Construction site information management platform Download PDF

Info

Publication number
CN117035676A
CN117035676A CN202311039217.9A CN202311039217A CN117035676A CN 117035676 A CN117035676 A CN 117035676A CN 202311039217 A CN202311039217 A CN 202311039217A CN 117035676 A CN117035676 A CN 117035676A
Authority
CN
China
Prior art keywords
construction
management
information
module
management platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311039217.9A
Other languages
Chinese (zh)
Inventor
王会宾
王渊浩
康正阳
赵献魁
卞江伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Iron Works Co ltd
Original Assignee
Tianjin Iron Works Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Iron Works Co ltd filed Critical Tianjin Iron Works Co ltd
Priority to CN202311039217.9A priority Critical patent/CN117035676A/en
Publication of CN117035676A publication Critical patent/CN117035676A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management

Abstract

The invention discloses a construction site information management platform, wherein a user management module is used for distributing management rights for a login user based on role information of the login user; the data management module is used for acquiring construction data acquired by workers and storing the construction data in a construction site information management platform; the construction log module is used for acquiring daily construction condition information recorded by a worker and formatting the construction condition information; the safety management module is used for acquiring safety check information input by a worker and formatting the safety check information; the construction quality management module is used for acquiring construction quality information input by a worker and formatting the construction quality information; the progress management module is used for acquiring construction progress information input by staff and formatting the construction progress information. The platform disclosed by the invention can improve the accurate management of a construction site.

Description

Construction site information management platform
Technical Field
The invention relates to the technical field of informatization management, in particular to a construction site information management platform.
Background
In the project construction process, the management condition of the construction site is very important, and improper management can lead to dirty and poor construction site environment, so that improper protection of construction materials can be caused, and even construction safety problems can occur. At present, the construction site is mainly managed manually, the management efficiency of the manual management construction site is low, the error rate is high, the construction site cannot be accurately managed, and then the safety problem can be caused.
Disclosure of Invention
The invention provides a construction site information management platform for solving the technical problems in the prior art, which can accurately manage the construction site and reduce the accident rate of the construction site.
The invention provides a construction site information management platform, which comprises: the system comprises a user management module, a data management module, a construction log module, a safety management module, a construction quality management module and a progress management module;
the user management module is used for distributing management rights for the login user based on the role information of the login user;
the data management module is used for acquiring construction data acquired by workers and storing the construction data in a construction site information management platform;
the construction log module is used for acquiring daily construction condition information recorded by a worker and formatting the construction condition information;
the safety management module is used for acquiring safety check information input by a worker and formatting the safety check information;
the construction quality management module is used for acquiring construction quality information input by a worker and formatting the construction quality information;
the progress management module is used for acquiring construction progress information input by staff and formatting the construction progress information.
Still further, the role information of the login user includes at least one of: constructor roles, full-time personnel roles, full-time manager roles and management roles.
Further, the construction site information management platform further comprises a construction project module;
the construction project module is used for acquiring a construction project registered by a full-time manager; and determining a target construction project in each construction project, and managing the target construction project.
Furthermore, the construction site information management platform also comprises an assessment module;
the assessment module is used for receiving construction safety information and construction environment information input by constructors; and displaying the construction safety information and the construction environment information to the full-time manager so that the full-time manager can carry out safety check and environment check.
Further, the construction site information management platform also comprises a construction team management module;
and the construction team management module is used for counting the number of workers on the construction site so that the full-time management personnel manage the construction team.
Further, the construction site information management platform also comprises a construction equipment management module;
and the construction team management module is used for counting the number of construction equipment on a construction site so that full-time management staff can manage the construction equipment.
Further, the construction site information management platform also comprises a material management module;
and the material management module is used for counting the material quantity of the construction site so as to enable a manager to manage the material.
Furthermore, the construction site information management platform also comprises a communication module;
the communication module receives and transmits data in the construction site information management platform based on the 4G data stream or the 5G data stream.
Further, the construction site information management platform is built based on the python language and the Django framework.
The invention has the advantages and positive effects that:
by the construction site information management platform provided by the invention, the data management module can acquire and store construction data, so that a worker can know the construction data of a construction site; the construction log module can acquire daily construction condition information, so that workers can know the daily construction condition; the safety management module can acquire safety inspection information, so that a worker can know the construction safety condition; the progress management module can acquire construction progress information, so that a worker can know the progress of construction, the construction quality management module can acquire construction quality information, so that the worker can know the quality of the construction quality, and in conclusion, the worker can accurately manage a construction site, and the accident rate of the construction site is reduced.
Drawings
FIG. 1 is a schematic view of the construction of a preferred embodiment of the present invention;
FIG. 2 is a schematic diagram of a preferred embodiment of the present invention;
FIG. 3 is a schematic view of a first platform of a preferred embodiment of the present invention;
FIG. 4 is a second platform schematic of a preferred embodiment of the present invention;
FIG. 5 is a third platform schematic of a preferred embodiment of the present invention;
FIG. 6 is a fourth platform schematic of a preferred embodiment of the present invention;
FIG. 7 is a fifth platform schematic of a preferred embodiment of the present invention;
FIG. 8 is a sixth platform schematic of a preferred embodiment of the present invention;
FIG. 9 is a seventh platform schematic of a preferred embodiment of the present invention;
FIG. 10 is a schematic view of an eighth platform according to a preferred embodiment of the present invention;
FIG. 11 is a ninth platform schematic of a preferred embodiment of the present invention;
FIG. 12 is a tenth platform schematic of a preferred embodiment of the invention;
FIG. 13 is a schematic view of an eleventh platform according to a preferred embodiment of the present invention
FIG. 14 is a twelfth stage schematic of a preferred embodiment of the invention;
FIG. 15 is a thirteenth platform schematic of a preferred embodiment of the invention;
FIG. 16 is a fourteenth platform schematic of a preferred embodiment of the invention;
fig. 17 is a schematic view of a fifteenth platform according to a preferred embodiment of the present invention.
Detailed Description
The invention will now be described with reference to the accompanying drawings and examples.
In order to better explain the present invention, an application scenario of the present invention will be described first.
In the project construction process, the management condition of the construction site is very important. At present, poor management conditions of construction sites are mainly caused by the following reasons:
1. the quality of constructors is not high.
By investigation of the current situation of engineering construction site management: the construction unit has low quality of field personnel, insufficient management force, poor constraint capability of construction personnel on the construction unit, low attitude, lack of standardization and specialty in the aspect of construction technology, and further potential safety hazards are bred, so that the quality of engineering projects is restricted. The constructor can put the material in disorder, and the use value of the material can be influenced. For example, the steel bars can rust on the exposed construction site for a long time, the quality of materials is affected, and potential safety hazards are raised.
2. Materials and equipment are poorly controlled.
The material waste is serious, the material quality problem is easy to be ignored, the control consciousness of constructors on the material quality is not high, and the maintenance and overhaul forces of equipment are insufficient, which are all problems revealed from the construction site. In order to benefit from the construction unit, the construction unit is replaced by materials with low quality and color, and the materials are replaced by materials with low quality, so that the cost is not reduced, the construction unit earns a gap from the materials, and the construction unit is an important embodiment of not in place on site management.
3. The problem of safety and field control is endless.
The safety problem in the construction link is concerned, a sound safety management system is lacked, the technical constraint capability of constructors is insufficient, the hidden danger is caused to breed, and the life and health problems of people are threatened. In order to ensure the construction quality, construction cost and progress of engineering projects, it is necessary to strengthen the safety management of engineering construction sites. Factors influencing engineering safety include artificial factors, technical factors and material factors, construction attitude of constructors is not strict, control of construction technology is not in place, quality control of materials is not strict, engineering safety problems can be generated, and stability and harmony of society are threatened.
Aiming at the problems, the construction site is mainly managed manually at present. The construction site is manually managed, related data is completely recorded by manpower, real-time transmission of the related data cannot be realized, and therefore management efficiency is low, and due to the fact that the management error rate is high in manual recording, accurate management of the construction site cannot be performed, and safety problems can be caused. Therefore, the invention discloses a construction site information management platform which can accurately manage a construction site and reduce the accident rate of the construction site.
Firstly, the development environment of the construction site information management platform is a Python development environment, and the Python development environment can be compatible with Windows, linux, unix and other operating systems, so that the invention is not limited to a server operating system, namely the construction site information management platform disclosed by the invention has stronger compatibility.
In addition, the construction site information management platform is built based on a Django framework, wherein the Django framework is a framework based on MVC construction, namely, the Django framework focuses on a Model, a Template and a view (Views), which are called MTV modes, and is beneficial to data operation and management.
The construction site information management platform adopts an HTML5 terminal format, and a user can log in the workshop equipment management platform through electronic equipment such as a notebook computer, a mobile phone and the like as a terminal, so that the method is flexible and convenient.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a construction site information management platform provided by the present invention, where the construction site information management platform includes: a user management module 101, a data management module 102, a construction log module 103, a security management module 104, a construction quality management module 105, and a progress management module 106.
The user login module 101 is configured to assign management rights to a login user based on role information of the login user.
In job site management, a constructor often involves multiple management departments or groups according to the difference of responsibilities and functions; likewise, construction parties are often divided into a plurality of construction units or teams by specialty or special terms; the operation module and the operation authority of the invention are different due to different responsibilities of each person.
In one embodiment, the roles of the login user include at least one of: constructors, full-time personnel, full-time management personnel and management personnel.
In another embodiment, the user login module 101 may have functions of user management, role management, rights allocation, and the like, and the user may manage personal information through user management. The higher-right users, such as management personnel, can manage the role information of other users and allocate operation rights to other users through role management and rights allocation.
The data management module 102 is configured to obtain construction data collected by a worker, and store the construction data in a construction site information management platform.
Wherein the construction data may include: and the construction data can be text data, image data, audio data, video data and the like. The construction data truly reflects the whole process of the construction process, has direct effects on the aspects of foundation, quality, acceptance and the like of the construction project, and is the most original and basic data of the construction process.
The data management module 102 may store the construction data in a database in a job site information management platform.
In one implementation, the database in the job site information management platform may be MySQL, which has the following advantages.
And (one) MySQL is small in size, high in running speed and high in command execution speed.
And (II) MySQL is open source and provides free version, which greatly reduces the use cost for most users.
And (III) the method has lower complexity and is easy to use compared with other large databases.
And (IV) the portability is strong, and MySQL can be run on various system platforms, such as Windows, linux, unix and the like.
And fifthly, mySQL supports the most commonly used data management function and is suitable for medium and small enterprises and even large website applications.
The system and the distribution, the preservation and the sharing of the data in the construction site management are important basic works, the system is an important means for constructing a high-quality construction environment jointly by multi-unit cooperation, coordination, division and cooperation, and the data management module 101 can collect and sort construction data and the construction system, so that the construction management level can be improved.
The construction log module 103 is configured to obtain daily construction condition information recorded by a worker, and format the construction condition information.
Wherein, daily construction condition information may include: project name, construction unit, date, air temperature, progress and construction condition, process acceptance, material and equipment arrival, influence construction condition, problems and solutions.
After the construction log module 103 obtains the construction condition information, the construction condition information can be formatted, for example, the construction condition information can be processed into list-format construction condition information, so that a user can conveniently read the construction condition information when printing by staff.
In one implementation manner, the construction log module 103 has the functions of photographing and uploading photos, so that when a worker inputs daily construction condition information, the worker does not need to manually input the construction condition information, but uploads the photos to input the construction condition information, and further the work efficiency can be improved.
The construction condition information is a written record form which is used for comprehensively, precisely, timely and accurately recording the implementation condition of each day in the construction process by construction manager and realizing traceability, is important information for recording and reflecting the whole construction process, can be timely recorded in the field through the construction log module 103, and automatically generates printing layout information through the construction log module 103, thereby greatly reducing the labor intensity of the manager and improving the management efficiency.
The security management module 104 is configured to obtain security check information entered by a worker, and format the security check information.
The security check information may include: project, date, construction unit routine labeling, security inspection project, security inspection result, hidden trouble problem processing time, problem processing result, implementation responsible person and the like.
Similarly, after the security management module 104 obtains the security check information, the security check information may be formatted, for example, the security check information may be processed into security check information in a list format, so that the user may conveniently read the security check information when printing by a staff.
In one implementation, the security management module 104 has the functions of taking and uploading photos, so that when a worker enters security check information, the worker does not need to manually input the security check information, but uses the uploaded photos to enter the security check information.
The safety management information can directly reflect the content and each result of the safety production management work, and can intuitively display the safety production management trace of enterprises, projects and related responsible persons; the safety management information provides valuable references for safety production management work; safety analysis, safety evaluation, accident handling and accident reporting are not separated from various safety production data; the safety management information is the basis for compiling safety production work opinions, making safety target responsibility books and compiling various safety production summaries and reports; the real and perfect safety management information can furthest avoid or reduce the risk of legal consequences of enterprises and related personnel due to production accidents, and is one of the most direct evidences for distinguishing and pursuing the legal responsibility of the safety production accidents.
And the construction quality management module 105 is used for acquiring construction quality information input by a worker and formatting the construction quality information.
Wherein the construction quality information may include: project, date, construction unit routine label, inspection project, inspection result, quality problem processing time, quality problem processing result, responsible person and other information.
Likewise, after the construction quality management module 105 obtains the construction quality information, the construction quality information may be formatted, for example, the construction quality information may be processed into construction quality information in a list format, so that a user may conveniently read the construction quality information when printing by a worker.
In one implementation manner, the construction quality management module 105 has the functions of photographing and uploading photos, so that when a worker inputs construction quality information, the worker does not need to manually input the construction quality information, but uploads the photos to input the construction quality information, so that the construction quality management module is fast and convenient, and the work efficiency can be improved.
Through the construction quality management module 105, management of quality information can be standardized, objectivity, accuracy and integrity of the quality information are ensured, standard quality management is achieved, management content is refined, and construction quality is ensured.
And the progress management module 106 is used for acquiring construction progress information input by the staff and formatting the construction progress information.
Wherein the construction progress information may include: project, date, construction unit conventional label, node project name, lag or lead time, lag reason, lag project approach measure, approach result, responsible person and other information.
Similarly, after the progress management module 106 obtains the construction progress information, the construction progress information may be formatted, for example, the construction progress information may be processed into construction progress information in a list format, so that a user may conveniently read the construction progress information when printing by a worker.
Through the progress management module 106, project construction progress can be better controlled, construction management efficiency and working quality are improved, and projects are guaranteed to be orderly carried out according to a plan.
Therefore, the data management module can acquire and store the construction data, so that a worker can know the construction data of a construction site; the construction log module can acquire daily construction condition information, so that workers can know the daily construction condition; the safety management module can acquire safety inspection information, so that a worker can know the construction safety condition; the progress management module can acquire construction progress information, so that a worker can know the progress of construction, the construction quality management module can acquire construction quality information, so that the worker can know the quality of the construction quality, and in conclusion, the worker can accurately manage a construction site, and the accident rate of the construction site is reduced.
In one embodiment of the invention, the construction site information management platform further comprises a construction project module; the construction project module is used for acquiring a construction project registered by a full-time manager; and determining a target construction project in each construction project, and managing the target construction project.
In order to standardize the construction site management and strengthen the management and control of the entrance of construction teams, a registration system can be carried out on construction units, and the entrance can be allowed only after the relevant flows of agreement signing, safety training and start notification are completed satisfactorily. Thus, to enhance this auditing work, the job site information management platform may also include a construction project module.
Specifically, a full-time manager can input the construction project and the construction unit which are already registered into the construction project module, when the construction project and the construction unit are required to be managed, the construction project module can determine target construction projects in all construction projects, and then the worker can utilize modules such as a data management module, a construction log module, a security management module, a construction quality management module, a progress management module and the like and manage the target construction projects.
In one embodiment of the invention, the construction site information management platform further comprises an assessment module; the assessment module is used for receiving construction safety information and construction environment information input by constructors; and displaying the construction safety information and the construction environment information to the full-time manager so that the full-time manager can carry out safety check and environment check.
The assessment module comprises two sub-modules, namely a safety assessment module and an environment assessment module. The construction safety information input by constructors can be received through the safety examination sub-module, and full-time management staff can carry out safety examination through the construction safety information displayed by the safety examination sub-module; through the environment examination sub-module, construction environment information input by constructors can be received, and full-time management staff can carry out environment examination through the construction environment information displayed by the environment examination sub-module.
Aiming at the condition that the examination is unsuccessful, the method can be divided into two punishment modes of rectification and examination, and can be used for rapidly and efficiently managing the automatic typesetting, printing and issuing notification sheets.
Through the examination module, various safety and environmental protection management systems of the construction site can be strictly executed, various safety violations, insufficient environmental protection measures and the like are avoided, constructors are guided to strengthen safety and environmental protection consciousness, and life safety of field personnel and execution strength of the environmental protection measures are guaranteed.
In one embodiment of the invention, the construction site information management platform further comprises a construction team management module, wherein the construction team management module is used for counting the number of workers on the construction site so as to enable the full-time manager to manage the construction team.
In another embodiment of the present invention, the construction site information management platform further includes a construction equipment management module, where the construction equipment management module is configured to count the number of construction equipment on a construction site, so that a full-time manager manages the construction equipment.
The construction team management module and the construction equipment management module are beneficial to systematically managing and allocating resources, optimize construction time sequence and working procedure and provide powerful means for improving construction efficiency.
In one embodiment of the invention, the construction site information management platform further comprises a material management module, wherein the material management module is used for counting the quantity of materials on a construction site so as to enable management staff to manage the materials.
The material management module is beneficial to quality management of the arriving materials, and the approach of the articles which do not meet the requirements is strictly controlled, so that the arriving of the articles is accurate, timely and perfect, and the quality and progress of the engineering are ensured.
In one embodiment of the invention, the construction site information management platform further comprises a communication module, and the communication module receives and transmits data in the construction site information management platform based on the 4G data stream or the 5G data stream.
Referring to fig. 2, fig. 2 is a schematic diagram of a preferred embodiment of the present invention.
The construction site information management platform is built based on a Django framework, a database used by the construction site information management platform is MySQL, a development environment is Python, and an operating system is not limited and can be Windows, linux, unix and the like.
The module composition in the construction site information management platform is divided into two main subject structures of project management and site management according to management properties, wherein the project management comprises: the system comprises a user management module, a data management module, a construction log module, a safety management module, a construction quality management module, a progress management module and a construction project module. "site management" includes: the system comprises an assessment module, a construction team management module, a construction equipment management module and a material management module.
In addition, the project management can also comprise a construction digital large screen, the construction digital large screen can dynamically display the development condition of each management work of a construction site, and the current date, 15 weather forecast, project profile, safety ring storage control, project progress Gantt chart, constructor attendance on the same day, constructor current day statistics, constructor tool history curve, construction management control information statistics and other charts are dynamically displayed in real time, intuitively, real time and vividly.
The user authority in the construction site information management platform comprises: the user authority may include a plurality of construction party groups, for example, a construction party group a, a construction party group B, a construction party group C, and the like.
The job site management platform is illustrated below.
The construction site management platform can be built based on python and Django frames, and after the construction site management platform is online, a user can select electronic devices such as a notebook computer, a desktop computer and mobile devices as terminals to log in the workshop device management platform. The workshop equipment management platform can log in a browser mode, and various browsers support logging in, so that the workshop equipment management platform has higher compatibility.
After a user logs in a construction site management platform, the left side of the platform interface is a menu area, and the right side of the platform interface is a display area, wherein the menu area comprises two primary menus of project management and site management and control. Project management and site management are described below, respectively.
1. And (5) project management.
Referring to fig. 3, the project management includes a secondary menu: management log, project name, construction unit, construction log, security management ledger, quality control ledger, progress control ledger and construction digital large screen.
The construction log is used for acquiring daily construction condition information recorded by staff and formatting the construction condition information. Referring to fig. 4, after the worker inputs the construction condition information, the construction log interface may be displayed to the user in a form of a table, where the construction condition information may include: project, construction unit, low air temperature, high air temperature, progress acceptance, material arrival, influence on construction conditions, problems, schemes, other information and the like, and in addition, the construction log can automatically fill update time and fill report people.
In addition, the user can take photos of daily construction condition to upload the picture to the construction log, and this job site management platform is not limited to the quantity of taking photos of uploading, and the quantity of taking photos of uploading that this embodiment provided is 3.
Optionally, the construction log has a printing function, and can automatically typeset and print construction condition information, so that the user can conveniently check the construction log offline. The user can click the execution tab to export the construction condition information displayed on the construction log interface into an excel-format file and store the excel-format file in the user equipment, so that the user can conveniently review the construction condition information.
According to the management authority of the user, the construction log interface of the user with higher management authority comprises an editing tab, the user clicks the editing tab to edit any piece of construction condition information, as shown in fig. 5, the user can modify any piece of content shown in fig. 5, and after clicking and storing, the user finishes editing the construction condition information. The user can click the delete tab to delete any piece of construction information. The user can click on the add tab to add construction information.
In addition, in order to improve the efficiency of inquiring the construction condition information by the user, the user can click the key sub-search to perform fuzzy inquiry, or can inquire the construction condition information under specific projects and construction units through a quick screening tab above a construction log interface.
It can be understood that the related secondary menu interface of the subsequent step can have the functions of editing, modifying, adding and exporting excel format files, fast filtering and keyword searching, and the subsequent embodiments will not be repeated.
The project names are used for recording project names of related processes such as agreement signing, security training, start-up notification and the like in the construction process, and referring to fig. 6, fig. 6 shows two project names of a special steel number 10 culvert reinforcing project and a heating furnace.
The construction unit is used for recording construction units for completing related processes such as agreement signing, security training, start notification and the like in the construction process, and referring to fig. 7, fig. 7 shows two construction units of AAA and BBB.
The safety management ledger is used for acquiring safety check information input by staff and formatting the safety check information. Referring to fig. 8, after the staff enters the security check information, the security management ledger interface may display the security check information to the user in the form of a table, where the security check information may include: project, construction unit, date, safety detection project, safety detection result, hidden trouble problem processing time, problem processing result, implementation responsible person, etc., and in addition, the safety management ledger can automatically fill update time and fill report person.
Likewise, the user may take photos of the security management situation and upload the pictures to the security management ledger, where the number of photos provided in this embodiment is 1.
The quality control ledger is used for construction quality information input by staff and formatting the construction quality information. Referring to fig. 9, after the worker inputs the construction quality information, the quality control ledger interface displays the construction quality information to the user in the form of a table, where the construction quality information may include: project, construction unit, date, inspection and detection project, inspection and detection result, quality problem processing time, quality problem processing result, quality problem tracking responsible person and remark, etc., in addition, the quality control ledger can automatically fill the newspaper person.
Likewise, the user can take photos of the construction quality condition and upload the pictures to the quality control ledger, and the number of photos provided in this embodiment is 1.
The progress control ledger is used for acquiring construction progress information input by staff and formatting the construction progress information. Referring to fig. 10, after the worker inputs the construction progress information, the progress control ledger interface displays the construction progress information to the user in a form of a table, and the construction progress information may include: project, construction unit, date, node project name, lag or lead time, lag reason, lag project approach measure, approach result, node tracking responsible person and remark, etc., in addition, the progress control ledger will automatically fill the newspaper.
The construction digital large screen can display all relevant information in the project construction process to a user in the form of a chart, as shown in fig. 11, and can display project overview, project progress, constructor attendance, construction machine daily statistics, safety, environmental protection management and control information and the like to the user in the form of text, pie charts, gantt charts, statistical charts and the like, so that the user can clearly and clearly review the relevant information.
2. And (5) project management.
Referring to fig. 12, the project management includes a secondary menu: safety check, environment protection check, number of construction workers, machine tool data and number of arriving goods.
In one implementation, only the user role is for a full-time manager to have access to a secondary menu under project management.
The full-time manager can check the construction project by utilizing the safety check and carry out rectification under the condition that the check is unsuccessful. Referring to fig. 13, the security assessment interface includes: project, construction unit, type, photograph, number of items, update time, and person to be filled. Wherein the update time and the filler are automatically filled by the platform.
The full-time manager can check the construction environment by using the environment protection check and carry out rectification under the condition that the check is unsuccessful. Referring to fig. 14, the environment-friendly assessment interface includes: project, construction unit, type, photograph, number of items, update time, and person to be filled. Wherein the update time and the filler are automatically filled by the platform.
In addition, in order to facilitate the inquiry of the full-time manager, the full-time manager can inquire the environment-friendly check condition under the security correction through the rapid screening function, and can also inquire the environment-friendly check condition under the security check.
The number of construction workers is used for counting the number of workers on a construction site, so that full-time management personnel manage construction teams. Referring to fig. 15, the constructor number interface includes: project, construction unit, number of people who arrive in fact, late arrival and early departure, update time, and person who fill in, wherein the update time and person who fill in are automatically filled in by the platform.
The number of the tools is used for counting the number of the tools on a construction site, so that a manager manages the tools. Referring to fig. 16, the implement number interface includes: project, construction unit, planning operation, actual operation, fault shutdown, update time, and filler, wherein the update time and filler are automatically filled by the platform.
The arrival quantity is used for counting the arrival quantity of the construction site so that the manager manages the cargoes. Referring to FIG. 17, the quantity to goods interface includes: project, construction unit, goods name, content, quantity, update time and filler, wherein the update time and filler are automatically filled by the platform.
The foregoing description is only of the preferred embodiments of the present invention, and is not intended to limit the invention in any way, but any simple modification, equivalent variation and modification of the above embodiments according to the technical principles of the present invention are within the scope of the technical solutions of the present invention.

Claims (9)

1. A job site information management platform, the job site information management platform comprising: the system comprises a user management module, a data management module, a construction log module, a safety management module, a construction quality management module and a progress management module;
the user management module is used for distributing management authority for the login user based on the role information of the login user;
the data management module is used for acquiring construction data and a construction system acquired by staff and storing the construction data and the construction system in the construction site information management platform;
the construction log module is used for acquiring daily construction condition information recorded by a worker and formatting the construction condition information;
the safety management module is used for acquiring safety check information input by a worker and formatting the safety check information;
the construction quality management module is used for acquiring construction quality information input by a worker and formatting the construction quality information;
the progress management module is used for acquiring construction progress information input by staff and formatting the construction progress information.
2. The job site information management platform according to claim 1, wherein the role information of the login user includes at least one of: constructor roles, full-time personnel roles, full-time manager roles and manager roles.
3. The job site information management platform of claim 2, wherein the job site information management platform further comprises a construction project module;
the construction project module is used for acquiring construction projects registered by full-time management personnel; and determining a target construction project in each construction project, and managing the target construction project.
4. The job site information management platform of claim 2, wherein the job site information management platform further comprises an assessment module;
the assessment module is used for receiving construction safety information and construction environment information input by the constructor; and displaying the construction safety information and the construction environment information to the full-time management personnel so that the full-time management personnel can carry out safety assessment and environment assessment.
5. The job site information management platform of claim 2, wherein the job site information management platform further comprises a construction team management module;
the construction team management module is used for counting the number of workers on a construction site so that full-time management personnel manage the construction team.
6. The job site information management platform of claim 2, wherein the job site information management platform further comprises a construction equipment management module;
and the construction team management module is used for counting the number of construction equipment on a construction site so as to enable full-time management staff to manage the construction equipment.
7. The job site information management platform of claim 2, wherein the job site information management platform further comprises a material management module;
the material management module is used for counting the material quantity of the construction site so as to enable management staff to manage the material.
8. The job site information management platform of any one of claims 1-7, wherein the job site information management platform further comprises a communication module;
the communication module receives and transmits data in the construction site information management platform based on the 4G data stream or the 5G data stream.
9. The job site information management platform of any one of claims 1-8, wherein the job site information management platform is built based on python language and Django framework.
CN202311039217.9A 2023-08-17 2023-08-17 Construction site information management platform Pending CN117035676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311039217.9A CN117035676A (en) 2023-08-17 2023-08-17 Construction site information management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311039217.9A CN117035676A (en) 2023-08-17 2023-08-17 Construction site information management platform

Publications (1)

Publication Number Publication Date
CN117035676A true CN117035676A (en) 2023-11-10

Family

ID=88644623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311039217.9A Pending CN117035676A (en) 2023-08-17 2023-08-17 Construction site information management platform

Country Status (1)

Country Link
CN (1) CN117035676A (en)

Similar Documents

Publication Publication Date Title
US9589243B2 (en) Field management and mobile inspection
CN111814240B (en) Highway engineering farmer management system based on BIM technology
CN115375146B (en) Digital construction integrated platform
EP3343477A1 (en) Remote accounting processing method and system
CN111709707A (en) Management and control system and method applied to project delivery construction site
CN112232710A (en) 6S field management system and method
CN112541748A (en) Engineering project management system based on BIM technology
CN110555675A (en) Method for realizing real-time online supervision
CN114186955A (en) Standardized management system for safety production
CN101976399A (en) Integrated reviewing method based on reviewing work system
CN112465457A (en) Supervision project management method, system, device and computer storage medium
CN117035676A (en) Construction site information management platform
CN110544007A (en) Establishment method for enterprise performance management and quantification and information system device
CN115330216A (en) Supervision data management system, method, equipment and medium
CN114707870A (en) Information management system and method for maintenance support service of nuclear power plant
CN114492685A (en) Intelligent system for point inspection of factory equipment
AU2012203380A1 (en) Project Management System
CN113362017A (en) Method for instantly sharing and analyzing standardized operation management information
CN115471163A (en) Information acquisition system for dispatching information management based on labor service
CN117172729B (en) Labor affair subcontracting personnel management system based on big data
US20020178188A1 (en) Productivity recovery and improvement software
KR102635057B1 (en) Project Management Information Device and System, and Project Management Information Handling Method using them
CN113902406A (en) Management and control method applied to project delivery construction site
CN113947366A (en) Supervision emergency management system based on mobile internet technology
CN117893096A (en) Standardized environment management dynamic standard evaluation system for hazardous waste generation enterprises

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination