CN117335570A - Visual monitoring system and method for panoramic information of elastic power distribution network - Google Patents

Visual monitoring system and method for panoramic information of elastic power distribution network Download PDF

Info

Publication number
CN117335570A
CN117335570A CN202311297325.6A CN202311297325A CN117335570A CN 117335570 A CN117335570 A CN 117335570A CN 202311297325 A CN202311297325 A CN 202311297325A CN 117335570 A CN117335570 A CN 117335570A
Authority
CN
China
Prior art keywords
power distribution
distribution network
data
time interval
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311297325.6A
Other languages
Chinese (zh)
Inventor
卢世昕
高莹
韩学军
张津星
李峰
赵焕景
刘海涛
董勇杰
夏俊生
徐红朝
户艳泽
杨德宏
丛秀纯
张义娜
马淼
朱硕
武林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Puyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Puyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Puyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202311297325.6A priority Critical patent/CN117335570A/en
Publication of CN117335570A publication Critical patent/CN117335570A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Human Computer Interaction (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a panoramic information visual monitoring system and method for an elastic power distribution network, and belongs to the technical field of power distribution network monitoring. A panoramic information visual monitoring system of an elastic power distribution network comprises an information acquisition module, an analysis and evaluation module, a real-time monitoring module and a visual display module. The method solves the problem that in the actual use process of the existing patent, the elasticity of the power distribution network cannot be analyzed and processed according to the extreme event, so that the accuracy of an analysis result is low when the elasticity index of the power distribution network is analyzed. According to the invention, the load response conditions of the disaster-suffering and recovery process of the power distribution network can be completely simulated according to the disaster types, the corresponding risk bearing capacity of the power distribution network is judged, the accuracy of analyzing the elasticity indexes of the power distribution network is improved, the accuracy of analyzing the risk grade bearing capacity is further ensured, the rush-repair efficiency of the power distribution network is improved, and the normal use of the power distribution network is prevented from being influenced by faults.

Description

Visual monitoring system and method for panoramic information of elastic power distribution network
Technical Field
The invention relates to the technical field of power distribution network monitoring, in particular to a panoramic information visual monitoring system and method for an elastic power distribution network.
Background
The safety and reliability of the power system are the necessary requirements for maintaining normal operation in the modern society. However, in recent years, extreme events have become more frequent, with a significant loss in power supply. Therefore, the capability of the system to cope with the extreme events needs to be actively built to improve the elastic distribution network, and in recent years, related researches on the elastic distribution network have been carried out, so that the system has become global consensus on the extreme events by improving the quick recovery capability of the system under the extreme events, and countries and regions such as the united states, the european union and japan, etc., and the elastic distribution network is built as a main measure to cope with the electric safety threat. Research and practice show that the rapid development of the intelligent power grid ensures that the power system has higher flexibility, higher safety, higher electric energy quality and higher self-healing capacity, and particularly the technologies of distributed power sources, micro-grids, active power distribution networks and the like endow the power distribution networks with more flexible and effective fault coping strategies, so that the active promotion of the restoring force of the power system is possible.
The Chinese patent with publication number of CN115169874A discloses a comprehensive monitoring platform for a high-elasticity power grid, wherein the power grid index after environmental influence and the power grid index after external influence are monitored through an external monitoring module and an internal environment monitoring module, and then evaluation substituted values calculated as comprehensive elastic values can be combined to reduce evaluation errors, meanwhile, the indexes are independently discharged from monitoring points in a whole row through short-term ultrahigh electricity demand indexes and are removed from the evaluation substituted values measured by the internal environment monitoring module through an index removing unit to keep accuracy, and after the evaluation substituted values are calculated through a data distribution calculating module through fuzzy measure, the comprehensive elastic values are obtained, further, the required elastic performance improvement index parameters under the combined influence of internal environment factors and external environment factors are judged according to the data of the model, and the comprehensive monitoring platform is favorable for full excavation of power grid elasticity regulation potential and performance improvement of power grid bearing capacity.
In the practical use process, the high-elasticity power grid comprehensive monitoring platform cannot analyze and process the elasticity of the power distribution network according to the extreme event, so that the accuracy of an analysis result is low when the elasticity index of the power distribution network is analyzed; therefore, the existing requirements are not met, and a panoramic information visual monitoring system and method for the elastic power distribution network are provided.
Disclosure of Invention
The invention aims to provide a panoramic information visual monitoring system and method for an elastic power distribution network, which can completely simulate the load response conditions of the power distribution network in the disaster recovery process according to disaster types, compare and analyze the real-time elastic indexes of the power distribution network by calculating the historical elastic indexes and risk bearing grades of the power distribution network, judge the corresponding risk bearing capacity of the power distribution network, display the risk bearing capacity from high to low according to the risk grades, improve the accuracy of analyzing the elastic indexes of the power distribution network, further ensure the accuracy of analyzing the risk bearing capacity, facilitate maintenance personnel to know the real-time working condition of the power distribution network in time, improve the rush-repair efficiency of the power distribution network, avoid the power distribution network from faults and influence normal use, and solve the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: an elastic power distribution network panoramic information visual monitoring system, comprising:
the information acquisition module is used for respectively acquiring and classifying and storing the historical disaster types of the areas where the power distribution networks are located, simultaneously acquiring the power, the fault rate, the average repair time, the important equipment accident rate, the safety equipment early warning rate, the network safety and the sustainability index of the power distribution networks, and classifying and storing the acquired results.
The analysis and evaluation module is used for analyzing disaster conditions and recovery processes of the power distribution network according to the combination of the historical disaster types of the areas where the power distribution networks are located and the power distribution network data, calculating the elasticity index of the current power distribution network, presetting the elasticity index threshold of the power distribution network according to the calculated elasticity index of the power distribution network, evaluating the risk bearing capacity of the power distribution network, and matching corresponding optimization schemes according to the analysis result of the risk bearing capacity.
The real-time monitoring module is used for monitoring disaster types and distribution network data of areas where the distribution networks are located in real time, calculating elasticity indexes of the distribution networks in real time according to the monitored data, comparing the calculated real-time elasticity indexes of the distribution networks with a preset elasticity index threshold value of the distribution network, judging whether the elasticity indexes of the current distribution network have risks or not, and making corresponding early warning prompts according to the risk grades.
The visual display module is used for carrying out corresponding visual display on the real-time elastic indexes of the power distribution networks, the risk judgment result and the optimization scheme.
Preferably, the information acquisition module includes:
the risk data acquisition module is used for respectively acquiring the historical disaster types of the areas where the power distribution networks are located, wherein the disaster types comprise weather disasters, geological disasters and disasters caused by human factors.
The power distribution network data acquisition module is used for acquiring power, fault rate, average repair time, important equipment accident rate, safety equipment early warning rate, network safety and sustainability indexes of a plurality of power distribution networks, and storing acquired results respectively, wherein the sustainability indexes comprise energy utilization efficiency, environmental pollution control and green power development.
Preferably, the distribution network data acquisition module includes:
the time interval extraction module is used for extracting the acquisition time interval of each data type in the power distribution network data; each data type in the power distribution network data comprises power, fault rate, average repair time, important equipment accident rate and safety equipment early warning rate of the power distribution network;
the maximum time interval extraction module is used for extracting the maximum time interval and the minimum time interval of the acquisition time interval of each data type in the power distribution network data;
The first time interval setting module is used for comparing the maximum time interval of the acquisition time interval of each data type in the power distribution network data with a preset time threshold, and setting the data transmission time interval as a first time interval when the maximum time interval is larger than the preset time threshold; wherein the preset time threshold is 1-3 days; wherein the first time interval is obtained by the following formula:
wherein T is 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) p Representing an average data acquisition time interval of the power distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; t (T) max0 Representing a preset time threshold; e represents a constant; t (T) i Representing a data acquisition time interval corresponding to the ith data type;
the first exclusive thread establishing module is used for establishing a first communication exclusive thread corresponding to the power distribution network data acquisition, and transmitting the power distribution network data according to the first time interval by utilizing the first communication exclusive thread, wherein the maximum throughput of the first communication exclusive thread in unit time is obtained through the following formula:
Wherein C is 01 Representing a maximum throughput per unit time of the first communication-specific thread; c (C) 0 Representing a preset initial throughput; t (T) 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; e represents a constant; c represents the average data volume corresponding to one data acquisition of the power distribution network data, wherein the data acquisition comprises all data types.
Preferably, the power distribution network data acquisition module further includes:
the second time interval setting module is used for comparing the maximum time interval of the acquisition time interval of each data type in the power distribution network data with a preset time threshold, and setting the data transmission time interval as a second time interval when the maximum time interval is smaller than or equal to the preset time threshold; wherein the preset time threshold is 1-3 days; wherein the second time interval is obtained by the following formula:
wherein T is 02 Representing a second time interval; n represents the number of each data type in the distribution network data; t (T) p Representing an average data acquisition time interval of the power distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; t (T) max0 Representing a preset time threshold; e represents a constant; t (T) i Representing a data acquisition time interval corresponding to the ith data type;
the second exclusive thread establishing module is configured to establish a second communication exclusive thread corresponding to the power distribution network data acquisition, and perform transmission of the power distribution network data according to the second time interval by using the second communication exclusive thread, where a maximum throughput per unit time of the second communication exclusive thread is obtained by using the following formula:
wherein C is 02 Representing a maximum throughput per unit time of the second communication dedicated thread; c (C) 0 Representing a preset initial throughput; t (T) 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; e represents a constant; c represents the average data volume corresponding to one data acquisition of the power distribution network data, wherein the data acquisition comprises all data types.
Preferably, the analysis and evaluation module includes:
The analysis module is used for analyzing disaster conditions and recovery processes of the power distribution network according to historical disaster types of areas where the power distribution network is located, and combining power, failure rate, average repair time, important equipment accident rate, safety equipment early warning rate, network safety and sustainability indexes of the power distribution network.
The calculation module is used for calculating the elasticity index of the current power distribution network according to the analyzed disaster situation and recovery process of the power distribution network, and presetting a power distribution network elasticity index threshold according to the calculated power distribution network elasticity index.
The evaluation module is used for evaluating the risk bearing capacity of the power distribution network according to the calculated elastic indexes of the power distribution network and the historical ring disaster type, and the risk bearing capacity is classified according to safety, low risk, high risk and out-of-limit.
And the early warning module is used for carrying out risk early warning on the power distribution network according to the analysis result of the evaluation module and matching a corresponding optimization scheme according to the analysis result of the risk bearing capacity.
Preferably, the analysis flow of the analysis module specifically includes:
and establishing a disaster scene model, and inputting the historical disaster type and the power distribution network data into the disaster scene model to simulate the disaster.
And analyzing the power grid node condition data, disaster types and fluctuation ranges of the power distribution network according to the simulated disaster scene to obtain disaster-affected conditions and recovery processes of the power distribution network, wherein the power grid node condition data comprise connection and disconnection, and the fluctuation ranges comprise single, multiple and areas.
And drawing a curve of the average state of the power distribution network according to the disaster condition and the recovery process of the power distribution network.
And calculating an elasticity index of the power distribution network according to the average state curve of the power distribution network.
Preferably, the evaluation module includes:
the risk bearing grade evaluation module is used for evaluating the risk bearing capacity of the power distribution network according to the historical environmental data, the historical meteorological data and the historical landform data of the area where the power distribution network is located.
And the restoring force evaluation module is used for evaluating the restoring force of the power distribution network according to the elasticity of the power distribution network and the risk bearing grade of the power distribution network.
The elastic optimization module is used for collecting various index data in the recovery process of the power distribution network and correspondingly optimizing the elastic recovery force of the power distribution network according to the collected recovery data.
Preferably, the monitoring module includes:
the real-time monitoring module is used for monitoring disaster types of areas where the power distribution networks are located and power distribution network data in real time and calculating the elasticity index of the current power distribution network in real time according to the monitored data.
And the comparison module is used for comparing the calculated real-time elasticity indexes of the power distribution network with a preset elasticity index threshold value of the power distribution network.
And the judging module is used for judging whether the current power distribution network elastic index has risk according to the result compared by the comparing module, and making corresponding early warning prompt according to the risk level.
Preferably, the visual display module includes:
and the elastic index display module is used for visually displaying the real-time elastic indexes of the power distribution networks monitored by the monitoring module.
The evaluation display module is used for visually displaying disaster grades born by the power distribution networks evaluated by the evaluation module and preferentially displaying the power distribution network with high risk grade according to the height of the risk grade.
The optimization display module is used for matching corresponding optimization methods according to disaster grades born by the plurality of elastic power distribution networks and visually displaying the optimization methods and the optimization process.
A working method of an elastic power distribution network panoramic information visual monitoring system comprises the following steps:
step one: and respectively acquiring the historical disaster types of the areas where the power distribution networks are located and the data of the power distribution networks, and storing the acquired results in a classified manner.
Step two: and analyzing disaster conditions and recovery processes of the power distribution network according to the historical disaster types of the areas where the power distribution networks are located and combining the power distribution network data, and calculating the elasticity index of the current power distribution network.
Step three: and presetting an elasticity index threshold of the power distribution network according to the calculated elasticity index of the power distribution network, evaluating risk bearing capacity of a plurality of power distribution networks, and matching corresponding optimization schemes according to analysis results of the risk bearing capacity.
Step four: the disaster type and the power distribution network data of the areas where the power distribution networks are located are monitored in real time, real-time elasticity indexes of the power distribution networks are calculated, the calculated real-time elasticity indexes of the power distribution networks are compared with a preset power distribution network elasticity index threshold value, and whether the current power distribution network elasticity indexes have risks is judged.
Step five: if the power distribution network has risks, grading the risks, and visually displaying the risks from high to low according to the levels of the risks.
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, the real-time elasticity index of the power distribution network is calculated by implementing monitoring on the disaster condition of the area where the power distribution network is located, the load response condition of the disaster and recovery process of the power distribution network can be completely simulated according to the disaster type, the real-time elasticity index of the power distribution network is compared and analyzed by calculating the historical elasticity index and the risk bearing grade of the power distribution network, the corresponding risk bearing capacity of the power distribution network is judged, the display is carried out from high to low according to the risk grade, the reference is provided for the elastic lifting measure of the power distribution network, the accuracy of analyzing the elasticity index of the power distribution network is improved, the accuracy of analyzing the risk grade bearing capacity is further ensured, and corresponding risk early warning is provided according to the risk bearing condition while corresponding risk early warning is provided, so that maintenance personnel can conveniently and timely know the real-time working condition of the power distribution network, the rush-repair efficiency of the power distribution network is improved, and the fault of the power distribution network is avoided, and normal use is influenced.
Drawings
FIG. 1 is a schematic diagram of a module of a visual monitoring system for panoramic information of an elastic power distribution network;
fig. 2 is a working flow chart of the panoramic information visual monitoring system of the elastic power distribution network.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In order to solve the problem that in the actual use process of the existing patent, the elasticity of the power distribution network cannot be analyzed and processed according to the extreme event, so that the accuracy of the analysis result is low when the elasticity index of the power distribution network is analyzed, please refer to fig. 1-2, the present embodiment provides the following technical scheme:
an elastic power distribution network panoramic information visual monitoring system, comprising:
the information acquisition module is used for respectively acquiring and classifying and storing the historical disaster types of the areas where the power distribution networks are located, simultaneously acquiring the power, the fault rate, the average repair time, the important equipment accident rate, the safety equipment early warning rate, the network safety and the sustainability index of the power distribution networks, classifying and storing the acquired results, and acquiring data of the power distribution networks, so that maintenance personnel can know the elasticity index of the power distribution networks at the same time, and the practicability is higher.
An information acquisition module comprising:
the risk data acquisition module is used for respectively acquiring the historical disaster types of the areas where the power distribution networks are located, wherein the disaster types comprise weather disasters, geological disasters and disasters caused by human factors.
The power distribution network data acquisition module is used for acquiring power, fault rate, average repair time, important equipment accident rate, safety equipment early warning rate, network safety and sustainability indexes of a plurality of power distribution networks, and storing acquired results respectively, wherein the sustainability indexes comprise energy utilization efficiency, environmental pollution control and green power development.
Specifically, the distribution network data acquisition module includes:
the time interval extraction module is used for extracting the acquisition time interval of each data type in the power distribution network data; each data type in the power distribution network data comprises power, fault rate, average repair time, important equipment accident rate and safety equipment early warning rate of the power distribution network;
the maximum time interval extraction module is used for extracting the maximum time interval and the minimum time interval of the acquisition time interval of each data type in the power distribution network data;
the first time interval setting module is used for comparing the maximum time interval of the acquisition time interval of each data type in the power distribution network data with a preset time threshold, and setting the data transmission time interval as a first time interval when the maximum time interval is larger than the preset time threshold; wherein the preset time threshold is 1-3 days; wherein the first time interval is obtained by the following formula:
Wherein T is 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) p Representing an average data acquisition time interval of the power distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; t (T) max0 Representing a preset time threshold; e represents a constant; t (T) i Representing a data acquisition time interval corresponding to the ith data type;
the first exclusive thread establishing module is used for establishing a first communication exclusive thread corresponding to the power distribution network data acquisition, and transmitting the power distribution network data according to the first time interval by utilizing the first communication exclusive thread, wherein the maximum throughput of the first communication exclusive thread in unit time is obtained through the following formula:
wherein C is 01 Representing a maximum throughput per unit time of the first communication-specific thread; c (C) 0 Representing a preset initial throughput; t (T) 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; e represents a constant; c represents the average data volume corresponding to one data acquisition of the power distribution network data, wherein the data acquisition comprises all data types.
The technical effects of the technical scheme are as follows: time interval extraction and management: the scheme provides a time interval extraction module which can extract the acquisition time interval according to different data types (such as power, fault rate, average repair time and the like) of the power distribution network data. This helps to optimize the time interval for data acquisition to ensure accuracy and efficiency of the data.
Automatically adjusting the data transmission time interval: the first time interval setting module in the scheme compares the maximum time interval with a preset time threshold value and automatically adjusts the data transmission time interval. This ensures that longer time intervals are used when the data changes slowly, thereby reducing communication overhead, and shorter time intervals are used when the data changes quickly, and important data is acquired in time.
Communication thread optimization: by means of the first exclusive thread establishing module, the system establishes an exclusive communication thread, and distribution network data can be transmitted according to a first time interval. The maximum throughput per unit time of this thread can be automatically adjusted according to the number of data types and the time interval to optimize the data transmission performance.
And the data transmission efficiency is improved: the scheme can improve the efficiency of data transmission by automatically optimizing the data transmission time interval and the throughput of the communication thread according to the data type and the time interval. This facilitates timely acquisition of critical power distribution network data while reducing communication costs and resource occupation.
In general, the main technical effect of the technical scheme is that the efficiency and the reliability of data acquisition and transmission of the power distribution network are improved, and meanwhile, the acquisition and transmission parameters are automatically adjusted according to actual conditions so as to meet the requirements of different data types. This may help power system operators to better monitor and manage the distribution grid, improving its operational efficiency and reliability.
Specifically, the distribution network data acquisition module further includes:
the second time interval setting module is used for comparing the maximum time interval of the acquisition time interval of each data type in the power distribution network data with a preset time threshold, and setting the data transmission time interval as a second time interval when the maximum time interval is smaller than or equal to the preset time threshold; wherein the preset time threshold is 1-3 days; wherein the second time interval is obtained by the following formula:
wherein T is 02 Representing a second time interval; n represents the number of each data type in the distribution network data; t (T) p Representing an average data acquisition time interval of the power distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; t (T) max0 Representing a preset time threshold; e represents a constant; t (T) i Representing a data acquisition time interval corresponding to the ith data type;
the second exclusive thread establishing module is configured to establish a second communication exclusive thread corresponding to the power distribution network data acquisition, and perform transmission of the power distribution network data according to the second time interval by using the second communication exclusive thread, where a maximum throughput per unit time of the second communication exclusive thread is obtained by using the following formula:
wherein C is 02 Representing a maximum throughput per unit time of the second communication dedicated thread; c (C) 0 Representing a preset initial throughput; t (T) 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; e represents a constant; c represents the average data volume corresponding to one data acquisition of the power distribution network data, wherein the data acquisition comprises all data types.
The technical effects of the technical scheme are as follows: additional time interval management: and the second time interval setting module is introduced, and the maximum time interval can be compared with the acquisition time interval of each data type in the power distribution network data according to a preset time threshold, so that the data transmission time interval is further refined according to different data types and data change rates.
Adaptive data transmission: after introducing the second time interval, the system can automatically adjust the time interval of data transmission according to different data types. The system will employ the second time interval when the maximum time interval of the data type is less than or equal to the preset time threshold. This helps to achieve a more flexible data acquisition and transmission strategy between different data types.
A second dedicated thread: by means of the second dedicated thread establishing module, the system can establish dedicated communication threads for the second time interval to further optimize data transmission performance. This ensures that there is an appropriate allocation of communication resources at different time intervals.
Re-optimization of data transmission performance: the maximum throughput of the second communication dedicated thread in unit time can also be automatically adjusted according to different data types and time intervals, so as to improve the data transmission performance to the greatest extent.
In general, the expanded technical scheme further improves the flexibility and the efficiency of data acquisition and transmission of the power distribution network, can more finely manage time intervals and communication resources of different data types, ensures timely acquisition of key data, and simultaneously minimizes communication cost and resource waste. This helps the power system operators to better monitor and manage the distribution network, improving their operational efficiency and reliability.
The analysis evaluation module is used for analyzing disaster-stricken conditions and recovery processes of the power distribution network according to historical disaster types of areas where the power distribution network is located by combining the power distribution network data, calculating elastic indexes of the current power distribution network, presetting power distribution network elastic index thresholds according to the calculated power distribution network elastic indexes, evaluating risk bearing capacity of the power distribution network, matching corresponding optimization schemes according to analysis results of the risk bearing capacity, completely simulating load response conditions of the disaster-stricken and recovery processes of the power distribution network according to disaster types, comparing and analyzing real-time elastic indexes of the power distribution network by calculating historical elastic indexes and risk bearing grades of the power distribution network, judging corresponding risk bearing capacity of the power distribution network, displaying from high to low according to the risk grades, further providing reference for elastic lifting measures of the power distribution network, guaranteeing accuracy of analysis of the elastic indexes, and guaranteeing accuracy of analysis of the risk grade bearing capacity.
An analytical evaluation module comprising:
the analysis module is used for analyzing disaster conditions and recovery processes of the power distribution network according to historical disaster types of areas where the power distribution network is located, and combining power, failure rate, average repair time, important equipment accident rate, safety equipment early warning rate, network safety and sustainability indexes of the power distribution network.
The calculation module is used for calculating the elasticity index of the current power distribution network according to the analyzed disaster situation and recovery process of the power distribution network, and presetting a power distribution network elasticity index threshold according to the calculated power distribution network elasticity index.
The evaluation module is used for evaluating the risk bearing capacity of the power distribution network according to the calculated elastic indexes of the power distribution network and the historical ring disaster type, and the risk bearing capacity is classified according to safety, low risk, high risk and out-of-limit.
And the early warning module is used for carrying out risk early warning on the power distribution network according to the analysis result of the evaluation module and matching a corresponding optimization scheme according to the analysis result of the risk bearing capacity.
The analysis flow of the analysis module specifically comprises:
and establishing a disaster scene model, and inputting the historical disaster type and the power distribution network data into the disaster scene model to simulate the disaster.
And analyzing the power grid node condition data, disaster types and fluctuation ranges of the power distribution network according to the simulated disaster scene to obtain disaster-affected conditions and recovery processes of the power distribution network, wherein the power grid node condition data comprise connection and disconnection, and the fluctuation ranges comprise single, multiple and areas.
And drawing a curve of the average state of the power distribution network according to the disaster condition and the recovery process of the power distribution network.
And calculating an elasticity index of the power distribution network according to the average state curve of the power distribution network.
An evaluation module, comprising:
the risk bearing grade evaluation module is used for evaluating the risk bearing capacity of the power distribution network according to the historical environmental data, the historical meteorological data and the historical landform data of the area where the power distribution network is located.
And the restoring force evaluation module is used for evaluating the restoring force of the power distribution network according to the elasticity of the power distribution network and the risk bearing grade of the power distribution network.
The elastic optimization module is used for collecting various index data in the recovery process of the power distribution network and correspondingly optimizing the elastic recovery force of the power distribution network according to the collected recovery data.
The real-time monitoring module is used for monitoring disaster types and distribution network data of areas where the distribution networks are located in real time, calculating elasticity indexes of the distribution networks in real time according to the monitored data, comparing the calculated elasticity indexes of the distribution networks in real time with a preset elasticity index threshold value of the distribution network, judging whether the elasticity indexes of the current distribution network have risks or not, and making corresponding early warning prompts according to risk grades, so that the elasticity indexes of the distribution networks can be monitored in real time, the current risk bearing capacity is judged according to monitoring results, corresponding optimization is provided according to the risk bearing conditions, corresponding risk early warning is given at the same time, maintenance personnel can conveniently know real-time working conditions of the distribution networks in time, the rush-repair efficiency of the distribution networks is improved, faults of the distribution networks are avoided, and normal use is affected.
A monitoring module, comprising:
the real-time monitoring module is used for monitoring disaster types of areas where the power distribution networks are located and power distribution network data in real time and calculating the elasticity index of the current power distribution network in real time according to the monitored data.
And the comparison module is used for comparing the calculated real-time elasticity indexes of the power distribution network with a preset elasticity index threshold value of the power distribution network.
And the judging module is used for judging whether the current power distribution network elastic index has risk according to the result compared by the comparing module, and making corresponding early warning prompt according to the risk level.
The visual display module is used for carrying out corresponding visual display on the real-time elastic indexes of the power distribution networks, the risk judgment result and the optimization scheme.
A visual display module, comprising:
and the elastic index display module is used for visually displaying the real-time elastic indexes of the power distribution networks monitored by the monitoring module.
The evaluation display module is used for visually displaying disaster grades born by the power distribution networks evaluated by the evaluation module, and the power distribution network with high risk grade is preferentially displayed according to the height of the risk grade, so that maintenance personnel can rapidly find out abnormal conditions of the power distribution network, can be directed against the preferential display with high risk, and can timely process the abnormal conditions, thereby improving the rush-repair efficiency of the power distribution network and further ensuring the normal use of the power distribution network.
The optimization display module is used for matching corresponding optimization methods according to disaster grades born by a plurality of elastic power distribution networks, visually displaying the optimization methods and the optimization process, facilitating maintenance personnel to clearly know the elastic performance and the bearable risk grades of the power distribution networks, matching corresponding optimization schemes according to the bearable risk grades, enabling the maintenance personnel to rapidly optimize the elastic performance of the power distribution networks, and guaranteeing normal work of the power distribution networks.
In order to better realize the working method of the panoramic information visual monitoring system of the elastic power distribution network, the method comprises the following steps:
step one: the historical disaster types of the areas where the power distribution networks are located and the data of the power distribution networks are respectively collected, the collected results are classified and stored, the situations of the power distribution networks can be known at the same time, and then the historical elasticity indexes of the power distribution networks are calculated.
Step two: according to the historical disaster types of the areas where the power distribution networks are located, the power distribution network data are combined, disaster conditions and recovery processes of the power distribution networks are analyzed, the elasticity index of the current power distribution network is calculated, and the historical elasticity indexes of the power distribution networks can be known at the same time.
Step three: the power distribution network elastic index threshold value is preset according to the calculated power distribution network elastic index, risk bearing capacity of a plurality of power distribution networks is evaluated, corresponding optimization schemes are matched according to analysis results of the risk bearing capacity, the risk bearing capacity of the power distribution networks can be known, corresponding optimization schemes are provided according to the risk bearing capacity, maintenance personnel can quickly know the risk bearing capacity of the power distribution networks, corresponding maintenance strategies are made according to the optimization schemes, the rush-repair efficiency of the power distribution networks is improved, faults of the power distribution networks are avoided, and normal use is affected.
Step four: the disaster type and the power distribution network data of the areas where the power distribution networks are located are monitored in real time, real-time elasticity indexes of the power distribution networks are calculated, the calculated real-time elasticity indexes of the power distribution networks are compared with a preset power distribution network elasticity index threshold value, and whether the current power distribution network elasticity indexes have risks is judged.
Step five: if the power distribution network has risks, the risks are classified, visual display is carried out from high to low according to the levels of the risks, maintenance personnel can intuitively know the real-time working condition of the power distribution network, and corresponding adjustment is carried out according to the real-time condition of the power distribution network.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. A panoramic information visual monitoring system of an elastic power distribution network is characterized in that; comprising the following steps:
the information acquisition module is used for respectively acquiring and classifying and storing the historical disaster types of the areas where the power distribution networks are located, simultaneously acquiring the power, the fault rate, the average repair time, the important equipment accident rate, the safety equipment early warning rate, the network safety and the sustainability index of the power distribution networks, and classifying and storing the acquired results;
The analysis and evaluation module is used for analyzing disaster conditions and recovery processes of the power distribution network according to the combination of the historical disaster types of the areas where the power distribution networks are located and the power distribution network data, calculating the elasticity index of the current power distribution network, presetting the elasticity index threshold of the power distribution network according to the calculated elasticity index of the power distribution network, evaluating the risk bearing capacity of the power distribution network, and matching corresponding optimization schemes according to the analysis result of the risk bearing capacity;
the real-time monitoring module is used for monitoring disaster types and power distribution network data of areas where the power distribution networks are located in real time, calculating elasticity indexes of the power distribution networks in real time according to the monitored data, comparing the calculated real-time elasticity indexes of the power distribution networks with a preset elasticity index threshold value of the power distribution network, judging whether the elasticity indexes of the current power distribution networks have risks or not, and making corresponding early warning prompts according to the risk grades;
the visual display module is used for carrying out corresponding visual display on the real-time elastic indexes of the power distribution networks, the risk judgment result and the optimization scheme.
2. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 1, wherein: the information acquisition module comprises:
The risk data acquisition module is used for respectively acquiring the historical disaster types of the areas where the power distribution networks are located, wherein the disaster types comprise meteorological disasters, geological disasters and disasters caused by human factors;
the power distribution network data acquisition module is used for acquiring power, fault rate, average repair time, important equipment accident rate, safety equipment early warning rate, network safety and sustainability indexes of a plurality of power distribution networks, and storing acquired results respectively, wherein the sustainability indexes comprise energy utilization efficiency, environmental pollution control and green power development.
3. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 1, wherein: the utility model provides a distribution network data acquisition module, includes:
the time interval extraction module is used for extracting the acquisition time interval of each data type in the power distribution network data; each data type in the power distribution network data comprises power, fault rate, average repair time, important equipment accident rate and safety equipment early warning rate of the power distribution network;
the maximum time interval extraction module is used for extracting the maximum time interval and the minimum time interval of the acquisition time interval of each data type in the power distribution network data;
The first time interval setting module is used for comparing the maximum time interval of the acquisition time interval of each data type in the power distribution network data with a preset time threshold, and setting the data transmission time interval as a first time interval when the maximum time interval is larger than the preset time threshold; wherein the preset time threshold is 1-3 days; wherein the first time interval is obtained by the following formula:
wherein T is 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) p Representing an average data acquisition time interval of the power distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; t (T) max0 Representing a preset time threshold; e represents a constant; t (T) i Representing a data acquisition time interval corresponding to the ith data type;
the first exclusive thread establishing module is used for establishing a first communication exclusive thread corresponding to the power distribution network data acquisition, and transmitting the power distribution network data according to the first time interval by utilizing the first communication exclusive thread, wherein the maximum throughput of the first communication exclusive thread in unit time is obtained through the following formula:
Wherein C is 01 Representing a maximum throughput per unit time of the first communication-specific thread; c (C) 0 Representing a preset initial throughput; t (T) 01 Representing a first time interval; n represents the distribution network dataThe number of individual data types; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; e represents a constant; c represents the average data volume corresponding to one data acquisition of the power distribution network data, wherein the data acquisition comprises all data types.
4. A flexible power distribution network panoramic information visualization monitoring system as recited in claim 3, wherein: the distribution network data acquisition module still includes:
the second time interval setting module is used for comparing the maximum time interval of the acquisition time interval of each data type in the power distribution network data with a preset time threshold, and setting the data transmission time interval as a second time interval when the maximum time interval is smaller than or equal to the preset time threshold; wherein the preset time threshold is 1-3 days; wherein the second time interval is obtained by the following formula:
wherein T is 02 Representing a second time interval; n represents the number of each data type in the distribution network data; t (T) p Representing an average data acquisition time interval of the power distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; t (T) max0 Representing a preset time threshold; e represents a constant; t (T) i Representing a data acquisition time interval corresponding to the ith data type;
the second exclusive thread establishing module is configured to establish a second communication exclusive thread corresponding to the power distribution network data acquisition, and perform transmission of the power distribution network data according to the second time interval by using the second communication exclusive thread, where a maximum throughput per unit time of the second communication exclusive thread is obtained by using the following formula:
wherein C is 02 Representing a maximum throughput per unit time of the second communication dedicated thread; c (C) 0 Representing a preset initial throughput; t (T) 01 Representing a first time interval; n represents the number of each data type in the distribution network data; t (T) min And T max Respectively representing a maximum time interval and a minimum time interval of the acquisition time interval of each data type in the power distribution network data; e represents a constant; c represents the average data volume corresponding to one data acquisition of the power distribution network data, wherein the data acquisition comprises all data types.
5. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 1, wherein: the analysis and evaluation module comprises:
the analysis module is used for analyzing disaster conditions and recovery processes of the power distribution network according to historical disaster types of areas where the power distribution network is located, and combining power, failure rate, average repair time, important equipment accident rate, safety equipment early warning rate, network safety and sustainability indexes of the power distribution network;
the calculation module is used for calculating the elasticity index of the current power distribution network according to the analyzed disaster situation and recovery process of the power distribution network, and presetting an elasticity index threshold of the power distribution network according to the calculated elasticity index of the power distribution network;
the evaluation module is used for evaluating the risk bearing capacity of the power distribution network according to the calculated elastic indexes of the power distribution network and the historical ring disaster type, and the risk bearing capacity is classified according to safety, low risk, high risk and out-of-limit;
and the early warning module is used for carrying out risk early warning on the power distribution network according to the analysis result of the evaluation module and matching a corresponding optimization scheme according to the analysis result of the risk bearing capacity.
6. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 5, wherein: the analysis flow of the analysis module specifically comprises:
Establishing a disaster scene model, and inputting the historical disaster type and the power distribution network data into the disaster scene model to simulate the disaster;
analyzing power grid node condition data, disaster types and fluctuation ranges of the power distribution network according to the simulated disaster scene to obtain disaster conditions and recovery processes of the power distribution network, wherein the power grid node condition data comprise connection and disconnection, and the fluctuation ranges comprise single, multiple and areas;
drawing a curve of the average state of the power distribution network according to the disaster condition and the recovery process of the power distribution network;
and calculating an elasticity index of the power distribution network according to the average state curve of the power distribution network.
7. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 5, wherein: the evaluation module comprises:
the risk bearing grade evaluation module is used for evaluating the risk bearing capacity of the power distribution network according to the historical environmental data, the historical meteorological data and the historical landform data of the area where the power distribution network is located;
the restoring force evaluation module is used for evaluating the restoring force of the power distribution network according to the elasticity of the power distribution network and the risk bearing grade of the power distribution network;
the elastic optimization module is used for collecting various index data in the recovery process of the power distribution network and correspondingly optimizing the elastic recovery force of the power distribution network according to the collected recovery data.
8. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 1, wherein: the monitoring module comprises:
the real-time monitoring module is used for monitoring disaster types of areas where the power distribution networks are located and power distribution network data in real time, and calculating the elasticity index of the current power distribution network in real time according to the monitored data;
the comparison module is used for comparing the calculated real-time elasticity indexes of the power distribution network with a preset elasticity index threshold value of the power distribution network;
and the judging module is used for judging whether the current power distribution network elastic index has risk according to the result compared by the comparing module, and making corresponding early warning prompt according to the risk level.
9. The visual monitoring system for panoramic information of an elastic power distribution network according to claim 1, wherein: the visual display module comprises:
the elastic index display module is used for visually displaying the real-time elastic indexes of the power distribution networks monitored by the monitoring module;
the evaluation display module is used for visually displaying disaster grades born by the power distribution networks evaluated by the evaluation module and preferentially displaying the power distribution network with high risk grade according to the height of the risk grade;
The optimization display module is used for matching corresponding optimization methods according to disaster grades born by the plurality of elastic power distribution networks and visually displaying the optimization methods and the optimization process.
10. The method according to claim 9 comprising the steps of:
step one: respectively acquiring the historical disaster types of the areas where the power distribution networks are located and the data of the power distribution networks, and classifying and storing the acquired results;
step two: analyzing disaster conditions and recovery processes of the power distribution network according to the historical disaster types of the areas where the power distribution networks are located and combining the power distribution network data, and calculating the elasticity index of the current power distribution network;
step three: presetting an elasticity index threshold of the power distribution network according to the calculated elasticity index of the power distribution network, evaluating risk bearing capacity of a plurality of power distribution networks, and matching corresponding optimization schemes according to analysis results of the risk bearing capacity;
step four: real-time monitoring of disaster types and power distribution network data of areas where the power distribution networks are located, calculating real-time elasticity indexes of the power distribution networks, comparing the calculated real-time elasticity indexes of the power distribution networks with preset power distribution network elasticity index thresholds, and judging whether the current power distribution network elasticity indexes have risks or not;
Step five: if the power distribution network has risks, grading the risks, and visually displaying the risks from high to low according to the levels of the risks.
CN202311297325.6A 2023-10-09 2023-10-09 Visual monitoring system and method for panoramic information of elastic power distribution network Pending CN117335570A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311297325.6A CN117335570A (en) 2023-10-09 2023-10-09 Visual monitoring system and method for panoramic information of elastic power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311297325.6A CN117335570A (en) 2023-10-09 2023-10-09 Visual monitoring system and method for panoramic information of elastic power distribution network

Publications (1)

Publication Number Publication Date
CN117335570A true CN117335570A (en) 2024-01-02

Family

ID=89292687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311297325.6A Pending CN117335570A (en) 2023-10-09 2023-10-09 Visual monitoring system and method for panoramic information of elastic power distribution network

Country Status (1)

Country Link
CN (1) CN117335570A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117895661A (en) * 2024-03-14 2024-04-16 国网山西省电力公司太原供电公司 Power distribution network control method and system combined with risk analysis

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2865333A1 (en) * 2004-01-20 2005-07-22 Atmel Nantes Sa Controller area network flow rate detecting process for e.g. motor vehicle, involves measuring time periods of signal levels for obtaining and validating new signal flow configuration
CN105842581A (en) * 2016-03-23 2016-08-10 国网山东省电力公司章丘市供电公司 Method and system for pre-warning power distribution network fault
CN106875105A (en) * 2017-01-23 2017-06-20 东北大学 A kind of power distribution network differentiation planing method for considering combined failure risk
CN109447330A (en) * 2018-10-12 2019-03-08 东北大学 Consider the power distribution network method for prewarning risk of power grid elasticity and adaptability
WO2019233047A1 (en) * 2018-06-07 2019-12-12 国电南瑞科技股份有限公司 Power grid dispatching-based operation and maintenance method
CN113191687A (en) * 2021-05-25 2021-07-30 广东电网有限责任公司广州供电局 Elastic power distribution network panoramic information visualization method and system
CN113810792A (en) * 2021-11-19 2021-12-17 南京绛门信息科技股份有限公司 Edge data acquisition and analysis system based on cloud computing
CN114358619A (en) * 2022-01-08 2022-04-15 西安交通大学 Double-layer assessment method and system for elastic power distribution network resilience assessment
WO2022116946A1 (en) * 2020-12-03 2022-06-09 华为技术有限公司 Channel coding and decoding method and related apparatus
US20220344936A1 (en) * 2021-04-26 2022-10-27 One Concern, Inc. Estimation of distribution network recovery after disaster
WO2022241056A1 (en) * 2021-05-11 2022-11-17 Electricfish Energy Inc. System and method for electrical grid management, risk mitigation, and resilience
KR20230007748A (en) * 2021-07-06 2023-01-13 한국전력공사 Apparatus and method for analyzing microgrid to improve resilience
CN115640936A (en) * 2022-09-05 2023-01-24 浙江华电器材检测研究院有限公司 Power distribution network elasticity evaluation method, device, equipment and readable storage medium
US20230080168A1 (en) * 2021-08-27 2023-03-16 Institute of Environment and Sustainable Development in Agriculture, CAAS Method for assessing comprehensive risk of drought and flood disaster on apples
CN116090819A (en) * 2022-12-27 2023-05-09 贵州电网有限责任公司 Power distribution network risk situation prediction method based on association rule
CN116388161A (en) * 2023-03-21 2023-07-04 国网冀北电力有限公司电力科学研究院 Toughness determination method and device for power distribution network
CN116777264A (en) * 2023-05-23 2023-09-19 国网北京市电力公司 Novel power distribution network toughness index determination method and evaluation system considering energy storage

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2865333A1 (en) * 2004-01-20 2005-07-22 Atmel Nantes Sa Controller area network flow rate detecting process for e.g. motor vehicle, involves measuring time periods of signal levels for obtaining and validating new signal flow configuration
CN105842581A (en) * 2016-03-23 2016-08-10 国网山东省电力公司章丘市供电公司 Method and system for pre-warning power distribution network fault
CN106875105A (en) * 2017-01-23 2017-06-20 东北大学 A kind of power distribution network differentiation planing method for considering combined failure risk
WO2019233047A1 (en) * 2018-06-07 2019-12-12 国电南瑞科技股份有限公司 Power grid dispatching-based operation and maintenance method
CN109447330A (en) * 2018-10-12 2019-03-08 东北大学 Consider the power distribution network method for prewarning risk of power grid elasticity and adaptability
WO2022116946A1 (en) * 2020-12-03 2022-06-09 华为技术有限公司 Channel coding and decoding method and related apparatus
US20220344936A1 (en) * 2021-04-26 2022-10-27 One Concern, Inc. Estimation of distribution network recovery after disaster
WO2022241056A1 (en) * 2021-05-11 2022-11-17 Electricfish Energy Inc. System and method for electrical grid management, risk mitigation, and resilience
CN113191687A (en) * 2021-05-25 2021-07-30 广东电网有限责任公司广州供电局 Elastic power distribution network panoramic information visualization method and system
KR20230007748A (en) * 2021-07-06 2023-01-13 한국전력공사 Apparatus and method for analyzing microgrid to improve resilience
US20230080168A1 (en) * 2021-08-27 2023-03-16 Institute of Environment and Sustainable Development in Agriculture, CAAS Method for assessing comprehensive risk of drought and flood disaster on apples
CN113810792A (en) * 2021-11-19 2021-12-17 南京绛门信息科技股份有限公司 Edge data acquisition and analysis system based on cloud computing
CN114358619A (en) * 2022-01-08 2022-04-15 西安交通大学 Double-layer assessment method and system for elastic power distribution network resilience assessment
CN115640936A (en) * 2022-09-05 2023-01-24 浙江华电器材检测研究院有限公司 Power distribution network elasticity evaluation method, device, equipment and readable storage medium
CN116090819A (en) * 2022-12-27 2023-05-09 贵州电网有限责任公司 Power distribution network risk situation prediction method based on association rule
CN116388161A (en) * 2023-03-21 2023-07-04 国网冀北电力有限公司电力科学研究院 Toughness determination method and device for power distribution network
CN116777264A (en) * 2023-05-23 2023-09-19 国网北京市电力公司 Novel power distribution network toughness index determination method and evaluation system considering energy storage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117895661A (en) * 2024-03-14 2024-04-16 国网山西省电力公司太原供电公司 Power distribution network control method and system combined with risk analysis
CN117895661B (en) * 2024-03-14 2024-05-24 国网山西省电力公司太原供电公司 Power distribution network control method and system combined with risk analysis

Similar Documents

Publication Publication Date Title
CN116304766B (en) Multi-sensor-based quick assessment method for state of switch cabinet
CN102170124A (en) Early warning method of stable-state index of power quality
CN104410163B (en) A kind of safety in production based on electric energy management system and power-economizing method
CN111160791A (en) Abnormal user identification method based on GBDT algorithm and factor fusion
CN117335570A (en) Visual monitoring system and method for panoramic information of elastic power distribution network
CN110942235B (en) Emergent evaluation system of electric power
CN112668821A (en) Distribution line risk analysis method based on insulator fault probability of sand blown region
CN117078017A (en) Intelligent decision analysis system for monitoring power grid equipment
CN114928173A (en) Intelligent power distribution system based on power grid business middling station and electric power data safety interaction
CN114928168A (en) Offshore platform unmanned data edge computing device
CN113159503B (en) Remote control intelligent safety evaluation system and method
CN117614137A (en) Power distribution network optimization system based on multi-source data fusion
CN112488361B (en) Transformer area low voltage prediction method and device based on big data
CN114448348A (en) Distributed photovoltaic operation data acquisition system and data processing method
CN117691722A (en) Lithium battery charging safety monitoring and early warning method and system
CN117390944A (en) Substation operation condition simulation system
CN116846085A (en) Self-sensing monitoring intelligent distribution box control system
CN115619098A (en) Intelligent electric power material data processing method based on grading monitoring and early warning
CN112434955B (en) Distribution network line operation risk sensing method based on multi-data fusion
CN113934795A (en) Power grid early warning system based on distributed management
CN114693186A (en) Method and system for analyzing and processing multiple fault events of differentiated combined type transformer substation
CN111882173A (en) Power grid static security risk assessment system and assessment method based on meteorological information
CN115224684A (en) Intelligent power distribution network risk state identification method and system based on immune hazard theory
CN114492608A (en) Big data-based management and control system for flood control and drainage water pump unit
CN112132819A (en) Communication network management monitoring method based on artificial intelligence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination