CN117162282A - Rope saw cutting device - Google Patents
Rope saw cutting device Download PDFInfo
- Publication number
- CN117162282A CN117162282A CN202311032062.6A CN202311032062A CN117162282A CN 117162282 A CN117162282 A CN 117162282A CN 202311032062 A CN202311032062 A CN 202311032062A CN 117162282 A CN117162282 A CN 117162282A
- Authority
- CN
- China
- Prior art keywords
- support frame
- pulley block
- pulley
- rope
- rope saw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005520 cutting process Methods 0.000 title claims abstract description 100
- 229910000831 Steel Inorganic materials 0.000 claims description 45
- 229910003460 diamond Inorganic materials 0.000 claims description 45
- 239000010432 diamond Substances 0.000 claims description 45
- 239000010959 steel Substances 0.000 claims description 45
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 8
- 230000008569 process Effects 0.000 abstract description 7
- 230000007306 turnover Effects 0.000 abstract description 5
- 238000010276 construction Methods 0.000 description 14
- 238000009434 installation Methods 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000002146 bilateral effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The application relates to a rope saw cutting device which is used for cutting temporary upright posts in a subway station, and the detachable support frame is arranged to enable the components of the device to be used in a turnover mode, so that the disassembling operation process is simpler and more convenient, the temporary scaffold is prevented from being repeatedly erected and removed, and the cutting operation is more convenient. Through two sets of assembly pulleys that set up at the support frame top, can adjust the cutting incision angle, realize cutting face and structural plane's complete leveling, reduce the aftertreatment to the incision face.
Description
Technical Field
The application relates to the technical field of cutting construction of targets in subway stations, in particular to a rope saw cutting device.
Background
The construction of the temporary upright post is carried out by sawing the inner rope of the subway station, a temporary scaffold is built, and the cutting machine is lifted by the temporary scaffold in a common mode. But in the in-service use, the time for constructing the temporary scaffold is longer, the temporary scaffold is also more complicated to detach after the construction is completed, and the upright post cutting notch is difficult to clean up due to the position of the cutting machine.
In order to cut the temporary upright post of the subway in the construction process of the high-altitude environment, the temporary scaffold is repeatedly built and dismantled, the working procedure is complicated, the turnover position is difficult, the construction period is longer, meanwhile, the phenomenon that the cutting surface and the structural surface are completely smooth cannot be realized due to the factors of the cutting machine, and the construction progress is influenced. Meanwhile, the cost for post-processing the incision surface is high, so that the proposal of the convenient and efficient rope saw cutting device is very necessary.
Disclosure of Invention
The application aims to provide a rope saw cutting device which is used for cutting temporary upright posts in a subway station, adopts a movable and detachable support frame mode, reduces the workload of disassembling and assembling a scaffold, adjusts the angle of a cutting notch through two groups of pulleys, and avoids the later treatment of a cutting surface.
In order to achieve the above purpose, the application provides a rope saw cutting device which is used for cutting temporary upright posts in a subway station, the rope saw cutting device comprises a detachable support frame, the support frame comprises a support frame base, a support frame middle end and a support frame top end, a jack is arranged at the bottom of the support frame, and travelling wheels are arranged on the support frame base;
the rope saw cutting machine and the diamond rope for cutting the temporary upright post are arranged at the top end of the support frame, the first pulley block comprises vertical pulleys arranged in pairs, and the second pulley block comprises horizontal pulleys arranged in pairs;
the diamond rope sequentially passes through the single-side pulleys of the first pulley block and the second pulley block, passes through the temporary upright post in a surrounding manner, sequentially passes through the second pulley block and the other single-side pulley of the first pulley block, and returns to the driving wheel to be closed into a ring;
the vertical pulley of the first pulley block and the diamond rope on the driving wheel are located on the same plane, and the second pulley block converts the diamond rope passing through the first pulley block into a horizontal direction and is arranged on the same plane with the cutting surface of the diamond rope on the temporary upright post.
In an alternative embodiment, a base socket sleeve is arranged on the support frame base, and a top socket sleeve is arranged at the top end of the support frame;
the middle end of the support frame comprises an upper vertical square tube, a middle end socket sleeve and a lower vertical square tube which are sequentially arranged from top to bottom, the lower vertical square tube is inserted into the base socket sleeve, and the upper vertical square tube is inserted into the top socket sleeve;
the joint parts of the socket sleeve and the vertical square tube are respectively connected and fixed through bolts.
In an alternative embodiment, the top end of the support frame comprises a top end support, and the first pulley block and the second pulley block are fixed on the top end support through a first fixed connecting piece and a second fixed connecting piece respectively;
the top support comprises a frame formed by welding square tubes, the first pulley block is arranged on the side portion of the top support, square steel is arranged at the top of the top support, the square steel is lifted, a mounting space is reserved for a second pulley block which is horizontally arranged, and the second pulley block is arranged in the height direction of the square steel.
In an alternative embodiment, a diagonal square tube is connected between the top support and the top socket sleeve, and diagonal screw steel is connected between the first fixed connector and the top socket sleeve.
In an alternative embodiment, the vertical pulley of the first pulley block and the horizontal pulley of the second pulley block are provided with V-shaped limiting grooves, the diamond rope is tightly held in the V-shaped limiting grooves, and the V-shaped limiting grooves on the vertical pulley and the V-shaped limiting grooves on the horizontal pulley are on the same horizontal plane.
In optional embodiment, still include the bracing steel pipe, the bracing steel pipe slope sets up between support frame middle-end and the ground, upper portion vertical side pipe the well end socket joint sleeve pipe and lower part vertical side pipe is including two that set up relatively respectively, be connected with first horizontal drawknot side pipe between the upper portion vertical side pipe, be connected with second horizontal drawknot side pipe between the lower part vertical side pipe, be connected with on the first horizontal drawknot side pipe and be used for fixing the dish knot of bracing steel pipe.
In an alternative embodiment, the upper vertical square tube is inserted into the middle end socket sleeve, and the lower vertical square tube is inserted into the middle end socket sleeve, and scale marks are arranged on the positions of the upper vertical square tube and the lower vertical square tube.
In an alternative embodiment, the support frame base comprises a rectangular frame welded by double-spliced I-steel, the middle part of the rectangular frame is connected with tie I-steel and ribbed steel bars, the jack comprises two, and the bottom of the tie I-steel is connected with a square pipe for limiting the jack.
In an alternative embodiment, the travelling wheel comprises a universal wheel with a self-locking function, and the universal wheel is fixedly arranged at the bottom of the rectangular frame.
In an alternative embodiment, the wire saw cutter is mounted on a carriage for moving the wire saw cutter.
The rope saw cutting device is used for cutting the temporary upright post in the subway station, and the detachable support frame is arranged, so that the components of the device can be used in a turnover way, the disassembling operation process is simpler and more convenient, the temporary scaffold is prevented from being repeatedly erected and removed, and the cutting operation is more convenient.
Through two sets of assembly pulleys that set up at the support frame top, can adjust the cutting incision angle, realize cutting face and structural plane's complete leveling, reduce the aftertreatment to the incision face.
Additional features and advantages of the application will be set forth in the detailed description which follows.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic view of the whole structure of a rope saw cutting device in the application;
FIG. 2 is a schematic view of the structure of the top end of the support frame;
FIG. 3 is a schematic view of the cross-sectional structure A-A in FIG. 2;
FIG. 4 is a schematic view of the cross-sectional structure B-B in FIG. 2;
FIG. 5 is a schematic view of the cross-sectional structure of the structure C-C in FIG. 2;
fig. 6 is a schematic structural view of a lower vertical square tube and a second horizontal drawknot square tube;
FIG. 7 is a schematic side view of FIG. 6;
fig. 8 is a schematic structural view of an upper vertical square tube, a first horizontal drawknot square tube and a diagonal bracing steel tube;
FIG. 9 is a schematic side elevational view of FIG. 8;
FIG. 10 is a schematic view of a structure of a support frame base;
FIG. 11 is a schematic view of the cross-sectional structure A-A of FIG. 10;
FIG. 12 is a schematic view of the cross-sectional structure B-B in FIG. 10;
fig. 13 is a schematic view of a cutting state structure of the rope saw cutting device.
Icon:
1-a supporting frame;
1 A-A support frame base; 1 b-the middle end of the support frame; 1 c-top of the support frame;
11-a base socket sleeve; 12-top socket sleeve; 13-upper vertical square tubes; 14-middle end socket sleeve; 15-lower vertical square tubes;
20-top support; 21-a first fixed connection; 22-a second fixed connection; 23-raising square steel; 24-inclined pulling square tubes; 25-diagonal bracing screw steel;
30-a first transverse drawknot square tube; 31-a second transverse drawknot square tube; 32-a plate buckle;
40-rectangular frame; 41-tying I-steel; 42-ribbed rebar; 43-square tube;
2-jack;
3-travelling wheels;
4-a rope saw cutter;
a 5-diamond rope;
6-temporary upright posts;
7-a driving wheel; 7 A-A first pulley block; 71-vertical pulleys; 7 b-a second pulley block; 72-horizontal pulleys; 73-V-shaped limit grooves;
8-bracing a steel pipe;
9-walking vehicle.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application more clear, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application. It will be apparent that the described embodiments are some, but not all, embodiments of the application. The components of the embodiments of the present application generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
In the description of the present application, it should be noted that, the azimuth or positional relationship indicated by the terms "inner", "outer", etc. are based on the azimuth or positional relationship shown in the drawings, or the azimuth or positional relationship that is commonly put in use of the product of this application, are merely for convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element to be referred to must have a specific azimuth, be configured and operated in a specific azimuth, and therefore should not be construed as limiting the present application. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
In the description of the present application, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed", "connected" and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected or integrally connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present application will be understood in specific cases by those of ordinary skill in the art.
The rope saw cutting device is mainly used for cutting temporary stand columns in subway stations in the subway construction process. The work load of the temporary scaffold is reduced by arranging the detachable support frame, the normal cutting angle of the diamond rope is ensured by arranging two groups of pulleys, and the later treatment on the cutting surface is reduced, so that the aim of improving the working efficiency is fulfilled.
Referring to fig. 1, and in combination with fig. 13, the main structure of the rope saw cutting device comprises a detachable support frame 1, wherein the support frame 1 comprises a support frame base 1a, a support frame middle end 1b and a support frame top end 1c which are sequentially arranged from bottom to top, and the bottom support, the middle end switching and the top abutting connection at the top of a subway station can be respectively realized through the support frame base 1a, the support frame middle end 1b and the support frame top end 1c which are sequentially arranged, so that the stable reliability of the structure of the support frame 1 is ensured.
The support frame base 1a specifically carries out the bottom bracing through jack 2, and jack 2 sets up in the bottom of support frame 1, lifts whole support frame 1 through flexible hydro-cylinder, installs walking wheel 3 on the support frame base 1a to can make support frame base 1a can remove when not cutting.
The wire saw cutting machine 4 and the diamond wire 5 for cutting the temporary upright 6 are further included, the top end 1c of the support frame is provided with a first pulley block 7a and a second pulley block 7b, the first pulley block 7a comprises vertical pulleys 71 which are arranged in pairs, and the second pulley block 7b comprises horizontal pulleys 72 which are arranged in pairs;
the rope saw cutting machine 4 is provided with a driving wheel 7 for driving the diamond rope 5 to move, the diamond rope 5 sequentially passes through a single-side pulley of the first pulley block 7a and a single-side pulley of the second pulley block 7b from the driving wheel 7, passes through the temporary upright 6 in a surrounding manner, sequentially passes through the second pulley block 7b and the other single-side pulley of the first pulley block 7a, and returns to the driving wheel 7 to be closed into a ring;
the diamond rope 5 is driven to move on the track of the closed loop through the driving wheel 7, meanwhile, the temporary upright column 6 is cut in the moving process, and the cutting angle direction of the diamond rope 5 can be controlled through the vertical pulley 71 of the first pulley block 7a and the horizontal pulley 72 of the second pulley block 7b, so that the correct wheel entering angle of the diamond rope 5 is ensured, and the abrasion to the diamond rope 5 is reduced.
The vertical pulley 71 of the first pulley block 7a is located on the same plane with the diamond rope 5 on the driving wheel 7, the second pulley block 7b converts the diamond rope 5 passing through the first pulley block 7a into a horizontal direction and is arranged on the same plane with the cutting surface of the diamond rope 5 on the temporary upright 6, and the diamond rope 5 on the first pulley block 7a and the diamond rope 5 on the driving wheel 7 are located on the same plane through the vertical pulley 71 of the first pulley block 7a, so that the diamond rope 5 on the first pulley block 7a and the diamond rope 5 on the driving wheel 7 are located on the same plane, and the diamond rope 5 is not easy to separate from the driving wheel 7, so that the stability of the cutting process is improved.
Further, the second pulley block 7b converts the diamond rope 5 passing through the first pulley block 7a into a horizontal direction and is arranged on the same plane with the cutting surface of the diamond rope 5 on the temporary upright post 6, so that the flatness of the cutting surface of the target object can be improved on the premise of ensuring a correct cutting angle and a correct entering wheel angle, and the whole turnover speed of the cutting device can be accelerated by combining the detachable support frame 1, so that the aim of improving the working efficiency is fulfilled.
In one specific embodiment, the detachably assembled support frame 1 is detachably connected, specifically, a base socket sleeve 11 is provided on a support frame base 1a, a top socket sleeve 12 is provided on a support frame top end 1c, and the base socket sleeve 11 and the top socket sleeve 12 are detachably connected with a support frame middle end 1b respectively.
The middle end 1b of the support frame comprises an upper vertical square tube 13, a middle end socket sleeve 14 and a lower vertical square tube 15 which are sequentially arranged from top to bottom, the lower vertical square tube 15 is inserted into the base socket sleeve 11, the upper vertical square tube 13 is inserted into the top socket sleeve 12, and the joint parts of the socket sleeve and the vertical square tube 43 are respectively fixed through bolt connection, so that the support frame 1 is convenient to assemble and disassemble, and compared with the erection of the existing temporary scaffold, the workload can be greatly reduced, and the working efficiency can be improved.
Based on the detachable main structure of the support frame 1 and the installation of the pulley on the support frame 1, the rope saw cutting device in the application is described below based on the structure from top to bottom.
Referring to fig. 2-5, the top 1c of the support frame includes a top support 20, the first pulley block 7a and the second pulley block 7b are welded and fixed on the top support 20 through a first fixed connecting piece 21 and a second fixed connecting piece 22, and the first pulley block 7a and the second pulley block 7b are fixedly welded on the top support frame, so that stable installation of pulleys can be ensured, and further reliable steering of the diamond rope 5 on the top 1c of the support frame is ensured.
The top support 20 comprises a frame formed by welding square tubes 43, the first pulley block 7a is mounted on the side portion of the top support 20, square steel 23 is lifted at the top of the top support 20, the square steel 23 is used for reserving a mounting space for the second pulley block 7b which is horizontally arranged, and the second pulley block 7b is mounted on the height direction of the square steel 23. Specifically, both the horizontal pulleys 72 of the second pulley block 7b are disposed at the height of the raised square steel 23, and interference between the horizontal pulleys 72 and the roof structure is prevented while facilitating installation of the horizontal pulleys 72, thereby avoiding influence on rotation of the horizontal pulleys 72.
In order to ensure the stability of the top end support 20 at the top of the support frame 1, a diagonal square pipe 24 is connected between the top end support 20 and the top end socket sleeve 12, and in order to increase the structural strength of the first pulley block 7a connecting piece, a diagonal screw steel 25 is connected between the first fixed connecting piece 21 and the top end socket sleeve 12, so that the overall structural strength of the top end 1c of the support frame is ensured.
V-shaped limiting grooves 73 are formed in the vertical pulley 71 of the first pulley block 7a and the horizontal pulley 72 of the second pulley block 7b, and based on the winding of the diamond rope 5 on the four pulleys, the displacement of the diamond rope 5 can be limited by tensioning and accommodating the diamond rope 5 in the V-shaped limiting grooves 73, so that the diamond rope 5 is prevented from being separated from the pulleys.
The diamond rope 5 in the tensioning state can be favorable for cutting the temporary upright 6, meanwhile, the smoothness of a cutting surface can be ensured, and the cutting quality is improved.
In order to bear the tensile force generated by the cutting machine in the cutting process, the rope saw cutting device further comprises a diagonal bracing steel pipe 8, and the diagonal bracing steel pipe 8 is obliquely arranged between the middle end 1b of the support frame and the ground. Through the bracing of bracing steel pipe 8, can effectively offset the pulling force that produces in the cutting process, reduce the risk of empting in the furthest.
The support frame base 1a and the top end support 20 in the application are of a frame structure, and the upper vertical square tube 13, the middle end socket sleeve 14 and the lower vertical square tube 15 respectively comprise two opposite vertical square tubes which are respectively supported and arranged between the support frame base 1a and the top end support 20.
Referring to fig. 6 to 9, in order to enhance structural strength, a first transverse drawknot square tube 30 is connected between two upper vertical square tubes 13, a second transverse drawknot square tube 31 is connected between two lower vertical square tubes 15, and in order to facilitate connection of the diagonal bracing steel tube 8, a disc buckle 32 for fixing the diagonal bracing steel tube 8 is connected to the first transverse drawknot square tube 30, so that the top end of the diagonal bracing steel tube 8 is fixed on the disc buckle 32, and the bottom end is abutted on the ground, thereby ensuring stability in the cutting process.
The whole length of support frame middle-end 1b can be adjusted, and then can adjust rope saw cutting device's whole height, specifically, upper portion vertical square pipe 13 peg graft in the position of well end socket joint sleeve 14 to and the vertical square pipe 15 of lower part peg graft in the position of well end socket joint sleeve 14 all are provided with the scale mark, through the setting of scale mark, combine the bolted connection that sets up at the grafting position, can adjust support frame middle-end 1 b's whole height, further can make the vertical square pipe 13 of upper portion, well end socket joint sleeve 14 of pairing and the vertical square pipe 15 of lower part maintain in same altitude plane in group, avoid the dislocation.
Referring to fig. 10-12, the support frame base 1a includes a rectangular frame 40 welded by double-spliced i-steel, and a tie i-steel 41 and ribbed steel bars 42 are connected to the middle of the rectangular frame 40 to enhance the structural strength of the support frame base 1 a.
The jack 2 includes two, and the bottom of drawknot I-steel 41 is connected with and is used for carrying out spacing square pipe 43 to jack 2, in the use, through making the flexible end of hydro-cylinder of jack 2 go up and down in square pipe 43, guarantees its reliability of lifting track. The two jacks 2 are simultaneously and upwards propped up, so that the travelling wheels 3 at the bottom of the support frame base 1a are completely separated from the ground, the middle end 1b of the support frame is stressed front and back, and the cutting device can be completely stressed without shaking, so that the cutting operation can be performed.
The travelling wheel 3 comprises a universal wheel with a self-locking function, and the universal wheel is fixed at the bottom of the support frame base 1a of the rectangular frame 40 and can move to a designated position as required when materials are circulated.
The rope saw cutting machine 4 is arranged on the traveling carriage 9, and the traveling carriage 9 is used for driving the rope saw cutting machine 4 to move, and the purpose of tensioning the diamond rope 5 can be achieved, so that the diamond rope 5 can effectively cut the temporary upright 6.
The application aims to provide a temporary stand column 6-rope saw cutting device in a subway station, which is convenient and improves the construction efficiency, can strengthen the applicability of the whole cutting device to the subway environment, ensure the correct wheel entering angle of a diamond rope 5, reduce the abrasion to the diamond rope 5, improve the flatness of a cutting surface of a target object, and improve the turnover speed of the whole cutting device so as to improve the working efficiency.
Through the mutual cooperation of the first pulley block 7a and the second pulley block 7b, the steering of the diamond rope 5 is realized, so that the rope saw cutting machine 4 is conveniently placed on the plane position which is not identical to the notch surface of the temporary upright post 6, the cutting device is enabled to be free from frequently erecting and dismantling a temporary scaffold under the environment of high-altitude operation, and the construction efficiency is improved.
The horizontal pulleys 72 of the second pulley group are absolutely horizontally calibrated through the level bubble ruler in the installation process, so that the center line of the second pulley block 7b is horizontal to the notch surface of the temporary upright 6, and the distance between the first pulley block 7a is a fixed size in the installation process because the temporary upright 6 is of a uniform diameter, so that the diamond rope 5 can maintain a constant cutting width between the two horizontal pulleys 72.
It should be noted that in other construction environments, the spacing between horizontal pulleys 72 may alternatively be adjustable to accommodate temporary columns 6 of different diameters.
In the use process of the whole rope saw cutting device, the support frame base 1a is jacked upwards through the jack 2, so that the vertical stability of the whole device is ensured, and meanwhile, the inclined strut steel tube 8 is installed, so that the stability of the horizontal direction in the cutting process is ensured.
Because the second pulley block 7b is fixed on the top end 1c of the support frame before being installed, the cutting flatness can be ensured after the cutting device is installed. Because the vertical pulley 71 type limit groove of the first pulley block 7a and the horizontal pulley 72 type limit groove of the second pulley block 7b are on the same horizontal plane, the diamond rope 5 is not easy to separate from the pulley in the cutting process.
The temporary upright post 6 and the driving wheel 7 are driven by the trolley to move back and forth, the rope saw cutting machine 4 is fixed according to site construction conditions, the diamond rope 5 is tensioned, a safety guard rail is arranged around a construction site to avoid safety accidents, the temporary upright post 6 can be cut after the guard rail is arranged, the temporary upright post 6 positioned at the bottom of a subway station is required to be cut according to the principle of 'from bottom to top, bilateral symmetry and block cutting', the temporary upright post 6 positioned at the bottom is directly dropped on a structural plate after the cutting is completed, then the forklift is utilized to transport, the rest temporary upright posts 6 are lifted off, before the cutting is carried out, special connecting plates are utilized, bolt holes are connected at the side surfaces of the temporary upright posts 6 through bolts, then lasso is carried out by utilizing steel ropes, and the temporary upright posts 6 can be kept in a lifting state in advance by matching with a structure top surface reservation lifting hook and a hand hoist, and cutting can be started.
After the cutting construction is completed, the pressure is relieved through the jack 2, the inclined strut steel pipe 8 is removed, the whole frame system moves to the next cutting position through the universal wheels under the support frame base 1a, and the whole construction process is convenient.
Besides being applied to the cutting of the temporary upright post 6 of the subway station, the rope saw cutting device can be also expanded to various structure cutting systems and various cutting modes of operations, and the details are not repeated here.
It should be noted that the features of the embodiments of the present application may be combined with each other without conflict.
The above description is only of the preferred embodiments of the present application and is not intended to limit the present application, but various modifications and variations can be made to the present application by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the protection scope of the present application.
Claims (10)
1. The rope saw cutting device is used for cutting temporary upright posts in a subway station and is characterized by comprising a detachable support frame, wherein the support frame comprises a support frame base, a support frame middle end and a support frame top end, a jack is arranged at the bottom of the support frame, and travelling wheels are arranged on the support frame base;
the rope saw cutting machine and the diamond rope for cutting the temporary upright post are arranged at the top end of the support frame, the first pulley block comprises vertical pulleys arranged in pairs, and the second pulley block comprises horizontal pulleys arranged in pairs;
the diamond rope sequentially passes through the single-side pulleys of the first pulley block and the second pulley block, passes through the temporary upright post in a surrounding manner, sequentially passes through the second pulley block and the other single-side pulley of the first pulley block, and returns to the driving wheel to be closed into a ring;
the vertical pulley of the first pulley block and the diamond rope on the driving wheel are located on the same plane, and the second pulley block converts the diamond rope passing through the first pulley block into a horizontal direction and is arranged on the same plane with the cutting surface of the diamond rope on the temporary upright post.
2. The rope saw cutting device according to claim 1, wherein a base socket sleeve is arranged on the base of the support frame, and a top socket sleeve is arranged at the top end of the support frame;
the middle end of the support frame comprises an upper vertical square tube, a middle end socket sleeve and a lower vertical square tube which are sequentially arranged from top to bottom, the lower vertical square tube is inserted into the base socket sleeve, and the upper vertical square tube is inserted into the top socket sleeve;
the joint parts of the socket sleeve and the vertical square tube are respectively connected and fixed through bolts.
3. The rope saw cutting device of claim 2, wherein the top end of the support frame comprises a top end support, and the first pulley block and the second pulley block are welded and fixed on the top end support through a first fixed connecting piece and a second fixed connecting piece respectively;
the top support comprises a frame formed by welding square tubes, the first pulley block is arranged on the side portion of the top support, square steel is arranged at the top of the top support, the square steel is lifted, a mounting space is reserved for a second pulley block which is horizontally arranged, and the second pulley block is arranged in the height direction of the square steel.
4. The rope saw cutting apparatus of claim 3, wherein a diagonal square tube is connected between the top end support and the top end socket sleeve, and a diagonal screw steel is connected between the first fixed connection and the top end socket sleeve.
5. The rope saw cutting device of claim 4, wherein the vertical pulley of the first pulley block and the horizontal pulley of the second pulley block are provided with V-shaped limiting grooves, the diamond rope is tightly held in the V-shaped limiting grooves, and the V-shaped limiting grooves on the vertical pulley and the V-shaped limiting grooves on the horizontal pulley are on the same horizontal plane.
6. The rope saw cutting device according to claim 2, further comprising a diagonal bracing steel pipe, wherein the diagonal bracing steel pipe is obliquely arranged between the middle end of the support frame and the ground, the upper vertical square pipe, the middle end socket sleeve and the lower vertical square pipe respectively comprise two opposite arranged vertical square pipes, a first transverse drawknot square pipe is connected between the upper vertical square pipes, a second transverse drawknot square pipe is connected between the lower vertical square pipes, and a disc buckle for fixing the diagonal bracing steel pipe is connected on the first transverse drawknot square pipe.
7. The rope saw cutting device according to claim 6, wherein the upper vertical square tube is inserted into the middle socket sleeve, and the lower vertical square tube is inserted into the middle socket sleeve, and scale marks are arranged on the positions of the upper vertical square tube and the lower vertical square tube.
8. The rope saw cutting device according to claim 1, wherein the support frame base comprises a rectangular frame welded by double-spliced I-steel, the middle part of the rectangular frame is connected with tie I-steel and ribbed steel bars, the jack comprises two jacks, and the bottom of the tie I-steel is connected with a square pipe used for limiting the jack.
9. The rope saw cutting device of claim 8, wherein the travelling wheel comprises a universal wheel with a self-locking function, and the universal wheel is fixedly arranged at the bottom of the rectangular frame.
10. The rope saw cutting apparatus of claim 1, wherein the rope saw cutter is mounted on a carriage for moving the rope saw cutter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311032062.6A CN117162282B (en) | 2023-08-15 | 2023-08-15 | Rope saw cutting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202311032062.6A CN117162282B (en) | 2023-08-15 | 2023-08-15 | Rope saw cutting device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN117162282A true CN117162282A (en) | 2023-12-05 |
CN117162282B CN117162282B (en) | 2024-08-09 |
Family
ID=88934655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202311032062.6A Active CN117162282B (en) | 2023-08-15 | 2023-08-15 | Rope saw cutting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117162282B (en) |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05256031A (en) * | 1992-12-15 | 1993-10-05 | Daimoshiya:Kk | Cutting and demolishing device for reinforced concrete structure |
JPH06272401A (en) * | 1993-10-22 | 1994-09-27 | Daimoshiya:Kk | Construction method for horizontally cutting and demolishing underwater columnar reinforced concrete structure |
US5361748A (en) * | 1991-11-06 | 1994-11-08 | Francesco Matteucci | Method and device for cutting underwater structures |
JPH11303417A (en) * | 1998-04-23 | 1999-11-02 | Dymosha:Kk | Cutting and removing method of column for vibration isolation |
CN1312144A (en) * | 2000-01-27 | 2001-09-12 | 三菱综合材料株式会社 | Drive wheel and jigsaw device using said drive wheel and cutting method thereof |
CN201924596U (en) * | 2010-12-31 | 2011-08-10 | 李明全 | Layout adjustable interconnection type upright column formwork supporting rod |
CN102373709A (en) * | 2011-11-23 | 2012-03-14 | 中铁大桥局集团第二工程有限公司 | Construction method for underwater cutting of reinforced concrete pile body |
KR101249481B1 (en) * | 2012-12-07 | 2013-04-03 | 제일이엔지건설 (주) | Concrete diamond wire saw apparatus and method thereof |
CN206752506U (en) * | 2017-05-10 | 2017-12-15 | 天津九为新型材料有限公司 | A kind of BI mobile formwork for underground pipe gallery external wall construction |
CN207332279U (en) * | 2017-10-25 | 2018-05-08 | 北京六建集团有限责任公司 | A kind of portable electromechanical mounting platform |
CN110682447A (en) * | 2019-10-18 | 2020-01-14 | 江苏华西村海洋工程服务有限公司 | Underwater cutting system and cutting method thereof |
CN210975812U (en) * | 2019-10-08 | 2020-07-10 | 中交广州航道局有限公司 | Underwater pile body cutting device |
CN111531722A (en) * | 2020-05-28 | 2020-08-14 | 广州市黄埔建筑工程总公司 | Method for cutting and dismantling supporting beam of foundation pit support by using wire saw |
CN212147025U (en) * | 2020-02-25 | 2020-12-15 | 中铁二十四局集团浙江工程有限公司 | Rope saw device for pier beam |
CN213034966U (en) * | 2020-07-30 | 2021-04-23 | 河南省安装集团有限责任公司 | Special quick cutting device of single-column pier |
CN213143057U (en) * | 2020-08-25 | 2021-05-07 | 中化地质矿山总局河北地质勘查院 | Rope saw for cutting CFG pile head |
CN214061312U (en) * | 2020-12-17 | 2021-08-27 | 酒泉天煜机械有限公司 | Safe and environment-friendly bridge dismantling system |
-
2023
- 2023-08-15 CN CN202311032062.6A patent/CN117162282B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5361748A (en) * | 1991-11-06 | 1994-11-08 | Francesco Matteucci | Method and device for cutting underwater structures |
JPH05256031A (en) * | 1992-12-15 | 1993-10-05 | Daimoshiya:Kk | Cutting and demolishing device for reinforced concrete structure |
JPH06272401A (en) * | 1993-10-22 | 1994-09-27 | Daimoshiya:Kk | Construction method for horizontally cutting and demolishing underwater columnar reinforced concrete structure |
JPH11303417A (en) * | 1998-04-23 | 1999-11-02 | Dymosha:Kk | Cutting and removing method of column for vibration isolation |
CN1312144A (en) * | 2000-01-27 | 2001-09-12 | 三菱综合材料株式会社 | Drive wheel and jigsaw device using said drive wheel and cutting method thereof |
CN201924596U (en) * | 2010-12-31 | 2011-08-10 | 李明全 | Layout adjustable interconnection type upright column formwork supporting rod |
CN102373709A (en) * | 2011-11-23 | 2012-03-14 | 中铁大桥局集团第二工程有限公司 | Construction method for underwater cutting of reinforced concrete pile body |
KR101249481B1 (en) * | 2012-12-07 | 2013-04-03 | 제일이엔지건설 (주) | Concrete diamond wire saw apparatus and method thereof |
CN206752506U (en) * | 2017-05-10 | 2017-12-15 | 天津九为新型材料有限公司 | A kind of BI mobile formwork for underground pipe gallery external wall construction |
CN207332279U (en) * | 2017-10-25 | 2018-05-08 | 北京六建集团有限责任公司 | A kind of portable electromechanical mounting platform |
CN210975812U (en) * | 2019-10-08 | 2020-07-10 | 中交广州航道局有限公司 | Underwater pile body cutting device |
CN110682447A (en) * | 2019-10-18 | 2020-01-14 | 江苏华西村海洋工程服务有限公司 | Underwater cutting system and cutting method thereof |
CN212147025U (en) * | 2020-02-25 | 2020-12-15 | 中铁二十四局集团浙江工程有限公司 | Rope saw device for pier beam |
CN111531722A (en) * | 2020-05-28 | 2020-08-14 | 广州市黄埔建筑工程总公司 | Method for cutting and dismantling supporting beam of foundation pit support by using wire saw |
CN213034966U (en) * | 2020-07-30 | 2021-04-23 | 河南省安装集团有限责任公司 | Special quick cutting device of single-column pier |
CN213143057U (en) * | 2020-08-25 | 2021-05-07 | 中化地质矿山总局河北地质勘查院 | Rope saw for cutting CFG pile head |
CN214061312U (en) * | 2020-12-17 | 2021-08-27 | 酒泉天煜机械有限公司 | Safe and environment-friendly bridge dismantling system |
Also Published As
Publication number | Publication date |
---|---|
CN117162282B (en) | 2024-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101103161A (en) | Apparatus for use in the construction of buildings | |
JP6533109B2 (en) | Bridge demolition method | |
CN106703845A (en) | Underground engineering arch-shaped support assembling, positioning and adjusting system, adjusting bogie and adjusting method | |
JP5032787B2 (en) | Heavy equipment installation equipment | |
CN105401527B (en) | Construction method for anchoring catwalk and catwalk anchoring device | |
CN110805305A (en) | Climbing and shifting method for high-rise building | |
CN117162282B (en) | Rope saw cutting device | |
CN211470603U (en) | Telescopic tower crane passageway | |
CN212532065U (en) | Gantry crane capable of being used in different height difference places | |
CN211228142U (en) | Full prefabricated assembled bridge construction platform | |
CN115637658B (en) | Cantilever pouring and running integrated machine | |
CN111021205A (en) | Concrete anti-collision guardrail formwork device and manufacturing method | |
CN112376947B (en) | Support frame and use method thereof | |
CN112502473B (en) | Supporting bearing capacity conversion device and method for dismantling large steel framework by using same | |
CN209958220U (en) | Movable trolley for mounting and dismounting railing | |
KR20060002650A (en) | Upper bridge structure construcion method with precast segment deck or box using a lifting traveller | |
CN112502475A (en) | Supporting bearing capacity conversion device and using method thereof | |
CN114182654B (en) | Railway box girder transverse falling device and dismantling construction method | |
CN216074809U (en) | Bridge rail guard template installation platform truck | |
CN221702466U (en) | Movable operating platform suitable for cofferdam construction | |
CN218712242U (en) | Bridge girder erection machine suitable for erecting spliced wide bridge piece | |
CN215101591U (en) | A shield constructs quick-witted hoisting structure for secretly dig construction | |
CN220827702U (en) | Steel structure bridge girth construction platform capable of being quickly disassembled and assembled and moved | |
CN220638385U (en) | Movable tensioning device suitable for precast T beam edge and midspan hogging moment | |
CN220434237U (en) | Scaffold device for bridge crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |