县供电公司 Electric power worker uses cable scaffold convenient to take cable
CN212687173U (en) * 2020-08-10 2021-03-12 大唐山东电力检修运营有限公司 Pay-off device capable of adaptively controlling rotating speed
CN214059507U (en) * 2020-12-30 2021-08-27 湖南华深电气工程有限公司 Quick coiling device of cable
CN215557876U (en) * 2021-06-25 2022-01-18 青海诺克斯电力工程有限公司 Cable unwrapping wire cutting device for power engineering
CN216918095U (en) * 2021-12-12 2022-07-08 山东一文环保科技有限公司 Automatic wire arranging device
CN217322811U (en) * 2021-12-23 2022-08-30 东莞市正伟电线电缆有限公司 Coiling mechanism is used in cable processing with clean function
CN114538185A (en) * 2022-02-18 2022-05-27 湖北西塞山发电有限公司 Cable pay-off device
CN115557322A (en) * 2022-10-14 2023-01-03 贵州电网有限责任公司 Cable rack for bypass operation of power distribution network and operation method
CN116812649A (en) * 2023-02-09 2023-09-29 国网河北省电力有限公司沧州供电分公司 Paying-off device for power transmission line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
席永平, 李佳蓉: "双盘自动收线机的技术改进", 安徽科技, no. 04, 10 May 2004 (2004-05-10), pages 42 - 43 *

Also Published As

Publication number Publication date
CN117416801B (en) 2024-04-26

Similar Documents

Publication Publication Date Title
CN104555522A (en) Unreeling device of automatic sheet cutter
CN213186890U (en) Building electrical construction fixing device convenient to installation
CN117416801B (en) Electric power overhead line construction device
CN111446046B (en) Stranding machine convenient for adjusting core wire quantity
CN211496403U (en) Take-up device for cable production
CN219098356U (en) Special automatic winding device for cable production
CN116281441A (en) Automatic winding and unwinding reel for high-voltage cable and use method thereof
CN215870528U (en) Electronic communication wire laying device
CN211594523U (en) Adjustable wire rope special stand of putting of elevator installation
CN219173804U (en) Converging belt winding device
CN220449376U (en) Cable winding and unwinding mechanism
CN220950667U (en) Adjustable automatic cable paying-off device
CN219326431U (en) Coiling equipment is used in cable production
CN215946212U (en) Overhead line paying-off equipment
CN221093155U (en) Wire and cable paying-off device
CN215185499U (en) Insulator replacing device
CN220358690U (en) Overhead line construction device for power equipment installation
CN216681939U (en) Auxiliary installation equipment for wires and cables
CN220128903U (en) Wire and cable cutting device
CN217656330U (en) Electric cable laying device
CN215916413U (en) Telegraph pole climbing mechanism for power engineering
CN218491040U (en) Waterproofing membrane coiling mechanism
CN213326071U (en) Cable processing rolling machine
CN220200949U (en) Auxiliary paying-off device for cable
CN219659293U (en) Threading device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant